- Installation of culverts
- Cut off drains for road run off harvesting
- Light grading
- Light bush clearing
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 4,900,000
Kithungo/Kitundu
Isuuni Drift
- Non-vented reinforced concrete drift construction
- Cut off drains for road run off harvesting
- Installation of gabions
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 11,000,000
Kithungo/Kitundu
Hay Stands
relocate the hay stall to utangwa dipsite
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 490,408
Kithungo/Kitundu
Kathambalani Irrigation Project.
survey and design of the high breed weir done. the project activities include training of 56 household on good agricultural practices and formation irrigation user association.
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 8,000,000
Kithungo/Kitundu
Kusyongali Playground
Levelling of the pkay ground
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 4,000,000
Kithungo/Kitundu
Kiumi Water Project
Rehabilitation of Kitundu-syathani pipeline and pipeline extension to Nthumbini, Rehabilitation of Kitundu-Kalambya pipeline and pipeline extension from kalala to Ngomangoni, construction of 2N. Water kiosks and installation of 2No. 10 Cubic metres plastic storage tanks.
Department of Water and Sanitation
Completed
Ksh 3,920,000
Kithungo/Kitundu
Drilling Of Mutooni Borehole
Drilling borehole and test pumping
Department of Water and Sanitation
Completed
Ksh 1,660,000
Kithungo/Kitundu
Youth Empowerment Programme -kithungo/kitundu
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 900,000
Kithungo/Kitundu
Water Improvement Programme
Repair of Boreholes
Department of Water and Sanitation
Completed
Ksh 57,556
Kithungo/Kitundu
Drainage Works Along Mwanyani-kwa Kyole Road
Installation of 42M culvertInstallation of 20 gabionsRoad for water structures- catch water drains excavation -405cm
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,380,040
Kithungo/Kitundu
Nzueni Ecde
2 No. ECDE Classrooms with an office and Store
3-Door Pit Latrine with Urinal
Full Electrical Works
Shelves
2 No. Wooden Desks
2 No. Wooden Arm Chairs
Water harvesting goods (10,000Ltrs Water Tank and base)
40 No. Kiddy chairs and 20. No. Kiddy tables
Play equipment 4 piece set (double swing, slide, climbing frame and double see-saw)
Display soft board
Branding, Publicity and Signwriting
2 No. Blackboard
4 No. duster
20 No. Markpens
2 No. White board
Department of ICT, Education and Internship
Completed
Ksh 3,920,000
Kithungo/Kitundu
Road Improvement Kithungo Kitundu
Road improvement programme in kithungo Kitundu ward through - Light grading - Spot graveling -Installation of culvert-Cut off meter drains
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 3,300,000
Kithungo/Kitundu
Kilyungi Hybrid High Mast Floodlight
Installation of starter bars, Installation of polygon 20m high pole, fixing of 6no. 250W fittings , Installation of manual/automatic pulleys and winches, installation of panels, installation of batteries,inverter, charger controller, changeover and kplc metering of the mast.
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 2,940,000
Kithungo/Kitundu
Upgrading Ngai Health Center
PROPOSED CONSTRUCTION OF MATERNITY BLOCK
Department of Health Services
Completed
Ksh 4,900,000
Kithungo/Kitundu
Utangwa Dispensary
CONSTRUCTION OF 2BEDROOM STAFF HOUSE, CHAINLINK FENCING, SEPTIC TANKS, INCINERATOR, PLACENTA PIT,CIVIL AND DRAINAGE WORKS AT UTANGWA DISPENSARY
Department of Health Services
Completed
Ksh 6,981,895
Kithungo/Kitundu
Kinyongo Water Project
Construction of 4No. Water Kiosks and installation of 10 Cubic metres for each kiosks. Water extension to Kilenge primary school from katunyoni market and water distribution extension from Kwa musyoka to Ngaani Market.
Department of Water and Sanitation
Completed
Ksh 3,920,000
Kithungo/Kitundu
Kiumi Water Project
Replacement of the PVC pipes with GI (Metallic pipes)
Department of Water and Sanitation
Completed
Ksh 64,250
Kithungo/Kitundu
Construction of A 4- Door Pit Latrine and Urinal At Kitundu Market And Kilyungi Market
Construction of A 4- Door Pit Latrine and Urinal At Kitundu Market And Kilyungi Market
Department of Trade, Marketing, Industry, Culture and Tourism.
