All Financial Years Projects
Go BackProject | Scope | Department | Status | Budget | Ward | Action |
---|---|---|---|---|---|---|
Kooi Earth Dam | Kooi earth dam - Desilting of the reservoir and construction of check dams |
Department of Water and Sanitation | Completed | Ksh 4,900,000 | Tulimani |
|
Lower Ngwani Water Project | Replacement of motor, inverter, desilting sump and replacement of vandalized power cables. |
Department of Water and Sanitation | Completed | Ksh 980,000 | Tulimani |
|
Nyaanyaa Earthdam Phase 2 | Construction of 1.3km rising main, construction of 1No. Water kiosk and installation of 1No. 10Cubic metres plastic storage tank. |
Department of Water and Sanitation | Completed | Ksh 1,568,000 | Kako/Waia |
|
Kyaluma Bore Hole Water Project | Solarization, replacement of pump end, flushing borehole, construction of elevated steel tower to hold 2No. 10CM plastict storage tanks, construction of kyaluma market water point, renovation of kyowani market water kiosk, water pipeline distribution distribution to kyowani and kyaluma market. |
Department of Water and Sanitation | Completed | Ksh 4,900,000 | Kako/Waia |
|
Solarization And Distribution Of Makaia Borehole | Solarization and Distribution of Makaia borehole - Installation of solar panels, Water distribution to Kathamba market, kathamba schools, mba market, Mba schools, Mwaani market, Sakai primary school, Kwa mutumba and Mavitini |
Department of Water and Sanitation | Completed | Ksh 6,860,000 | Kako/Waia |
|
Kwa Muthama Earthdam | Kwa Muthama Earthdam – desilting, hire of machinery |
Department of Water and Sanitation | Completed | Ksh 2,450,000 | Kalawa |
|
Rehabilitation Of Wanzauni Kikima Pipeline | Rehabilitation of Wanzauni Kikima pipeline |
Department of Water and Sanitation | Completed | Ksh 686,000 | Tulimani |
|
Kwa Ivali Earthdam | Desiling reservoir and rehabilitation of spillway |
Department of Water and Sanitation | Completed | Ksh 4,900,000 | Kalawa |
|
Songeni Water Project | Drilling of borehole, equipping and solarizing, construction of 0.6 km rising main to Itulu water kiosk |
Department of Water and Sanitation | Completed | Ksh 4,900,000 | Kisau/Kiteta |
|
Kwa Matinga Water Project | Drilling of borehole, equipping and solarizing, construction of 1.0km rising main to kwa Matinga storage tank, rehabilitation of 3.4km distribution pipeline ,construction of 1No. water kiosk and installation 2No.5 cubic metres plastic storage tank |
Department of Water and Sanitation | Completed | Ksh 4,794,228 | Kisau/Kiteta |
|
Upper Ngwani Water Project | Installation of pump, solarization, rehabilitation of kakima pipeline and pipeline extension to Tulimani primary school. |
Department of Water and Sanitation | Completed | Ksh 2,509,811 | Tulimani |
|
Matiku Borehole | Drilling and developing the borehole and capping |
Department of Water and Sanitation | Completed | Ksh 1,409,940 | Emali/Mulala |
|
Katatu Dam | i. Desilting and expansion of the reservoir |
Department of Water and Sanitation | Completed | Ksh 3,920,000 | Kiima Kiu/Kalanzoni |
|
Kwa Makaa Earthdam | i. Reservoir desilting. |
Department of Water and Sanitation | Completed | Ksh 2,940,000 | Kiima Kiu/Kalanzoni |
|
Mikuyu II Water Project | Phased scopes: |
Department of Water and Sanitation | Completed | Ksh 1,470,000 | Kasikeu |
|
Muatineni Borehole | Equipping and distribution of Muatineni borehole |
Department of Water and Sanitation | Completed | Ksh 3,920,000 | Kasikeu |
|
Mutiluni Borehole | i. Borehole flushing and test pumping. |
Department of Water and Sanitation | Completed | Ksh 4,900,000 | Mukaa |
|
Kwa Mbila Water Project | Distribution from Mbuvo - Makutano -Milute, construction of a tank platform, supply of 1 No 10000 litres water tank, construction of a water point |
Department of Water and Sanitation | Completed | Ksh 1,960,000 | Kathonzweni |
|
Itumbule Bh | solarization, borehole flashing, supply of 10 m3 plastic tank, operationalization of 1 No water point |
Department of Water and Sanitation | Completed | Ksh 2,450,000 | Kathonzweni |
