All Financial Years Projects
Go BackProject | Scope | Department | Status | Budget | Ward | Action | |
---|---|---|---|---|---|---|---|
Ngiitini Borehole Solarization And Distribution | Ngiitini borehole Solarization and distribution - Solarization, elevated storage tank and distribution of the water to Kivani clusters (Ngiitini, Kyuluni and Kyangungi villages) each village served by a water kiosk |
Department of Water and Sanitation | Ongoing | Ksh 4,000,000 | Kee |
|
|
Kwa Kikungu Earth Dam Desilting And Kikonde Earthdam Spillway | Kwa kikungu Earth dam desilting and Kikonde Earthdam spillway |
Department of Water and Sanitation | Ongoing | Ksh 3,429,848 | Kee |
|
|
Construction Of Drainage Structures At Kitandi-muusini-kakisya-munyuni-nguluni Road | Construction of drainage structures along Kitandi-Muusini-Kakisya-Munyuni-Nguluni Road | Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 1,000,000 | Kee |
|
|
Mutungu Ecde |
|
Department of ICT, Education and Internship | Ongoing | Ksh 2,940,000 | Kilungu |
|
|
Kithembe Sub-ward Dispensaries: Fencing, Solar Energy At Nyaani Dispensary, Health Facilities Upgrading | Fencing, solar installation at Nyaani dispensary |
Department of Health Services | Ongoing | Ksh 1,960,000 | Kilungu |
|
|
Kyanganda Dispensary – Fencing, Solarization And Water Connectivity | Fencing and renovations of OPD block |
Department of Health Services | Ongoing | Ksh 1,884,003 | Kilungu |
|
|
Water Supply To Nunguni-phase 1 | Feasibility studies and design of Nunguni Water Supply Project (Consultancy) |
Department of Water and Sanitation | Ongoing | Ksh 2,287,965 | Kilungu |
|
|
Muthethe Ecde | Construction of two classrooms with an office, 3-door pit latrine with urinal, electrical works, shelving to the stores, 2 lockable metallic cabinets, 2 wooden desks, 2 wooden arm chairs, water hervesting goods ( 10,000 ltrs water tank and base), 40 kiddy chairs and 20 kiddy tables, play equipment 4 piece set (double swing, slide, climbing frame, and double see-saw) display soft board and branding, publicity and signwriting |
Department of ICT, Education and Internship | Ongoing | Ksh 3,500,000 | Kilungu |
|
|
Kilungu Ward Bursary | Allocation of bursaries – application, Vetting, award, and distribution – (each applicant to receive kshs. 2,000) |
Department of ICT, Education and Internship | Ongoing | Ksh 5,000,000 | Kilungu |
|
|
Road Improvement Programme along Kitituni -Nyaani road | 0.5kms Spot Gravelling,installation of 8m culvert, 50 No. Gabions and 200cm catch water drains |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 1,500,000 | Kilungu |
|
|
Road Improvement Programme Along Kilungu – Kimandeni Road | Road improvement programme through 1.5kms road grading- 0.5Kms, Spot Gravelling , Gabions - 25No., catch water drains - 150cm along Kilungu – Kimandeni Road |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 1,500,000 | Kilungu |
|
|
Routine Maintenance Of Kilungu Access Roads(fuel) | 21.30kms Bush
clearing, Grading, Road Water harvesting structures along |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 1,000,000 | Kilungu |
|
|
Ndiani Water Project | 2km raising main, (utumo umu area supply), 100cu.m masonry tank, 2km distribution line, 2No. water kiosks with tanks. |
Department of Water and Sanitation | Ongoing | Ksh 2,000,000 | Kilungu |
|
|
Rehabilitation Of Kwa Sikauti- Kisyulya Road In Kilungu Ward | 2.5Kms heavy grading, 1km road graveling, installation of drainage structures such as 600mm dia 22m culvert, 40 gabions and keywalls |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 3,904,677 | Kilungu |
|
|
Extension Of Kwa Mwilu Sand Dam Water Project – 3km Return Lines, 2no. 1.5km Katikomu Village Distribution Line And Kyangunzu-nzeveni Dl 2km 5tanks. | Desilting of Sump and Operationalization of the Pumping System |
