Construction of 120m long x 6m wide non vented drift along Kaselyia - kwa Kulomba road
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 8,106,722
Kisau/Kiteta
Road Improvement Program
Masonry Drift Riding Slab 70m by 5m Cut off drains for road run off harvesting Mechanical Road Widening- 10kms
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 4,410,000
Kisau/Kiteta
Iviani, Kivani And Kiteta Playgrounds
Levelling of the play ground
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 1,900,000
Kisau/Kiteta
Lungu Borehole
Drilling of borehole and test pumping
Department of Water and Sanitation
Completed
Ksh 2,374,220
Kisau/Kiteta
Songeni Ecde
2 No. ECDE Classrooms with an office and Store
Electrical Works (conduits only)
Shelves
2 No. Wooden Desks
2 No. Wooden Arm Chairs
Water harvesting goods (5,000Ltrs Water Tank)
Play equipment - 4 piece set (double swing, slide, climbing frame and double see-saw)
Display Pinned board
Branding, Publicity and Signwriting
2 No. Black board retained
4 No. Duster
20 No. Mark pens
2 No. Whiteboard
Department of ICT, Education and Internship
Completed
Ksh 3,136,000
Kisau/Kiteta
Kithongo Borehole
Drilling of borehole and test pumping
Department of Water and Sanitation
Completed
Ksh 2,374,221
Kisau/Kiteta
Kimandi Borehole
Construction of 2No. Water kiosks, installation of 2No. 10cm cubic metres plastic storage tanks, water distribution pipeline to kyambusya and rehabilitation of rising main.
Department of Water and Sanitation
Completed
Ksh 3,710,279
Kisau/Kiteta
Songeni Water Project
Drilling of borehole, equipping and solarizing, construction of 0.6 km rising main to Itulu water kiosk
Department of Water and Sanitation
Completed
Ksh 4,900,000
Kisau/Kiteta
Kwa Matinga Water Project
Drilling of borehole, equipping and solarizing, construction of 1.0km rising main to kwa Matinga storage tank, rehabilitation of 3.4km distribution pipeline ,construction of 1No. water kiosk and installation 2No.5 cubic metres plastic storage tank
Department of Water and Sanitation
Completed
Ksh 4,794,228
Kisau/Kiteta
Routine maintenance of Kisau/Kiteta ward access roads
Bush clearing, Grading, Road Water harvesting structures along - AIC Tawa Church Road-Ngwani
Drift Road 2.5km- Mbumbuni-Iviani-Kithongo-Mukimwani-Katung'uli-Thwake
Road 8km- Mbumbuni-Kalimani Road 5km- Kalimani-Kalingile Road 6.5km- Kwa Nganda-Kaunda-Kyambusya
Road 2.4km- Kyambusya-Kitandini Road 6.8km
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 5,000,000
Kisau/Kiteta
Opening Kwa Kisingu - Kyome -Kwa Makenzi Kithetheni kwa Ndisya road
12kms mechanical road opening, 12km heavy grading and 858.6m cut-off mitre drains
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 5,000,000
Kisau/Kiteta
Installation Of Floodlights At Mbiiani ,nthungoni,katungoli, Kwa Kulomba And Kavutini Markets
Installation of 15M grid connected 4-arm floodlights at Mbiiani ,Nthungoni,Katungoli, Kwa Kulomba and Kavutini MarketsRehabilitation of existing market lights at Kwa Ndunda, Utuneni and Namba Nyanya markets
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 3,000,000
Kisau/Kiteta
Mulasya Ecde
2No. ECDE Classrooms with an office and Store
Electrical Works (conduits only)
Shelves
2No. Wooden Desks
2No. Wooden Arm Chairs
Water harvesting goods (5,000Ltrs Water Tank)
Play equipment - 4 piece set (double swing, slide, climbing frame and double see-saw)
Display Pinned board
Branding, Publicity and Signwriting
2 No. Black board retained
4 No. Duster
20 No. Mark pens
2 No, Whiteboard
Department of ICT, Education and Internship
Completed
Ksh 3,136,000
Kisau/Kiteta
Ndumanu Earth Dam
