All Projects In FY 2024/2025

Go Back

Project Scope Department Status Budget Ward Action
Kiluluini Ecde Construction of two class rooms with office and store, water harvesting (10,000 ltrs water tank) Department of ICT, Education and Internship Ongoing Ksh 3,500,000 Ilima    
Kathangathini Ecde

Construction of one class room with office and store, Installation of water harvesting goods(10,000 ltrs water tank)

Department of ICT, Education and Internship Ongoing Ksh 2,500,000 Ilima    
Kiusyi Water Project Department of Water and Sanitation Ongoing Ksh 5,000,000 Ilima    
Ukia Ward Bursary

Bursaries-bursary allocation- Application, Vetting, award and distribution

Department of ICT, Education and Internship Ongoing Ksh 4,000,000 Ukia    
Rerec Matching Grant (for Ukia -10 Villages In Upper Iuani Cluster)

Installation of transformers, construction and extension of HV lines, construction of distribution lv lines networks across 10 villages in upper Iuani cluster

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 3,000,000 Ukia    
Construction Of Concrete Slab 40m Long Along Makuli Forest Road At Kwa Mbunga

Construction of 40M drift, 8m long culvert and150m catchwater drain

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 1,800,000 Ukia    
Construction of road structures across Ukia sub ward

Construction of road structures

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 1,500,000 Ukia    
Road Improvement Programme Through Installation Of Road Structures Across Kilala/iuani Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 1,500,000 Ukia    
Construction Of Concrete Slab 30m Long Along Kavani Kituluku Dispensary Road

Construction of 30M drift and 150cm catchwater drain

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 1,500,000 Ukia    
Drilling And Equipping Borehole In Ukia Girls Secondary School

Drilling and equipping borehole  in Ukia Girls Secondary school  - Drilling and equipping of borehole  

Department of Water and Sanitation Ongoing Ksh 5,000,000 Ukia    
Itenge Water Project

-Installation of 3KM 3” diameter Itenge rising main. Submersible pump, control panel, solarization,2.5Km Makongo, Kyambalasi, Kilolo rising main 2Km Nzouni rising main

Department of Water and Sanitation Ongoing Ksh 5,000,000 Ukia    
Ithanze Water Project

2.5Km water distribution pipeline while connecting existing Ithanze Water kiosk

Department of Water and Sanitation Ongoing Ksh 3,000,000 Ukia    
Nzouni Dispensary-construction Of Staff Quarters, Placenta Pit, Ash Pit, Electrification And Fencing

construction Of Staff Quarters,

Placenta Pit,

Ash Pit,

Electrification And Fencing

Department of Health Services Ongoing Ksh 4,500,000 Ukia    
Routine maintenance of MAkindu ward access roads

road widening - 3.5Kms, Grading - 5.6Kms, Spot Gravelling - 1.6Kms around Kiambani schools and Kwa Kimongo Muoki Area, Makindu Stock Yard - Mulilii Market, Skygo-St.Mathew-Airstrip-Airstrip centre to Kwa Kimuyu church, Kwa Ngala road at Yinzau (covering of kwa Ngala pit), Murraming of 3KM Nthia - Mbiuni road and Kwa Kijana-Kavatini-Syusyani to Yiiani.along Makindu stockyard - Mulilii mkt road

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 3,500,000 Makindu    
Rerec Matching Grant In Makindu Ward

Installation of transformer at Kwa kimuyu  church, construction and extension of HV lines, construction of distribution lv lines networks for Ziwani,Kiuani,Yiani and Katheka Kai Villages, enroute, Skygo Petrol station, Kwa Mavuti, Kwa Simon Muthiani Junction to Kwa kimuyu church

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 3,000,000 Makindu    
Excavation Of Syengoni Earth Damdam
Excavation of Syengoni earth dam
Department of Water and Sanitation Ongoing Ksh 3,000,000 Makindu    
Makindu Ward Bursary

Bursary allocation -Application, vetting, award and distribution

Department of ICT, Education and Internship Ongoing Ksh 7,000,000 Makindu    
Kai Ecde

