All Projects In FY 2024/2025
Go BackProject | Scope | Department | Status | Budget | Ward | Action | |
---|---|---|---|---|---|---|---|
Agriculture Mechanzation Services(ams) | farm ponds rehabilitation - Provision of mechanization services |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 1,000,000 | Headquaters | ||
De-risking And Value Enhancement (drive) Project | De-Risking and Value Enhancement (DRIVE) project |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 7,500,000 | Headquaters | ||
Purchase Of Mangoes | Purchase of mangoes for puree production |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 13,400,000 | Headquaters | ||
Puree Production | Puree production |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 11,561,000 | Headquaters | ||
Implement Animal Health And Breeding Program For All 30 Wards For Dairy And Beef Animals | Procure assorted livestock vaccines |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 7,780,000 | Headquaters | ||
Ready To Drink Juice | Ready to drink juice(RTD) production |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 10,891,765 | Headquaters | ||
Purified Drinking Water | Purified drinking water production |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 10,269,682 | Headquaters | ||
Installation Of An Epoxy Floor Repair | Installation of an Epoxy floor repair |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 1,276,917 | Headquaters | ||
Government Automation - Other Ict Programmes | Government automation |
Department of ICT, Education and Internship | Completed | Ksh 3,576,875 | Headquaters | ||
Maintenance Of Street/flood Lights- Climate Action | Maintenance of installed non-working/faulty streetlights and floodlights in the county. These include Testing photocells, contactors, electrical circuits and connections to ensure proper functioning of the lights. Replace burned-out bulbs or faulty LED fittings, contactors and photocells.Upgrade to more energy-efficient lighting solutions (LED fittings) |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 8,386,455 | Headquaters | ||
Dam Construction by (dcu) | constrution of dam |
Department of Water and Sanitation | Completed | Ksh 9,000,000 | Headquaters | ||
Maintance Of Low Pest Zones - Procurement Of Low Pest Management Technologies, And Training Farmers |
|
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 3,500,000 | Headquaters | ||
Industrial Crops Development (coffee, Macadamia) |
|
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 3,180,000 | Headquaters | ||
Establishment Of 10 Aggregation Centeres To Facilitate Market Linkages For Agricultural Produce And Pulses |
|
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 2,500,000 | Headquaters | ||
Grains Development |
|
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 2,500,000 | Headquaters | ||
Drilling And Test Pumping Unit (dtu) Rig | Department of Water and Sanitation | Completed | Ksh 5,000,000 | Headquaters | |||
Water Development Programme | Department of Water and Sanitation | Completed | Ksh 3,787,578 | Headquaters | |||
Kenya Water And Sanitation And Hygiene K-wash | Department of Water and Sanitation | Completed | Ksh 5,000,000 | Headquaters | |||
Kyisa Games-hq | facilitating activities for county teams in KYISA games |
Department of Gender, Children, Youth, Sports and Social Services | Completed | Ksh 3,000,000 | Headquaters | ||
Makueni Child Protection Centre-hq | -operationalization, electrification and equipping, Solarization |
Department of Gender, Children, Youth, Sports and Social Services | Completed | Ksh 3,000,000 | Headquaters | ||
Sports Development Programme | Sports Development Programme(Pool table competition),Supa Cup,Special Olympics and Ndukuma Run/Marathon) |
Department of Gender, Children, Youth, Sports and Social Services | Completed | Ksh 10,615,000 | Headquaters | ||
Quality Management Certifications | Facilitation for Quality Management Certifications for the plant |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 2,950,000 | Headquaters | ||
Effluent Treatment Plant(etp) | Purchase of ETP Chemicals |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 600,000 | Headquaters | ||
Drainage improvement and Murrumingof Old slaughter to Kwa Kitindo Road -Construction of Culverts, Grading and Murruming |
