All Financial Years Projects
Go BackProject | Scope | Department | Status | Budget | Ward | Action | |
---|---|---|---|---|---|---|---|
Wote Fire Station |
|
Department of Devolution, Public Service, Public Participation and Special Programs | Completed | Ksh 800,000 | Wote/Nziu |
|
|
Makueni Girls Borehole | Equipping of Makueni Girls borehole, pipeline extension, solarization |
Department of Water and Sanitation | Completed | Ksh 2,940,000 | Wote/Nziu |
|
|
Ida (world Bank) Credit: Kenya Urban Support Project (kusp)- Urban Institutional Grants (uig) | KUSP funded progarmme to support Municipality activities - KUSP Financial Management Training for Municipal Managers, Engineers & Accountants |
Department of Lands, Urban Planning and Development, Environment and Climate Change | Completed | Ksh 203,215 | Wote/Nziu |
|
|
Ida (world Bank) Credit: Kenya Urban Support Project(kusp) - Urban Development Grant (udg) | KUSP funded towards Mukuyuni Modern Market. Used to install Mukuyuni freezer and cold room |
Department of Lands, Urban Planning and Development, Environment and Climate Change | Completed | Ksh 6,669,716 | Wote/Nziu |
|
|
Cabro Paving Of Wote Township Parking Zones |
|
Department of Lands, Urban Planning and Development, Environment and Climate Change | Completed | Ksh 3,000,000 | Wote/Nziu |
|
|
Opening And Unclogging Of Drainage Systems |
|
Department of Lands, Urban Planning and Development, Environment and Climate Change | Completed | Ksh 1,196,192 | Wote/Nziu |
|
|
Construction Of Muaani Drift And Murraming Of Jones To Muaani Girls Road | Construction of Muaani drift, road grading, gravelling, Installation of culverts and gabions along Jones to Muaani Girls road | Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 4,900,000 | Wote/Nziu |
|
|
Kwa Kitingi -kwa Joel -kwa Mwaniki Road Opening And Grading | Opening, Grading, installation of culverts & excavation of roads for water structures along Kwa Kitingi -Kwa Joel -Kwa Mwaniki road |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 3,430,000 | Wote/Nziu |
|
|
Road Opening (ndivuni- Kisemeini- Kwamukosi- Nziu Market) Road Opening And Grading | Road opening and grading of Ndivuni-Kisemeini -Kwa Mukosi - Nziu market |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 2,940,000 | Wote/Nziu |
|
|
Unoa Grounds Floodlights | Installation of starter bars, Installation of polygon 20m high pole, fixing of 6no. 400W fittings , Installation of manual/automatic pulleys and winches, kplc metering of the mast. |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 2,300,000 | Wote/Nziu |
|
|
Fruit Value Chain Development | Supply and Distribution of fruit fly management technologies |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 3,000,000 | Wote/Nziu |
|
|
Makueni Integrated Vocation Education Centre - Dormitory | Construction of a dormitory |
Department of ICT, Education and Internship | Completed | Ksh 2,536,001 | Wote/Nziu |
|
|
Kitikyumu Playground | Budgeted for payment of PMC , supervision and allowance for the machine operators. |
Department of Gender, Children, Youth, Sports and Social Services | Completed | Ksh 142,032 | Wote/Nziu |
|
|
Establishment Of Low Pest Zones | Procurement and delivery of fruit fly management technologies, farmer and extension officers capacity building, technology deployment, data collection and monitoring, market dossier development and creation of new markets |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 14,200,000 | Wote/Nziu |
|
|
Sports Development Wote/nziu | Purchase of sport items |