Completed
Ksh 2,000,000
Kithungo/Kitundu
Utangwa Coffee Factory,rehabilitation Of Infrastructure And Establishment Of Coffee Nursery
Utangwa Coffee Factory,rehabilitation of
infrastructure and establishment of coffee nursery
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 3,000,000
Kithungo/Kitundu
Survey, Road Opening And Widening And Murraming Of Kwa Titus-aic Mbiuni-kwa Iwaikanga Road
7km mechanical road opening, 7km heavy grading, installation of 24m culverts and 863.46m cut off mitre drains along Kwa Titus-Aic Mbiuni-kwa IwaIkanga Road
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 4,000,000
Kithungo/Kitundu
Kitundu-mwea-kalala-ititu-ngai Health Centre Road
5km mechanical road opening, 5km heavy grading, construction of 20m by 6m vented masonry drift, installation of 18m culverts and 394.1 cut off mitre drains along Kitundu-Mwea-Kalala-Ititu-Ngai Health Centre Road
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 4,000,000
Kithungo/Kitundu
Installation Of Floodlights At Kyanzuki, Katumani, Munyeetani And Muumani Markets
Installation of 15M grid connected 4-arm floodlights at Kyanzuki, Katumani, Munyeetani and Muumani markets
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 3,000,000
Kithungo/Kitundu
Hire Of Grader For Routine Maintenance Of Kithungo/kitundu
Road widening and grading, 2.5km Mutula Kilonzo Snr-Woyani Primary School Road,1.2km Kilyungi Market -Woyani Catholic Church Road, 1.1km Kwa Muoki-Kyaukwa Road, 0.8km Kwa Kilonzo-Kwa Cyrus Road, 0.7km Kwa Cyrus-Kwa Kaunda Road, 1.3km Kwa Ngunya-Kithimani-Kwa Ngwisya Road,1.5km Umma Market-Kithimani Road,2.2km Kwa Matolo-Ngaani Road, 1.8km Kahawani-Kithini-Kwa Principal, 1.3km Mwanyani-Kilungyi, 1.6km Kitundu-Kalambya, 4,5km Kalambya-Mwenyeani-Utangwa. and -7kms Kalala-Ititu-Syukoni-Kwa Kimae road.
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 2,000,000
Kithungo/Kitundu
Road Grading And Culvert Installation Along Kwa Nzelu-ndandini-kyevutula-munyeetani
7km bush clearing, 7kms heavy grading, Installation of culvets 4om and 340.2m3 cut-off mitre drains
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 2,000,000
Kithungo/Kitundu
Mitooni Water Project
Distribution to Mitooni Hill and Kithungo market
Department of Water and Sanitation
Completed
Ksh 3,230,000
Kithungo/Kitundu
Vegetable Value Chain Developement
Vegetable value chain developement
(Tomatoes, frenchbeans and local vegetables) - Water connection, electricity
connection and operationalisation of the Utangwa vegetable agregation centres
and establishment of a agro-tree nursery.
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 3,500,000
Kithungo/Kitundu
Rehabilitation Of Kitundu-kilyungi Pipeline And Extention Kiumi Water Project
Rehabilitation of Kitundu –kilyungi pipeline and extension to water distribution network to ithembo. construction of 1No. water kiosk at ithembo. market to be served is kilyungu and ithemboni shopping centre and 2No.schools (Kilyungi secondary school and Kilyungi primary school). Replacement of water storage tank at for kiumbuni water kiosk.
