Supply and installation of 42 Salor Panel 280Watts
Department of Water and Sanitation
Completed
Ksh 1,960,000
Kathonzweni
Drilling And Develovement Of Kiteei Mutini Bh
DRILLING AND DEVELOPMENT OF BOREHOLE
Department of Water and Sanitation
Completed
Ksh 2,837,000
Kathonzweni
Desilting Of Mitooni Earthdam In Kitise Kithuki Ward
Department of Water and Sanitation
Completed
Ksh 1,491,000
Kathonzweni
Rehabilitation Of Kaiani Borehole
Department of Water and Sanitation
Completed
Ksh 931,750
Kathonzweni
Athi-mavindini Water Project
Solaraization/KPLC Grid
Department of Water and Sanitation
Completed
Ksh 7,668,213
Mavindini
High Mast Street Lighting At Iiani Market
Installation of 20M high monopole
Fixing of 6 No. 400W Floodlights fittings
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,960,000
Mavindini
Ivinga Nzia Ctti
Electrification, fencing and construction of a workshop
Department of ICT, Education and Internship
Completed
Ksh 3,430,000
Mavindini
Mavindini Ctti Dormitory
Construction of a dormitory
Department of ICT, Education and Internship
Completed
Ksh 3,430,000
Mavindini
Road Structures And Protection Works
Excavation and filling for structureinstallation of culverts and drainage works Backfilling
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 2,940,000
Mavindini
Road Improvements
Inhouse works 1. Opening and grading of 3.2km at Nthunguni - Ngosini 2.Grading and graveling of 1.8km at Ung’atani – Kwa Kasyuki 1.8km3.Opening and Grading of 3.8km at Mathangathi - Thwake4. Opening and Grading of 4.6km at Sinai – Kwa David5. Opening of 5.6km at Kwa Kavilu – Kwa Mboo - Kwa Mbindyo – Kwa Ndule6. opening of 6.3km at Kwa Ngumu – Kwa Kajiwe – Kwa Matikitiki –
Syandoo – Nduu Ndune
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,300,000
Mavindini
Pasture Development
Community sensetization, pmc formation beneficiary identifiaction training,pasture seed
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 1,000,000
Mavindini
Upgrading Of Mavindini Health Center
construction of Laboratory block
Department of Health Services
Completed
Ksh 4,312,000
Mavindini
Renovation Iani Dispensary
renovation of OPD block
Department of Health Services
Completed
Ksh 4,000,000
Mavindini
Sports Development Mavindini
Purchase of sports items
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 700,000
Mavindini
Yekanga Borehole
Drilling
Department of Water and Sanitation
Completed
Ksh 1,960,000
Mavindini
Kamuithi -ungatani Water Project
Pipeline extension from Kamuithi –Ungatani, installation of two-10000litres water tanks at Ungatani and Ivinga Nzia, construction of 1 water kiosks and 2 water points
Department of Water and Sanitation
Completed
Ksh 2,450,000
Mavindini
Kiimani Borehole
Drilling and development of borehole, equipping of borehole, solarization, supply of 10000 ltrs plastic tank
Department of Water and Sanitation
Completed
Ksh 5,380,000
Mavindini
Athi Mavindini Water Project
Distribution to Miangeni-Ilumani-Mavindi
Department of Water and Sanitation
Completed
Ksh 5,880,000
Mavindini
Muusini Borehole
Pipeline extension to Syandoo and Ngosini (Distribution and Storage tanks)
Department of Water and Sanitation
Completed
Ksh 6,380,000
Mavindini
Kithuki Sub-ward Administrator's Office
Renovation of Administrator's Office
Department of Devolution, Public Service, Public Participation and Special Programs
Completed
Ksh 651,580
Kitise/Kithuki
Kikome Irrigation Scheme Phase 11
Phase 11 project activities which include; raising main, solarization and T- point on the 3 distribution lines.