4170m3 reservoir desilting1000m3 embankment making goodGabion works at the spillway
Department of Water and Sanitation
Completed
Ksh 3,000,000
Kisau/Kiteta
Kithongo Borehole
Borehole equippingConstruction of a water kiosk at sourceInstallation of 1No 10,000ltank at sourceFencing of borehole siteInstallation of a 200m PN16 pipeline
Department of Water and Sanitation
Completed
Ksh 2,500,000
Kisau/Kiteta
Lungu Borehole
Equipping, solarisation and a water point kiosk
Department of Water and Sanitation
Completed
Ksh 1,500,000
Kisau/Kiteta
Kyooni Ecde
Construction of two classroom
Department of ICT, Education and Internship
Completed
Ksh 3,200,000
Kisau/Kiteta
Muluti Ecde
Construction of two classrooms
Department of ICT, Education and Internship
Completed
Ksh 3,200,000
Kisau/Kiteta
Kisau/kiteta Ward Bursary
Bursary allocation – Application, Vetting, award and distribution
Department of ICT, Education and Internship
Completed
Ksh 3,950,000
Kisau/Kiteta
Support To Groups(tents And Chairs)- Kisau Kiteta ward
Support to groups(Tents and chairs)
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 3,000,000
Kisau/Kiteta
Kiteta Playground Kisau/kiteta
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 2,100,000
Kisau/Kiteta
Sports And Youth Development Programme -kisau/kiteta
Facilitation for ligi mashinani , purchase and delivery of sport items
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 300,000
Kisau/Kiteta
Syumbe Borehole
Hydrological surveyDrilling and testpumping
Department of Water and Sanitation
Completed
Ksh 2,500,000
Kisau/Kiteta
Requisition For Water Improvement Program-kiamani And Kyome Markets
Water connection to Kyome and Kiamani markets and supply of petrol pumps to 3 community groups
Department of Water and Sanitation
Completed
Ksh 807,629
Kisau/Kiteta
Mango Production And Storage Support And Poultry Farming.
Mango production and storage support and
poultry farming.Mango(fruit fly traps and cold storage)and supply with
chicks
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 500,000
Kisau/Kiteta
Road Improvement Programme
Mechanical Road widening and heavy grading of 9Kms on selected roads ie Ikundu- Kwa male - kwa Maingi Thwake road, Malili -Kuku-Thwake road, Kwa Chief Ndiku- Mwaani- Kingathuni road, Malatani - Miseleni -kwa kianga road, Nguumo- MBA road.Non vented masonry drift-25m by 5m and 35m by 5m and installation of culverts 16m by 600mm DIA along Matalani - Miseleleni - Kwa Kianga road.
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 7,180,720
Kako/Waia
Kyang'ondu Stock Yard
Kyang'ondu stock yard
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 3,000,000
Kako/Waia
Construction Of Kako - Kandulyu (savani) Drift
FY2023/24 allocation was pending bill
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 4,210,612
Kako/Waia
Grain And Pulse Value Chain Development
Provision of certified maize and beans seeds to farmers
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 1,000,000
Kako/Waia
Boda Boda Shed - Kako/waia
Construction of a bodaboda shed
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 300,000
Kako/Waia
Waia Earth Dam
Construction of 3No. Water Koisks and installation of 4No. 10Cubic metres plastic storage tanks. Water distribution extension from kavingo market to kyamangatu, kwa masai to Ilela market and Kwa masai to kwa mutava. Construction of 1No. Cattle trough at kwa Ilela market.
Department of Water and Sanitation
Completed
Ksh 5,880,000
Kako/Waia
Nyaanyaa Earthdam Phase 2
Construction of 1.3km rising main, construction of 1No. Water kiosk and installation of 1No. 10Cubic metres plastic storage tank.