Department of Water and Sanitation
Completed
Ksh 3,500,000
Kithungo/Kitundu
Kya Muata Water Project
Construction of gravity mains to kyambwika ECDE, Constrcution of 3No. water kiosks at Kyambwika , Kakuyuni market and kyamuata market and extension to kyamuata primary school and kyamuata market
Department of Water and Sanitation
Completed
Ksh 3,000,000
Kithungo/Kitundu
Kithungo/kitundu Ward Bursary
Bursary allocation – Application, Vetting, award and distribution
Department of ICT, Education and Internship
Completed
Ksh 3,000,000
Kithungo/Kitundu
Ngaani Ecde
Construction of one classroom
Department of ICT, Education and Internship
Completed
Ksh 2,000,000
Kithungo/Kitundu
Ngai Health Centre -equipping Maternity Wing, Upgrading Septic Tank, Additional Staff, Electricity Connectivity
2bedroom staff house to completionconstruction of 15000lts septic tankconstruction of a soak pit
Department of Health Services
Completed
Ksh 4,000,000
Kithungo/Kitundu
Procurement Of Fuel And Lubricant In The Department Of Agriculture
procurement of Fuel and Lubricant in the Department of Agriculture
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 909,000
Kithungo/Kitundu
Supply And Delivery Of Pipes For Kithungo Kitundu Ward
supply and delivery of 20mo. pipes for Kithungo Kitundu ward
Department of Water and Sanitation
Completed
Ksh 1,230,000
Kithungo/Kitundu
Isuuni – Kwa Kisela Pumping And Water Distribution Project
Desilting of sump tank, Solar and pumping system, Rising main to highest point (Itulu,
Kwa Gregory, Kwakimuyi), Installation of water tanks and
fencing and water point, Return pipes and distribution and
water point and irrigation hydrant , Water kiosk at KavumbuRehabilitation of Isuuni- Muumani
line, ¼ acre Demo farm establishment with
drip kits, Supply and delivery of 20 vertical
sacks and 20 conical gardens, Promotion of sustainable land management
practices and soil and water conservation structures – roads for water,
terraces
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 13,000,000
Kithungo/Kitundu
Feasibility Study On Mining
Consultancy services for Geological mineral mapping
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 2,500,000
Tulimani
Mulooni Ecde
Construction of 3 Door No. toilet with urinal
Department of ICT, Education and Internship
Completed
Ksh 490,000
Tulimani
Kyamithengi Library
Installation of LAN, structured cabling and furnishing
Department of ICT, Education and Internship
Completed
Ksh 1,000,000
Tulimani
Road Improvement In The Ward
Mechanical road widening and heavy grading( 18.4km)
Cut-off drains for road runoff harvesting of 397m3
Selected roads include AIC Kamau- kwa douglas mbaluka- Manyanzaani - Kwa ngweti- Kwa Nzoka roas, Kwa Kasina- Ngeleni- Syuuni river - Kwa Muete - Kyamithenge road, Ngunini - kinyuani- Tututha - Leva road, Kwa inthi -Manzuvi- Kyanduu- Kikini road, Kanoto- Kwa katiba- Kwa yindu road, Emale- Kwa colonel Kitaka- Ngwani river - Uvaani school- Uvaani dispensary- Kwa Nzivo road, Kalawani- uini- wa Novi- Kwa Ndavi road).
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 10,000,000
Tulimani
Heavy Grading, Construction Protection Works And Installation Of Culverts At Kwa Ikavi-musoa Coffee Factory-kyaviti Drift-uuta-kwa Solo-mulooni-kyanzuki-muthwani-kanoto Road.
Non-vented Reinforced Concrete Drift construction
Cut off drains for road run off harvesting
Culverts Installation
Gabions Installation
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 6,861,200
Tulimani
Medical Bills And Surgical Implants
payment of medical bills and procurement of surigcal
Department of Health Services
Completed
Ksh 172,464
Tulimani
Provision Of Mango And Avocado Seedlings
Provision of mango and avocado seedlings
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 2,500,000
Tulimani
Installation Of Flood Lights At Kalawani
Installation of 10meters high concrete pole ,stringing of conductors
10mm,fixing of 1.5m long streetlighting arm, Installation of 120W light
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,000,000
Tulimani
Uvaani Dispensary
facelifting and renovation of the facility
Department of Health Services
Completed
Ksh 1,404,736
Tulimani
Kooi Earth Dam
Kooi earth dam - Desilting of the reservoir and construction of check dams
Department of Water and Sanitation
Completed
Ksh 4,900,000
Tulimani
Lower Ngwani Water Project
Replacement of motor, inverter, desilting sump and replacement of vandalized power cables.