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 7,000,000
Kitise/Kithuki
Ngunguuni Ecde
2 No. ECDE Classrooms with an office and Store
3-Door Pit Latrine with Urinal
Full Electrical Works
Shelves
2 No. Wooden Desks
2 No. Wooden Arm Chairs
Water harvesting goods (10,000Ltrs Water Tank and base)
40 No. Kiddy chairs and 20. No. Kiddy tables
Play equipment 4 piece set (double swing, slide, climbing frame and double see-saw)
Display soft board
Branding, Publicity and Signwriting
2 No. Blackboard
4 No. duster
20 No. Mark pens
2 No. White board
Department of ICT, Education and Internship
Completed
Ksh 3,920,000
Kitise/Kithuki
Yinthungu Ctti
Construction of a dormitory for the male trainees
Department of ICT, Education and Internship
Completed
Ksh 1,960,000
Kitise/Kithuki
Opening Of Matheani Kwa Nyaa Road
Road opening and grading of Matheani- kwa Nyaa road
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 2,500,000
Kitise/Kithuki
Opening And Grading Of Kalembu- Mulango Road Through Kwa Kavilu
Road opening and grading of Kalembu -Mulango roud through kwa kavilu
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 2,000,000
Kitise/Kithuki
Construction Of Road Structures (culverts And Drifts)
Construction of a retaining wall and rockfilling at Kalembu
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,960,000
Kitise/Kithuki
Road Improvement Program – Fuel For Inhouse Works
Grading of Munathi - KyuasiKitise – Ngunguuni – Kiangini riverKiangini River – Maau Eli Mbata – Mayuu – Manza – Ngunguuni – Ukokolani – Athiani
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 900,000
Kitise/Kithuki
Rerec Matching Grant (for Kitise And Kithuki Subwards)
Installation of transformers, construction of HV lines, construction of distribution lv lines networks to house holds,Public institutions/facilities and churches.
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 2,000,000
Kitise/Kithuki
Installation Of Floodlights
Installation of double arm metallic pole 8.5m high , fixing of 150W integrated solar streetlights fittings
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,960,000
Kitise/Kithuki
Installation Of Flood Lights At Matheani Market
Installation of flood lights at matheani market
Installation of starter bars, Installation of polygon 20m high pole, fixing of 6no. 400W fittings , Installation of manual/automatic pulleys and winches, kplc metering of the mast
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 500,000
Kitise/Kithuki
Construction Of Kwa Kalelo - Winzeni Drift
Construction of kwa Kalelo - Winzeni drift
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 4,000,000
Kitise/Kithuki
Installation Of Road Structures And Culverts - Mbata - Mayuu - Manza - Ngunguuni - Athiani Road
Installation of road structures and culverts - Mbata - Mayuu - Manza - Ngunguuni - Athiani road
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 4,000,000
Kitise/Kithuki
Sports Development Kitise/kithuki
Purchase of sport items
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 340,000
Kitise/Kithuki
Dias At Kisite Market
Construction of a dias at Kitise market
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 1,000,000
Kitise/Kithuki
Kimundi Sump
Distribution to Kithuki Market, and 2 N0: Water Point+C22
Department of Water and Sanitation
Completed
Ksh 2,500,000
Kitise/Kithuki
Kwetui Water Dam
Desilting
Department of Water and Sanitation
Completed
Ksh 1,477,000
Kitise/Kithuki
Mbata Borehole
Department of Water and Sanitation
Completed
Ksh 150,000
Kitise/Kithuki
Kwa Kaivu Borehole
Department of Water and Sanitation
Completed
Ksh 150,000
Kitise/Kithuki
Kitise Water Project
Connection to power grid to Booster Station at Katangini and intake
Department of Water and Sanitation
Completed
Ksh 600,000
Kitise/Kithuki
Road Improvement Program
Road opening and grading on selected roads across the ward
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 3,430,000
Kitise/Kithuki
Kikome Irrigation Scheme
. Operationalization of Kikome Irrigation scheme sump tank &
galleries, 3 distribution line,rehabilitation distribution tank
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 7,932,953
Kitise/Kithuki
Mukaatini Ctti
Construction of a dormitory
Department of ICT, Education and Internship
Completed
Ksh 3,920,000
Mbooni
Operationalization Of Kikima Dairy Processing Plant
Operationalization of Kikima Dairy Processing Plant
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 500,000
Mbooni