|
Drilling And Equipping Of 5 No. Boreholes In The Ward Using Own Machines | Department of Water and Sanitation | Completed | Ksh 7,000,000 | Kalawa |
|
|
Repair Of Mukameni, Kyandulu, Maumbuni Boreholes | i. Syumile Borehole. |
Department of Water and Sanitation | Completed | Ksh 1,000,000 | Nguumo |
|
Rehabilitation Of Stalled Boreholes In The Ward ( Kwa Kimulu, Kiiwai, Emali, Nduuduni Etc) | i. Flushing and Test Pumping of Maatha Borehole |
Department of Water and Sanitation | Completed | Ksh 1,960,000 | Emali/Mulala |
|
Kimia-kateiko Water Project-water Distribution. Extension Of The Pipeline For 4kms | i. Laying, jointing, backfilling and testing of 2.6km DN63 rising mai |
Department of Water and Sanitation | Completed | Ksh 4,900,000 | Nguu/Masumba |
|
Kwa Kathoka Borehole | i. Equipping Borehole with solar and pump |
Department of Water and Sanitation | Completed | Ksh 2,113,755 | Nguumo |
|
Syumile Borehole | Syumile borehole-Solarization ,submersible pump installation and distribution |
Department of Water and Sanitation | Completed | Ksh 1,960,000 | Nguumo |
|
Kalakalya Borehole | i. Equipping Borehole with solar and pump |
Department of Water and Sanitation | Completed | Ksh 1,500,000 | Nguumo |
|
Pipeline Extension To Kiaoni Market (kibmawasco) | i. 1.3km DN50 pipeline extension |
Department of Water and Sanitation | Completed | Ksh 1,000,000 | Kikumbulyu North |
|
Kimawasco Line Extension-mbeetwani (water) | i. 2.2km DN63 HDPE line |
Department of Water and Sanitation | Completed | Ksh 1,500,000 | Kikumbulyu South |
|
Distribution Of Mumbuni Samp(solarisation And Distribution At Source) | i. Installation of Solar Power |
Department of Water and Sanitation | Completed | Ksh 4,900,000 | Emali/Mulala |
|
Katangini Water Project | i. Laying, jointing, backfilling and testing of 4km DN63 HDPE pipeline |
Department of Water and Sanitation | Completed | Ksh 2,985,128 | Nguu/Masumba |
|
Drilling Of Ngaamba Borehole | i. Equipping the Borehole with Pump and Solar |
Department of Water and Sanitation | Completed | Ksh 2,979,200 | Nguumo |
|
Mbata Borehole | Department of Water and Sanitation | Completed | Ksh 150,000 | Kitise/Kithuki |
|
|
Ward Motorcycle | Purchase of motorcycle |
Department of Water and Sanitation | Completed | Ksh 276,600 | Mbitini |
|
Kwa Muthama Borehole | Rehabilitation of Kwa Muthama borehole |
Department of Water and Sanitation | Completed | Ksh 343,000 | Nzaui/Kilili/Kalamba |
|
Water Improvement And Borehole Maintenance | Department of Water and Sanitation | Completed | Ksh 524,207 | Kathonzweni |
|
|
Water Exploration Equipment | Department of Water and Sanitation | Completed | Ksh 705,420 | Headquaters |
|
|
Yandia Kalatu To Kakuswi- Pipeline Extension | Distribution to Kaukuswi, water kiosk, platform and 1000lt storage tank |
Department of Water and Sanitation | Completed | Ksh 980,000 | Nzaui/Kilili/Kalamba |
|
Katoloni Pipeline Extension | Pipeline extension to Katoloni market, construction of tank Platform, water kiosk and storage tank 1000lts |
Department of Water and Sanitation | Completed | Ksh 980,000 | Wote/Nziu |
|
Water Tanks | Supply of 5No: 1000lts Water Tanks |
Department of Water and Sanitation | Completed | Ksh 1,201,499 | Nzaui/Kilili/Kalamba |
|
Kwa Moto Water Sump | Connection to power grid to the water project |
Department of Water and Sanitation | Completed | Ksh 1,470,000 | Nzaui/Kilili/Kalamba |
|
Kwa Musila Earth Dam | Rehabilitation of spillway, construction of seal and gabion installation |
Department of Water and Sanitation | Completed | Ksh 1,470,000 | Wote/Nziu |
|
Kwa Mbila Water Project | Supply and installation of 42 Salor Panel 280Watts |
Department of Water and Sanitation | Completed | Ksh 1,960,000 | Kathonzweni |
|
Kamuithi -ungatani Water Project | Pipeline extension from Kamuithi –Ungatani, installation of two-10000litres water tanks at Ungatani and Ivinga Nzia, construction of 1 water kiosks and 2 water points |
Department of Water and Sanitation | Completed | Ksh 2,450,000 | Mavindini |
|
