Completed Projects In FY 2023/2024
Go BackProject | Scope | Department | Status | Budget | Ward | Action | ||
---|---|---|---|---|---|---|---|---|
Grain And Pulse Value Chain Development | Provision of certified maize and beans seeds to farmers |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 1,000,000 | Kako/Waia | |||
Pasture Development | Community sensetization, pmc formation beneficiary identifiaction training,pasture seed |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 1,000,000 | Mavindini | |||
Establishment Of Low Pest Zones | Procurement and delivery of fruit fly management technologies, farmer and extension officers capacity building, technology deployment, data collection and monitoring, market dossier development and creation of new markets |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 14,200,000 | Wote/Nziu | |||
Livestock Disease Control | Balance of Ksh 300,000 used to procure vaccination equipments. |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 5,308,526 | Headquaters | |||
Puree Production | production of puree |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 13,549,224 | Headquaters | |||
Ida (world Bank) Credit (national Agricultural And Rural Inclusive Growth Project (narigp) Pending Matching Grant For Fy 2021/22 | facilitate closure activities of the programme |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 14,344,221 | Headquaters | |||
Agriculture Development Programme | this is abalance from previous years and the balance to be used for M&E and PMC |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 127,160 | Nguumo | |||
Mbavani Irrigation Scheme | facilitation for feasibility study done report submitted with BoQs for approval and verification. |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 4,101,300 | Headquaters | |||
Rtd Line Arrears | Funds was used for top up funds for payment of RTD line arrears |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 1,000,000 | Headquaters | |||
Nzavoni Drift | Construction of Nzavoni drift |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 2,940,000 | Thange | |||
Fuel/machine Hire For Grading Of Sekeleni-ilatu-kalembe Raha Road | Bush clearing done, Road opening and grading (9km) - Construction of mitre drains |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 1,960,000 | Nguumo | |||
Green Energy Promotion | Installation of Solar photovoltaic system at Makueni County Referral Hospital. Installation of access ladders, walkways and fall protection systems Installation of 205k Wp solar system Installation of two 100ktl inverters Installation of AC combiner box Installation of solar system to the frid and generator Installation of project monitoring and evaluation system |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 28,420,000 | Headquaters | |||
Grading And Installation Of Drainage Structures Along Ngaamba-marwa Road | Installation ofCulverts and drainage works, -Spot grading -Spot gravelling |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 3,920,000 | Kiima Kiu/Kalanzoni | |||
Grading, Murraming And Installation Of Structures Along Mbaloni – Kyenzenzeni Road | Grading, murraming and installation of structures at Mbaloni – Kyangunzu – Wautu – Kyambeke – Kwa Mwove – Nzukini – Kisuu – Upendo – Syathani – Kyenzenzeni Road to be done.
|
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 5,880,000 | Ilima | |||
Nzueni, Muvaa, Kusyokithoiand Ndandini Road Improvement | - Installation of culverts - Cut off drains for road run off harvesting - Light grading - Light bush clearing |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 4,900,000 | Kithungo/Kitundu | |||
Isuuni Drift | - Non-vented reinforced concrete drift construction - Cut off drains for road run off harvesting - Installation of gabions |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 11,000,000 | Kithungo/Kitundu | |||