Construction 1 no. ECDE Classroom with an office; Electrical Works; Shelving to the stores; 1No. Wooden Desk; 1No.Wooden Arm Chair; 20 No. Kiddy chairs and 10. No. Kiddy tables; Play equipment 2-piece set (double swing, slide, climbing frame and double see-saw); Displays of Pin board, White Board &Mark Pens and Branding, Publicity and Signwriting

Department of ICT, Education and Internship Ongoing Ksh 2,400,000 Makindu    
Syengoni Borehole- Testpumbing

Syengoni borehole- testpumbing

Department of Water and Sanitation Ongoing Ksh 3,000,000 Makindu    
Construction Of Muangeni Drift

2.7kms heavy Bush clearing,  2.7kms heavy grading, 1km Gravelling ,installation of  16m  (600mm dia.) Culverts,construction of  20No. Gabions, 40m x6m RC non-vented drift slab, 30mx6m wide ridding surface, and 695cm of Catch water drains

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 2,000,000 Kikumbulyu North    
Road Improvement Programme in Kikumbulyu North

20kms road widening, 41kms grading and 1545cm  excavation of catch water drains.

(Opening and grading of Kisayani Kyandululu-Kiwanzani road-5.9km, Kyaani Ngaikini road-6.3Km, Kisayani jn-Ithumula-Katilamuni road-8.2km, Mikauni-Manga4-Malebwa road- 6.0km, Athi - Kwa Ngomba-Ngaikini road-12.8km and Mukononi-Nguumo road 2,2km)

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 7,000,000 Kikumbulyu North    
Construction Of Muangeni Drift

2.7kms heavy Bush clearing,  2.7kms heavy grading, 1km Gravelling ,installation of  16m  (600mm dia.) Culverts,construction of  20No Gabions, 40m x6m RC non-vented drift slab, 30mx6m wide ridding surface, and 695cm of Catch water drains

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 5,000,000 Kikumbulyu North    
Kiaoni Floodlights

Installation of 20M high mast floodlight with 6No. 400W LED fittings

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 2,000,000 Kikumbulyu North    
Kisayani Street Light

Installation of 12 No. 10M single arm grid connected streetlights

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 2,000,000 Kikumbulyu North    
Kathyaka Floodlights

Installation of 20M high mast floodlight with 6No. 400W LED fittings

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 2,000,000 Kikumbulyu North    
Kilisa Water Tank Reseivoir.reseivoir.
Kilisa water tank reseivoir.
Department of Water and Sanitation Ongoing Ksh 2,000,000 Kikumbulyu North    
Ithumula Ecde Construction of 2no. ECDE Classrooms with an office,3-Door Pit Latrine with Urinal,Electrical Works,Shelving to the stores, 2No.lockable metallic cabinets,2No. Wooden Desks,2No. Wooden Arm Chairs,Water harvesting goods (10,,000Ltrs Water Tank and base),40 No. Kiddy chairs and 20. No. Kiddy tables,Play equipment 4 piece set (double swing, slide, climbing frame and double see-saw),Display soft board and Branding, Publicity and Signwriting  Department of ICT, Education and Internship Ongoing Ksh 4,300,000 Kikumbulyu North    
Kikumbulyu North Ward Bursary

Application, Vetting, awarding and distribution of cheques

Department of ICT, Education and Internship Ongoing Ksh 5,000,000 Kikumbulyu North    
Athi Kilema Water Project- Launching

Athi kilema water project- launching

Department of Water and Sanitation Ongoing Ksh 5,733,568 Kikumbulyu North    
Rerec Matching Grant Kikumbulyu South

Installation of transformers, construction and extension of HV lines, construction of distribution LV lines networks and connection of targeted customers (AIC, Mbeetwani and surrounding villages)

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 2,000,000 Kikumbulyu South    
Installation Of Road Structures Along Kwakitavu Road

Construction of 25mx5m masonry drift and 7No. Gabions along Kwakitavu road

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 1,000,000 Kikumbulyu South    
Kibwezi-bpp Streetlights

Installation of 8.5M single arm grid connected streetlights

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 1,000,000 Kikumbulyu South    
Kikumbulyu South Bursary

Bursary allocation – Application , Vetting, award and distribution

Department of ICT, Education and Internship Ongoing Ksh 4,950,000 Kikumbulyu South    
Kilema-muundani-kwa Kanyasya-muuani Soko Muyo-mutantheeu Road