Department of Water and Sanitation
Completed
Ksh 1,568,000
Kako/Waia
Kinze Earthdam Enhancement
Installation of a solar pumping system. (Solar tower, solar panels, stringing and pumping, Namba Nyanya water kiosk, Elevated water tanks at Namba Nyanya, Construction of a cattle trough, Fingerling stocking at Kinze earth
dam, Pasture component – Bracharia splits, Demo farm, Supply and delivery of 120 vertical
sacks and 120 conical gardens, Extra works – repair for Kinze –
Ngaa line, masonry tank platform and 1 No. 10M3 water tank at Muangwa, minor
rehabilitation of source cattle trough, provision of fittings for Mbumbuni Line, Capacity building on climate smart agriculture,
pasture establishment (Bracharia) and aquaculture.
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 11,000,000
Kisau/Kiteta
Kwa Mutombi Water Project
Rehabilitation of rising main and installation of 2No. 10 Cubic metres platic storage tanks and constrcution of 2No. Platforms, Servicing of Genset and installation of new battery.
Department of Water and Sanitation
Completed
Ksh 1,960,000
Kako/Waia
Kyaluma Bore Hole Water Project
Solarization, replacement of pump end, flushing borehole, construction of elevated steel tower to hold 2No. 10CM plastict storage tanks, construction of kyaluma market water point, renovation of kyowani market water kiosk, water pipeline distribution distribution to kyowani and kyaluma market.
Department of Water and Sanitation
Completed
Ksh 4,900,000
Kako/Waia
Solarization And Distribution Of Makaia Borehole
Solarization and Distribution of Makaia borehole - Installation of solar panels, Water distribution to Kathamba market, kathamba schools, mba market, Mba schools, Mwaani market, Sakai primary school, Kwa mutumba and Mavitini
Department of Water and Sanitation
Completed
Ksh 6,860,000
Kako/Waia
Kavingiliti Earthdam ( Miau earthdam)
Kavingiliti earthdam - in house machines
Department of Water and Sanitation
Completed
Ksh 2,940,000
Kako/Waia
Construction Of Kwa Malai Earthdam,enlargement Spillway Checkdam,drawal System
Department of Water and Sanitation
Completed
Ksh 284,274
Kako/Waia
Establish Satellite Fertiliser
Establish Satellite Fertiliser at Wambiti-
Electrification
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 500,000
Kako/Waia
Provision Of Certified Seeds
Provision of certified seeds
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 1,000,000
Kako/Waia
Rehabilitation of Ikundu- Kwa Mali -Kwa Maingi - Kwa Ndungu Road
4km mechanical road opening, 4km heavy grading, installation of 56m culverts and 1100m mitre drains
Department of Infrastructure, Transport, Public Works, Housing and Energy
3.5km mechanical road opening, 3.5km heavy grading, installation of 48m culvert and 1441.80m cut off mitre drains
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 4,000,000
Kako/Waia
Road Improvement Programme In Kako/waia Ward -mtf
Road improvement through Bush clearing, Grading, Road Water harvesting structures alongWatuka-Uviluni-Kyaume
Junction Road 14kmKwa Mitambo-Uviluni Road 2.5kmKako Secondary-Kwa Ndoroka
Road 2.3KmNgovu-Nthangathini-Mwaani
Road 10.5Km
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 3,200,000
Kako/Waia
Installation Of Floodlights In Kitongu Market
Installation of 20M high mast floodlight with 6No. 400W LED fittings
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 2,000,000
Kako/Waia
Kako/waia Bursary
Bursary allocation – Application , Vetting, award and distribution
Department of ICT, Education and Internship
Completed
Ksh 3,000,000
Kako/Waia
Ligi Mashinani Kako/waia
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 1,000,000
Kako/Waia
Miau Earthdam
Miau
earth dam - Rising main to kwa katheo and water distribution network to
nthangathini,kitandi Ctti,ngovu and mba makets, construction of 5No. water
kiosks and installation of water tank for each kiosk, construction of 1No. 50
cubic metres masonry storage tank, water distribution to 2No. schools(Miau
Primary School and Miau Secondary School)
Department of Water and Sanitation
Completed
Ksh 6,000,000
Kako/Waia
Waia Earth Dam
Waia
earth dam - Installation of solar
power supply for pumping system , installation of
submersible pump and Water treatment
chambers.