Department of Water and Sanitation
Completed
Ksh 980,000
Tulimani
Rehabilitation Of Wanzauni Kikima Pipeline
Rehabilitation of Wanzauni Kikima pipeline
Department of Water and Sanitation
Completed
Ksh 686,000
Tulimani
Upper Ngwani Water Project
Installation of pump, solarization, rehabilitation of kakima pipeline and pipeline extension to Tulimani primary school.
Department of Water and Sanitation
Completed
Ksh 2,509,811
Tulimani
Sport Development Programme- Tulimani ward
Purchase and delivery of sport items
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 150,000
Tulimani
Youth Empowerment Programme- Tulimani ward
Driving course training for Tulimani Youth
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 810,000
Tulimani
Social Groups Tents And Chairs Tulimani
Purchase of tents and chairs
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 2,450,000
Tulimani
Masyonyeki Earth Dam
Department of Water and Sanitation
Completed
Ksh 4,900,000
Tulimani
Development Of Sustainable Value Chains
Development of sustainable value chains:
avocado, mango, coffee, Provision of certified maize, beans seeds, Capacity
building of the farmers and recruitment of Extension officers
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 1,000,000
Tulimani
Installation of floodlights At Iiani Market,itetani Market,wanzauni Market And Mavindu Market
Installation of 20M high mast floodlight, 400W LED fittings at Iiani market and installation of 15M, 400W LED fittings, 4-arm floodlights at Wanzauni, Mavindu and Itetani markets
Department of Infrastructure, Transport, Public Works, Housing and Energy
9.6km bush clearing, 12km light grading, installation of 72m culverts, 35 gabions and 931.5cm3 cut off mitre drains along Ndiangu-Malaa- Kanoto Ndoo,Kyanguma-Ithemboni-Mukangu- Mavindu road.
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 4,000,000
Tulimani
Kwa Ithitu – Itetani – Kikumbo Road
5km bush clearing, 7kms light grading, construction of 45m by 6m masonry drift and installation of 486cm cut-off mitre drains along kwa Ithitu – Itetani – Kikumbo road
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 3,100,000
Tulimani
Routine Maintenance Of Tulimani Ward Access Roads
Light grading of existing ward roads, 8km Ng'etha-Mavindu-Vyaa-Utumoni Road, 3km Utumoni-Kisyani Road, 4km Kwa Solo-Mulooni-AIC Kyanzuki-Muthwani-Kanoto Road, 6km Leva Market-Kakenge Market, 11km Kwa Mwona-Ivuvuka-Kali-Kithuia-Manzuvi Road, 5.5kmKyanduu-Manzuvi Road, 2.4km Kwa Nzuu-Kwa Nguli-Kwa Mackdonal, 2.2km Ivumbuni-ABC Nthukika Road, 3.4km Kwa Ndolo-Kwa Zakayo Road, 1.2km Itetani mkt-Ikothya Drift, 4.3km Kwa Ndolo-Kyanguswi-Kyamithenge road, 6.5kmKyamithenge-Wambuli-Iiani Road
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,000,000
Tulimani
Extension Of Upper Ngwani Water Project
Extension of upper Ngwani water project Construction of storage tanks, Pumping line to the storage tank, Distribution lines to Malili shopping centre and Uvaani area and Construction of water kiosks along the line. Construction of storage tanks, Pumping line to the storage tank, Distribution lines to Malili shopping centre and Uvaani area andConstruction of 6No.water kiosks (Malili market, Kamwinzi junction, Uvaani Dispensary, kanoto shopping centre, uvaani primary school and uvaani secondary school) along the line.