Department of Water and Sanitation | Ongoing | Ksh 6,370,000 | Ilima |
|
|
Hire Of Excavator For Unblocking Of Kangeeni -kyanga Road | Hired wheel loaders to breaking of rock and clearing of boulders for 22days |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 632,200 | Ilima |
|
|
Ilima Ward Bursary | Bursary allocation, application, vetting, award and distribution |
Department of ICT, Education and Internship | Ongoing | Ksh 5,000,000 | Ilima |
|
|
Inyokoni Ecde | Construction of two class rooms with office and store, water harvesting (10,000 ltrs water tank) |
Department of ICT, Education and Internship | Ongoing | Ksh 3,500,000 | Ilima |
|
|
Kiluluini Ecde | Construction of two class rooms with office and store, water harvesting (10,000 ltrs water tank) | Department of ICT, Education and Internship | Ongoing | Ksh 3,500,000 | Ilima |
|
|
Kathangathini Ecde | Construction of one class room with office and store, Installation of water harvesting goods(10,000 ltrs water tank) |
Department of ICT, Education and Internship | Ongoing | Ksh 2,500,000 | Ilima |
|
|
Kiusyi Water Project | Department of Water and Sanitation | Ongoing | Ksh 5,000,000 | Ilima |
|
||
Kiusyi Wear Rehabilitation | Kiusyi wear rehabilitation |
Department of Water and Sanitation | Ongoing | Ksh 1,475,624 | Ilima |
|
|
Riverine conservation and restoration |
|
Department of Lands, Urban Planning and Development, Environment and Climate Change | Ongoing | Ksh 99,720 | Ukia |
|
|
Mumbuni Ecde |
|
Department of ICT, Education and Internship | Ongoing | Ksh 1,470,000 | Ukia |
|
|
Ukaatuni Ctti | Equipping |
Department of ICT, Education and Internship | Ongoing | Ksh 1,751,882 | Ukia |
|
|
Water Boreholes Maintenance | Upgrading of Solar Pumping System - Ithanzeni BH Project |
Department of Water and Sanitation | Ongoing | Ksh 980,000 | Ukia |
|
|
Chairs - Ukia Ward | Purchase of 270 chairs |
Department of Gender, Children, Youth, Sports and Social Services | Ongoing | Ksh 266,900 | Ukia |
|
|
Kwa Kamoli (utaati) Talent Centre | Levelling of the field |
Department of Gender, Children, Youth, Sports and Social Services | Ongoing | Ksh 737,350 | Ukia |
|
|
Development Of Farm Ponds- Fuel | Funds used purchase fuel and repair of backhoe for farm ponds excavation. Targetting 60 farmponds per households( the project provides fuel and the farmer pays ksh3500 per hour on dry rate ) the activities is implemented during dry spell. |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Ongoing | Ksh 1,412,400 | Ukia |
|
|
Ukia Ward Bursary | Bursaries-bursary allocation- Application, Vetting, award and distribution |
Department of ICT, Education and Internship | Ongoing | Ksh 4,000,000 | Ukia |
|
|
Rerec Matching Grant (for Ukia -10 Villages In Upper Iuani Cluster) | Installation of transformers, construction and extension of HV lines, construction of distribution lv lines networks across 10 villages in upper Iuani cluster |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 3,000,000 | Ukia |
|
|
Construction Of Concrete Slab 40m Long Along Makuli Forest Road At Kwa Mbunga | Construction of 40M drift, 8m long culvert and150m catchwater drain |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 1,800,000 | Ukia |
|
|
Construction of road structures across Ukia sub ward | Construction of road structures |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 1,500,000 | Ukia |
|
|
Road Improvement Programme Through Installation Of Road Structures Across Kilala/iuani | Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 1,500,000 | Ukia |
|
||
Construction Of Concrete Slab 30m Long Along Kavani Kituluku Dispensary Road | Construction of 30M drift and 150cm catchwater drain |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 1,500,000 | Ukia |
|
|