Department of Water and Sanitation
Completed
Ksh 4,000,000
Kako/Waia
Itulu Ecde
Construction of 2no. ECDE Classrooms with an office,3-Door Pit Latrine with Urinal,Electrical Works,Shelving to the stores,2No.lockable metallic cabinets,2No. Wooden Desks,2No. Wooden Arm Chairs,Water harvesting goods (10,,000Ltrs Water Tank and base),40 No. Kiddy chairs and 20. No. Kiddy tables,Play equipment 4 piece set (double swing, slide, climbing frame and double see-saw),
Department of ICT, Education and Internship
Completed
Ksh 4,300,000
Kako/Waia
Pwds Mapping Kako/waia
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 500,000
Kako/Waia
Rehabilitation Of Kwa Mwanzau And Muia Drifts
Construction of a 30m by 6m drift
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,000,000
Kako/Waia
Drilling And Capping Of Kathamba Borehole
Hydro logical survey Drilling and capping of Kathamba boreholeTest pumping
Department of Water and Sanitation
Completed
Ksh 1,802,294
Kako/Waia
Support To Farmers - Supply Of Manure-fuel
Support to farmers - supply of manure-fuel
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 800,000
Kako/Waia
Pest And Disease Control For Mango Value Chain
Pest and disease control for mango value
Chain-Provision of fruit fly traps for Mango value chain
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 1,000,000
Kako/Waia
Construction Of Kwa Malai Earthdam,enlargement Spillway Checkdam,drawal System
Construction Of Kwa Malai Earthdam,Enlargement Spillway Checkdam,Drawal System
Department of Water and Sanitation
Completed
Ksh 284,274
Kako/Waia
Kavumbu Public Toilet (kalawa)
construction of 2-Door pit latrine and urinal
Department of Trade, Marketing, Industry, Culture and Tourism.
Completed
Ksh 500,000
Kalawa
Planning and survey of Kathulumbi market
Preparation of local physical development plan
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 1,000,000
Kalawa
Planning and survey of Kalawa market
Preparation of local physical development plan
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 1,000,000
Kalawa
Road Improvent Programme
Road improvement programme through mechanical Road Opening, Light Grading and installation of cut-off drains on selected roads across the ward - 101 hours on crawler dozers- 245 hours on motor grader
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 9,750,000
Kalawa
Katangini Dispensary -completion Of Maternity Block And Incinerator
Construction of new maternity block
Department of Health Services
Completed
Ksh 1,390,450
Kalawa
Syongungi Ecde
2 No. ECDE Classrooms with an office and Store
Electrical Works (conduits only)
2 No. Wooden Desks
2 No. Wooden Arm Chairs
Water harvesting goods (5,000Ltrs Water Tank and base)
Display Pinned board
Branding, Publicity and Signwriting
2 No. Black board
Department of ICT, Education and Internship
Completed
Ksh 2,940,000
Kalawa
Kathulumbi Model Health Centre.(fencing And Gate)
Fencing of the facility and installation of gate
Department of Health Services
Completed
Ksh 30,544
Kalawa
Mutembuku Heath Centre (renovations)
Renovation of OPD block - New roof and iron sheets, painting, tiles and eletrical installations
Department of Health Services
Completed
Ksh 2,500,000
Kalawa
Athi Kalawa Wash Programme
Department of Water and Sanitation
Completed
Ksh 2,430,000
Kalawa
Hire Of Machines For Roadworks; Katangini – Ngunini Rd, Murramuni -kavumbu-miangeni-mbavani-mutembuko-syongungi-kwa Mareka Junction Rd And Kalawa Health Cetre – Kathiani Market Rd,
FY2023/24 allocation was pending bill
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 3,000,000
Kalawa
Mweleli Ecde
Construction of one classroom
Department of ICT, Education and Internship
Completed
Ksh 527,367
Kalawa
Sports Development Kalawa
Purchase of sports items
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 200,000
Kalawa
Social Protection Kalawa
Purchase and distribution of food and non food items
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 887,500
Kalawa
Athi-miangeni- Kalawa Water Project.