Road widening - 9Kms, Heavy Grading -14Kms, 24m 900mm dia. Culverts, 16m 600mm culverts, 15No. Gabions, along Kilema-Muundani-Kwa kanyasya-Muuani Soko Muyo-Mutantheeu Road

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 4,500,000 Nguumo    
Kwa Kivou Tala-kwa Kinyingi-kaunguni-tindima Road

5kms heavy grading, 2.5km Spot Gravelling, 500cm3 catch water drain along Kwa kivou Tala-kwa kinyingi-Kaunguni-Tindima road

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 4,000,000 Nguumo    
Kiunduani Market

4kms road grading, 1.9kms Spot Gravelling  in Kiunduani market

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 3,000,000 Nguumo    
Kibarani-wivia-kiuani Road

4.8kms bush clearing,4.8kms grading, 0.6kms Spot Gravelling, construction of 20no. Gabions, and excavation of 400cm  Catch water drains

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 2,500,000 Nguumo    
Murraming Of Jcc Kaunguni-kwa Muoka To Kwa Kivivye -3km Road.

2.5km road opening, 0.7km graveling

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 1,500,000 Nguumo    
KALEMBE RAHA KIAMBANI ROAD

3.1km road opening, 3.1km grading, 400cm3 catch water drains

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 1,000,000 Nguumo    
Mukameni Borehole Water Project
Mukameni Borehole Water Project- Pipeline extension from Mukameni to Kiunduani,Kwa kaviti area to Ilatu area
Department of Water and Sanitation Ongoing Ksh 6,000,000 Nguumo    
Construction Of Water Stand At Kwangala Borehole
Construction of water stand at Kwangala borehole (Kaunguni)
Department of Water and Sanitation Ongoing Ksh 500,000 Nguumo    
Katangini Ecde

Construction of one classroom

Department of ICT, Education and Internship Ongoing Ksh 1,000,000 Nguumo    
Nguumo Bursary
Bursary allocation–Application, Vetting, award and distribution
Department of ICT, Education and Internship Ongoing Ksh 4,000,000 Nguumo    
Ndovoini Dispensary (fencing, Installation Of A Gate, Electrification(drop), Ceiling, And Supply Of A 10,000liters Water Tank)ndovoini Dispensary (fndovoini Dispensary (fencing, Installation Of A Gate, Electrification(drop), Ceiling, And Supply Of A 10,000liters Water Tank)encing, Installation Of A Gate, Electrification(drop), Ceiling, And Supply Of A 10,000liters Water Tank)

fencing, Installation Of A Gate, Electrification(drop), Ceiling, And Supply Of A 10,000liters Water tank fencing, Installation Of A Gate, Electrification(drop), Ceiling, And Supply Of A 10,000liters Water Tank)encing, Installation Of A Gate, Electrification(drop), Ceiling, And Supply Of A 10,000liters Water Tank)

Department of Health Services Ongoing Ksh 3,000,000 Nguumo    
Fencing Of Tutini Dispensary

fencing of tutini dispensary

Department of Health Services Ongoing Ksh 500,000 Emali/Mulala    
Masauti -muselele -mumbuni -mungetheele Road

3kms road widening, 4kms heavy grading, 40km gravelling  Culverts (900mm dia. -32m), 35x6m wide RC non-vented drift, 15No. Gabions, 550m3 of Catch water drains along Masauti-muselele-mumbuni- mungetheele road

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 4,500,000 Emali/Mulala    
Mulala Primary Borehole

Drilling of borehole

Department of Water and Sanitation Ongoing Ksh 6,000,000 Emali/Mulala    
Kwa Maima Earth Dam
Kwa Maima earth dam - Dam Wall, Reservoir, Draw-off System, Cattle water trough, Fence, Communal water point/kiosk and access road to the Dam.
Department of Water and Sanitation Ongoing Ksh 4,000,000 Emali/Mulala    
Emali Township Borehole
Solarisation and equipping of Emali Township Borehole
Department of Water and Sanitation Ongoing Ksh 2,000,000 Emali/Mulala    
Piping Of Matiku Borehole
Piping of Matiku Borehole to Matiku Market
Department of Water and Sanitation Ongoing Ksh 500,000 Emali/Mulala    
Emali/mulala Ward Bursary