Dairy Farming And Livestock Keeping
Dairy farming and livestock keeping - supply of hormones, capacity building
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 2,000,000
Mbooni
Grain And Pulse Value Chain Development
Grain and pulse value chain development - 2.112MT maize, 3.05MT beans, distributed to 2,581 beneficiaries
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 2,000,000
Mbooni
Upgrading Of Kalamani- Nzaini Road
Non- vented masonry drift 40m by 6m, culverts installation 600mm-56M, installation of 8 gabions and cut off drains for rain water harvesting
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 2,940,000
Mbooni
Road Improvement
Road opening , grading and spot murraming on selected roads across the ward- Kivandini market-Winzeni market-Nzaini Road- Kivandini-Ngaa-Mukasi Primary School Road- Kyangoma-Forest-Mulima dam-Nthungoni Road- Nthungoni-Kivale Forest - Kivale forest-Tulimani- Kwa Joel-Mweani Primary School Road- Ithamaa-Kwa Nthawa-Kitue Road- Kinyee-Mulima Road- Kivandini-Police Grounds Road- Tuvilani-Yambae-Makuu Road- Nthungoni-Mbuvuni Road- Kwa Mavoko-Ndueni Road- Kiveetyo Forest-ABC Nthungoni Road- Mweani-Kitoo Junction Road- Mbooni Girls-Kalima-Ithemboni Road-Mutitu-Kyamuloi Road- Ndueni-Uvaa Road- Red sea-Matondoni Primary School-Kwa Nzasi Road- Kwa Nzasi-Kyumbuni Road- Nthungoni-Ndueni Primary School RoadThis budget line entails both contracted and inhouse works
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 7,000,000
Mbooni
Kikima Market Improvement Programme
Installation of 10meters high concrete pole ,stringing of conductors 10mm,fixing of 1.5m long streetlighting arm, Installation of 120W light
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 9,410,000
Mbooni
Kikima Market Development
Kikima market development
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 980,000
Mbooni
Completion & Equipping Of Mbooni Isolation Ward
Construction of an Isolation hospital in mbooni SCH
Department of Health Services
Completed
Ksh 474,000
Mbooni
Muisyo-ngomeni River Drift
Construction of 100m by 5m Non-vented Reinforced Concrete drift
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 9,815,000
Mbooni
Kyangoma Stadium
Levelling of the filed
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 1,025,000
Mbooni
Social Protection - Pwds Empowerment - Mbooni
Purchase of assistive devices
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 918,400
Mbooni
Kyambui Water Project
construction of 4km gravity pipeline, 2No. Water kiosks, installation of 2No. 10 Cubic metres plastic storage tanks for each kiosk constructed and platforms.
Department of Water and Sanitation
Completed
Ksh 3,920,000
Mbooni
Rehabilitation Of Water Tank And Pipeline Rehabilitation To Yatwa-itaani Village( Uviuni)
Rehabilitation of rising main to Yatwa Primary school, rehabilitation of yatwa - Itaani pipeline and rehabilitation masonry tank collapsed roof slab.
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 980,000
Mbooni
Conservation Of Kwa Kithue Wetland
Community outreach
Construction of spring intake chambers
Installation of take system
Stone pitching
Installation of communal water access points
Fencing
Installation of gabions
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 1,500,000
Mbooni
Mulima Water Project
i.Trainig of the community on management.
ii.Mobilization of personal plant and equipment to site.
iii.Implementation of treatment works components and chemical building.
Department of Water and Sanitation
Completed
Ksh 10,176,660
Mbooni
Mulima Phase 1
i.Traininig of community on management
ii.Mobilization of personnel plant and equipment to site
iii.Implementation of treatment works components and chemical building
- Installation of culverts
- Cut off drains for road run off harvesting
- Light grading
- Light bush clearing
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 4,900,000
Kithungo/Kitundu
Isuuni Drift
- Non-vented reinforced concrete drift construction
- Cut off drains for road run off harvesting
- Installation of gabions
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 11,000,000
Kithungo/Kitundu
Hay Stands
relocate the hay stall to utangwa dipsite
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 490,408
Kithungo/Kitundu
Kathambalani Irrigation Project.
survey and design of the high breed weir done. the project activities include training of 56 household on good agricultural practices and formation irrigation user association.
