Installation of 26 gabions, culvert installation (900-2lines, 600-4lines), heavy grading 5.7km and construction of a 35M slab (drift)
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 4,410,000
Nguumo
Fuel/machine Hire For Grading And Murraming Of Mbui Nzau-yala-kalyakalya-kwa Kanyingi-kwa Manthi-kwa Mbilo-kwa Mutua Ivila-ndivuni-kwa Mativo-kwa Ngala-kwa Viti-tindima
69hours of road opening, 12km grading, 1.3km spot gravelling and cut off mitre drains for road run-off harvesting
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 3,963,520
Nguumo
Uvileni Ctti- Toilet
Construction of a toilet
Department of ICT, Education and Internship
Completed
Ksh 686,000
Nguumo
Green Grams Value Chain Development
Provision of Green grams certified seeds
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 2,500,000
Nguumo
Food stuff and non-food stuff; Nguumo ward
Supply of food and non-food items (beans , rice and blankets)
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 1,000,000
Nguumo
Repair Of Mukameni, Kyandulu, Maumbuni Boreholes
i. Syumile Borehole.• Rewinding Exciter• Generator set servicing Distribution from Mukameni to Philip-Masuni, from Kimundi to Kwa Kavyati, from Kimundi to kiambani, from Mukameni to kwa mualuko
Department of Water and Sanitation
Completed
Ksh 1,000,000
Nguumo
Aligon Pumping Set
Replacing a Pump
Department of Water and Sanitation
Completed
Ksh 1,500,000
Nguumo
Kaunguni Dispensary Borehole
i. Equipping Borehole with solar and pumpii. Installation of a 10m3 plastic tank on masonary platformiii. Construction of 1No. Water Kioskiv. connection to dispensary Kaunguni Dispensary Borehole
Department of Water and Sanitation
Completed
Ksh 140,623
Nguumo
Yikisemei Bohehole
i. Construction of a 6m high steel tower with 3No plastic water tanks.ii. Replacement of 3no solar panels
Department of Water and Sanitation
Completed
Ksh 1,500,000
Nguumo
Makusu Borehole
i. Equipping Borehole with solar and pumpii. Installation of a 10m3 plastic tank on masonary platformiii. Construction of 1No. Water Kiosk
Department of Water and Sanitation
Completed
Ksh 111,852
Nguumo
Kwa Kathoka Borehole
i. Equipping Borehole with solar and pumpii. Installation of a 10m3 plastic tank iii. Rehabilitation of Steel tower
Department of Water and Sanitation
Completed
Ksh 2,113,755
Nguumo
Syumile Borehole
Syumile borehole-Solarization ,submersible pump installation and distribution
Department of Water and Sanitation
Completed
Ksh 1,960,000
Nguumo
Kalakalya Borehole
i. Equipping Borehole with solar and pumpii. Installation of a 10m3 plastic tank iii. Rehabilitation of Steel tower
Department of Water and Sanitation
Completed
Ksh 1,500,000
Nguumo
Sekeleni Earthdam
i. Embankment shapingii. Desilting iii. Spillway protection
Department of Water and Sanitation
Completed
Ksh 3,430,000
Nguumo
Kalungu-ngambi Ya Myunzyu Extension Of Water Pipeline
Construction of Kalungu-Ilingoni-Kamunzyu line a. Equipping with Solar power and pumpb. 4.5km DN63 HDPE pipelinec. Rehabilitation of 2No. existing Kiosks and tank
Department of Water and Sanitation
Completed
Ksh 2,940,000
Nguumo
Mivuyuni Borehole
Drilling and developing the borehole and capping
Department of Water and Sanitation
Completed
Ksh 1,563,600
Nguumo
Drilling Of Ngaamba Borehole
i. Equipping the Borehole with Pump and Solar ii. Construction of 1No. Water Kioskiii. 1No. 10m3 plastic tank on a platform
Department of Water and Sanitation
Completed
Ksh 2,979,200
Nguumo
Agriculture Development Programme
this is abalance from previous years and the balance to be used for M&E and PMC
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 4,500,000
Nguumo
Kwa Kivou Tala-kwa Kinyingi-kaunguni-tindima Road
5kms heavy grading, 2.5km Spot Gravelling, 500cm3 catch water drain along Kwa kivou Tala-kwa kinyingi-Kaunguni-Tindima road
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 4,000,000
Nguumo
Kiunduani Market
4kms road grading, 1.9kms Spot Gravelling in Kiunduani market
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 3,000,000
Nguumo
Kibarani-wivia-kiuani Road
4.8kms bush clearing,4.8kms grading, 0.6kms Spot Gravelling, construction of 20no. Gabions, and excavation of 400cm Catch water drains
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 2,500,000
Nguumo
Murraming Of Jcc Kaunguni-kwa Muoka To Kwa Kivivye -3km Road.
