Water Extension Line From Kyau Kwa Munanga To Kwa Kitili
Supply of pipes and fittings to Kyau BH Water Project
Department of Water and Sanitation
Completed
Ksh 102,052
Ukia
Construction Of Sump Tank And Piping Of Mbaani Water Project
Construction of chambers to abstract raw water• Laying and anchoring of HDPE pipe Re-route a section of pipeline (500m) at the source • Re-route a section of pipeline (800m) at Kwa sive and nyanzi • Repair works on Kyuasini line • Installation of air release valves and wash-outs on the intake gravity line
Department of Water and Sanitation
Completed
Ksh 305,355
Ukia
Kaumoni Earth Dam- Expansion Of Shallow Well And Water Treatmen
Drilling and development of Kaumoni Earth Dam Borehole
Department of Water and Sanitation
Completed
Ksh 602,200
Ukia
Itenge Water Project- Water Distribution
Construction of 100Cu.M sump tank
Department of Water and Sanitation
Completed
Ksh 1,960,000
Ukia
Kyeng'eethe Water Project- Extension And Distribution And Solar Installation
Extension of Utaati Rising Main, Utaati Junction Communal Water Point
Department of Water and Sanitation
Completed
Ksh 114,371
Ukia
Water Boreholes Maintenance
Upgrading of Solar Pumping System - Ithanzeni BH Project
Department of Water and Sanitation
Completed
Ksh 980,000
Ukia
Ithanzeni Bore Hole: Upgrading Of Solar Pump System
Upgrading of Solar Pumping System - Ithanzeni BH Project
Department of Water and Sanitation
Completed
Ksh 1,960,000
Ukia
Kilala Bh Water Project
Extension of Mbalani Pipeline, Extension of Kilala Project line to Kyumu, Kyumu Water Kiosk, Mbalani Water Kiosk
Department of Water and Sanitation
Completed
Ksh 1,470,000
Ukia
Kaiti Miting'ani Sand Dam : Construction Of Sump, Increase Sand Dam Height By 1.5m And Construction Of Raised Main Ms Panel Tank At Yiumo Kwa Mukosi
Raising of sand dam wall, construction of 100Cu.M Sump Tank, Construction of Yiumo Elevated 50Cu.M steel tank
Department of Water and Sanitation
Completed
Ksh 7,840,000
Ukia
Kyuasini Health Centre
Construction of staff house
Department of Health Services
Completed
Ksh 400,113
Ukia
Upgrading Of Kilala Dispensary; Staff House
Construction of a new OPD block
Department of Health Services
Completed
Ksh 3,194,400
Ukia
Chairs - Ukia Ward
Purchase of 270 chairs
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 266,900
Ukia
Social Protection Ukia
Purchase of beds and beddings
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 233,100
Ukia
Kwa Kamoli (utaati) Talent Centre
Levelling of the field
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 737,350
Ukia
Development Of Farm Ponds- Fuel
Funds used purchase fuel and repair of backhoe for farm ponds excavation. Targetting 60 farmponds per households( the project provides fuel and the farmer pays ksh3500 per hour on dry rate ) the activities is implemented during dry spell.
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 1,412,400
Ukia
Ukia Ward Bursary
Bursaries-bursary allocation- Application, Vetting, award and distribution
Department of ICT, Education and Internship
Completed
Ksh 4,000,000
Ukia
Kisyungii Ecde
Construction of one class, toilet, an office,10,000L water tank and renovation of the existing class.