|
Department of Lands, Urban Planning and Development, Environment and Climate Change | Completed | Ksh 4,000,000 | Headquaters | ||
Tourism Infrastructure Improvement | Tourism promotion and development through, mbui nzau hill hiking event promotion( hiking events, signage installation and videogragh).Unoa hill enhancement for tourism and recreation activities.Signage installtion nzau hill and kivale forest, establishment of prayer center at nzau hill, stalkeholder sensitaztion on destination makueni platform and review of makueni county tourism policy. |
Department of Trade, Marketing, Industry, Culture and Tourism. | Completed | Ksh 1,500,000 | Headquaters | ||
Ccf Administrative Cost- Proposal Development, Vetting, Projects Grievances Committees, Eia, Wccpc-climate Change Fund | CCF Administrative cost- proposal development, Vetting, Projects Grievances committees, EIA, WCCPC-Climate change fund |
Department of Lands, Urban Planning and Development, Environment and Climate Change | Completed | Ksh 1,176,600 | Headquaters | ||
Government Automation - Cihmis Phase Two | 1. MCRH -LAN /FIREWALL (Network security enhancement ) at Ksh.1,200,000 2. Desktop computers for MCRH at Ksh.3,250,000 . 3. Desktop computers for Mbooni sub county hospital at Ksh.3,680,000 . 4. CIHMIS implementation for Mbooni Sub county at 2,520,000 . 5. Sultan hamud sub county hospital LAN /FIREWALL (Network security enhancement ) at Ksh.1,815,625 . 6. CIHMIS rolled out at MCRH and Mbooni at Ksh.1,669,820. |
Department of ICT, Education and Internship | Completed | Ksh 14,135,445 | Headquaters | ||
Feasibility Study And Designs For Kathonzweni Livestock Abattoir | finalization of the report( data collection ,team of technical staff will be visiting thika for bench marking and learning) |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 1,300,000 | Headquaters | ||
Feasibility Study And Designs For Kathonzweni Livestock Abattoir | Feasibility study and designs for Kathonzweni livestock abattoir |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 1,300,000 | Headquaters | ||
Rtd Line Repairs | RTD line Repairs |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 1,000,000 | Headquaters | ||
Fencing Of Ndumoni Dispensary | chainlink fencing |
Department of Health Services | Completed | Ksh 1,000,000 | All Wards | ||
Ngua/syengoni Brehole- Supply And Delivery Of Drilling Materials | Ngua/Syengoni brehole- supply and delivery of drilling materials |
Department of Water and Sanitation | Completed | Ksh 3,000,000 | All Wards | ||
Wote Fire Station |
|
Department of Devolution, Public Service, Public Participation and Special Programs | Completed | Ksh 800,000 | Wote/Nziu | ||
Makueni Girls Borehole | Equipping of Makueni Girls borehole, pipeline extension, solarization |
Department of Water and Sanitation | Completed | Ksh 2,940,000 | Wote/Nziu | ||
Extension Service Delivery | Support establishment of one model youth community led extension service delivery (Malooi Youth Demonstration Farm and Kanoto Farmers society - Tulimani) |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Ongoing | Ksh 3,404,444 | Wote/Nziu | ||
Ida (world Bank) Credit: Kenya Urban Support Project (kusp)- Urban Institutional Grants (uig) | KUSP funded progarmme to support Municipality activities - KUSP Financial Management Training for Municipal Managers, Engineers & Accountants |
Department of Lands, Urban Planning and Development, Environment and Climate Change | Completed | Ksh 203,215 | Wote/Nziu | ||
Ida (world Bank) Credit: Kenya Urban Support Project(kusp) - Urban Development Grant (udg) | KUSP funded towards Mukuyuni Modern Market. Used to install Mukuyuni freezer and cold room |
Department of Lands, Urban Planning and Development, Environment and Climate Change | Completed | Ksh 6,669,716 | Wote/Nziu | ||
Cabro Paving Of Wote Township Parking Zones |
|
Department of Lands, Urban Planning and Development, Environment and Climate Change | Completed | Ksh 3,000,000 | Wote/Nziu | ||
Opening And Unclogging Of Drainage Systems |
|
Department of Lands, Urban Planning and Development, Environment and Climate Change | Completed | Ksh 1,196,192 | Wote/Nziu | ||