Marraming Of Kwa Kimasyu – Misuuni Road | Road murraming of 3.5km of kwa kimasyu-misuuni road |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 2,450,000 | Ivingoni/Nzambani | |||
High Mast Street Lighting At Iiani Market |
|
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 1,960,000 | Mavindini | |||
Road Improvement In The Ward | Mechanical road widening and heavy grading( 18.4km) Cut-off drains for road runoff harvesting of 397m3 Selected roads include AIC Kamau- kwa douglas mbaluka- Manyanzaani - Kwa ngweti- Kwa Nzoka roas, Kwa Kasina- Ngeleni- Syuuni river - Kwa Muete - Kyamithenge road, Ngunini - kinyuani- Tututha - Leva road, Kwa inthi -Manzuvi- Kyanduu- Kikini road, Kanoto- Kwa katiba- Kwa yindu road, Emale- Kwa colonel Kitaka- Ngwani river - Uvaani school- Uvaani dispensary- Kwa Nzivo road, Kalawani- uini- wa Novi- Kwa Ndavi road). |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 10,000,000 | Tulimani | |||
Road Improvent Programme | Road improvement programme through mechanical Road Opening, Light Grading and installation of cut-off drains on selected roads across the ward - 101 hours on crawler dozers - 245 hours on motor grader |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 9,750,000 | Kalawa | |||
Road Improvement Programme | Mechanical Road widening and heavy grading of 9Kms on selected roads ie Ikundu- Kwa male - kwa Maingi Thwake road, Malili -Kuku-Thwake road, Kwa Chief Ndiku- Mwaani- Kingathuni road, Malatani - Miseleni -kwa kianga road, Nguumo- MBA road. |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 7,180,720 | Kako/Waia | |||
Heavy Grading, Construction Protection Works And Installation Of Culverts At Kwa Ikavi-musoa Coffee Factory-kyaviti Drift-uuta-kwa Solo-mulooni-kyanzuki-muthwani-kanoto Road. |
|
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 6,861,200 | Tulimani | |||
Road Improvements | Light grading on various roads across the ward :- Furaha -Kwa mutune- Mangauni -Kiaoni -Kwa nzivu - Kwa Nyumba (14.2km), Kwa Mutevu- Kona- west Ngosini- Kari central - Makutano road 13.2km), Kwa Nguta -Catholiic church (6.km), Kyemwole- Kwa Matolo- Muvau- Kyusyani -Kavuliloni- Mwilu (17.2km), Ngunu-Itaa 14.3Km, Fiveten- kwa niko-Nzaai(10.5km), Kangondi-Kitonyini-Mwilu(4.7km) |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 4,900,000 | Kikumini/Muvau | |||
Roads Improvement Across The Ward | This budget line entails both contracted and inhouse works Contracted entailed hire of shovel for road improvement in nzaui kilili kalamba ward for 182 hours |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 4,900,000 | Nzaui/Kilili/Kalamba | |||
Road Improvement Programme | Road opening and grading of :- 1. Mikimani -Kyapota road,Kikuswi-ivaini kwa Mbinda- Kyakithuku- kivani road, Ngunga- kyanga- Ngolomoko- kiumoni-Mitini road, 2. Wautu- Katikomu -Kyangala road, 3. St.Teresia -Inyokoni -Musalala road, 4.Kivani-Katondoloni- Kwa maoka -Mbusyani- Kwa Recho- Mwaani road |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 3,430,000 | Ilima | |||
Mechanical Road Opening And Widening | Mechanical road opening and widening of Kavuthu- A.I.C Kiioi road 5.5km and Kwa Vutu- Yumbani road 6.7Km |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 2,970,000 | Mbitini | |||
Road Improvement Programme | Mechanical light grading and spot graveling of selected roads across the ward:- Domino- kyandue -Mbukuni road, Mwanyani-Kyangala road, AIC Kathemboni- Mukimani- Uvete Road, Kitondo- kwangole- Mangunguu- kwa nzalu road,Kyangalamkt- Matumbini - Enzai road, Kwa ndiku- kwa joshia- kwa kivila-maiani salvation army road, Kamuthini - kwa Nagai- Moyale- Kwa kakui dam road, |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 2,965,200 | Mukaa | |||
Rehabilitation of Kwa Tuva - Ngiini- Kalanzoni - Yaitha Road | Heavy grading, spot murraming and drainage works from Ngiini- Kalanzoni - Yaitha road Construction of gabions at Kwa Malonga - Mulumini road |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 9,860,000 | Kiima Kiu/Kalanzoni | |||