Department of Gender, Children, Youth, Sports and Social Services | Completed | Ksh 925,000 | Wote/Nziu |
|
|
Nziu Playground | Levelling and goal posts installation |
Department of Gender, Children, Youth, Sports and Social Services | Completed | Ksh 1,500,000 | Wote/Nziu |
|
|
Kamunyolo Earthdam | Operationalization of distribution line to Wote, installation of new pumpset, rehabilitation of raising main. Operationalization of Mwambani pipeline, installation of new pumpset, fencing, treatment plant, pipeline extension of 1.1km and connection to KPLC |
Department of Water and Sanitation | Completed | Ksh 605,680 | Wote/Nziu |
|
|
Kaiti/kamunyii Water Project | Construction of sump, rehabilitation of raising main, new distribution line, connection to KPLC, construction of tank platform and installation of 8 tanks 1000lts to 8 water points |
Department of Water and Sanitation | Completed | Ksh 921,928 | Wote/Nziu |
|
|
Katoloni Pipeline Extension | Pipeline extension to Katoloni market, construction of tank Platform, water kiosk and storage tank 1000lts |
Department of Water and Sanitation | Completed | Ksh 980,000 | Wote/Nziu |
|
|
Kwa Musila Earth Dam | Rehabilitation of spillway, construction of seal and gabion installation |
Department of Water and Sanitation | Completed | Ksh 1,470,000 | Wote/Nziu |
|
|
Kamunyolo Earth Dam | Operationalization of distribution line to Wote, installation of new pumpset, rehabilitation of raising main. Operationalization of Mwambani pipeline, installation of new pumpset, fencing, treatment plant, pipeline extension of 1.1km and connection to KPLC |
Department of Water and Sanitation | Completed | Ksh 2,500,000 | Wote/Nziu |
|
|
Kituasi Water Project | Construction of new sump, solarization, installation of pumpset and distribution |
Department of Water and Sanitation | Completed | Ksh 3,430,000 | Wote/Nziu |
|
|
Kwa Kamende Borehole | Solarization, installation of new pumpset, rehabilitation of pump house and fencing |
Department of Water and Sanitation | Completed | Ksh 3,920,000 | Wote/Nziu |
|
|
Kathuma Borehole | Power installation, distribution line extension, 1 No: water kiosk and two plastic storage tanks 1000lts |
Department of Water and Sanitation | Completed | Ksh 4,900,000 | Wote/Nziu |
|
|
Kaiti-kamunyii Water Project | Construction of sump, rehabilitation of raising main, new distribution line, connection to KPLC, construction of tank platform and installation of 8 tanks 1000lts to 8 water points |
Department of Water and Sanitation | Completed | Ksh 5,000,000 | Wote/Nziu |
|
|
Mwaani Water Project | Department of Water and Sanitation | Completed | Ksh 9,917,000 | Wote/Nziu |
|
||
Support To Organized Groups Including Pwds In Nziu Sub-ward | Supply of spray pumps, wheel chairs, diapers, crutches, tents and chaird |
Department of Gender, Children, Youth, Sports and Social Services | Completed | Ksh 5,096,000 | Wote/Nziu |
|
|
Roads Improvement | Road improvement within wote/nziu ward In wote subward - 10 selected roads were graded KMTC - Ginnery road -kalosi road, Kwa kitise -Cereal road -Kwa masilia, White House- Total road- Choma base, Choma base - St John's Sec.malivani- Ndue Nguu road, Kwa Ngulue - Kwa kamende road In Nziu subward 7 selected roads were graded Mikwani - Mulolongo road,Mikwani - Nziu road,Febi road -Makuli road, kathuma- Kwa kilungya road, Mutulani- Muvakani road, Kobai- kyongulu road, Nziu -Muthyoi road |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 1,940,000 | Wote/Nziu |
|
|
Construction Of Toilet Kuku Market Acacia |
|
Department of Lands, Urban Planning and Development, Environment and Climate Change | Completed | Ksh 650,000 | Wote/Nziu |