Drilling And Equipping Borehole In Ukia Girls Secondary School | Drilling and equipping borehole in Ukia Girls Secondary school - Drilling and equipping of borehole |
Department of Water and Sanitation | Ongoing | Ksh 5,000,000 | Ukia |
|
|
Itenge Water Project | -Installation of 3KM 3” diameter Itenge rising main. Submersible pump, control panel, solarization,2.5Km Makongo, Kyambalasi, Kilolo rising main 2Km Nzouni rising main |
Department of Water and Sanitation | Ongoing | Ksh 5,000,000 | Ukia |
|
|
Ithanze Water Project | 2.5Km water distribution pipeline while connecting existing Ithanze Water kiosk |
Department of Water and Sanitation | Ongoing | Ksh 3,000,000 | Ukia |
|
|
Nzouni Dispensary-construction Of Staff Quarters, Placenta Pit, Ash Pit, Electrification And Fencing | construction Of Staff Quarters, Placenta Pit, Ash Pit, Electrification And Fencing |
Department of Health Services | Ongoing | Ksh 4,500,000 | Ukia |
|
|
Makindu Fire Station | Fencing of fire station |
Department of Devolution, Public Service, Public Participation and Special Programs | Ongoing | Ksh 300,000 | Makindu |
|
|
Makindu Stock Yard | rehabilitation of fence(post n chain link and running tiber) contruction of loading ramp with collecting boma and replacement of gate |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Ongoing | Ksh 381,172 | Makindu |
|
|
Youth Empowerment ; Ajira Kwa Vijana, Ujuzi Teketeke- Makindu | Purchase of Tools of trade and training of the youths | Department of Gender, Children, Youth, Sports and Social Services | Ongoing | Ksh 500,000 | Makindu |
|
|
Kalii Earth Dam | Not viable |
Department of Water and Sanitation | Ongoing | Ksh 2,940,000 | Makindu |
|
|
Makindu-kiu Catchment Borehole | Drilling and developing the borehole and capping |
Department of Water and Sanitation | Ongoing | Ksh 1,500,000 | Makindu |
|
|
Athi Tunguni Water Project | 1. EXISTING INTAKE IMPROVEMENTS AND REHABILITATION 8NO. WATER KIOSKS |
Department of Water and Sanitation | Ongoing | Ksh 8,820,000 | Makindu |
|
|
Routine maintenance of MAkindu ward access roads | road widening - 3.5Kms, Grading - 5.6Kms, Spot Gravelling - 1.6Kms around Kiambani schools and Kwa Kimongo Muoki Area, Makindu Stock Yard - Mulilii Market, Skygo-St.Mathew-Airstrip-Airstrip centre to Kwa Kimuyu church, Kwa Ngala road at Yinzau (covering of kwa Ngala pit), Murraming of 3KM Nthia - Mbiuni road and Kwa Kijana-Kavatini-Syusyani to Yiiani.along Makindu stockyard - Mulilii mkt road |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 3,500,000 | Makindu |
|
|
Rerec Matching Grant In Makindu Ward | Installation of transformer at Kwa kimuyu church, construction and extension of HV lines, construction of distribution lv lines networks for Ziwani,Kiuani,Yiani and Katheka Kai Villages, enroute, Skygo Petrol station, Kwa Mavuti, Kwa Simon Muthiani Junction to Kwa kimuyu church |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 3,000,000 | Makindu |
|
|
Excavation Of Syengoni Earth Damdam |
|
Department of Water and Sanitation | Ongoing | Ksh 3,000,000 | Makindu |
|
|
Makindu Ward Bursary | Bursary allocation -Application, vetting, award and distribution |
Department of ICT, Education and Internship | Ongoing | Ksh 7,000,000 | Makindu |
|
|
Kai Ecde | Construction 1 no. ECDE Classroom with an office; Electrical Works; Shelving to the stores; 1No. Wooden Desk; 1No.Wooden Arm Chair; 20 No. Kiddy chairs and 10. No. Kiddy tables; Play equipment 2-piece set (double swing, slide, climbing frame and double see-saw); Displays of Pin board, White Board &Mark Pens and Branding, Publicity and Signwriting |
Department of ICT, Education and Internship | Ongoing | Ksh 2,400,000 | Makindu |
|
|
Syengoni Borehole- Testpumbing | Syengoni borehole- testpumbing |
Department of Water and Sanitation | Ongoing | Ksh 3,000,000 | Makindu |
|
|