2.5km road opening, 0.7km graveling
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,500,000
Nguumo
KALEMBE RAHA KIAMBANI ROAD
3.1km road opening, 3.1km grading, 400cm3 catch water drains
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,000,000
Nguumo
Mukameni Borehole Water Project
Rehabilitation and extension of project pipeline-3800mConstruction of 1No R-M water kioskRehabilitation of 1N0 water kiosk
Department of Water and Sanitation
Completed
Ksh 6,000,000
Nguumo
Nguumo Bursary
Bursary
allocation–Application, Vetting, award and distribution
Department of ICT, Education and Internship
Completed
Ksh 4,000,000
Nguumo
Sports And Youth Development Programme Youth, Talent And Infrastructure Development For Athletics, Ballgames, Indoor Games, Establishment Of Sport Fund And Development Of Sports Development Proposals-nguumo
Support to Ligi mashinani ward league games and cash awards
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 300,000
Nguumo
Ndovoini Dispensary (fencing, Installation Of A Gate, Electrification(drop), Ceiling, And Supply Of A 10,000liters Water Tank)ndovoini Dispensary (fndovoini Dispensary (fencing, Installation Of A Gate, Electrification(drop), Ceiling, And Supply Of A 10,000liters Water Tank)encing, Installation Of A Gate, Electrification(drop), Ceiling, And Supply Of A 10,000liters Water Tank)
fencing, Installation Of A Gate, Electrification(drop), Ceiling, And Supply Of A 10,000liters Water tank fencing, Installation Of A Gate, Electrification(drop), Ceiling, And Supply Of A 10,000liters Water Tank)encing, Installation Of A Gate, Electrification(drop), Ceiling, And Supply Of A 10,000liters Water Tank)
Department of Health Services
Completed
Ksh 3,000,000
Nguumo
Hospitals Bills And Implants
Department of Health Services
Completed
Ksh 2,000,000
Nguumo
Ng'etha Ctti
Construction of a twin workshop and equipping
Department of ICT, Education and Internship
Completed
Ksh 6,860,000
Emali/Mulala
Fencing Of Kwa-kotoe Dispensary (katune Disp)
Chainlink fencing of the facility
Department of Health Services
Completed
Ksh 980,000
Emali/Mulala
Emali Wholesale Market( Kdsp Project)
Electricity installation at Emali wholesale market
Department of Trade, Marketing, Industry, Culture and Tourism.
Completed
Ksh 3,375,725
Emali/Mulala
Ict Inftrastructure - Lan
Installation of LAN in Emali/Sultan Municipality offices at Emali
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 2,000,000
Emali/Mulala
Kenya Music And Cultural Festivals
Ward level Music and Cultural Festival-bringing together Music and dance, elocution and exhibitions from all parts of the Ward
Department of Trade, Marketing, Industry, Culture and Tourism.