Bursary allocation, application, vetting, award and distribution

Department of ICT, Education and Internship Ongoing Ksh 4,500,000 Emali/Mulala    
Tutini Dispensary – Fencing

fencing

Department of Health Services Ongoing Ksh 500,000 Emali/Mulala    
Mwanyani Health Centre

2 bed room staff house

water harvesting

mechanical works

electrical works

Department of Health Services Ongoing Ksh 3,000,000 Emali/Mulala    
Mulala Primary School Borehole

testpumping of mulala primary borehole

Department of Water and Sanitation Ongoing Ksh 6,000,000 Emali/Mulala    
Construction Of A Three Door Latrine At Utini Market Construction of a three door latrine at Utini Market Department of Trade, Marketing, Industry, Culture and Tourism. Ongoing Ksh 650,000 Masongaleni    
Masongaleni Bursary

Bursary allocation – Application , Vetting, award and distribution

Department of ICT, Education and Internship Ongoing Ksh 3,000,000 Masongaleni    
Rerec Matching Grant- Masongaleni ward

REREC Matching Grant-Mitamboni Village in Mukaange Sub Ward and Miangeni/ Maluini Villages in Kyumani Sub Ward and Ngangani Village.Installation of transformers, construction and extension of HV lines, construction of distribution lv lines networks.

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 4,000,000 Masongaleni    
Road Improvement Programme In Masongaleni Ward

Road widening - 8Kms, Heavy Grading - 21Kms, Spot Gravelling - 7Kms, Culvert installation 45m, Catch water drains Excavation - 423cm along access roads in the Ward.  

  1. Ngangani,Yumbuni,Katulye,Yikitaa,Kasua ngove,Yikivuthi,Utiini,Kithyululu,Wandei,mwaani Masaku ndogo. 2. Kithiiani Ulilinzi road.

3. Rhodah Kavusya Miumoni road.

4. Wandei Muangeni road.

5. KARI, Florah Wambua, Kwa Muema, Makongeni roads.

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 7,000,000 Masongaleni    
Installation Of Solar Market Lights At Munyenze, Kithiiani, Kithyululu And Kyanguli Markets

Installation of 10.5M, 2-150W Integrated Solar floodlights at Munyenze, Kithiiani, Kithyululu and Kyanguli Markets

Rehabilitation of Market lights at Katulye, Masaku Ndogo and Kyumani markets

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 1,400,000 Masongaleni    
Repair Of Solar Market Lights (intregrated Model) At Katulye, Masaku Ndogo And Kyumani Markets

Repair of Solar market lights (intregrated model) at Katulye, Masaku Ndogo and Kyumani Markets

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 650,000 Masongaleni    
Purchase Of Tents-masongaleni Ward Department of Gender, Children, Youth, Sports and Social Services Ongoing Ksh 2,000,000 Masongaleni    
Construction Of Culverts In Masongaleni Ward

Construction of culverts along Ngangani,Yumbuni,Katulye,Yikitaa,Kasuangove,Yikivuthi,Utiini,Kithyululu,Wandei,mwaani Masaku ndogo.


Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 1,000,000 Masongaleni    
Mtito Andei Ward Bursary

Bursary allocation – Application , Vetting, award and distribution

Department of ICT, Education and Internship Ongoing Ksh 3,000,000 Mtito Andei    
Yindundu Ecde

Construction of 1no. ECDE Classrooms with an office,3-Door Pit Latrine with Urinal,Electrical Works,Shelving to the stores,2No.lockable metallic cabinets,2No. Wooden Desks,2No. Wooden Arm Chairs,Water harvesting goods (10,000Ltrs Water Tank and base),40 No.Kiddy chairs and 20. No. Kiddy tables,Play equipment 4 piece set (double swing, slide, climbing frame and double see-saw),Display soft board and Branding, Publicity and Signwriting


Department of ICT, Education and Internship Ongoing Ksh 2,500,000 Mtito Andei    
Mwaani Ecde

Construction of 1no. ECDE Classrooms with an office,3-Door Pit Latrine with Urinal,Electrical Works,Shelving to the stores,2No.lockable metallic cabinets,2No. Wooden Desks,2No. Wooden Arm Chairs,Water harvesting goods (10,000Ltrs Water Tank and base),40 No.Kiddy chairs and 20. No. Kiddy tables,Play equipment 4 piece set (double swing, slide, climbing frame and double see-saw),Display soft board and Branding, Publicity and Signwriting