Athi-Miangeni- Kalawa water project. Phase 1-Construction of pump house, treatment, pump the water to Wii hills and piping for distribution.
Department of Water and Sanitation
Completed
Ksh 1,000,000
Kalawa
Kyamakuthi Earth Dam
Desilting of kyamakuthi reservoir
Department of Water and Sanitation
Completed
Ksh 14,910,012
Kalawa
Akwash Water Project
AKWASH water project- Extension of AKWASH and distribution to kathongo kavumbu and Mweleli clusters
Department of Water and Sanitation
Completed
Ksh 1,312,182
Kalawa
Kwa Muthama Earthdam
Desilting Kwa Muthama Earthdam
Department of Water and Sanitation
Completed
Ksh 2,450,000
Kalawa
Kwa Ivali Earthdam
Desiling reservoir and rehabilitation of spillway
Department of Water and Sanitation
Completed
Ksh 4,900,000
Kalawa
Drilling And Equipping Of 5 No. Boreholes In The Ward Using Own Machines
Department of Water and Sanitation
Completed
Ksh 7,000,000
Kalawa
Syokilati Market Toilet
construction of 2 Door Pit Latrine at Syokilati market
Department of Trade, Marketing, Industry, Culture and Tourism.
Completed
Ksh 500,000
Kalawa
Syotuvali Market Toilet
Construction of 2 Door Pit Latrine and Urinal at Syokilati Market
Department of Trade, Marketing, Industry, Culture and Tourism.
Completed
Ksh 500,000
Kalawa
Establish Satellite Fertiliser Depot
Establish Satellite Fertiliser Depot
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 500,000
Kalawa
Seed Bulking
Support farmers with farm inputs and Train
identified farmers to be ToTs of the others ( seed Bulking)
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 1,000,000
Kalawa
Rehabilitation of Malamuni-Miangeni-Mwenethe-Kinze-Mbavani- Ngaanwa-Mutembuko -Syongungi-Kwa Maseka Road
Rehabilitation of Malamuni-Miangeni-Mwenethe-Kinze-Mbavani- Ngaanwa-Mutembuko -Syongungi-Kwa Maseka Road through 5kms light bush clearing, 30km light grading, 1000m spot gravelling
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 3,509,550
Kalawa
Road Improvement Programme Through Machine Hire In Kalawa Ward
9km light bush clearing, 17km heavy grading, Installation of 40m culverts, 364.50m cut off mitre drains and 20 gabions
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 3,000,000
Kalawa
Road Improvement Programme In Kalawa Ward
45kms Light grading on existing selected roads through county machinery machines along Malamuni-Kinze
Road, Mukuku-Nganwa
Road, Mukelenzu-Malikiti
market Road, Thwake-Mbukoni Junction
Road, Kwa Ndungo-Kiluluini-Malili Road, Kalawa-Ngamu-Kaseve Road, Catholic- Kwa Mutunge-Thwake Road, Kwa Ndeti Kiosk-Kiandiko-Kwa
Kilonzo-Kwa Faith Mbai-Kwa Kimea-Kwa Mwango-Kwa Kiliu-Kamutonye-Athi River
Road, Asst. Chief
office Syotuvali-Athi River Road
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,900,000
Kalawa
Disilting Of Katukulu Earth Dam
Mobilization and demobilization to and from site of equipmentReservoir basin desisting , spillway rehabilitation and draw off system rehabilitation
Department of Water and Sanitation
Completed
Ksh 4,000,000
Kalawa
Katukulu Earth Dam
Mobilization and demobilization to and from site of equipmentReservoir basin desisting , spillway rehabilitation and draw off system rehabilitation
Department of Water and Sanitation
Completed
Ksh 1,500,000
Kalawa
Kasooni Ecde
Construction of 2no. ECDE Classrooms with an office,3-Door Pit Latrine
with Urinal,Electrical Works,Shelving to the stores,
2No.lockable metallic cabinets,2No. Wooden Desks,2No. Wooden Arm
Chairs,Water harvesting goods (10,,000Ltrs Water Tank and base),40 No. Kiddy