Completed
Ksh 1,000,000
Emali/Mulala
Development of Municipal Integrated Development Plan (IDEP) and Municipal Spatial Plan
Development Plan (IDEP) and Municipal Spatial Plan
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 10,000,000
Emali/Mulala
Opening And Unclogging Of Drainage Systems
Opening And Unclogging Of Drainage Systems
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 2,000,000
Emali/Mulala
Opening And Sport Murraming Of Roads At Emali And Sultan Towns
Opening And Sport Murraming Of Roads At Emali And Sultan Towns
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 5,546,800
Emali/Mulala
Partitioning And Equiping Of Emali-sultan Municipality Office
Partitioning And Equiping Of Emali-sultan Municipality Office
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 3,000,000
Emali/Mulala
Road Improvement Programme
Road improvement programme1. installation of culverts and spot graveling of kwa somba mulala road (Contracted ) 2.Grading and Graveling (through inhouse) of- Emali-ACK-Goat yard-road, Emali Slaughter-Misuuni dispensary-Muooni river- Lukenya -Kwa Mutua-Kambi, Misuuni Dispensary-Police Post-Juakali road- Grading of Matiku-Mulala- Kitandi road, - Kwa Kotoe -Nduundune, Mulala - Uthangathi - Kwa Kotoe road
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 4,500,000
Emali/Mulala
Mwasa Ng'ombe Ecde
2No. ECDE Classrooms with an office and Store
3-Door Pit Latrine with Urinal
Electrical Works (conduits only)
Water harvesting goods (5,000Ltrs Water Tank and base)
Display Pinned board
Branding, Publicity and Signwriting
2No. Black Board
Department of ICT, Education and Internship
Completed
Ksh 3,430,000
Emali/Mulala
Agricultural And Livestock Productivity
Agricultural and livestock productivity- Provision of subsidized AI services , Extension programme and construction of 5 cattle crushes
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 2,000,000
Emali/Mulala
Construction Of X-ray Block And Equipping At Emali Model Health Centre
3Phase power connection
Department of Health Services
Completed
Ksh 240,205
Emali/Mulala
Spring Hill Kwa Kakulu Ctti Workshop
Construction of motor vehicle workshop and equipping with vehicle hoist machine
Department of ICT, Education and Internship
Completed
Ksh 3,073,613
Emali/Mulala
Mulala Play Ground
Levelling of the play ground
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 3,497,204
Emali/Mulala
Emali Township Ecde
2No. ECDE Classrooms with an office and Store
3-Door Pit Latrine with Urinal
Electrical Works (conduits only)
Water harvesting goods (5,000Ltrs Water Tank and base)
Display Pinned board
Branding, Publicity and Signwriting
2No. Black Board
Department of ICT, Education and Internship
Completed
Ksh 3,430,000
Emali/Mulala
Makueni Child Protection Centre
Construction of a building, street lighting and land scaping
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 6,348,220
Emali/Mulala
Matiku Borehole
Drilling and developing the borehole and capping
Department of Water and Sanitation
Completed
Ksh 1,409,940
Emali/Mulala
Emali Police Station Borehole
i. Equipping Borehole with solar and pumpii. Installation of 2No. 10m3 plastic tank on masonary platformsiii. Construction of 1No. Water Kiosk
Department of Water and Sanitation
Completed
Ksh 35,784
Emali/Mulala
Rehabilitation Of Stalled Boreholes In The Ward ( Kwa Kimulu, Kiiwai, Emali, Nduuduni Etc)
i. Flushing and Test Pumping of Maatha Boreholeii. Flushing and Test Pumping of Kiuani Boreholeiii. Replacement of 1No Inverter in Mulala borehole
Department of Water and Sanitation
Completed
Ksh 1,960,000
Emali/Mulala
Distribution Of Water At Ilengeni Springs
Distribution of water at Ilengeni Springs
Department of Water and Sanitation
Completed
Ksh 5,900,000
Emali/Mulala
Feasibility Study Of Muooni Mega Dam
a) Community Mobilization and engagementb) Feasibility study c) Workshops
Department of Water and Sanitation
Completed
Ksh 1,000,000
Emali/Mulala
Distribution Of Mumbuni Samp(solarisation And Distribution At Source)
i. Installation of Solar Powerii. Installation of a submersible solar powered pumpiii. Construction of a power houseiv. Connection to existing Muselele line
Department of Water and Sanitation
Completed
Ksh 4,900,000