Department of ICT, Education and Internship Ongoing Ksh 2,500,000 Mtito Andei    
Silanga Ecde Class

Construction of 1no. ECDE Classrooms with an office,3-Door Pit Latrine with Urinal,Electrical Works,Shelving to the stores,2No.lockable metallic cabinets,2No. Wooden Desks,2No. Wooden Arm Chairs,Water harvesting goods (10,000Ltrs Water Tank and base),40 No.Kiddy chairs and 20. No. Kiddy tables,Play equipment 4 piece set (double swing, slide, climbing frame and double see-saw),Display softboard and Branding, Publicity and Signwriting

Department of ICT, Education and Internship Ongoing Ksh 2,500,000 Mtito Andei    
Kalimani – Kitengei – Kilumilo road

15km road grading, 33m x 5m wide drift  repair and extension 676m excavation of catch water along Kamulalani – Kalimani – Kitengei – Kilumilo – Yindundu – Athi-Makutani – Mikomani –Kambu River- Lukenya Junction – Ilikoni- Mwaani – Misani – Kamunyu – Ngiluni – Syusyani – Iviani.

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 4,000,000 Mtito Andei    
Hire Of Road Maintainance Equipment

20km road  grading, 1km gravelling and 190M3 Mitre drains

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 3,185,000 Mtito Andei    
Installation Of Street Lighting In Subati, Kilumilo And Kwa Kinyuti, Nzoila, Ngiluni, Iviani And Yindundu Markets Installation of 8.5M 2-arm Integrated Solar floodlights in Subati, Kilumilo and Kwa Kinyuti, Nzoila, Ngiluni, Iviani and Yindundu markets Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 3,000,000 Mtito Andei    
Ngai Ndethya Water Project

Requisition for Ngai Ndethya water project, solar installation and pipeline extension

Department of Water and Sanitation Ongoing Ksh 7,417,400 Mtito Andei    
Hire Of Road Mantainance Equipment - Mtito Andei Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 1,917,764 Mtito Andei    
Thange Ward Bursary

Bursary allocation – Application, Vetting, award and distribution

Department of ICT, Education and Internship Ongoing Ksh 3,000,000 Thange    
Thange Ecde

Construction of 1no. ECDE Classrooms with an office; Electrical Works; Shelving to the stores;1No. Wooden Desks; 1No. Wooden Arm Chairs; Water harvesting goods (10,000Ltrs Water Tank); Play equipment - 4 piece set (double swing, slide, climbing frame and double see-saw); Display soft Pin board, White Board & Mark Pens; Branding, Publicity and Signwriting; 20 Kiddy chairs and 10 Kiddy table

Department of ICT, Education and Internship Ongoing Ksh 2,100,000 Thange    
Kikingini-usalama- Muusini-maikuu-kwa Malyungi-kwa Mwololo-kwa Nyaanya- Ituumo-utithi-kalulu-kwa Muthoka- Makwata- Stage Iviani

8.5kms road widening, 21kms heavy grading, 40m culverts installation (600mm diameter.), Catch water drains -250cm along Kikingini-usalama- muusini-maikuu-kwa malyungi-kwa mwololo-kwa nyaanya- ituumo-utithi-kalulu-kwa muthoka- makwata- stage iviani road

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 3,000,000 Thange    
Construction Of Culverts At Kikingini-usalama- Muusini-maikuu-kwa Malyungi-kwa Mwololo-kwa Nyaanya- Ituumo-utithi-kalulu-kwa Muthoka- Makwata- Stage Iviani Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 1,000,000 Thange    
Supply And Delivery Of One Motorbike For Thange Ward

supply and delivery of one motorbike for Thange ward

Department of Water and Sanitation Ongoing Ksh 200,000 Thange    
Matulani Ecde

Construction of 2no. ECDE Classrooms with an office,3-Door Pit Latrine with Urinal,Electrical Works, Supply of 2No.lockable metallic cabinets,2No. Wooden Desks,2No. Wooden Arm Chairs,Water harvesting goods (10,,000Ltrs Water Tank and base),40 No. Kiddy chairs and 20. No. Kiddy tables,Play equipment 4 piece set (double swing, slide, climbing frame and double see-saw),Display soft board and Branding, Publicity and Signwriting