Department of ICT, Education and Internship
Completed
Ksh 3,300,000
Ukia
Construction Of Concrete Slab 40m Long Along Makuli Forest Road At Kwa Mbunga
Construction of 40M drift, 8m long culvert and150m catchwater drain
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,800,000
Ukia
Construction of road structures across Ukia sub ward
Construction of road structures
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,500,000
Ukia
Road Improvement Programme Through Installation Of Road Structures Across Kilala/iuani
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,500,000
Ukia
Construction Of Concrete Slab 30m Long Along Kavani Kituluku Dispensary Road
Construction of 30M drift and 150cm catchwater drain
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,500,000
Ukia
Installation Of 2-15 M Concrete Pole Market Lights At Ikalyoni Market And Kyau Market
Installation of 15 m concrete pole, 4No. lanterns C/W all accessories and 400W LED Fittings Market lights at Ikalyoni market and Kyau market
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,400,000
Ukia
Drilling And Equipping Borehole In Ukia Girls Secondary School
Borehole test pumping for 24 hours continuouslyWater quality analysis
Department of Water and Sanitation
Completed
Ksh 5,000,000
Ukia
Itenge Water Project
-Installation of 3KM 3” diameter Itenge rising main. Submersible pump, control panel, solarization,2.5Km Makongo, Kyambalasi, Kilolo rising main 2Km Nzouni rising main
Department of Water and Sanitation
Completed
Ksh 5,000,000
Ukia
Ithanze Water Project
2.5Km water distribution pipeline while connecting existing Ithanze Water kiosk
Department of Water and Sanitation
Completed
Ksh 3,000,000
Ukia
Kwa Kamoli Talent Center Ukia
Kwa Kamoli talent center-Construction of a modern talent center and equipping
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 1,500,000
Ukia
Sports And Youth Development Programme Ukia
Facilitation to ligi mashinani, ward league games.
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 300,000
Ukia
Pwd Support-assistive Devises Ukia
PWD support-assistive Devises-support PWDs with assorted assistive devices
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 500,000
Ukia
Supply Of 500 Chairs To Organized Groups - Ukia ward
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 500,000
Ukia
Nzouni Dispensary-construction Of Staff Quarters, Placenta Pit, Ash Pit, Electrification And Fencing
construction Of Staff Quarters, Placenta Pit, Ash Pit, Electrification And Fencing
Department of Health Services
Completed
Ksh 4,500,000
Ukia
Grading And Murraming Of Road Across Kilala/iuani - Fuel
Road grading and murraming on selected roads within the ward
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,500,000
Ukia
Grading And Spot Murraming Of Road Across Ukia Sub Ward
Grading and spot Murraming along 1) Kyamunyaliti
to Kyamuthei – 3.5Kms, 2) Kyamuthei
to Kyuasini - 6.7kms, 3) Kyamuthei
to Kiniu -5.9 kms, 4) Limuni
to Isuuni – 2.5 kms, 5) Signature
to Isuuni- 2.5 kms, 6) Mukuyuni
to Isuuni 3 kms, 7) Kivutini
to Ivumbuni- 5.9 kms, 8) Itangini
to Ndumbi -11 kms
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,500,000
Ukia
Drilling Of Mukuyuni Sub County Hospital Borehole
Drilling
of Mukuyuni Sub County Hospital Borehole
Department of Water and Sanitation
Completed
Ksh 2,000,000
Ukia
Kaiti-Miting'ani water project
Solar Pumping System – solar tower-
solar panels, Rising Main from sump to Yiumo, Construction of Yiumo - Kaseveni
Gravity Line, Kwa Muumbika Pipeline extension, Construction of Yiumo-Kwa
Nyamai-Ukia Junction - Mitingani – Kwa Musuvali Pipeline, 3 No. communal water points –Iviani,
Kwa Mumbika and Kwa Musuvali, Standard Water Kiosk 3m x2.5m (3 No
- Miting'ani, kwa Nyamai and Kaseveni), Establishment of 2 Demo sites with
drip kits – Mitingani & Kaseveni, supply of 600 assorted agroforestry
tree seedling, Riparian conservation (Supply and
planting of 200 assorted riparian tree species) Supply and delivery of 50 vertical
sacks and 50 conical gardens, Capacity building on climate smart agriculture
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 11,000,000
Ukia
Makindu Fire Station
Fencing of fire station
Department of Devolution, Public Service, Public Participation and Special Programs
Completed
Ksh 300,000
Makindu
Centralized Small-scale Farming
supply of 6.048MT green grams seeds distributed to 3,024 beneficiaries
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 2,500,000
Makindu
Kiboko Town Planning
Kiboko Town Planning
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 3,320,000
Makindu
Town Planning of Thithi/simba Market
Town Planning Of Thithi/simba Market
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 1,000,000
Makindu
Roads Improvement Programme
Roads improvement programme within the ward using county machines Grading of Kwa kethi-kwa kisambi –kwa ngala-rombo- Makindu stock yard-kwa selu-mulili-wote road- Masalani-kalindiloni-nduluni- Kwa kijana-kwa kamanda-syusyani-kisingo-kai road- Shine star-kwa esther-kwa malungu-back to abc kai- Kwa karanja-kwa malembwa-kwa agnes-kyanda kikauni
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 490,000
Makindu
Streetlighting Kiambani Primary,secondary Schools And Makindu Town
Installation of single arm metallic pole 8.5m high , fixing of 150W integrated solar streetlights fittings
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 3,430,000
Makindu
Installation Of Flood Light Masts At Makindu Upper Market
Installation of starter bars, Installation of polygon 20m high pole, fixing of 9no. 400W fittings , Installation of manual/automatic pulleys and winches, kplc metering of the mast.