|
|
Road Improvement | Grading of Kwa mumangi - kwa ngui - kwa kamweli – kamunyolo - 7.5 Malivani – iviani – unoa – 6km Malivani – kavingo – ngutwa – 8.2km Kyenze – kathuma – 6.5km Kwa ikavi - mwaani primary – kambi – 12.6km Kwa kwinga – kwa kyule – nthangu – 7.1km |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 1,960,000 | Wote/Nziu |
|
|
Grading along Makolongo-kwa Juda- Kaiti Road | 4.8km opening and grading along Kaiti- Kwa Juda - Makolongo road, Installation of 48m culvert, 10 gabions and excavation of 450m3 mitre drains. |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 5,000,000 | Wote/Nziu |
|
|
Opening And Grading Of Mutinda- Mbalu-kitheini Pri-makuli-nichodemus-kwa Matheka Road | 2.8km road grading, 2.8m road opening, 48m culverts,8 No of gabbions, 300cm3 catch water |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 4,000,000 | Wote/Nziu |
|
|
Maintenance of Kivandini- Yathonza road, mikwani -Kombai road &Febi-Makuli road | Installation of culverts along Kivandini- Yathonza road, 60m culvert, 35 No of gabions,80m3 catch water drain |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 4,000,000 | Wote/Nziu |
|
|
Installation Of Submersible Pumps And Infiltration Galleries Kaiti 1 | installation of submersible pumps and infiltration galleries at kaiti 1 |
Department of Water and Sanitation | Completed | Ksh 4,000,000 | Wote/Nziu |
|
|
Repair Of Green Park Borehole | Department of Lands, Urban Planning and Development, Environment and Climate Change | Completed | Ksh 1,000,000 | Wote/Nziu |
|
||
Sports Development - Wote/nziu Ward | Facilitation for ligi mashinani/ cash awards |
Department of Gender, Children, Youth, Sports and Social Services | Completed | Ksh 300,000 | Wote/Nziu |
|
|
Roads Improvement Across The Ward | This budget line entails both contracted and inhouse works Contracted entailed hire of shovel for road improvement in nzaui kilili kalamba ward for 182 hours |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 4,900,000 | Nzaui/Kilili/Kalamba |
|
|
Kalamba Ecde |
|
Department of ICT, Education and Internship | Completed | Ksh 1,568,000 | Nzaui/Kilili/Kalamba |
|
|
Matiliku Subcounty Hospital (dental Chair, Accessories And Other Smal Equipment) | Renovation works and supply of dental chair |
Department of Health Services | Completed | Ksh 46,007 | Nzaui/Kilili/Kalamba |
|
|
Fruit Value Chain Development (seedlings) Matching Grant | Fruit Value Chain Development(seedlings) Matching grant-procurrement of 9,335 root stock seedlings of mango, citrus and paw paw supplied and distributed to 428 beneficiaries |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 2,000,000 | Nzaui/Kilili/Kalamba |
|
|
Surgical Implants And Medical Bills | payment of medical bills and procurement of surigcal implants |
Department of Health Services | Completed | Ksh 553,412 | Nzaui/Kilili/Kalamba |
|
|
Social groups - Tents And Chairs Nzaui/kilili/kalamba | Purchase of tents and chairs |
Department of Gender, Children, Youth, Sports and Social Services | Completed | Ksh 5,635,000 | Nzaui/Kilili/Kalamba |
|
|
Yiuma Ecde |
|
Department of ICT, Education and Internship | Completed | Ksh 2,940,000 | Nzaui/Kilili/Kalamba |
|
|
Kwa Muthama Borehole | Rehabilitation of Kwa Muthama borehole |
Department of Water and Sanitation | Completed | Ksh 343,000 | Nzaui/Kilili/Kalamba |
|
|
Yandia Kalatu To Kakuswi- Pipeline Extension | Distribution to Kaukuswi, water kiosk, platform and 1000lt storage tank |
Department of Water and Sanitation | Completed | Ksh 980,000 | Nzaui/Kilili/Kalamba |
|
|