Emali/Mulala
Emali Rehabilitation Centre Borehole
Drilling and Equipping of Emali Rehabilitation Centre Borehole
Department of Water and Sanitation
Completed
Ksh 100,000
Emali/Mulala
Restoring Water At Emali
Paymet of electricity bill for Noltress water project
Department of Water and Sanitation
Completed
Ksh 4,345,016
Emali/Mulala
Equiping Of Emali-sultan Municipality Office
Equiping Of Emali-sultan Municipality Office
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 3,000,000
Emali/Mulala
Kwa Kausha-kimbingo-mulala-makutano-kwa Kinuka-mwasang'ombe-ngomongo-thea-kwa Masauti-muselele-kwa -ngii-malii-mwanyani-ngoni-mwingati Road
Kwa kausha-kimbingo-mulala-makutano-kwa
kinuka-mwasang'ombe-ngomongo-thea-kwa masauti-muselele-kwa
-ngii-malii-mwanyani-ngoni-mwingati road improvement
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 344,466
Emali/Mulala
Survey Of Ward Road Network And Ward Public Utilities
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 500,000
Emali/Mulala
Purchase of ERP system
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 5,000,000
Emali/Mulala
Opening And Unclogging Of Drainage Systems
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 561,798
Emali/Mulala
Fencing Of Tutini Dispensary
fencing of tutini dispensary
Department of Health Services
Completed
Ksh 500,000
Emali/Mulala
Masauti -muselele -mumbuni -mungetheele Road
3kms road widening, 4kms heavy grading, 40km gravelling Culverts (900mm dia. -32m), 35x6m wide RC non-vented drift, 15No. Gabions, 550m3 of Catch water drains along Masauti-muselele-mumbuni- mungetheele road
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 4,500,000
Emali/Mulala
Routine Maintenance Of Emali/mulala Ward Access Roads
This budget line entails both contracted (Ksh 2,000,000) and in house works (Ksh 2,000,000)Scope for Contracted works include 6km road opening amd 12km road grading along Emali kwa kamba - kongo -kwa kite road (2.9Kms) Kwa amini - kwa kirunja - kwa ndeke (6Kms), Kativani kwa kombo - katisaa - Mwasangombe(4.2Kms)Inhouse (MTF)
Opening and grading of Welfare-Katisaa-Mwasang’ombe
road
• Opening and grading of Kwa
Kombo-Kativani-Katisaa road
•
Opening and grading of Kwa Kamba-Kongo- Kite road
• Opening
and grading of Kwa Amin -Kwa Kilungya-Kwa Maima-Kwa Ndeke road
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 4,000,000
Emali/Mulala
Mulala Primary Borehole
Test pumping of the boreholeWater quality analysis approved by WRA
Department of Water and Sanitation
Completed
Ksh 6,000,000
Emali/Mulala
Emali Township Borehole
Solarisation
and equipping of Emali Township BoreholeCommunal water point infranstructure
Department of Water and Sanitation
Completed
Ksh 2,000,000
Emali/Mulala
Piping Of Matiku Borehole
Pipeline extensionConstruction of communal water kiosk
Department of Water and Sanitation
Completed
Ksh 500,000
Emali/Mulala
Emali/mulala Ward Bursary
Bursary allocation, application, vetting, award and distribution
Department of ICT, Education and Internship
Completed
Ksh 4,500,000
Emali/Mulala
Support To Groups With Chairs And Tents-emali/mulala
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 2,500,000
Emali/Mulala
Sports Development- Emali/Mulala ward
Support to ligi mashinani, ward league games
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 300,000
Emali/Mulala
Pwd Support – Support Pwds With Assorted Assistive Devices -emali/mulala
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 500,000
Emali/Mulala
Tutini Dispensary – Fencing
fencing
Department of Health Services
Completed
Ksh 500,000
Emali/Mulala
Emali/mulala -medical Bills
Department of Health Services
Completed
Ksh 1,000,000
Emali/Mulala
Purchase Of Market Cleaning Equipment And Protective Gear
Purchase of market cleaning equipment and protective gear
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 1,000,000
Emali/Mulala
Purchase Of Cleaning Machinery
Purchase of cleaning machinery
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 6,000,000
Emali/Mulala
Emali Mechanics Support Program
Provision of Aprons for Emali mechanics
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 500,000
Emali/Mulala
Mulala Primary School Borehole
Test pumping of the boreholeWater quality analysis approved by WRA