Mukaa-uvete Road | Road opening, grading/formation, spot murraming and drainage structures along Mukaa-Uvete road |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 5,385,000 | Mukaa | |||
Road Improvement And Maintenance | Grading and spot gravelling of
|
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 4,400,000 | Kasikeu | |||
Rehabilitation Of Kasikeu – Mutweamboo – Kwa Ndiki – Ndumbini – Mombasa Road | Drift construction, box culverts reinstatement spot murraming and drainage structures along Kasikeu – Mutweamboo – Kwa Ndiki – Ndumbini – Mombasa road Construction of 75m*6m drift 240m2 Stone pitching Demolishing structure Graveling on 500m construction of 150 scour checks |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 10,843,838 | Kasikeu | |||
Road Improvement Programme | Road improvement programme through road opening 1) Kwa nzai ivia yiu isika road 3)kitivo masokani road 6)wathini kalaani road |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 2,940,000 | Kasikeu | |||
Mukaa Road Improvement | Construction of culverts and drainage structures |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 1,500,000 | Mukaa | |||
Hire Of Machinery | Road improvement programme through road grading on selected roads across the ward
|
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 1,176,000 | Mukaa | |||
Kaumoni - Nthangathi - Kitutu Road | Construction of 3 short drifts |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 2,940,000 | Ukia | |||
Kisimbi-mutanga/ Nthangathi- Muiu Road | 6kms road opening and grading along Kisimbi-Mutanga/ Nthangathi- Muiu roads |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 2,940,000 | Ukia | |||
Nzouni - Mutambuukoni - Kavani Road | Construction of Culverts and small drifts along Nzouni - Mutambuukoni - Kavani road 1. Kyamuthei -kavani - mutambuukoni- nzouni |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 1,960,000 | Ukia | |||
Opening Of And Ugrading Of Kwa Power, Kwa Solomon, Kasarani, Mikuyuni Secondary, Kyanzili Kavete Wayani Road | opening of and ugrading of Kwa power, Kwa Solomon, Kasarani, Mikuyuni Secondary, Kyanzili Kavete Wayani Road -Road opening, -8.5km grading, -2km spot gravelling, -Installation of culverts(900mm-1line, 600mm-4lines) - Cut off mitre drains for road run-off harvesting |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 5,900,000 | Kikumbulyu South | |||
Kisayani-kathyaka-mukononi-ngaikini Road | Heavy grading and Murraming and Construction of adequate road structures along Kisayani-Kathyaka-Mukononi-Ngaikini road |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 4,410,000 | Kikumbulyu North | |||
Kwa Kavuu- Kwa Kyulu- Ithaayoni- Kasasule- Kwa Kolovoi Road | Road murraming of Kwa Kavuu- Kwa Kyulu- ithaayoni- kasasule- kwa kolovoi road. |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 2,500,000 | Thange | |||
Heavy Grading And Gravelling Of Machinery- Baptist – Makongenii – Nzavoni- Ndivuni – Kamunyuni Drift – Veneti – Muusini - Maikuu- Ituumo – Kasasule | Heavy grading and gravelling of Machinery- Baptist – Makongenii – Nzavoni- Ndivuni – Kamunyuni drift – Veneti – Muusini - Maikuu- Ituumo – Kasasule of 24km road |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 1,960,000 | Thange | |||
Marraming Of Kativani - Pastor Komu – Utu Roads | Bush clearing, Road grading, Spot gravelling, Culvert installation, Installation of slabs, installation of gabions and road widening along Kativani-Pastor komu- Utu Road |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 1,960,000 | Ivingoni/Nzambani | |||
Matingini – Kwa Kata – Kwa Muli – Kwa Mutuku – Sila Mulu | Marraming of Matingini – Kwa Kata – Kwa Muli – Kwa Mutuku – Sila Mulu |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 1,960,000 | Ivingoni/Nzambani | |||