Mbiuni Borehole | Drilling and Caping |
Department of Water and Sanitation | Completed | Ksh 1,000,000 | Nzaui/Kilili/Kalamba |
|
|
Water Tanks | Supply of 5No: 1000lts Water Tanks |
Department of Water and Sanitation | Completed | Ksh 1,201,499 | Nzaui/Kilili/Kalamba |
|
|
Kwa Moto Water Sump | Connection to power grid to the water project |
Department of Water and Sanitation | Completed | Ksh 1,470,000 | Nzaui/Kilili/Kalamba |
|
|
Kanzili Borehole | Drilling and Caping |
Department of Water and Sanitation | Completed | Ksh 1,500,000 | Nzaui/Kilili/Kalamba |
|
|
Ngaa Borehole | Drilling and Caping |
Department of Water and Sanitation | Completed | Ksh 1,500,000 | Nzaui/Kilili/Kalamba |
|
|
Purchase Of Tanks | Purchase and supply of 3 of water tanks |
Department of Health Services | Completed | Ksh 451,760 | Nzaui/Kilili/Kalamba |
|
|
Isololo Kwakoki Bh Pipeline Extention | Construction of isololo and kwa koki BH an pipeline extention |
Department of Water and Sanitation | Completed | Ksh 5,390,000 | Nzaui/Kilili/Kalamba |
|
|
Road Improvement Programme Through Road Opening And Grading Of Roads | 14km road opening in Nzaui/Kilili/ Kalamba ward | Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 4,706,086 | Nzaui/Kilili/Kalamba |
|
|
Supply Of Water Tanks And Piping | Supply of water tanks and piping for the various water projects – Kilinga, Kisinzi, Mwanyani and Ithimani and Yanthooko water projects. |
Department of Water and Sanitation | Completed | Ksh 4,000,000 | Nzaui/Kilili/Kalamba |
|
|
Supply Of Water Tanks And Distribution Pipes For Mandela, Kweleli, Syaolwe, Kwa Moto And Isololo Water Project | Supply of Water tanks and distribution pipes mandela, Kweleli, Syaolwe, Kwa Moto and Isololo water project |
Department of Water and Sanitation | Completed | Ksh 4,000,000 | Nzaui/Kilili/Kalamba |
|
|
Kwa Kalui Ecde | Construction of one classroom |
Department of ICT, Education and Internship | Completed | Ksh 2,400,000 | Nzaui/Kilili/Kalamba |
|
|
Maatha Ecde | Construction of one classroom |
Department of ICT, Education and Internship | Completed | Ksh 2,400,000 | Nzaui/Kilili/Kalamba |
|
|
Sports And Youth Development Programme -nzaui/kilili/kalamba | Facilitation for ligi mashinani/ cash awards |
Department of Gender, Children, Youth, Sports and Social Services | Completed | Ksh 405,000 | Nzaui/Kilili/Kalamba |
|
|
Rehabilitation Of Mandela Sump And Muthini Borehole | Rehabilitation of Mandela sump and Muthini borehole |
Department of Water and Sanitation | Completed | Ksh 609,736 | Nzaui/Kilili/Kalamba |
|
|
Kwa Moto Electrical And Rehabilitation Works | Kwa Moto electrical and rehabilitation works |
Department of Water and Sanitation | Completed | Ksh 3,787,578 | Nzaui/Kilili/Kalamba |
|
|
Rehabilitation Of Kalima Sump | Rehabilitation of kalima sump |
Department of Water and Sanitation | Completed | Ksh 609,737 | Nzaui/Kilili/Kalamba |
|
|
Matiliku Sub County Hospital Portable Xray | Purchase and installation of portable AI Supported XRAY Machine |
Department of Health Services | Completed | Ksh 8,000,000 | Nzaui/Kilili/Kalamba |
|
|
Tree Planting |
|
Department of Lands, Urban Planning and Development, Environment and Climate Change | Completed | Ksh 1,000,000 | Mbitini |
|
|
Mechanical Road Opening And Widening | Mechanical road opening and widening of Kavuthu- A.I.C Kiioi road 5.5km and Kwa Vutu- Yumbani road 6.7Km |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 2,970,000 | Mbitini |
|
|
Masokani Ctti & Kithumani Ctti - Water Tanks | Installation of gutters and water tanks |
Department of ICT, Education and Internship | Completed | Ksh 1,470,000 | Mbitini |