Department of Water and Sanitation
Completed
Ksh 4,000,000
Tulimani
Tulimani Ward Bursary
Bursary allocation – Application, Vetting, award and distribution
Department of ICT, Education and Internship
Completed
Ksh 5,000,000
Tulimani
Youth Empowerment-licensing Tulimani
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 1,000,000
Tulimani
Wambuli Ecde
Construction of 2no. ECDE Classrooms with an office,3-Door Pit Latrine withUrinal,Electrical Works,Shelving to the stores,2No.lockable metallic cabinets,2No. Wooden Desks,2No. Wooden Arm Chairs, Water harvesting goods (10,,000Ltrs Water Tank and base),40 No. Kiddy chairs and 20. No. Kiddy tables,Play equipment 4 piece set (double swing, slide, climbing frame and double see-saw),Display soft board and Branding, Publicity and Signwritin
Department of ICT, Education and Internship
Completed
Ksh 4,400,000
Tulimani
Ikokani Water Project
Rehabilitation and desilting of the intake, Distribution line to Kalawani market, Kakenge and Tututha areas, Re-design of pumping system to Mulooni andDistribution line to Mulooni and Kanoto areas.Ikokani we have kalawani market , 4no schoolsMatungwa primary school, Matungwa Secondary School, Kiliku primary school, Tututha Secondary school and Tututha Primary school), 4no. water kiosks (kalawani market,kiliku primary,kithuluni market and leva market).
Department of Water and Sanitation
Completed
Ksh 7,000,000
Tulimani
Kyamuata Water Project-distribution Tokyambwika Ecde And Kyamuata Market
1 no standard signbord4km pipeline-HDPE PN12.5 & PN165 No Valve chambers2 No 10,000l tanks 0n platforms and a 3,000 BTP1 No standard kiosk at MaliliI No 2- tap masonry tap stand & Chamber at Kamwinzi junction
Department of Water and Sanitation
Completed
Ksh 3,000,000
Tulimani
Roads Improvement Programme
Road Improvement on selected roads across the ward 8km Ng'etha-Mavindu-Vyaa-Utumoni Road, 3km Utumoni-Kisyani Road, 4km Kwa Solo-Mulooni-AIC Kyanzuki-Muthwani-Kanoto Road, 6km Leva Market-Kakenge Market, 11km Kwa Mwona-Ivuvuka-Kali-Kithuia-Manzuvi Road, 5.5kmKyanduu-Manzuvi Road, 2.4km Kwa Nzuu-Kwa Nguli-Kwa Mackdonal
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 801,540
Tulimani
Support Agricultural Saccos Distribution Of Certified Farm Inputs-seedlings, Fertilizer, Pestcides,farmers Training On Smart Agriculture Rehabilitation Of Tulimani Satelite(electricity Drop And Wiring)
Support
Agricultural Saccos Distribution of certified farm inputs-seedlings,
fertilizer, pestcides,Farmers training on smart agriculture Rehabilitation of
Tulimani satelite(Electricity drop and wiring) -Support Agricultural
Saccos,Distribution of certified farm inputs-seedlings, fertilizer,
pestcides, Farmers training on smart agriculture and Rehabilitation of
Tulimani satelite
Support
Agricultural Saccos Distribution of certified farm inputs-seedlings,
fertilizer, pestcides,Farmers training on smart agriculture Rehabilitation of
Tulimani satelite(Electricity drop and wiring) -Support Agricultural
Saccos,Distribution of certified farm inputs-seedlings, fertilizer,
pestcides, Farmers training on smart agriculture and Rehabilitation of
Tulimani satelite(Electricity drop and wiring)
(Electricity drop and wiring)
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 2,700,000
Tulimani
Ngaa Ecde
2 No. ECDE Classrooms with an office and Store
Electrical Works (conduits only)
Shelves
2 No. Wooden Desks
2 No. Wooden Arm Chairs
Water harvesting goods (5,000Ltrs Water Tank)
Play equipment - 4 piece set (double swing, slide, climbing frame and double see-saw)
Display Pinned board
Branding, Publicity and Signwriting
2 No. Black board retained
4 No. Duster
20 No. Mark pens
2No. Whiteboard
Department of ICT, Education and Internship
Completed
Ksh 3,136,000
Kisau/Kiteta
Kakuswi Ctti Dormitory
Construction of a domitory
Department of ICT, Education and Internship
Completed
Ksh 6,860,000
Kisau/Kiteta
Cottage Industry Support For Kingongi-mivuko Women Group
Purchase of maize crusher for Kingongi mivuko women group
Department of Trade, Marketing, Industry, Culture and Tourism.