Kamunyolo Earth Dam | Operationalization of distribution line to Wote, installation of new pumpset, rehabilitation of raising main. Operationalization of Mwambani pipeline, installation of new pumpset, fencing, treatment plant, pipeline extension of 1.1km and connection to KPLC |
Department of Water and Sanitation | Completed | Ksh 2,500,000 | Wote/Nziu |
|
Kikunduku Borehole | Department of Water and Sanitation | Completed | Ksh 3,430,000 | Thange |
|
|
Kwa Kamende Borehole | Solarization, installation of new pumpset, rehabilitation of pump house and fencing |
Department of Water and Sanitation | Completed | Ksh 3,920,000 | Wote/Nziu |
|
Kathuma Borehole | Power installation, distribution line extension, 1 No: water kiosk and two plastic storage tanks 1000lts |
Department of Water and Sanitation | Completed | Ksh 4,900,000 | Wote/Nziu |
|
Kiimani Borehole | Drilling and development of borehole, equipping of borehole, solarization, supply of 10000 ltrs plastic tank |
Department of Water and Sanitation | Completed | Ksh 5,380,000 | Mavindini |
|
Muusini Borehole | Pipeline extension to Syandoo and Ngosini (Distribution and Storage tanks) |
Department of Water and Sanitation | Completed | Ksh 6,380,000 | Mavindini |
|
Ndueni-mulima Water Project | Rehabilitation of Mulima - Ndueni water distribution network |
Department of Water and Sanitation | Completed | Ksh 4,900,000 | Mbooni |
|
Kwa Daina Mavindini Pipeline Improvement | Department of Water and Sanitation | Completed | Ksh 2,340,000 | Mtito Andei |
|
|
Mulima Water Project | i.Trainig of the community on management. ii.Mobilization of personal plant and equipment to site. iii.Implementation of treatment works components and chemical building. |
Department of Water and Sanitation | Completed | Ksh 10,176,660 | Mbooni |
|
Mulima Phase 1 | i.Traininig of community on management ii.Mobilization of personnel plant and equipment to site iii.Implementation of treatment works components and chemical building |
Department of Water and Sanitation | Completed | Ksh 1,905,334 | Mbooni |
|
Desilting Of Mitooni Earthdam In Kitise Kithuki Ward | Department of Water and Sanitation | Completed | Ksh 1,491,000 | Kathonzweni |
|
|
Kyunguni Earth Dam | Department of Water and Sanitation | Completed | Ksh 2,189,243 | Kiima Kiu/Kalanzoni |
|
|
Muthenyenze Borehole | Department of Water and Sanitation | Completed | Ksh 1,160,000 | Masongaleni |
|
|
Masyonyeki Earth Dam | Department of Water and Sanitation | Completed | Ksh 4,900,000 | Tulimani |
|
|
Miradi Kwa Jamii (sand Dam/drift At Kileani Iiani) | CDD works at watema borehole water project |
Department of Water and Sanitation | Completed | Ksh 500,000 | Kee |
|
Kwa Malombe Earth Dam | Department of Water and Sanitation | Completed | Ksh 1,982,000 | Kikumini/Muvau |
|
|
Mulilii Earth Dam | i. Embankment shaping |
Department of Water and Sanitation | Completed | Ksh 2,940,000 | Makindu |
|
Kiumi Water Project | Replacement of the PVC pipes with GI (Metallic pipes) |
Department of Water and Sanitation | Completed | Ksh 64,250 | Kithungo/Kitundu |
|
Equipping And Distribution Kithuni Borehole | Equipping and Distribution - Equipping with solar pumping system and Distribution of water to Kithuni dispensary and Kithuni shopping centre and mavuu village with 2No Water Kiosks |
Department of Water and Sanitation | Completed | Ksh 1,500,000 | Kee |
|
Kwa Mbila Water Project | Replacement of Distribution pipeline with HDPE PN10 3" 4000m
Construction of 2No. Tank platform 2 and water point
Construction of HDPE PN10 11/4*° 500 m and Relocation of Tanks
Installation of Air Valves and Construction of Valve chamber |
Department of Water and Sanitation | Completed | Ksh 4,000,000 | Kathonzweni |
|
Mukameni B Borehole - Purchase And Installation Of Motor | Department of Water and Sanitation | Completed | Ksh 500,000 | Kitise/Kithuki |
|
|
Kwanyaa Borehole - Purchase And Installation Of Motor | Test pumping and water quality analysis 2. Servicing of existing pump 3. 4 5. Supply and install of new motor equal to existing pump clw fittings Supply and installation of AC/DC inverter SV3/5.5T or equivalent approved Apply three coat of Aluminum paint to general surface |