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 2,940,000
Makindu
Machine Hire-grading Of Kwa Kasoli-kwa Nthoka Wote Road,kandengya-ndalani-junction (kisingo-ngomano Road),miangeni-kamboo Market-kamboo Health Center-kamboo Secondary-kamboo Rpimary School,ngomano-kamboo Market -kikauni,kalii Secondary Kawala Market
Bush Clearing
Road opening and grading of 24km
installation of gabions, culverts and cut off mitre drains for road run-off harvesting
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 4,900,000
Makindu
Electrification And Fencing Of Kai Dispensary
fencing and electricity connection to the facility
Department of Health Services
Completed
Ksh 2,999,266
Makindu
Preparation Of Kisip Designs For County Informal Settlement Improved Plan
Infrastructural designs for informal settlement in Emali, Kibwezi and Makindu towns
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 420,000
Makindu
Rehabilitation Of Kiboko Underpass-mbiuni-muuni River-ngakaa-kyanda-kawala Market Kalii Pri -kavatini Market- Yimwaa Market-masalani Market- Wote-makindu Road
Rehabilitation of 43km along Kiboko underpass-Mbiuni-Muuni river-Ngakaa-Kyanda-Kawala Market Kalii Pri -Kavatini Market- Yimwaa Market-Masalani Market- Wote-Makindu road through- Road opening,- 43.5km road grading,- 1.0km spot gravelling, - Culvert installation of( 900mm-2lines, 600mm-5lines) - Cut off mitre drains for rain water harvesting
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 9,800,000
Makindu
Youth Empowerment ; Ajira Kwa Vijana, Ujuzi Teketeke- Makindu
Purchase of Tools of trade and training of the youths
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 500,000
Makindu
Makindu Town Water Project – Grant To Kimawasco To Boost Water Supply In Makindu (a Borehole)
i. Equipping the borehole with pump and accessoriesii. Construction of a power houseiii. Connection to the existing line to Makindu town
Department of Water and Sanitation
Completed
Ksh 142,000
Makindu
Makindu-kiu Catchment Borehole
Drilling and developing the borehole and capping
Department of Water and Sanitation
Completed
Ksh 1,500,000
Makindu
Mulilii Earth Dam
i. Embankment shapingii. Desilting iii. Spillway protection
Department of Water and Sanitation
Completed
Ksh 2,940,000
Makindu
Excavation Of Syengoni Earth Damdam
Excavation
of the dam using county machinery
Department of Water and Sanitation
Completed
Ksh 3,000,000
Makindu
Routine maintenance of MAkindu ward access roads
Hire of Shovel 51 hours,27.3km grading along 5.6km Stockyard to Mulili, 2.6km Kwa Kimongo - simba, 3.2km Skygo - St.Matthew - Kiambani road, 1.2km Airstrip to kwa Kimuyu Church road, 7.5kmNthia - malivini - Mbiuni road,7.2km Kwa Kijana - Syusyani - Yiiani road.
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 3,500,000
Makindu
Development Of Makueni Ask Show
Development
of Makueni ASK Show - Fencing and borehole rehabiltation and
establishment of a demo and clearing
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 4,663,000
Makindu
Makueni Integrated Grain Value Addition Plant
Makueni Integrated Grain Value Addition
Plant - Servicing of machinery,
purchase and procesing of pulses and procurement of packaging material.