Completed
Ksh 700,000
Kisau/Kiteta
Road Improvement Program (fuel For Road Maintanance)
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,000,000
Kisau/Kiteta
Construction Of Ngwani River Drift
Construction of 120m long x 6m wide non vented drift along Kaselyia - kwa Kulomba road
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 8,106,722
Kisau/Kiteta
Road Improvement Program
Masonry Drift Riding Slab 70m by 5m Cut off drains for road run off harvesting Mechanical Road Widening- 10kms
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 4,410,000
Kisau/Kiteta
Iviani, Kivani And Kiteta Playgrounds
Levelling of the play ground
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 1,900,000
Kisau/Kiteta
Lungu Borehole
Drilling of borehole and test pumping
Department of Water and Sanitation
Completed
Ksh 2,374,220
Kisau/Kiteta
Kithongo Borehole
Drilling of borehole and test pumping
Department of Water and Sanitation
Completed
Ksh 2,374,221
Kisau/Kiteta
Songeni Ecde
2 No. ECDE Classrooms with an office and Store
Electrical Works (conduits only)
Shelves
2 No. Wooden Desks
2 No. Wooden Arm Chairs
Water harvesting goods (5,000Ltrs Water Tank)
Play equipment - 4 piece set (double swing, slide, climbing frame and double see-saw)
Display Pinned board
Branding, Publicity and Signwriting
2 No. Black board retained
4 No. Duster
20 No. Mark pens
2 No. Whiteboard
Department of ICT, Education and Internship
Completed
Ksh 3,136,000
Kisau/Kiteta
Kimandi Borehole
Construction of 2No. Water kiosks, installation of 2No. 10cm cubic metres plastic storage tanks, water distribution pipeline to kyambusya and rehabilitation of rising main.
Department of Water and Sanitation
Completed
Ksh 3,710,279
Kisau/Kiteta
Songeni Water Project
Drilling of borehole, equipping and solarizing, construction of 0.6 km rising main to Itulu water kiosk
Department of Water and Sanitation
Completed
Ksh 4,900,000
Kisau/Kiteta
Kwa Matinga Water Project
Drilling of borehole, equipping and solarizing, construction of 1.0km rising main to kwa Matinga storage tank, rehabilitation of 3.4km distribution pipeline ,construction of 1No. water kiosk and installation 2No.5 cubic metres plastic storage tank
Department of Water and Sanitation
Completed
Ksh 4,794,228
Kisau/Kiteta
Routine maintenance of Kisau/Kiteta ward access roads
Bush clearing, Grading, Road Water harvesting structures along - AIC Tawa Church Road-Ngwani
Drift Road 2.5km- Mbumbuni-Iviani-Kithongo-Mukimwani-Katung'uli-Thwake
Road 8km- Mbumbuni-Kalimani Road 5km- Kalimani-Kalingile Road 6.5km- Kwa Nganda-Kaunda-Kyambusya
Road 2.4km- Kyambusya-Kitandini Road 6.8km
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 5,000,000
Kisau/Kiteta
Opening Kwa Kisingu - Kyome -Kwa Makenzi Kithetheni kwa Ndisya road
12kms mechanical road opening, 12km heavy grading and 858.6m cut-off mitre drains
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 5,000,000
Kisau/Kiteta
Installation Of Floodlights At Mbiiani ,nthungoni,katungoli, Kwa Kulomba And Kavutini Markets
Installation of 15M grid connected 4-arm floodlights at Mbiiani ,Nthungoni,Katungoli, Kwa Kulomba and Kavutini MarketsRehabilitation of existing market lights at Kwa Ndunda, Utuneni and Namba Nyanya markets
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 3,000,000
Kisau/Kiteta
Ndumanu Earth Dam
4170m3 reservoir desilting1000m3 embankment making goodGabion works at the spillway
Department of Water and Sanitation
Completed
Ksh 3,000,000
Kisau/Kiteta
Mulasya Ecde
2No. ECDE Classrooms with an office and Store
Electrical Works (conduits only)
Shelves
2No. Wooden Desks
2No. Wooden Arm Chairs
Water harvesting goods (5,000Ltrs Water Tank)
Play equipment - 4 piece set (double swing, slide, climbing frame and double see-saw)
Display Pinned board
Branding, Publicity and Signwriting
2 No. Black board retained
4 No. Duster