Opening Of Kalikoni Borehole-kilokwe-mulu Ngomeli-kilongosi-wandia-mboyanganda-kwa Nduku-kwa Mutindi-kwa Kyalo-kwa Muema Road | Road opening and grading of Kalikoni Borehole-Kilokwe-Mulu Ngomeli-Kilongosi-Wandia-MboyaNganda-Kwa Nduku-Kwa Mutindi-Kwa Kyalo-Kwa Muema Road |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 980,000 | Ivingoni/Nzambani | |||
Opening Of Kwa Mbwika-ivingoni School-kwa Kimilu Road | Road opening,grading, gravelling, construction of culverts excavation and filling of structures along Kwa Mbwika-Ivingoni School-Kwa Kimilu road |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 980,000 | Ivingoni/Nzambani | |||
Opening Of Kyuasini- Kwa Nzekele Road | Road opening and widening of Kyuasini- Kwa Nzekele road |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 980,000 | Ivingoni/Nzambani | |||
Road Improvement Programme | Road improvement programme (Fuel for county machinery) -inhouse works road grading of roads 5km road grading along Kwa mbithi-kisayani-masaku dogo-ulilinzi-kwa kamaya road 2km road grading alongNguuni-junction road
|
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 490,000 | Masongaleni | |||
Kithumani- Mbalani-Katundu Drift | culverts installation and spot gravelling of Kithumani- Mbalani- Katundu Drift |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 3,920,000 | Mbitini | |||
Kwa Kitei Drift | Kwa Kitei Drift -Construction of 35m drift and protection works | Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 3,430,000 | Mbitini | |||
Kwa Kateli Drift | Kwa Kateli Drift- Construction of a 35m drift, Gabion installation and cut off drains for road harvesting |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 2,940,000 | Kikumini/Muvau | |||
Road Opening (ndivuni- Kisemeini- Kwamukosi- Nziu Market) Road Opening And Grading | Road opening and grading of Ndivuni-Kisemeini -Kwa Mukosi - Nziu market |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 2,940,000 | Wote/Nziu | |||
Road Structures And Protection Works | Excavation and filling for structure installation of culverts and drainage works Backfilling |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 2,940,000 | Mavindini | |||
Opening Of Matheani Kwa Nyaa Road | Road opening and grading of Matheani- kwa Nyaa road |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 2,500,000 | Kitise/Kithuki | |||
Opening And Grading Of Kalembu- Mulango Road Through Kwa Kavilu | Road opening and grading of Kalembu -Mulango roud through kwa kavilu |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 2,000,000 | Kitise/Kithuki | |||
Machine Hire For Opening Of Feeder Roads | opening and grading of of yemulwa - kitutu-mathemba road, munathi - syethemkt-kwa syeni - kiangine market road |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 1,960,000 | Kathonzweni | |||
Kwa Kisoi Gulley | Kwa Kisoi Gulley - Construction of culverts and scour checks |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 1,470,000 | Kikumini/Muvau | |||
Kwa Mwenga Culverts | Construction of culverts and scour checks |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 1,470,000 | Kikumini/Muvau | |||
Road Improvements | Inhouse works 1. Opening and grading of 3.2km at Nthunguni - Ngosini 2.Grading and graveling of 1.8km at Ung’atani – Kwa Kasyuki 1.8km 3.Opening and Grading of 3.8km at Mathangathi - Thwake 4. Opening and Grading of 4.6km at Sinai – Kwa David 5. Opening of 5.6km at Kwa Kavilu – Kwa Mboo - Kwa Mbindyo – Kwa Ndule 6. opening of 6.3km at Kwa Ngumu – Kwa Kajiwe – Kwa Matikitiki – Syandoo – Nduu Ndune |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 1,300,000 | Mavindini | |||
Road Improvement Program – Fuel For Inhouse Works | Grading of Munathi - Kyuasi Kitise – Ngunguuni – Kiangini river Kiangini River – Maau Eli Mbata – Mayuu – Manza – Ngunguuni – Ukokolani – Athiani |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 900,000 | Kitise/Kithuki | |||