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 4,000,000
Makindu
Kanaani Water Project
Installation of project signboardSupply and installation of a surface pump and accessoriesCivil works for minor pump house repairs
Department of Water and Sanitation
Completed
Ksh 2,000,000
Makindu
Makindu Ward Bursary
Bursary allocation -Application, vetting, award and distribution
Department of ICT, Education and Internship
Completed
Ksh 7,000,000
Makindu
Sports And Youth Development Program-youth, Talent And Infrastructure Development For Athletics, Ballgames, Indoor Games, Establishment Of Sport Fund And Development Of Sports Development Proposals-makindu
Support to ligi mashinani ward league games
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 100,000
Makindu
Installation Of Fence And Chain Link At Kiboko Dispensary.
CHAIN LINK FENCINGMETALIC GATE
Department of Health Services
Completed
Ksh 1,500,000
Makindu
Hospital Bills And Implants
Department of Health Services
Completed
Ksh 2,000,000
Makindu
Syengoni Borehole- Testpumbing
Rehabilitation of pumping set and plumbing works , installation of electrical works
Department of Water and Sanitation
Completed
Ksh 3,000,000
Makindu
Kwa Mbuli Borehole Water Project
Installation of a project signboardSupply of and installation of a surface pump and accessoriesCivil works for communal water point infrastructure
Department of Water and Sanitation
Completed
Ksh 500,000
Makindu
Roads Improvement Programme(fuel) Makindu ward
Road grading and murraming on selected roads within the ward
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 500,000
Makindu
Kisayani-kathyaka-mukononi-ngaikini Road
Heavy grading and Murraming and Construction of adequate road structures along Kisayani-Kathyaka-Mukononi-Ngaikini road
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 4,410,000
Kikumbulyu North
Medical Bills And Surgical Implants
payment of medical bills and procurement of surigcal implants
Department of Health Services
Completed
Ksh 42,610
Kikumbulyu North
Road Improvement Programme
Road opening on selected roads Parton-Kwa Kyeva-Kwa Ndolo road, Kwa Mwandia-Kwa Kwa Wembe road, St. Teresa-Kwa Kituu-Kwa Pasco road, Ndetani Poly, Nyaani road
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 2,450,000
Kikumbulyu North
Kyaani Ecde
2No. ECDE Classrooms with an office and Store
3-Door Pit Latrine with Urinal
Electrical Works (conduits only)
Water harvesting goods (5,000Ltrs Water Tank and base)
Display Pinned board
Branding, Publicity and Signwriting
2No. Black Board
Department of ICT, Education and Internship
Completed
Ksh 3,430,000
Kikumbulyu North
Katilamuni Ecde
2No. ECDE Classrooms with an office and Store
3-Door Pit Latrine with Urinal
Electrical Works (conduits only)
Water harvesting goods (5,000Ltrs Water Tank and base)
Display Pinned board
Branding, Publicity and Signwriting
2No. Black Board
Department of ICT, Education and Internship
Completed
Ksh 3,430,000
Kikumbulyu North
Mukononi Ecde
2No. ECDE Classrooms with an office and Store
3-Door Pit Latrine with Urinal
Electrical Works (conduits only)
Water harvesting goods (5,000Ltrs Water Tank and base)
Display Pinned board
Branding, Publicity and Signwriting
2No. Black Board
Department of ICT, Education and Internship
Completed
Ksh 3,430,000
Kikumbulyu North
Installation Of Kisayani Flood Light/ Mast
Installation of starter bars, Installation of polygon 20m high pole, fixing of 6no. 400W fittings , Installation of manual/automatic pulleys and winches, kplc metering of the mast.