Department of ICT, Education and Internship Ongoing Ksh 3,600,000 Ivingoni/Nzambani    
Ivingoni/nzambani Ward Bursary

Bursary allocation; Application , Vetting, award and distribution

Department of ICT, Education and Internship Ongoing Ksh 3,000,000 Ivingoni/Nzambani    
Iiani Ecde

Construction of 2no. ECDE Classrooms with an office,3-Door Pit Latrine with Urinal,Electrical Works,Shelving to the stores, 2No.lockable metallic cabinets,2No. Wooden Desks,2No. Wooden Arm Chairs,Water harvesting goods (10,,000Ltrs Water Tank and base),40 No. Kiddy chairs and 20. No. Kiddy tables,Play equipment 4 piece set (double swing, slide, climbing frame and double see- saw),Display soft board and Branding, Publicity and Signwriting

Department of ICT, Education and Internship Ongoing Ksh 3,600,000 Ivingoni/Nzambani    
Routine Maintenance Of Ivingoni /nzambani Ward Access Roads

42.80KM Road opening, Light grading  and excavation of mitre drains through county machinery on selected roads across the ward :-

. Kavingoni-Kwa Kyambu-Kwa Muia Kaviti-Kwa Sir K Road.
2. Kwa Kathima-Kwa Mavua-Kwa Katili-Makokani Road.
3. Kwa Janet Kiilu-Kwa Mutie-Kwa Munyao-Kwa Dr. Mwende-Kiaoni Bridge Road.
4. Kwa Crusher-Makokani Catholic-Kasarani-Kwa Song’o-Makokani Road.
5. Makokani Town-Kwa Kasemba-Kwa Cyrus-Kwa Ndemange-Kavilila Road.
6. Mbenuu Baptist-Kwa Alice Kilonzo-Kwa Nyamai-Kwa Ndetei-Kiaoni Bridge Road.
7. Kwa Kisambia-Kwa King’oo-Iia Itune Road.
8. Kwa Mwanthi-Kwa Engineer Mwatu-Kwa Nzevela-Kwa Benard Kikuvi-Kwa Kitavi Road.
Kwa Mutua Nzioka-Kwa Makonge-Kwa Ndulili-Kwa Nyamai Mateng’e Road
1. Simamba-Matulani Primary-Kwa Simo Road.
2. Simamba-Kwa Mulei-Kwa Kalinga-Kwa Mutheu-Kwa Willy-Mtito-andei Road.
3. Matulani Primary-Kwa Reverend Mwonga-Matulani AIC-Mtito-andei Road.
4. Matulani AIC-Kwa Mateli-Kwa Mutinda Road.
5. Kwa Mbwika-Ivingoni Secondary-Kwa Kyondo-Kwa Ndeleva-Mutomo Road.
6. Kwa Matikila-Kwa Syong’alu-Kosovo-Kwa Mbondo-Kwa Mwaura Road.
7. Kwa Mbithi-Kwa Mutua Kavila-Kwa Kaminda-Kwa Mwau Ndilu-Kwa Waie-Goshen (Kwa Mbuta)-Kwa Mwaniki-Mtito-andei Road

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 2,000,000 Ivingoni/Nzambani    
Kwa Mwambu-mbukoni-manyata-mbotela Market

2.5km road gravelling along Kwa Mwambu-Mbukoni-Manyata-Mbotela Market

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 2,000,000 Ivingoni/Nzambani    
Kiuukuni-kwa Malonza-yumbuni-rose Dominic-nzeveni-ndithini

4km road opening along Kiuukuni-Kwa Malonza-Yumbuni-Rose Dominic-Nzeveni-Ndithini

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 1,000,000 Ivingoni/Nzambani    
Kwa Masaa Road

4km road opening along Kwa Masaa road 1

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 1,000,000 Ivingoni/Nzambani    
Katheka Kai Borehole Department of Water and Sanitation Ongoing Ksh 4,000,000 Ivingoni/Nzambani    
Rehabilitation Of Kwa Kalekye Borehole Department of Water and Sanitation Ongoing Ksh 4,000,000 Ivingoni/Nzambani    
Installation Of Culverts At Chief Ngutu Road