chairs and 20. No. Kiddy tables,Play equipment 4 piece set (double swing,
slide, climbing frame and double see-saw),Display soft board and Branding,
Publicity and Signwriting
Department of ICT, Education and Internship
Completed
Ksh 3,000,000
Kalawa
Kathulumbi Ctti Twin Workshop
Construction of a twin workshop
Department of ICT, Education and Internship
Completed
Ksh 3,000,000
Kalawa
Mutanda Ctti Twin Workshop
Construction of a twin workshop
Department of ICT, Education and Internship
Completed
Ksh 3,000,000
Kalawa
Kalawa Ward Bursary
Construction of a twin workshop
Department of ICT, Education and Internship
Completed
Ksh 2,000,000
Kalawa
Sports And Youth Development Programme - Kalawa
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 300,000
Kalawa
Pwd Support-assistive Devices -kalawa
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 500,000
Kalawa
Equipping Of Kathulumbi Hospital Laboratory
purchase of laboratory, maternity and office equipment
Department of Health Services
Completed
Ksh 2,000,000
Kalawa
Renovation And Extension Of Waiting Bay And Furniture Mbavani Dispensary
renovation And Extension Of Waiting Bay And Furniture
Department of Health Services
Completed
Ksh 1,500,000
Kalawa
Fencing And Gate At Kathongo Dispensary
chain link fence installation and installation of metallic gate
Department of Health Services
Completed
Ksh 2,000,000
Kalawa
Kalawa Subcounty Hospital Solarization
Department of Health Services
Completed
Ksh 4,000,000
Kalawa
Kalawa Subcounty Hospital Fence And Gate
Department of Health Services
Completed
Ksh 1,470,000
Kalawa
Grading And Murraming From Malamuni - Miangeni -kinze- Mbavani- Mutembuku- Syongungi To Kwa Maseka Junction
Grading and murraming from malamuni - miangeni -kinze- mbavani- mutembuku- syongungi to kwa maseka junction
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 3,509,550
Kalawa
Grading And Installation Of Drainage Structures Along Ngaamba-marwa Road
Installation ofCulverts and drainage works,
-Spot grading
-Spot gravelling
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 3,920,000
Kiima Kiu/Kalanzoni
Control Of Gulleys At Kwe Kuyu Kalembwani
Excavation
Concrete works and protection works
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 1,000,000
Kiima Kiu/Kalanzoni
Rehabilitation of Kwa Tuva - Ngiini- Kalanzoni - Yaitha Road
Heavy grading, spot murraming and drainage works from Ngiini- Kalanzoni - Yaitha road
Construction of gabions at Kwa Malonga - Mulumini road
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 9,860,000
Kiima Kiu/Kalanzoni
Construction Of A Public Toilet At Marwa Market
Construction of Pit latrine block and urinal at Marwa Market
Ticket booth
Rain water goods
5000 lts plastic water tank and base
Department of Trade, Marketing, Industry, Culture and Tourism.
Completed
Ksh 1,000,000
Kiima Kiu/Kalanzoni
Construction Of Public Toilet At Ngiini Playground
Construction of public toilet at Ngiini Playground
Department of Trade, Marketing, Industry, Culture and Tourism.
Completed
Ksh 1,000,000
Kiima Kiu/Kalanzoni
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
Project Awarded more funds in FY2024/25 and redesigned. Current it's at procurement level.
Has additional funds in 2024/25.
To be implemented in FY 2024/25
Construction works stopped for re-designing and addition of funds.
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
For in house works 2 Trips Rockfilling along Nthangu –Watuka and 0.9km Road opening along Kwa Kamuya – Kaiti were done