Road Improvement Programme | Road opening, grading and graveling of :- 1. Ngiluni AIC – Kwa Kaleli road & Makongo, Makongo View Point – Ngiluni primary road and leveling of Nngiluni Primary paly ground (2.8Kms), 2. Opening and spot graveling of ikalyoni access road , 3. Grading And Graveling Of Kivani – Kivaku Road, Kivani Town Access Road And Kivani – Kyandumbi Road , |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 7,700,000 | Kee | |||
Itambani – Kyanganda Road | Road grading Construction of Culverts, road grading and spot marraming along Itambani – Kyanganda Road Catch water drains and scour checks |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 3,920,000 | Kilungu | |||
Road Improvement | Road improvement -MTF (inhouse works) |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 1,960,000 | Ukia | |||
Kituaimwe – Kyakathungu And Itambani - Kilisa Roads | Road opening and grading of kituamwe - Kyakathungu- itambani- kilisa road through - Hire of crawler 70hours -Road grading and watering of 2800m2 -Excavation of catch water drains 450m3 |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 1,960,000 | Kilungu | |||
Road Improvement | Road improvement -light grading |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 1,960,000 | Ukia | |||
Kyaka Drift Construction | Construction of Kyaka drift |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 1,000,000 | Kilungu | |||
Miradi Kwa Jamii(mkj) Sand Dams/ Drift Labour At Muusini And Kya Kaleli | Light grading,bush clearing and cut off mitre drains to harvest the rainy water at muusini and kya kaleli |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 490,000 | Kee | |||
Miradi Kwa Jamii(mkj) At Matangi And Kivani | Light grading, bush clearing and cut-off mitre drains at matangi and Kivani 1. bush clearing, road formation and excavation of catch water drains along Kwa Ngolia - Kathanzi - Mwea road 5.0km |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 490,000 | Kee | |||
Road Improvement | Road opening of 22km along kwa kinyuti to Nzoila in Mtito Andei ward Road gravelling of 4km road widening of 10m width |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 10,617,604 | Mtito Andei | |||
Rehabilitation Of Isunguluni-cutline-kyanguli-masaku Ndogo Road | Construction of reinforced concrete drift , road grading , installation of culverts and gabions |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 7,400,000 | Masongaleni | |||
Upgrading of road from Mang’elete- yumbuni- kitheini- katheka kai- kwa muma- mbotela- manyata- kathiiani- kongo- makutano- miiani- kwa Noah- kikwasuni- kwa mbata- strabag- kamunyuni- makokani- kwa ngewa Road. | Road gravelling of Mang’elete- yumbuni- kitheini- katheka kai- kwa muma- mbotela- manyata- kathiiani- kongo- makutano- miiani- kwa Noah- kikwasuni- kwa mbata- strabag- kamunyuni- makokani- kwa ngewa Road. |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 4,900,000 | Ivingoni/Nzambani | |||
Road Improvement | Road Improvement through road grading |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 2,962,200 | Thange | |||
Road Improvement Programme | Hire of machine for 109 hours to open roads
|
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 1,988,800 | Masongaleni | |||
Road Improvement | 4km of road opening and grading along Makokani road |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 1,470,000 | Ivingoni/Nzambani | |||
Road Improvement( Matulani Roads) | Road opening in Matulani |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 1,470,000 | Ivingoni/Nzambani | |||
Kambaland Road, Ngomano – Nzembete Rd, Salama – Kwa Makete Rd, Mwaani – Wandei Rd, Ngwata-mukaange Rd And Kiange - Kativani Rd | Installation of Culverts, gabions & scour checks along Kambaland road, Ngomano – Nzembete Rd, Salama – Kwa Makete Rd, Mwaani – Wandei Rd, Ngwata-Mukaange Rd and Kiange - Kativani Rd |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 1,217,954 | Masongaleni | |||