Construction Of Muaani Drift And Murraming Of Jones To Muaani Girls Road | Construction of Muaani drift, road grading, gravelling, Installation of culverts and gabions along Jones to Muaani Girls road | Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 4,900,000 | Wote/Nziu | ||
Kwa Kitingi -kwa Joel -kwa Mwaniki Road Opening And Grading | Opening, Grading, installation of culverts & excavation of roads for water structures along Kwa Kitingi -Kwa Joel -Kwa Mwaniki road |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 3,430,000 | Wote/Nziu | ||
Road Opening (ndivuni- Kisemeini- Kwamukosi- Nziu Market) Road Opening And Grading | Road opening and grading of Ndivuni-Kisemeini -Kwa Mukosi - Nziu market |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 2,940,000 | Wote/Nziu | ||
Unoa Grounds Floodlights | Installation of starter bars, Installation of polygon 20m high pole, fixing of 6no. 400W fittings , Installation of manual/automatic pulleys and winches, kplc metering of the mast. |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 2,300,000 | Wote/Nziu | ||
Fruit Value Chain Development | Supply and Distribution of fruit fly management technologies |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 3,000,000 | Wote/Nziu | ||
Makueni Integrated Vocation Education Centre - Dormitory | Construction of a dormitory |
Department of ICT, Education and Internship | Completed | Ksh 2,536,001 | Wote/Nziu | ||
Kitikyumu Playground | Budgeted for payment of PMC , supervision and allowance for the machine operators. |
Department of Gender, Children, Youth, Sports and Social Services | Completed | Ksh 142,032 | Wote/Nziu | ||
Establishment Of Low Pest Zones | Procurement and delivery of fruit fly management technologies, farmer and extension officers capacity building, technology deployment, data collection and monitoring, market dossier development and creation of new markets |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 14,200,000 | Wote/Nziu | ||
Sports Development Wote/nziu | Purchase of sport items |
Department of Gender, Children, Youth, Sports and Social Services | Completed | Ksh 925,000 | Wote/Nziu | ||
Nziu Playground | Levelling and goal posts installation |
Department of Gender, Children, Youth, Sports and Social Services | Completed | Ksh 1,500,000 | Wote/Nziu | ||
Kamunyolo Earthdam | Operationalization of distribution line to Wote, installation of new pumpset, rehabilitation of raising main. Operationalization of Mwambani pipeline, installation of new pumpset, fencing, treatment plant, pipeline extension of 1.1km and connection to KPLC |
Department of Water and Sanitation | Completed | Ksh 605,680 | Wote/Nziu | ||
Kaiti/kamunyii Water Project | Construction of sump, rehabilitation of raising main, new distribution line, connection to KPLC, construction of tank platform and installation of 8 tanks 1000lts to 8 water points |
Department of Water and Sanitation | Completed | Ksh 921,928 | Wote/Nziu | ||
Katoloni Pipeline Extension | Pipeline extension to Katoloni market, construction of tank Platform, water kiosk and storage tank 1000lts |
Department of Water and Sanitation | Completed | Ksh 980,000 | Wote/Nziu | ||
Kwa Musila Earth Dam | Rehabilitation of spillway, construction of seal and gabion installation |
Department of Water and Sanitation | Completed | Ksh 1,470,000 | Wote/Nziu | ||
Kamunyolo Earth Dam | Operationalization of distribution line to Wote, installation of new pumpset, rehabilitation of raising main. Operationalization of Mwambani pipeline, installation of new pumpset, fencing, treatment plant, pipeline extension of 1.1km and connection to KPLC |
Department of Water and Sanitation | Completed | Ksh 2,500,000 | Wote/Nziu | ||
Kituasi Water Project | Construction of new sump, solarization, installation of pumpset and distribution |
Department of Water and Sanitation | Completed | Ksh 3,430,000 | Wote/Nziu | ||
Kwa Kamende Borehole | Solarization, installation of new pumpset, rehabilitation of pump house and fencing |
Department of Water and Sanitation | Completed | Ksh 3,920,000 | Wote/Nziu | ||
Kathuma Borehole | Power installation, distribution line extension, 1 No: water kiosk and two plastic storage tanks 1000lts |
Department of Water and Sanitation | Completed | Ksh 4,900,000 | Wote/Nziu | ||