Department of Water and Sanitation
Completed
Ksh 6,000,000
Emali/Mulala
Emali Street Lights Rehabilitation
Repair of streetlights in Emali town
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 500,000
Emali/Mulala
Land Succession Program, Survey And Titling
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 1,500,000
Emali/Mulala
Drilling And Equipping Of Emali Rehabilitation Centre Borehole
Drilling and Equipping of Emali
Rehabilitation Centre Borehole
Department of Water and Sanitation
Completed
Ksh 644,814
Emali/Mulala
Drilling And Equipping Of Matiku Borehole
Drilling and Equipping of Matiku
Borehole
Department of Water and Sanitation
Completed
Ksh 3,000,000
Emali/Mulala
Drilling And Equipping Of Emali Town Borehole
Drilling and Equipping of Emali Town
Borehole
Department of Water and Sanitation
Completed
Ksh 2,500,000
Emali/Mulala
Yandia Water Project
Rising main to Matha Hill, construction of water tank (100M3 ), Return pipe to existing Muselele
water tanks and Mumbuni , Rehabilitation and construction of
water kiosks, Construction of cattle trough , Kwa Soo - Water distribution line, Muselele Distribution Line, Marker posts , 3 water kiosks (kwa Soo, Mumbuni,
Kwa Kombo), Construction of apiary house, Supply of bee 10 No. bee hives, Supply of pasture seeds, ¼ acre Demo farm establishment with
drip kits, Supply and delivery of 50 vertical
sacks and 50 conical gardensCapacity building on CSA, apiculture and pasture
establishment
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 13,000,000
Emali/Mulala
Drilling And Extension Of Kwa Kioko Kiluluini Village Kavingoni Borehole
Drilling and extension of Kwa Kioko
Kiluluini Village Kavingoni borehole
Department of Water and Sanitation
Completed
Ksh 2,057,995
Emali/Mulala
Drilling And Extension Of Kwa Kioko Kiluluini Village Kavingoni Borehole
Drilling and extension of Kwa Kioko
Kiluluini Village Kavingoni borehole
Department of Water and Sanitation
Completed
Ksh 2,057,955
Emali/Mulala
Improvement Of Emali Town Water Reticulation
Improvement of Emali Town Water
Reticulation
Department of Water and Sanitation
Completed
Ksh 500,000
Emali/Mulala
Ulilinzi Ecde
1No. ECDE Classroom
1No.lockable metallic cabinet
1No. Wooden Desk
1No. Wooden Arm Chair
Water harvesting goods (5,000Ltrs Water Tank and Base)
Full Electrical Works
Display Pinned board
Branding, Publicity and Signwriting
Department of ICT, Education and Internship
Completed
Ksh 1,470,000
Masongaleni
Road Improvement Programme
Road improvement programme (Fuel for county machinery) -inhouse works road grading of roads5km road grading
along Kwa mbithi-kisayani-masaku dogo-ulilinzi-kwa kamaya road2km road grading alongNguuni-junction road
4km road grading along iongoni-kwa
kithuka-lukenya road6km road grading along Kwa daud mweu-anna nzuki-kiambani-roadrock filling along Katulye –ulilinzi road and Yumbuni-ngangani road
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 490,000
Masongaleni
Rehabilitation Of Isunguluni-cutline-kyanguli-masaku Ndogo Road
Construction of reinforced concrete drift , road grading , installation of culverts and gabions
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 7,400,000
Masongaleni
Road Improvement Programme
Hire of machine for 109 hours to open roads
Daud Mweu - Muliluni road
Ititi- Katulye Road
Masaku ndogo- Ulilinzi road
Nguuni -Kwa Kilili road
Kwa Nyette -Cutline road
Kwa maswili -Kwa kamuya road
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,988,800
Masongaleni
Solar Market Floodlights - 1m Kativani, Kavatini, Makutano, Ndauni Markets
Installation of double arm metallic pole 8.5m high , fixing of 150W integrated solar streetlights fittings at market
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 980,000
Masongaleni
Rehabilitation As Integrated Lights At Yikitaa And Ulilinzi Markets And Installation Of A New Integrated Solar Light At Kiambani Market
Replacement of faulty batteries at Yikitaa and Ulilinzi markets and installation of a new integrated solar light at Kiambani market
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 779,708
Masongaleni
Upgrading Kithyululu Model Health Centre
Renovation of maternity block, construction of
staff house, construction of soak pit.