Migingo Parking | Road gravelling and compaction |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 980,000 | Ivingoni/Nzambani | |||
Hire Of Machines For Opening And Grading; Lukenya – Utini Rd, Utini Junction - Yikivuthi Rd, Kalandini – Masaku Ndogo Rd, Kwa Mwambui – Kwa Mwandola Rd, Kwa Musa – Aic Masonga Rd | Hire Of Machines For Opening And Grading; Lukenya road |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 34,652 | Masongaleni | |||
Road Improvement Programme | 11.5km Road grading,2.3km spot gravelling cut off mitre drains for road run-off harvesting |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 4,943,800 | Nguumo | |||
Makasa primary - Thuti -Utini road | Mechanical road opening-4.7km,
heavy grading-4.7km, installation of culverts-64M , Gabions -20N, and and cut
off mitre-800M drains for road run-off harvesting along Makasa primary - Thuti -Utini road |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 4,900,000 | Nguu/Masumba | |||
Machine Hire-grading Of Kwa Kasoli-kwa Nthoka Wote Road,kandengya-ndalani-junction (kisingo-ngomano Road),miangeni-kamboo Market-kamboo Health Center-kamboo Secondary-kamboo Rpimary School,ngomano-kamboo Market -kikauni,kalii Secondary Kawala Market | Bush Clearing Road opening and grading of 24km installation of gabions, culverts and cut off mitre drains for road run-off harvesting |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 4,900,000 | Makindu | |||
Road Improvement Programme | Road improvement programme 1. installation of culverts and spot graveling of kwa somba mulala road (Contracted ) 2.Grading and Graveling (through inhouse) of - Emali-ACK-Goat yard-road, Emali Slaughter-Misuuni dispensary-Muooni river - Lukenya -Kwa Mutua-Kambi, Misuuni Dispensary-Police Post-Juakali road - Kwa Kotoe -Nduundune, Mulala - Uthangathi - Kwa Kotoe road |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 4,500,000 | Emali/Mulala | |||
Ngambi Ya Munzyu- Tuanga Road | Installation of 26 gabions, culvert installation (900-2lines, 600-4lines), heavy grading 5.7km and construction of a 35M slab (drift) |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 4,410,000 | Nguumo | |||
Kibwezi Town Roads Improvement | Road opening, 2.65km spot gravelling, 2.8km of road grading |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 4,410,000 | Kikumbulyu South | |||
Road Opening | Road opening, heavy grading and cut off mitre drains for road run-off harvesting Road opening and heavy grading of kwa Ngulumbi(kikuu river) -Mweini -Kwa Kilonzo- Mukame - Kwa Ndava -Mulolongo - Muooni river |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 4,185,128 | Nguu/Masumba | |||
Fuel/machine Hire For Grading And Murraming Of Mbui Nzau-yala-kalyakalya-kwa Kanyingi-kwa Manthi-kwa Mbilo-kwa Mutua Ivila-ndivuni-kwa Mativo-kwa Ngala-kwa Viti-tindima | 69hours of road opening, 12km grading, 1.3km spot gravelling and cut off mitre drains for road run-off harvesting |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 3,963,520 | Nguumo | |||
Vololo -Kemalili road | Road opening, 5.6km road grading, installation culverts ( 900mm-4lines, 600mm-3lines) 5 gabions and cut off mitre drains for rain water harvesting185 |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 2,940,000 | Nguu/Masumba | |||
Road Improvement Programme | Road opening on selected roads Parton-Kwa Kyeva-Kwa Ndolo road, Kwa Mwandia-Kwa Kwa Wembe road, St. Teresa-Kwa Kituu-Kwa Pasco road, Ndetani Poly, Nyaani road |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 2,450,000 | Kikumbulyu North | |||
Miradi Kwa Jamii(mkj) | MKJ programme - bush clearing,light grading and cut off mitre drains excavation of catch water drains along - Ilingoni-Kalungu Siembeni road |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 500,000 | Kikumbulyu South | |||