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 8,000,000
Kithungo/Kitundu
Nzueni Ecde
2 No. ECDE Classrooms with an office and Store
3-Door Pit Latrine with Urinal
Full Electrical Works
Shelves
2 No. Wooden Desks
2 No. Wooden Arm Chairs
Water harvesting goods (10,000Ltrs Water Tank and base)
40 No. Kiddy chairs and 20. No. Kiddy tables
Play equipment 4 piece set (double swing, slide, climbing frame and double see-saw)
Display soft board
Branding, Publicity and Signwriting
2 No. Blackboard
4 No. duster
20 No. Markpens
2 No. White board
Department of ICT, Education and Internship
Completed
Ksh 3,920,000
Kithungo/Kitundu
Road Improvement Kithungo Kitundu
Road improvement programme in kithungo Kitundu ward through - Light grading - Spot graveling -Installation of culvert-Cut off meter drains
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 3,300,000
Kithungo/Kitundu
Kilyungi Hybrid High Mast Floodlight
Installation of starter bars, Installation of polygon 20m high pole, fixing of 6no. 250W fittings , Installation of manual/automatic pulleys and winches, installation of panels, installation of batteries,inverter, charger controller, changeover and kplc metering of the mast.
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 2,940,000
Kithungo/Kitundu
Upgrading Ngai Health Center
PROPOSED CONSTRUCTION OF MATERNITY BLOCK
Department of Health Services
Completed
Ksh 4,900,000
Kithungo/Kitundu
Utangwa Dispensary
CONSTRUCTION OF 2BEDROOM STAFF HOUSE, CHAINLINK FENCING, SEPTIC TANKS, INCINERATOR, PLACENTA PIT,CIVIL AND DRAINAGE WORKS AT UTANGWA DISPENSARY
Department of Health Services
Completed
Ksh 6,981,895
Kithungo/Kitundu
Kusyongali Playground
Levelling of the pkay ground
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 4,000,000
Kithungo/Kitundu
Kinyongo Water Project
Construction of 4No. Water Kiosks and installation of 10 Cubic metres for each kiosks. Water extension to Kilenge primary school from katunyoni market and water distribution extension from Kwa musyoka to Ngaani Market.
Department of Water and Sanitation
Completed
Ksh 3,920,000
Kithungo/Kitundu
Kiumi Water Project
Rehabilitation of Kitundu-syathani pipeline and pipeline extension to Nthumbini, Rehabilitation of Kitundu-Kalambya pipeline and pipeline extension from kalala to Ngomangoni, construction of 2N. Water kiosks and installation of 2No. 10 Cubic metres plastic storage tanks.
Department of Water and Sanitation
Completed
Ksh 3,920,000
Kithungo/Kitundu
Drilling Of Mutooni Borehole
Drilling borehole and test pumping
Department of Water and Sanitation
Completed
Ksh 1,660,000
Kithungo/Kitundu
Youth Empowerment Programme -kithungo/kitundu
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 900,000
Kithungo/Kitundu
Water Improvement Programme
Repair of Boreholes
Department of Water and Sanitation
Completed
Ksh 57,556
Kithungo/Kitundu
Drainage Works Along Mwanyani-kwa Kyole Road
Installation of 42M culvertInstallation of 20 gabionsRoad for water structures- catch water drains excavation -405cm
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,380,040
Kithungo/Kitundu
Kiumi Water Project
Replacement of the PVC pipes with GI (Metallic pipes)
Department of Water and Sanitation
Completed
Ksh 64,250
Kithungo/Kitundu
Feasibility Study On Mining
Consultancy services for Geological mineral mapping
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 2,500,000
Tulimani
Road Improvement In The Ward
Mechanical road widening and heavy grading( 18.4km)
Cut-off drains for road runoff harvesting of 397m3
Selected roads include AIC Kamau- kwa douglas mbaluka- Manyanzaani - Kwa ngweti- Kwa Nzoka roas, Kwa Kasina- Ngeleni- Syuuni river - Kwa Muete - Kyamithenge road, Ngunini - kinyuani- Tututha - Leva road, Kwa inthi -Manzuvi- Kyanduu- Kikini road, Kanoto- Kwa katiba- Kwa yindu road, Emale- Kwa colonel Kitaka- Ngwani river - Uvaani school- Uvaani dispensary- Kwa Nzivo road, Kalawani- uini- wa Novi- Kwa Ndavi road).
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 10,000,000
Tulimani
Heavy Grading, Construction Protection Works And Installation Of Culverts At Kwa Ikavi-musoa Coffee Factory-kyaviti Drift-uuta-kwa Solo-mulooni-kyanzuki-muthwani-kanoto Road.