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 2,058,000
Kikumbulyu North
Street Lighting For Main Stage To Kisayani Health Centre
Installation of 10meters high concrete pole ,stringing of conductors 10mm,fixing of 1.5m long streetlighting arm, Installation of 120W light
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 980,000
Kikumbulyu North
Tents And Chairs- Kikumbulyu North
Purchase of tents and Plastic Chairs
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 2,000,000
Kikumbulyu North
Youth empowerment and Sports Development Kikumbulyu North
Purchase of sport items
Department of Gender, Children, Youth, Sports and Social Services
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,493,400
Kikumbulyu North
Purchase Of Water Tanks For Women Groups - Kikumbulyu North
Purchase and supply of water tanks for Kikumbulyu North
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 500,000
Kikumbulyu North
Pipeline Extension To Kiaoni Market (kibmawasco)
i. 1.3km DN50 pipeline extensionii. Installation of1No. 10m3 plastic water tanks on 1m high masonry platforms iii. Construction of 1No communal water points
Department of Water and Sanitation
Completed
Ksh 1,000,000
Kikumbulyu North
Service Line Rehabilitation Milu-kimawasco
i. 0.54km pipeline rehabilitationii. Construction of 1No communal water points
Department of Water and Sanitation
Completed
Ksh 355,100
Kikumbulyu North
Improvement Of Water In Kikumbulyu North Ward By Kibmawasco-kasayani Market To Cutline, Kwa Kakumi To Kwa Rose Muambani, Kasayani Market To Kwa Presillah Mutinda , Ndetani Ccti To Aic Kalinga To Kwa Kitheka, Kathyaka Market To Kilisa To King’uutheni And Nyayo Market To Soko Muyo
. Rehabilitation of Kathyaka – Nyayo water pipeline extension 1.32kmii. Cutline Makaani pipeline extension 4km
Department of Water and Sanitation
Completed
Ksh 4,300,000
Kikumbulyu North
Construction Of Kathyaka Masonry Tank/ Under Kibmawasco
. Rehabilitation of Kathyaka – Nyayo water pipeline extension 1.32kmii. Cutline Makaani pipeline extension 4km
Department of Water and Sanitation
Completed
Ksh 4,410,000
Kikumbulyu North
Construction Of Sump Tank Reservoir, Water Treatment And Distribution To 10 Clusters From Athi River Water
Department of Water and Sanitation
Completed
Ksh 1,410,250
Kikumbulyu North
Construction Of Muangeni Drift
2.7kms heavy Bush clearing, 2.7kms heavy grading, 1km Gravelling
,installation of 16m (600mm dia.) Culverts,construction of 20No.
Gabions, 40m x6m RC non-vented drift slab, 30mx6m wide ridding surface,
and 695cm of Catch water drains
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 2,000,000
Kikumbulyu North
Road Improvement Programme in Kikumbulyu North
20kms road widening, 41kms grading and 1545cm excavation of catch water drains.(Opening and grading of Kisayani Kyandululu-Kiwanzani road-5.9km, Kyaani Ngaikini road-6.3Km, Kisayani jn-Ithumula-Katilamuni road-8.2km, Mikauni-Manga4-Malebwa road- 6.0km, Athi - Kwa Ngomba-Ngaikini road-12.8km and Mukononi-Nguumo road 2,2km)
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 7,000,000
Kikumbulyu North
Construction Of Muangeni Drift
2.7kms heavy Bush clearing, 2.7kms heavy grading, 1km Gravelling ,installation of 16m (600mm dia.) Culverts,construction of 20No Gabions, 40m x6m RC non-vented drift slab, 30mx6m wide ridding surface, and 695cm of Catch water drains
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 5,000,000
Kikumbulyu North
Kiaoni Floodlights
Installation of 20M high mast floodlight with 6No. 400W LED fittings
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 2,000,000
Kikumbulyu North
Kisayani Street Light
Installation of 12 No. 10M single arm grid connected streetlights
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 2,000,000
Kikumbulyu North
Kathyaka Floodlights
Installation of 20M high mast floodlight with 6No. 400W LED fittings
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 2,000,000
Kikumbulyu North
Silanga Borehole
Silanga
borehole - desalination and chlorination, Connection to KIBMAWASCO
Department of Water and Sanitation
Completed
Ksh 2,000,000
Kikumbulyu North
Kilisa Water Tank Reseivoir.reseivoir.