Kaiti-kamunyii Water Project | Construction of sump, rehabilitation of raising main, new distribution line, connection to KPLC, construction of tank platform and installation of 8 tanks 1000lts to 8 water points |
Department of Water and Sanitation | Completed | Ksh 5,000,000 | Wote/Nziu | ||
Mwaani Water Project | Department of Water and Sanitation | Completed | Ksh 9,917,000 | Wote/Nziu | |||
Support To Organized Groups Including Pwds In Nziu Sub-ward | Supply of spray pumps, wheel chairs, diapers, crutches, tents and chaird |
Department of Gender, Children, Youth, Sports and Social Services | Completed | Ksh 5,096,000 | Wote/Nziu | ||
Roads Improvement | Road improvement within wote/nziu ward In wote subward - 10 selected roads were graded KMTC - Ginnery road -kalosi road, Kwa kitise -Cereal road -Kwa masilia, White House- Total road- Choma base, Choma base - St John's Sec.malivani- Ndue Nguu road, Kwa Ngulue - Kwa kamende road In Nziu subward 7 selected roads were graded Mikwani - Mulolongo road,Mikwani - Nziu road,Febi road -Makuli road, kathuma- Kwa kilungya road, Mutulani- Muvakani road, Kobai- kyongulu road, Nziu -Muthyoi road |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 1,940,000 | Wote/Nziu | ||
Construction Of Toilet Kuku Market Acacia |
|
Department of Lands, Urban Planning and Development, Environment and Climate Change | Completed | Ksh 650,000 | Wote/Nziu | ||
Road Improvement | Grading of Kwa mumangi - kwa ngui - kwa kamweli – kamunyolo - 7.5 Malivani – iviani – unoa – 6km Malivani – kavingo – ngutwa – 8.2km Kyenze – kathuma – 6.5km Kwa ikavi - mwaani primary – kambi – 12.6km Kwa kwinga – kwa kyule – nthangu – 7.1km |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 1,960,000 | Wote/Nziu | ||
Roads Improvement Across The Ward | This budget line entails both contracted and inhouse works Contracted entailed hire of shovel for road improvement in nzaui kilili kalamba ward for 182 hours |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 4,900,000 | Nzaui/Kilili/Kalamba | ||
Kalamba Ecde |
|
Department of ICT, Education and Internship | Completed | Ksh 1,568,000 | Nzaui/Kilili/Kalamba | ||
Matiliku Subcounty Hospital (dental Chair, Accessories And Other Smal Equipment) | Renovation works and supply of dental chair |
Department of Health Services | Completed | Ksh 46,007 | Nzaui/Kilili/Kalamba | ||
Fruit Value Chain Development (seedlings) Matching Grant | Fruit Value Chain Development(seedlings) Matching grant-procurrement of 9,335 root stock seedlings of mango, citrus and paw paw supplied and distributed to 428 beneficiaries |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 2,000,000 | Nzaui/Kilili/Kalamba | ||
Surgical Implants And Medical Bills | payment of medical bills and procurement of surigcal implants |
Department of Health Services | Completed | Ksh 553,412 | Nzaui/Kilili/Kalamba | ||
Social groups - Tents And Chairs Nzaui/kilili/kalamba | Purchase of tents and chairs |
Department of Gender, Children, Youth, Sports and Social Services | Completed | Ksh 5,635,000 | Nzaui/Kilili/Kalamba | ||
Matiliku Ecde |
|
Department of ICT, Education and Internship | Ongoing | Ksh 1,568,000 | Nzaui/Kilili/Kalamba | ||
Yiuma Ecde |
|
Department of ICT, Education and Internship | Completed | Ksh 2,940,000 | Nzaui/Kilili/Kalamba | ||
Kwa Muthama Borehole | Rehabilitation of Kwa Muthama borehole |
Department of Water and Sanitation | Completed | Ksh 343,000 | Nzaui/Kilili/Kalamba | ||
Yandia Kalatu To Kakuswi- Pipeline Extension | Distribution to Kaukuswi, water kiosk, platform and 1000lt storage tank |
Department of Water and Sanitation | Completed | Ksh 980,000 | Nzaui/Kilili/Kalamba | ||
Maumi Ecde |
|
Department of ICT, Education and Internship | Stalled | Ksh 1,568,000 | Nzaui/Kilili/Kalamba | ||
Mbiuni Borehole | Drilling and Caping |
Department of Water and Sanitation | Completed | Ksh 1,000,000 | Nzaui/Kilili/Kalamba | ||
Water Tanks | Supply of 5No: 1000lts Water Tanks |
Department of Water and Sanitation | Completed | Ksh 1,201,499 | Nzaui/Kilili/Kalamba | ||
Kwa Moto Water Sump | Connection to power grid to the water project |
Department of Water and Sanitation | Completed | Ksh 1,470,000 | Nzaui/Kilili/Kalamba | ||
Kanzili Borehole | Drilling and Caping |