Road Improvement Programme | Grading and spot improvement - Kisayani-Kisingo-Kathyaka road |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 1,493,400 | Kikumbulyu North |
|
|
Improvement Of Water In Kikumbulyu North Ward By Kibmawasco-kasayani Market To Cutline, Kwa Kakumi To Kwa Rose Muambani, Kasayani Market To Kwa Presillah Mutinda , Ndetani Ccti To Aic Kalinga To Kwa Kitheka, Kathyaka Market To Kilisa To King’uutheni And Nyayo Market To Soko Muyo | . Rehabilitation of Kathyaka – Nyayo water pipeline extension 1.32km |
Department of Water and Sanitation | Ongoing | Ksh 4,300,000 | Kikumbulyu North |
|
|
Construction Of Kathyaka Masonry Tank/ Under Kibmawasco | . Rehabilitation of Kathyaka – Nyayo water pipeline extension 1.32km |
Department of Water and Sanitation | Ongoing | Ksh 4,410,000 | Kikumbulyu North |
|
|
Athi-tunguni Water Project | 1. EXISTING INTAKE IMPROVEMENTS AND REHABILITATION of Intake Galleries pipe OD63mm Perforated infiltration pipe to OD250mm.1. EXISTING INTAKE IMPROVEMENTS AND REHABILITATION • Expansion of Intake Galleries pipe OD63mm Perforated infiltration pipe to OD250mm. 8NO. WATER KIOSKS |
Department of Water and Sanitation | Ongoing | Ksh 6,000,000 | Kikumbulyu North |
|
|
Construction Of Muangeni Drift | 2.7kms heavy Bush clearing, 2.7kms heavy grading, 1km Gravelling ,installation of 16m (600mm dia.) Culverts,construction of 20No. Gabions, 40m x6m RC non-vented drift slab, 30mx6m wide ridding surface, and 695cm of Catch water drains |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 2,000,000 | Kikumbulyu North |
|
|
Road Improvement Programme in Kikumbulyu North | 20kms road widening, 41kms grading and 1545cm excavation of catch water drains. (Opening and grading of Kisayani Kyandululu-Kiwanzani road-5.9km, Kyaani Ngaikini road-6.3Km, Kisayani jn-Ithumula-Katilamuni road-8.2km, Mikauni-Manga4-Malebwa road- 6.0km, Athi - Kwa Ngomba-Ngaikini road-12.8km and Mukononi-Nguumo road 2,2km) |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 7,000,000 | Kikumbulyu North |
|
|
Construction Of Muangeni Drift | 2.7kms heavy Bush clearing, 2.7kms heavy grading, 1km Gravelling ,installation of 16m (600mm dia.) Culverts,construction of 20No Gabions, 40m x6m RC non-vented drift slab, 30mx6m wide ridding surface, and 695cm of Catch water drains |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 5,000,000 | Kikumbulyu North |
|
|
Kiaoni Floodlights | Installation of 20M high mast floodlight with 6No. 400W LED fittings |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 2,000,000 | Kikumbulyu North |
|
|
Kisayani Street Light | Installation of 12 No. 10M single arm grid connected streetlights |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 2,000,000 | Kikumbulyu North |
|
|
Kathyaka Floodlights | Installation of 20M high mast floodlight with 6No. 400W LED fittings |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 2,000,000 | Kikumbulyu North |
|
|
Kilisa Water Tank Reseivoir.reseivoir. |
|
Department of Water and Sanitation | Ongoing | Ksh 2,000,000 | Kikumbulyu North |
|
|
Ithumula Ecde | Construction of 2no. ECDE Classrooms with an office,3-Door Pit Latrine with Urinal,Electrical Works,Shelving to the stores, 2No.lockable metallic cabinets,2No. Wooden Desks,2No. Wooden Arm Chairs,Water harvesting goods (10,,000Ltrs Water Tank and base),40 No. Kiddy chairs and 20. No. Kiddy tables,Play equipment 4 piece set (double swing, slide, climbing frame and double see-saw),Display soft board and Branding, Publicity and Signwriting | Department of ICT, Education and Internship | Ongoing | Ksh 4,300,000 | Kikumbulyu North |
|
|
Kikumbulyu North Ward Bursary | Application, Vetting, awarding and distribution of cheques |
Department of ICT, Education and Internship | Ongoing | Ksh 5,000,000 | Kikumbulyu North |
|
|