Non-vented Reinforced Concrete Drift construction
Cut off drains for road run off harvesting
Culverts Installation
Gabions Installation
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 6,861,200
Tulimani
Mulooni Ecde
Construction of 3 Door No. toilet with urinal
Department of ICT, Education and Internship
Completed
Ksh 490,000
Tulimani
Kyamithengi Library
Installation of LAN, structured cabling and furnishing
Department of ICT, Education and Internship
Completed
Ksh 1,000,000
Tulimani
Medical Bills And Surgical Implants
payment of medical bills and procurement of surigcal
Department of Health Services
Completed
Ksh 172,464
Tulimani
Provision Of Mango And Avocado Seedlings
Provision of mango and avocado seedlings
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 2,500,000
Tulimani
Installation Of Flood Lights At Kalawani
Installation of 10meters high concrete pole ,stringing of conductors
10mm,fixing of 1.5m long streetlighting arm, Installation of 120W light
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,000,000
Tulimani
Uvaani Dispensary
facelifting and renovation of the facility
Department of Health Services
Completed
Ksh 1,404,736
Tulimani
Kooi Earth Dam
Kooi earth dam - Desilting of the reservoir and construction of check dams
Department of Water and Sanitation
Completed
Ksh 4,900,000
Tulimani
Lower Ngwani Water Project
Replacement of motor, inverter, desilting sump and replacement of vandalized power cables.
Department of Water and Sanitation
Completed
Ksh 980,000
Tulimani
Rehabilitation Of Wanzauni Kikima Pipeline
Rehabilitation of Wanzauni Kikima pipeline
Department of Water and Sanitation
Completed
Ksh 686,000
Tulimani
Upper Ngwani Water Project
Installation of pump, solarization, rehabilitation of kakima pipeline and pipeline extension to Tulimani primary school.
Department of Water and Sanitation
Completed
Ksh 2,509,811
Tulimani
Sport Development Programme- Tulimani ward
Purchase and delivery of sport items
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 150,000
Tulimani
Youth Empowerment Programme- Tulimani ward
Driving course training for Tulimani Youth
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 810,000
Tulimani
Social Groups Tents And Chairs Tulimani
Purchase of tents and chairs
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 2,450,000
Tulimani
Masyonyeki Earth Dam
Department of Water and Sanitation
Completed
Ksh 4,900,000
Tulimani
Ngaa Ecde
2 No. ECDE Classrooms with an office and Store
Electrical Works (conduits only)
Shelves
2 No. Wooden Desks
2 No. Wooden Arm Chairs
Water harvesting goods (5,000Ltrs Water Tank)
Play equipment - 4 piece set (double swing, slide, climbing frame and double see-saw)
Display Pinned board
Branding, Publicity and Signwriting
2 No. Black board retained
4 No. Duster
20 No. Mark pens
2No. Whiteboard
Department of ICT, Education and Internship
Completed
Ksh 3,136,000
Kisau/Kiteta
Songeni Ecde
2 No. ECDE Classrooms with an office and Store
Electrical Works (conduits only)
Shelves
2 No. Wooden Desks
2 No. Wooden Arm Chairs
Water harvesting goods (5,000Ltrs Water Tank)
Play equipment - 4 piece set (double swing, slide, climbing frame and double see-saw)
Display Pinned board
Branding, Publicity and Signwriting
2 No. Black board retained
4 No. Duster
20 No. Mark pens
2 No. Whiteboard
Department of ICT, Education and Internship
Completed
Ksh 3,136,000
Kisau/Kiteta
Kakuswi Ctti Dormitory
Construction of a domitory
Department of ICT, Education and Internship
Completed
Ksh 6,860,000
Kisau/Kiteta
Cottage Industry Support For Kingongi-mivuko Women Group
Purchase of maize crusher for Kingongi mivuko women group
Department of Trade, Marketing, Industry, Culture and Tourism.
Completed
Ksh 700,000
Kisau/Kiteta
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
Project Awarded more funds in FY2024/25 and redesigned. Current it's at procurement level.
Has additional funds in 2024/25.
To be implemented in FY 2024/25
Construction works stopped for re-designing and addition of funds.
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
For in house works 2 Trips Rockfilling along Nthangu –Watuka and 0.9km Road opening along Kwa Kamuya – Kaiti were done