Department of Water and Sanitation | Completed | Ksh 500,000 | Kitise/Kithuki |
|
Fisheries Development Programme | fibre glass fishing motor boat and nets |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 1,500,000 | Headquaters |
|
Agriculture Extension Programme | Implementation of value chain strategies extension, ksh40,000 anual staff facilitation of field activities targetting 60,000 house holds |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 10,587,436 | Headquaters |
|
Co-operative Development And Management | procurement of two items (laptop and printer) the balance shall be used for fuel and facilatation for m&e activities |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 4,583,930 | Headquaters |
|
Ready To Drink Juice(rtd) Production | production and packaging of ready to drink (RTD)juices |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 27,587,000 | Headquaters |
|
Purified Drinking Water Production | purification and package water |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 1,513,505 | Headquaters |
|
Purchase Of Mangoes | purchase mangoes for production of puree through cooperatives groups |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 14,400,000 | Headquaters |
|
Green Grams Value Chain Development | procurement of 1MT green grams seeds distributed to 1,000 beneficiarie & GAP trainings. |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 2,500,000 | Mtito Andei |
|
Centralized Small-scale Farming | supply of 6.048MT green grams seeds distributed to 3,024 beneficiaries |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 2,500,000 | Makindu |
|
Hay Stands | relocate the hay stall to utangwa dipsite |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 490,408 | Kithungo/Kitundu |
|
Kathambalani Irrigation Project. | survey and design of the high breed weir done. the project activities include training of 56 household on good agricultural practices and formation irrigation user association. |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 8,000,000 | Kithungo/Kitundu |
|
Kenya Devolution Support Programme | funds is for undertaking technical evaluation of the 3 cold rooms and support water reticulation at Kavuthu cold room |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 8,525,054 | Headquaters |
|
Kathonzweni Dairy | water connection(piping contract terminated ) payment of electricity bills. procurement of pastueriser and water purification & softening machine advertised. |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 9,500,000 | Kathonzweni |
|
National Agricultural And Rural Inclusive Growth Project (narigp) | National Agricultural and Rural Inclusive Growth Project (NARIGP)20 wards: Muvau/Kikumini, Mavindini, Kitise/Kithuki, Emali/Mulala, Kalawa, Kako-waia, Kiteta/Kisau, Tulimani, Kee, Ilima, Kilungu, Kiima Kiu/Kalanzoni, Mukaa/Kitaingo, Kasikeu, Mbitini, Kikumbulyu North, Kikumbulyu South, Masongaleni, Thange & Mtito Andei |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 60,000,000 | Headquaters |
|
Ida(world Bank) Credit National Agricultural Value Chain Development Project(navcdp) | Farmer profiling: 187,327 farmers, 387 agrodealers and 373 Agrostockists were registered in September 2023. A total 573 Agripreneurs were trained and engaged in the farmer profiling exercise. 2 CTAC and 1 CPSC meemtings.Participatory Intergrated Community Development process, supporting SACCOs and Farmer Producer Organizations with Enetprise Matching grants, Establishment of County Irrigation Development Unit, Implementation of Farmer Led-Development |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 200,000,000 | Headquaters |
|
Kikome Irrigation Scheme Phase 11 | Phase 11 project activities which include; raising main, solarization and T- point on the 3 distribution lines. |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 7,000,000 | Kitise/Kithuki |