Installation of drainage structure(culvert) at Chief Ngutu road

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 400,000 Ivingoni/Nzambani    
Murramig Of Nzeveni-selewa-kwa Matundu-kwa Willy Road

Murraming of Nzeveni-Selewa-Kwa Matundu-Kwa Willy Road

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 1,250,000 Ivingoni/Nzambani    
Nguu Masumba Bursary

Bursary allocation – Application, Vetting, award and distribution

Department of ICT, Education and Internship Ongoing Ksh 6,000,000 Nguu/Masumba    
Kwa-mukonyo Ecde

Construction of 2no. ECDE Classrooms with an office,3-Door Pit Latrine with Urinal, Electrical Works, Shelving to the stores,2No.lockable metallic cabinets,2No. Wooden Desks,2No. Wooden armchairs, Water harvesting goods (10,000Ltrs Water Tank and base),40 No. Kiddy chairs and 20. No. Kiddy tables, play equipment 4-piece set (double swing, slide, climbing frame and double seesaw), Display soft board and Branding, Publicity and Signwriting

Department of ICT, Education and Internship Ongoing Ksh 3,600,000 Nguu/Masumba    
Matutu Ecde

Construction of 2no. ECDE Classrooms with an office,3-Door Pit Latrine with Urinal, Electrical Works, Shelving to the stores,2No.lockable metallic cabinets,2No. Wooden Desks, 2No. Wooden armchairs, Water harvesting goods (10,000Ltrs Water Tank and base),40 No. Kiddy chairs and 20. No. Kiddy tables, play equipment 4-piece set (double swing, slide, climbing frame and double seesaw), Display soft board and Branding, Publicity and Signwriting

Department of ICT, Education and Internship Ongoing Ksh 3,600,000 Nguu/Masumba    
Pwd Support – Assistive Devices -nguu/masumba Department of Gender, Children, Youth, Sports and Social Services Ongoing Ksh 500,000 Nguu/Masumba    
Masumba Dispensary -rehabilitation & Renovation Works

Renovation of the health center facility

maternity/laboratory

Department of Health Services Ongoing Ksh 2,000,000 Nguu/Masumba    
Yikivumbu Dispensary

FINISHES

SANITARY/ MECHANICAL WORKS

WATER HARVESTING

Department of Health Services Ongoing Ksh 1,500,000 Nguu/Masumba    
Rehabilitation Of Kwa Kiamba -makasa Aic -kwa Tumbo- Ngulai Road

4.1Kms heavy grading, 2.8 Kms gravelling, installation of culverts 64m (600mm and 900mm), excavation of 1500m cubic catch water drains and 1 publicity signboard

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 6,806,810 Nguu/Masumba    
Construction Of A Culvert At Matongoleni

Construction of a culvert at Matongoleni

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 2,000,000 Nguu/Masumba    
Ida (world Bank) Credit Financing Locally-led Climate Action (flloca) Program, County Climate Resilience Investment (ccri) Grant Department of Lands, Urban Planning and Development, Environment and Climate Change Ongoing Ksh 142,746,435 Headquaters    
Road Upgrading - Cabro Paving Access Roads In Wote Township -a Thousand Palms - Kwa Nguku - Equity Road, Kapeo - Cooperative Bank Parking Lot, Mumu Super Market Ngooni Soda Depot - Kasanga Butchery Road Department of Lands, Urban Planning and Development, Environment and Climate Change Ongoing Ksh 10,000,000 Headquaters    
Erection Of Integrated Solar Flood Light High Mast 20 Metre (bangladesh- Wote Town) -20 Metre High Flood Light, Solar Powered Department of Lands, Urban Planning and Development, Environment and Climate Change Ongoing Ksh 3,000,000 Headquaters    
Construction Of Modern Toilet At Kalamba - Construction Of 5 Door Wc With Urinal, Septic, Water Tank Department of Lands, Urban Planning and Development, Environment and Climate Change Ongoing Ksh 2,300,000 Headquaters    
Old Mukuyuni Marikiti Market

Renovation of old Mukuyuni Marikiti market

Department of Lands, Urban Planning and Development, Environment and Climate Change Ongoing Ksh 1,000,000 Headquaters