|
|
Kyumbuni Ecde |
|
Department of ICT, Education and Internship | Completed | Ksh 3,430,000 | Mbitini |
|
|
Kavuthu Coldroom | Operationalization of post harvest facility (cold room pack house) at Kavuthu in Mbitini ward |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 100,000 | Mbitini |
|
|
Kithumani- Mbalani-Katundu Drift | culverts installation and spot gravelling of Kithumani- Mbalani- Katundu Drift |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 3,920,000 | Mbitini |
|
|
Kwa Kitei Drift | Kwa Kitei Drift -Construction of 35m drift and protection works | Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 3,430,000 | Mbitini |
|
|
Grain And Pulse Value Chain Development | Grain and pulse value chain development- 2.112MT maize, 3.05MT beans, distributed to 2,581 beneficiaries |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 2,000,000 | Mbitini |
|
|
Upgrading Of Mbitini Dispensary | completion of the OPD block |
Department of Health Services | Completed | Ksh 3,000,000 | Mbitini |
|
|
Muambwani ECDE | Construction of 2 No.classrooms and a 3 door pit latrine |
Department of ICT, Education and Internship | Completed | Ksh 3,500,000 | Mbitini |
|
|
Ward Motorcycle | Purchase of motorcycle |
Department of Water and Sanitation | Completed | Ksh 276,600 | Mbitini |
|
|
Mbitini Borehole | HGS, Drilling |
Department of Water and Sanitation | Completed | Ksh 1,360,000 | Mbitini |
|
|
Ilengeni Water Project | Intake and treatment works, pumping systems, pipeline, water points and storage |
Department of Water and Sanitation | Completed | Ksh 6,870,000 | Mbitini |
|
|
Yuuni Ecde | Construction of 2 No. classroom and 3 door pit latrine |
Department of ICT, Education and Internship | Completed | Ksh 1,255,660 | Mbitini |
|
|
Issuance Of Certified Maize Seeds |
|
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 4,000,000 | Mbitini |
|
|
Installation Of Highmast Floodlight At Mutyambua Market | Installation of 20M high mast floodlight with 6No. 400W LED fittings |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 2,000,000 | Mbitini |
|
|
Distribution Of Ilengeni Water | Feasibility survey, survey and design, construction of distribution pipeline to Masue, Construction of water kiosk, installation of 10,000 m3 plastic tank |
Department of Water and Sanitation | Completed | Ksh 2,000,000 | Mbitini |
|
|
Sports And Youth Development Programme -mbitini | Facilitation for ligi mashinani |
Department of Gender, Children, Youth, Sports and Social Services | Completed | Ksh 450,000 | Mbitini |
|
|
Ngoto Ecde | Construction of 2no. ECDE Classrooms with an office; Electrical Works; Shelving to the stores; 2No. Wooden Desks; 2No. Wooden Arm Chairs; Water harvesting goods (10,000Ltrs Water Tank and base); 40 No. Kiddy chairs and 20. No. Kiddy tables; Play equipment 4 piece set (double swing, slide, climbing frame and double seesaw); Display soft Pin board, White Board & Mark-Pens and ; Branding, Publicity and Signwriting |
Department of ICT, Education and Internship | Completed | Ksh 3,600,000 | Mbitini |
|
|
Kavuthu Ecde | Construction of 2no. ECDE Classrooms with an office; Electrical Works; Shelving to the stores; Water harvesting goods (10,000Ltrs Water Tank and base); 40 No. Kiddy chairs and 20. No. Kiddy tables; Play equipment 4 piece set (double swing, slide, climbing frame and double see-saw); Display soft Pin board, White Board & Mark Pens and Branding, Publicity and Signwriting |
Department of ICT, Education and Internship | Completed | Ksh 3,600,000 | Mbitini |
|
|
Mbuthani Water Sump | construction of Rc sump, upgrading of pumping system rehabilitation |