Department of Water and Sanitation | Completed | Ksh 1,500,000 | Nzaui/Kilili/Kalamba | ||
Ngaa Borehole | Drilling and Caping |
Department of Water and Sanitation | Completed | Ksh 1,500,000 | Nzaui/Kilili/Kalamba | ||
Purchase Of Tanks | Purchase and supply of 3 of water tanks |
Department of Health Services | Completed | Ksh 451,760 | Nzaui/Kilili/Kalamba | ||
Isololo Kwakoki Bh Pipeline Extention | Construction of isololo and kwa koki BH an pipeline extention |
Department of Water and Sanitation | Completed | Ksh 5,390,000 | Nzaui/Kilili/Kalamba | ||
Tree Planting |
|
Department of Lands, Urban Planning and Development, Environment and Climate Change | Completed | Ksh 1,000,000 | Mbitini | ||
Mechanical Road Opening And Widening | Mechanical road opening and widening of Kavuthu- A.I.C Kiioi road 5.5km and Kwa Vutu- Yumbani road 6.7Km |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 2,970,000 | Mbitini | ||
Masokani Ctti & Kithumani Ctti - Water Tanks | Installation of gutters and water tanks |
Department of ICT, Education and Internship | Completed | Ksh 1,470,000 | Mbitini | ||
Kyumbuni Ecde |
|
Department of ICT, Education and Internship | Completed | Ksh 3,430,000 | Mbitini | ||
Kavuthu Coldroom | Operationalization of post harvest facility (cold room pack house) at Kavuthu in Mbitini ward |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 100,000 | Mbitini | ||
Mbulutini Drift- Construction Of A Drift | Construction of a 100m drift, 40pcs Gabion installation 400m cut off drains for road harvesting Installation of a concrete markpost |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 12,550,000 | Mbitini | ||
Kithumani- Mbalani-Katundu Drift | culverts installation and spot gravelling of Kithumani- Mbalani- Katundu Drift |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 3,920,000 | Mbitini | ||
Kwa Kitei Drift | Kwa Kitei Drift -Construction of 35m drift and protection works | Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 3,430,000 | Mbitini | ||
Grain And Pulse Value Chain Development | Grain and pulse value chain development- 2.112MT maize, 3.05MT beans, distributed to 2,581 beneficiaries |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 2,000,000 | Mbitini | ||
Upgrading Of Mbitini Dispensary | completion of the OPD block |
Department of Health Services | Completed | Ksh 3,000,000 | Mbitini | ||
Muambwani ECDE | Construction of 2 No.classrooms and a 3 door pit latrine |
Department of ICT, Education and Internship | Completed | Ksh 3,500,000 | Mbitini | ||
Ward Motorcycle | Purchase of motorcycle |
Department of Water and Sanitation | Completed | Ksh 276,600 | Mbitini | ||
Mbitini Borehole | HGS, Drilling |
Department of Water and Sanitation | Completed | Ksh 1,360,000 | Mbitini | ||
Ilengeni Water Project | Intake and treatment works, pumping systems, pipeline, water points and storage |
Department of Water and Sanitation | Completed | Ksh 6,870,000 | Mbitini | ||
Yuuni Ecde | Construction of 2 No. classroom and 3 door pit latrine |
Department of ICT, Education and Internship | Completed | Ksh 1,255,660 | Mbitini | ||
Mbuthani Water Sump | construction of Rc sump, upgrading of pumping system rehabilitation |
Department of Water and Sanitation | Completed | Ksh 3,796,770 | Mbitini | ||
Kwa Kathoka Town Planning |
|
Department of Lands, Urban Planning and Development, Environment and Climate Change | Completed | Ksh 1,000,000 | Kikumini/Muvau | ||
Road Improvements | Light grading on various roads across the ward :- Furaha -Kwa mutune- Mangauni -Kiaoni -Kwa nzivu - Kwa Nyumba (14.2km), Kwa Mutevu- Kona- west Ngosini- Kari central - Makutano road 13.2km), Kwa Nguta -Catholiic church (6.km), Kyemwole- Kwa Matolo- Muvau- Kyusyani -Kavuliloni- Mwilu (17.2km), Ngunu-Itaa 14.3Km, Fiveten- kwa niko-Nzaai(10.5km), Kangondi-Kitonyini-Mwilu(4.7km) |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Completed | Ksh 4,900,000 | Kikumini/Muvau | ||
Agricultural Training Institute - Kwa Kathoka | Funds intent to for Implementation of damliner, shednet, poultry drinkers, poultry feeders, green house, payment of casuals inter connection and purchase of projectors |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Completed | Ksh 6,898,299 | Kikumini/Muvau |