Roads Improvement Programme | Roads improvement programme within the ward using county machines Grading of Kwa kethi-kwa kisambi –kwa ngala-rombo |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 490,000 | Makindu | |||
Heavy Grading And Murraming Of Kilome- Uvete- Kayata- Kasikeu- Mutweamboo- Lumu- Kiou Top- Kwa Kalelo- Off Mombasa Road- Kima Dairy- Marwa Road (kasikeu Ward Section)and Heavy Grading And Murraming Of Muangeni,ngalana,mutyemboolumu,kiou Top ,kwa Kalelo Off Mombasa Road ,kima Diary –marwa Road And Kwa Mikate Road At Muani . | Drift construction, box culverts reinstatement spot murraming and drainage structures along Kilome- Uvete- Kayata- Kasikeu- Mutweamboo- Lumu- Kiou top- Kwa kalelo- Off Mombasa road- Kima dairy- Marwa road (Kasikeu Ward section)and heavy grading and murraming of Muangeni,Ngalana,MutyembooLumu,Kiou top ,Kwa Kalelo Off Mombasa road ,Kima Diary –Marwa Road and Kwa Mikate road at Muani |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 9,310,000 | Kasikeu | |||
Kwa Kavenzi-mitamboni-mwangini Road | culvert construction |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 965,000 | Kasikeu | |||
Upgrading Of Kalamani- Nzaini Road | Non- vented masonry drift 40m by 6m, culverts installation 600mm-56M, installation of 8 gabions and cut off drains for rain water harvesting |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 2,940,000 | Mbooni | |||
Road Improvement Kithungo Kitundu | Road improvement programme in kithungo Kitundu ward through - Light grading - Spot graveling -Installation of culvert -Cut off meter drains |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 3,300,000 | Kithungo/Kitundu | |||
Road Improvement Program (fuel For Road Maintanance) | Light grading along 1. Mbumbuni-Ndumbi Road 10km 2. Mbumbuni-Iviani-Mukimwani Road (6km) 3. Mbumbuni-Kalimani-Kwa Kalenga Road (4km) 4. Lung’uni-Kavuvoni Primary School Road (3km) 5.Mbumbuni-Kalimani Road (2.5km) 6. Ngoni-Kisekini Road (5.5km) 7. Mbumbuni-Kalimani-Mukimwani Road (11.5Km) |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 1,000,000 | Kisau/Kiteta | |||
Road Improvement | Road opening , grading and spot murraming on selected roads across the ward - Kivandini market-Winzeni market-Nzaini Road This budget line entails both contracted and inhouse works |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 7,000,000 | Mbooni | |||
Rural Electrification Programme - Rerec Matching Grant | Installation of transformers, construction and extension of HV lines, construction of distribution lv lines networks to house holds,Public institutions/facilities and churches. |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 30,000,000 | Headquaters | |||
Kikima Market Improvement Programme | Installation of 10meters high concrete pole ,stringing of conductors 10mm,fixing of 1.5m long streetlighting arm, Installation of 120W light |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 9,410,000 | Mbooni | |||
Maintenance Of Street/flood Lights | Replacement of faulty floodlights fittings in mulika mwizi, Replacement of faulty streetlights fittings, Replacement of faulty streetlights/floodlights controls ( contactors ,photocell, double pole, cut out and earthrod),Replacement of control boxes, Replacement of faulty solar batteries , charger controllers and panels |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 7,900,000 | Headquaters | |||
Kibwezi Town Lighting Programme ( Matundani Floodlight, Kibwezi Streetlighting) | Installation of starter bars, Installation of polygon 20m high pole, fixing of 6no. 400W fittings , Installation of manual/automatic pulleys and winches, kplc metering of the mast. |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 3,822,000 | Kikumbulyu South | |||
Streetlighting Kiambani Primary,secondary Schools And Makindu Town | Installation of single arm metallic pole 8.5m high , fixing of 150W integrated solar streetlights fittings |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 3,430,000 | Makindu |