Department of Water and Sanitation | Completed | Ksh 3,796,770 | Mbitini |
|
|
Kwa Kathoka Town Planning |
|
Department of Lands, Urban Planning and Development, Environment and Climate Change | Completed | Ksh 1,000,000 | Kikumini/Muvau |
|
|
Road Improvements | Light grading on various roads across the ward :- Furaha -Kwa mutune- Mangauni -Kiaoni -Kwa nzivu - Kwa Nyumba (14.2km), Kwa Mutevu- Kona- west Ngosini- Kari central - Makutano road 13.2km), Kwa Nguta -Catholiic church (6.km), Kyemwole- Kwa Matolo- Muvau- Kyusyani -Kavuliloni- Mwilu (17.2km), Ngunu-Itaa 14.3Km, Fiveten- kwa niko-Nzaai(10.5km), Kangondi-Kitonyini-Mwilu(4.7km) |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 4,900,000 | Kikumini/Muvau |
|
|
Agricultural Training Institute - Kwa Kathoka | Funds intent to for Implementation of damliner, shednet, poultry drinkers, poultry feeders, green house, payment of casuals inter connection and purchase of projectors |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 6,898,299 | Kikumini/Muvau |
|
|
Kambi Mawe Ecde |
|
Department of ICT, Education and Internship | Completed | Ksh 1,960,000 | Kikumini/Muvau |
|
|
Kikumini Model Health Center | Construction of new Outpatient block |
Department of Health Services | Completed | Ksh 4,585,142 | Kikumini/Muvau |
|
|
Kwa Kateli Drift | Kwa Kateli Drift- Construction of a 35m drift, Gabion installation and cut off drains for road harvesting |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 2,940,000 | Kikumini/Muvau |
|
|
Kwa Kisoi Gulley | Kwa Kisoi Gulley - Construction of culverts and scour checks |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 1,470,000 | Kikumini/Muvau |
|
|
Kwa Mulinge Drift | Kwa Mulinge drift- construction of a drift, culverts, installation of gabions and excavation of roads for water structures |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 1,470,000 | Kikumini/Muvau |
|
|
Kwa Mwenga Culverts | Construction of culverts and scour checks |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 1,470,000 | Kikumini/Muvau |
|
|
Green Grams Value Chain Addition | Provision of certified green grams seeds to farmers |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 1,500,000 | Kikumini/Muvau |
|
|
Demarcation Of Riparian Land Within Ndukuma |
|
Department of Lands, Urban Planning and Development, Environment and Climate Change | Completed | Ksh 730,113 | Kikumini/Muvau |
|
|
Climate Change Intiative |
|
Department of Lands, Urban Planning and Development, Environment and Climate Change | Completed | Ksh 1,000,000 | Kikumini/Muvau |
|
|
Kimuumo Ecde |
|
Department of ICT, Education and Internship | Completed | Ksh 1,960,000 | Kikumini/Muvau |
|
|
Kwa Kathoka Community Borehole | Drilling of Kwa Kathoka Community Borehole |
Department of Water and Sanitation | Completed | Ksh 90,000 | Kikumini/Muvau |
|
|
Kwa Mutemwa Borehole | Drilling and development of borehole |
Department of Water and Sanitation | Completed | Ksh 3,920,000 | Kikumini/Muvau |
|
|
Road Improvement | Grading of Road -Furaha-Kwa Mutune-Mangauni-Kiaoni-Kwa Nzivu –Kwa Kyumba -14.2Km, Kwa Mutevu-Kona-West Ngosini—Kari Central –Makutano road, Kwa Nguta-Catholic Church -6.0Km 4. Kyemwole-Kwa Matolo-Muvau-Kyusyani-Kavuliloni -17.2Km 5. Ngunu-T.Ten-Kaseve-Ndukuma-Itaa -14.3Km 6. Five Ten –Beach –Kwa Niko –Nzaai -10.5 Km 7. Kangondi-Kitonyoni-Mwilu-4.7Km |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 1,000,000 | Kikumini/Muvau |
|
|
Kwa Malombe Earth Dam | Department of Water and Sanitation | Completed | Ksh 1,982,000 | Kikumini/Muvau |
|