|
Agricultural Training Institute - Kwa Kathoka | Funds intent to for Implementation of damliner, shednet, poultry drinkers, poultry feeders, green house, payment of casuals inter connection and purchase of projectors |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 6,898,299 | Kikumini/Muvau |
|
Rabies Elimination Programme | procurement vaccines with 3000 target house hold across the county. |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 6,168,500 | Headquaters |
|
Provision Of Certified Mango, Avocado Seedlings, Certified Seeds, Fertilizer And Other Farm Inputs | Provision of certified avocado seedlings, certified seeds, fertilizer and other farm inputs |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 4,000,000 | Kee |
|
Makueni Integrated Grain Value Chain Development Project | Purchase and installation of retail packaging machine and purchase of pulses |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 4,000,000 | Headquaters |
|
Fruit Development Programme | Fruit development programme |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 234,032 | Headquaters |
|
Kavuthu Coldroom | Operationalization of post harvest facility (cold room pack house) at Kavuthu in Mbitini ward |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 100,000 | Mbitini |
|
Nguumo Poultry Aggregation Centre | Completion of Nguumo poultry aggregation centre |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 80,343 | Nguumo |
|
Extension Service Delivery | Community Economic Empowerment- 30 wards Agricultural extension service for increased production and productivity |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 244,714 | Headquaters |
|
Installation Of Pallets At Satellite Fertiliser Stores | equiping subsidy fertilizer satellite depots with pallets
|
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 500,000 | Headquaters |
|
Operationalization Of Kikima Dairy Processing Plant | Operationalization of Kikima Dairy Processing Plant |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 500,000 | Mbooni |
|
Green Grams Value Chain Development | supply of 2.464MT green grams seeds distributed to 1,232 beneficiaries |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 1,000,000 | Thange |
|
Sweden- Agricultural Sector Development Support Programme (asdsp) Ii | Carry out project close out activities that include documentation, hand over activities and operational costs (office utilities and fuel). |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 1,101,751 | Headquaters |
|
Avocado Value Chain Development | Avocado Value Chain development - Procurement of organic fertilizer |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 1,500,000 | Ilima |
|
Green Grams Value Chain Development | Provision of certified green grams seeds to farmers |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 1,500,000 | Ivingoni/Nzambani |
|
Green Grams Value Chain Addition | Provision of certified green grams seeds to farmers |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 1,500,000 | Kikumini/Muvau |
|
Irrigation Development Programmes | Irrigation Development Programmes - Survey, identification, mapping and Designs( All wards) |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 1,795,800 | Headquaters |
|
Grain And Pulse Value Chain Development | Provision of certified green grams, maize, cowpeas and beans seeds to farmers |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 2,000,000 | Kasikeu |
|
Avocado Value Chain Development | Avocado Value Chain development |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 2,000,000 | Kilungu |
|
Grain And Pulse Value Chain Development | Grain and pulse value chain development- 2.112MT maize, 3.05MT beans, distributed to 2,581 beneficiaries |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 2,000,000 | Mbitini |
|
Dairy Farming And Livestock Keeping | Dairy farming and livestock keeping - supply of hormones, capacity building |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 2,000,000 | Mbooni |
|