20 No. Mark pens
2 No, Whiteboard
Department of ICT, Education and Internship
Completed
Ksh 3,136,000
Kisau/Kiteta
Kithongo Borehole
Borehole equippingConstruction of a water kiosk at sourceInstallation of 1No 10,000ltank at sourceFencing of borehole siteInstallation of a 200m PN16 pipeline
Department of Water and Sanitation
Completed
Ksh 2,500,000
Kisau/Kiteta
Lungu Borehole
Equipping, solarisation and a water point kiosk
Department of Water and Sanitation
Completed
Ksh 1,500,000
Kisau/Kiteta
Kyooni Ecde
Construction of two classroom
Department of ICT, Education and Internship
Completed
Ksh 3,200,000
Kisau/Kiteta
Muluti Ecde
Construction of two classrooms
Department of ICT, Education and Internship
Completed
Ksh 3,200,000
Kisau/Kiteta
Kisau/kiteta Ward Bursary
Bursary allocation – Application, Vetting, award and distribution
Department of ICT, Education and Internship
Completed
Ksh 3,950,000
Kisau/Kiteta
Support To Groups(tents And Chairs)- Kisau Kiteta ward
Support to groups(Tents and chairs)
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 3,000,000
Kisau/Kiteta
Kiteta Playground Kisau/kiteta
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 2,100,000
Kisau/Kiteta
Sports And Youth Development Programme -kisau/kiteta
Facilitation for ligi mashinani , purchase and delivery of sport items
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 300,000
Kisau/Kiteta
Syumbe Borehole
Hydrological surveyDrilling and testpumping
Department of Water and Sanitation
Completed
Ksh 2,500,000
Kisau/Kiteta
Requisition For Water Improvement Program-kiamani And Kyome Markets
Water connection to Kyome and Kiamani markets and supply of petrol pumps to 3 community groups
Department of Water and Sanitation
Completed
Ksh 807,629
Kisau/Kiteta
Road Improvement Programme
Mechanical Road widening and heavy grading of 9Kms on selected roads ie Ikundu- Kwa male - kwa Maingi Thwake road, Malili -Kuku-Thwake road, Kwa Chief Ndiku- Mwaani- Kingathuni road, Malatani - Miseleni -kwa kianga road, Nguumo- MBA road.Non vented masonry drift-25m by 5m and 35m by 5m and installation of culverts 16m by 600mm DIA along Matalani - Miseleleni - Kwa Kianga road.
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 7,180,720
Kako/Waia
Kyang'ondu Stock Yard
Kyang'ondu stock yard
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 3,000,000
Kako/Waia
Construction Of Kako - Kandulyu (savani) Drift
FY2023/24 allocation was pending bill
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 4,210,612
Kako/Waia
Grain And Pulse Value Chain Development
Provision of certified maize and beans seeds to farmers
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 1,000,000
Kako/Waia
Boda Boda Shed - Kako/waia
Construction of a bodaboda shed
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 300,000
Kako/Waia
Waia Earth Dam
Construction of 3No. Water Koisks and installation of 4No. 10Cubic metres plastic storage tanks. Water distribution extension from kavingo market to kyamangatu, kwa masai to Ilela market and Kwa masai to kwa mutava. Construction of 1No. Cattle trough at kwa Ilela market.
Department of Water and Sanitation
Completed
Ksh 5,880,000
Kako/Waia
Nyaanyaa Earthdam Phase 2
Construction of 1.3km rising main, construction of 1No. Water kiosk and installation of 1No. 10Cubic metres plastic storage tank.
Department of Water and Sanitation
Completed
Ksh 1,568,000
Kako/Waia
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
Project Awarded more funds in FY2024/25 and redesigned. Current it's at procurement level.
Has additional funds in 2024/25.
To be implemented in FY 2024/25
Construction works stopped for re-designing and addition of funds.
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
For in house works 2 Trips Rockfilling along Nthangu –Watuka and 0.9km Road opening along Kwa Kamuya – Kaiti were done