Installation of 3.5km distribution pipelineconstruction of 150m3 masonry tankRehabilitation of 2No watering points with5m3 water tanks
Department of Water and Sanitation
Completed
Ksh 2,000,000
Kikumbulyu North
Ithumula Ecde
Construction of 2no. ECDE Classrooms with an office,3-Door Pit Latrine with Urinal,Electrical Works,Shelving to the stores, 2No.lockable metallic cabinets,2No. Wooden Desks,2No. Wooden Arm Chairs,Water harvesting goods (10,,000Ltrs Water Tank and base),40 No. Kiddy chairs and 20. No. Kiddy tables,Play equipment 4 piece set (double swing, slide, climbing frame and double see-saw),Display soft board and Branding, Publicity and Signwriting
Department of ICT, Education and Internship
Completed
Ksh 4,300,000
Kikumbulyu North
Sports And Youth Development Programme -youth, Talent And Infrastructure Development For Athletics, Ballgames, Indoor Games, Establishment Of Sport Fund And Development Of Sports Development Proposals-kikumbulyu North
Support to league mashinani ward league games
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 300,000
Kikumbulyu North
Health Implants -kikumbulyu North
Department of Health Services
Completed
Ksh 1,335,460
Kikumbulyu North
Kikumbulyu North Ward Bursary
Application, Vetting, awarding and distribution of cheques
Department of ICT, Education and Internship
Completed
Ksh 5,000,000
Kikumbulyu North
Kwa Kyai Ecde
2No. ECDE Classrooms with an office and Store
3-Door Pit Latrine with Urinal
Electrical Works (conduits only)
Water harvesting goods (5,000Ltrs Water Tank and base)
Display Pinned board
Branding, Publicity and Signwriting
2No. Black Board
Department of ICT, Education and Internship
Completed
Ksh 3,430,000
Kikumbulyu South
Construction Of Pwd Empowered Structures At Kalulini Health Centre
Construction of PWD friendly toilet, walkways and ramp
Department of Health Services
Completed
Ksh 980,000
Kikumbulyu South
Construction Of Gabions Along Mbeetwani Road
Bush clearing
Grading
Spot gravelling
Culverts
Signborad
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 1,000,000
Kikumbulyu South
Goat Rearing Programme - Distribution Of Galla Goats
Goat rearing programme - Distribution of galla goats
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 172,150
Kikumbulyu South
Goat Value Chain Development
supplyof the Galla goats. Estimated number of beneficiaries 166 house hold.
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 2,000,000
Kikumbulyu South
Kibwezi Town Roads Improvement
Road opening,
2.65km spot gravelling,
2.8km of road grading
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 4,410,000
Kikumbulyu South
Fuel For County Machinery
Inhouse works, road grading of county roads- Grading and spot improvement of Marikiti open Air market and access roads - 42-Ithambaume-kalungu-road- Barrier Kyanginywa road- Matinga-Kwa Kilai road-Kalungu Mkt-Nthunguni- Kalungu Sec-Kwa Chief office-Kawala-Kwa Kimote- Kwa Chief kalungu office- Siembeni shopping Center
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,414,720
Kikumbulyu South
Miradi Kwa Jamii(mkj)
MKJ programme - bush clearing,light grading and cut off mitre drains excavation of catch water drains along- Ilingoni-Kalungu Siembeni road- Kalungu – Nthunguni-Kilifi-42- Katulani-Mitundu-Nyeki Nduni
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 500,000
Kikumbulyu South
Opening Of And Ugrading Of Kwa Power, Kwa Solomon, Kasarani, Mikuyuni Secondary, Kyanzili Kavete Wayani Road
opening of and ugrading of Kwa power, Kwa Solomon, Kasarani, Mikuyuni Secondary, Kyanzili Kavete Wayani Road-Road opening, -8.5km grading, -2km spot gravelling,-Installation of culverts(900mm-1line, 600mm-4lines) - Cut off mitre drains for road run-off harvesting
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 5,900,000
Kikumbulyu South
Kibwezi Town Lighting Programme ( Matundani Floodlight, Kibwezi Streetlighting)
Installation of starter bars, Installation of polygon 20m high pole, fixing of 6no. 400W fittings , Installation of manual/automatic pulleys and winches, kplc metering of the mast.
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 3,822,000
Kikumbulyu South
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
Project Awarded more funds in FY2024/25 and redesigned. Current it's at procurement level.
Has additional funds in 2024/25.
To be implemented in FY 2024/25
Construction works stopped for re-designing and addition of funds.
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
For in house works 2 Trips Rockfilling along Nthangu –Watuka and 0.9km Road opening along Kwa Kamuya – Kaiti were done