Athi Kilema Water Project- Launching | Athi kilema water project- launching |
Department of Water and Sanitation | Ongoing | Ksh 5,733,568 | Kikumbulyu North |
|
|
Goat Rearing Programme - Distribution Of Galla Goats | Goat rearing programme - Distribution of galla goats |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Ongoing | Ksh 172,150 | Kikumbulyu South |
|
|
Goat Value Chain Development | supplyof the Galla goats. Estimated number of beneficiaries 166 house hold. |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Ongoing | Ksh 2,000,000 | Kikumbulyu South |
|
|
Fuel For County Machinery | Inhouse works, road grading of county roads - Grading and spot improvement of Marikiti open Air market and access roads |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 1,414,720 | Kikumbulyu South |
|
|
Athi Tunguni Water Project | 1. EXISTING INTAKE IMPROVEMENTS AND REHABILITATION 8NO. WATER KIOSKS |
Department of Water and Sanitation | Ongoing | Ksh 37,500,000 | Kikumbulyu South |
|
|
Social groups Tents And Chairs- Kikumbulyu South | Purchase of tents and plastic chairs |
Department of Gender, Children, Youth, Sports and Social Services | Ongoing | Ksh 2,000,000 | Kikumbulyu South |
|
|
Youth empowerment programme Kikumbulyu South | Purchase of tools of trade |
Department of Gender, Children, Youth, Sports and Social Services | Ongoing | Ksh 1,361,346 | Kikumbulyu South |
|
|
Kibmawasco– Kilui Water Extension To Ngolomoki – Kwa Sunza -kalulini -matinga Line, Mikuyuni – Kasarani Line , Mitundu – Malatani Line , Kalungu-ilingoni-kamunzyu Line And Matundani One Main Line, Matua-kwa Kimote Line | KIBMAWASCO– Kilui water extension to Ngolomoki – Kwa Sunza -Kalulini -Matinga Line, Mikuyuni – Kasarani Line , Mitundu – Malatani line , Kalungu-Ilingoni-Kamunzyu line and Matundani One main Line, Matua-Kwa Kimote line |
Department of Water and Sanitation | Ongoing | Ksh 8,000,000 | Kikumbulyu South |
|
|
Rerec Matching Grant Kikumbulyu South | Installation of transformers, construction and extension of HV lines, construction of distribution LV lines networks and connection of targeted customers (AIC, Mbeetwani and surrounding villages) |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 2,000,000 | Kikumbulyu South |
|
|
Installation Of Road Structures Along Kwakitavu Road | Construction of 25mx5m masonry drift and 7No. Gabions along Kwakitavu road |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 1,000,000 | Kikumbulyu South |
|
|
Kibwezi-bpp Streetlights | Installation of 8.5M single arm grid connected streetlights |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 1,000,000 | Kikumbulyu South |
|
|
Kikumbulyu South Bursary | Bursary allocation – Application , Vetting, award and distribution |
Department of ICT, Education and Internship | Ongoing | Ksh 4,950,000 | Kikumbulyu South |
|
|
Survey of Muuni Subward |
|
Department of Lands, Urban Planning and Development, Environment and Climate Change | Ongoing | Ksh 304,620 | Nguumo |
|
|
Goat Value Chain Development- Pwds | supply Galla goats for breeding. With estimated beneficiary of 83 household |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Ongoing | Ksh 1,243,000 | Nguumo |
|
|
Ndeini Ctti Electricity | Electrification |
Department of ICT, Education and Internship | Ongoing | Ksh 490,000 | Nguumo |
|
|
Kalungu-ngambi Ya Myunzyu Extension Of Water Pipeline | Construction of Kalungu-Ilingoni-Kamunzyu line |
Department of Water and Sanitation | Ongoing | Ksh 2,940,000 | Nguumo |
|
|
Athi Water Project | 1. EXISTING INTAKE IMPROVEMENTS AND REHABILITATION 8NO. WATER KIOSKS |
Department of Water and Sanitation | Ongoing | Ksh 4,900,000 | Nguumo |
|
|
Athi-tunguni Water Project | 1. EXISTING INTAKE IMPROVEMENTS AND REHABILITATION 8NO. WATER KIOSKS |
Department of Water and Sanitation | Ongoing | Ksh 9,506,000 | Nguumo |
|
|