Department of Health Services
Completed
Ksh 1,775,636
Masongaleni
Yikitaa ECDE
2No. ECDE Classrooms with an office and Store
Electrical Works (conduits only)
Shelves
2No. Wooden Desks
2No. Wooden Arm Chairs
Water harvesting goods (5,000Ltrs Water Tank)
Play equipment - 4 piece set (double swing, slide, climbing frame and double see-saw)
Installation of Culverts, gabions & scour checks along Kambaland road, Ngomano – Nzembete Rd, Salama – Kwa Makete Rd, Mwaani – Wandei Rd, Ngwata-Mukaange Rd and Kiange - Kativani Rd
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,217,954
Masongaleni
Upgrading Ngwata Maternity Centre
Construction of new OPD block
Department of Health Services
Completed
Ksh 5,350,000
Masongaleni
Extension Of Ngwata, Kativani, Kiange, Yumbuni, And Kyuasini By KIBWAWASCO
Extension of Ngwata, Kativani, Kiange, Yumbuni, and Kyuasini by KIBMAWASCO.
Department of Water and Sanitation
Completed
Ksh 4,116,000
Masongaleni
Kiambani Borehole
Kiambani borehole –Drilling , equipping with Solar, and distribution
Department of Water and Sanitation
Completed
Ksh 3,430,000
Masongaleni
Extension Of Water By 4kms Makutano- Makongeni- Masimbani- Mbondeni (kwa Kalee) To Mwaani Market And Construction Of Kiosks By Kibmawasco
Extension of water by 4Kms Makutano- Makongeni- Masimbani- Mbondeni (Kwa Kalee) to Mwaani market and Construction of kiosks by KIBMAWASCO
Department of Water and Sanitation
Completed
Ksh 3,920,000
Masongaleni
Maintenance Of Boreholes In Masongaleni Ward
Maintenance of boreholes in Masongaleni ward
Department of Water and Sanitation
Completed
Ksh 490,000
Masongaleni
Hire Of Machines For Opening And Grading; Lukenya – Utini Rd, Utini Junction - Yikivuthi Rd, Kalandini – Masaku Ndogo Rd, Kwa Mwambui – Kwa Mwandola Rd, Kwa Musa – Aic Masonga Rd
Hire Of Machines For Opening And Grading; Lukenya road
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 34,652
Masongaleni
Ovo Earth Pan
Ovo earth pan- fencing of the earth pan and levelling
Department of Water and Sanitation
Completed
Ksh 47,455
Masongaleni
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
Project Awarded more funds in FY2024/25 and redesigned. Current it's at procurement level.
Has additional funds in 2024/25.
To be implemented in FY 2024/25
Construction works stopped for re-designing and addition of funds.
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
For in house works 2 Trips Rockfilling along Nthangu –Watuka and 0.9km Road opening along Kwa Kamuya – Kaiti were done