Kilema-muundani-kwa Kanyasya-muuani Soko Muyo-mutantheeu Road | Road widening - 9Kms, Heavy Grading -14Kms, 24m 900mm dia. Culverts, 16m 600mm culverts, 15No. Gabions, along Kilema-Muundani-Kwa kanyasya-Muuani Soko Muyo-Mutantheeu Road |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 4,500,000 | Nguumo |
|
|
Kwa Kivou Tala-kwa Kinyingi-kaunguni-tindima Road | 5kms heavy grading, 2.5km Spot Gravelling, 500cm3 catch water drain along Kwa kivou Tala-kwa kinyingi-Kaunguni-Tindima road |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 4,000,000 | Nguumo |
|
|
Kiunduani Market | 4kms road grading, 1.9kms Spot Gravelling in Kiunduani market |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 3,000,000 | Nguumo |
|
|
Kibarani-wivia-kiuani Road | 4.8kms bush clearing,4.8kms grading, 0.6kms Spot Gravelling, construction of 20no. Gabions, and excavation of 400cm Catch water drains |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 2,500,000 | Nguumo |
|
|
Murraming Of Jcc Kaunguni-kwa Muoka To Kwa Kivivye -3km Road. | 2.5km road opening, 0.7km graveling |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 1,500,000 | Nguumo |
|
|
KALEMBE RAHA KIAMBANI ROAD | 3.1km road opening, 3.1km grading, 400cm3 catch water drains |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 1,000,000 | Nguumo |
|
|
Mukameni Borehole Water Project |
|
Department of Water and Sanitation | Ongoing | Ksh 6,000,000 | Nguumo |
|
|
Construction Of Water Stand At Kwangala Borehole |
|
Department of Water and Sanitation | Ongoing | Ksh 500,000 | Nguumo |
|
|
Katangini Ecde | Construction of one classroom |
Department of ICT, Education and Internship | Ongoing | Ksh 1,000,000 | Nguumo |
|
|
Nguumo Bursary |
|
Department of ICT, Education and Internship | Ongoing | Ksh 4,000,000 | Nguumo |
|
|
Ndovoini Dispensary (fencing, Installation Of A Gate, Electrification(drop), Ceiling, And Supply Of A 10,000liters Water Tank)ndovoini Dispensary (fndovoini Dispensary (fencing, Installation Of A Gate, Electrification(drop), Ceiling, And Supply Of A 10,000liters Water Tank)encing, Installation Of A Gate, Electrification(drop), Ceiling, And Supply Of A 10,000liters Water Tank) | fencing, Installation Of A Gate, Electrification(drop), Ceiling, And Supply Of A 10,000liters Water tank fencing, Installation Of A Gate, Electrification(drop), Ceiling, And Supply Of A 10,000liters Water Tank)encing, Installation Of A Gate, Electrification(drop), Ceiling, And Supply Of A 10,000liters Water Tank) |
Department of Health Services | Ongoing | Ksh 3,000,000 | Nguumo |
|
|
Makueni Child Protection Centre | Construction of a building, street lighting and land scaping |
Department of Gender, Children, Youth, Sports and Social Services | Ongoing | Ksh 6,348,220 | Emali/Mulala |
|
|
Distribution Of Water At Ilengeni Springs | Distribution of water at Ilengeni Springs |
Department of Water and Sanitation | Ongoing | Ksh 5,900,000 | Emali/Mulala |
|
|
Feasibility Study Of Muooni Mega Dam | a) Community Mobilization and engagement |
Department of Water and Sanitation | Ongoing | Ksh 1,000,000 | Emali/Mulala |
|
|
Fencing Of Tutini Dispensary | fencing of tutini dispensary |
Department of Health Services | Ongoing | Ksh 500,000 | Emali/Mulala |
|
|
Masauti -muselele -mumbuni -mungetheele Road | 3kms road widening, 4kms heavy grading, 40km gravelling Culverts (900mm dia. -32m), 35x6m wide RC non-vented drift, 15No. Gabions, 550m3 of Catch water drains along Masauti-muselele-mumbuni- mungetheele road |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 4,500,000 | Emali/Mulala |
|
|
Mulala Primary Borehole | Drilling of borehole |
Department of Water and Sanitation | Ongoing | Ksh 6,000,000 | Emali/Mulala |
|
|
Kwa Maima Earth Dam |
|
Department of Water and Sanitation | Ongoing | Ksh 4,000,000 | Emali/Mulala |
|