All Projects In FY 2023/2024

Go Back

Project Scope Department Status Budget Ward Action
Road Improvement Program Masonry Drift Riding Slab 70m by 5m Cut off drains for road run off harvesting Mechanical Road Widening- 10kms  Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 4,410,000 Kisau/Kiteta
Iviani, Kivani And Kiteta Playgrounds Levelling of the play ground Department of Gender, Children, Youth, Sports and Social Services Completed Ksh 1,900,000 Kisau/Kiteta
Lungu Borehole Drilling of borehole and test pumping Department of Water and Sanitation Completed Ksh 2,374,220 Kisau/Kiteta
Kithongo Borehole Drilling of borehole and test pumping Department of Water and Sanitation Completed Ksh 2,374,221 Kisau/Kiteta
Songeni Ecde
  • 2 No. ECDE Classrooms with an office and Store
  • Electrical Works (conduits only)
  • Shelves
  • 2 No. Wooden Desks
  • 2 No. Wooden Arm Chairs
  • Water harvesting goods (5,000Ltrs Water Tank)
  •  Play equipment - 4 piece set (double swing, slide, climbing frame and double see-saw)
  • Display Pinned board
  • Branding, Publicity and Signwriting
  • 2 No. Black board retained
  • 4 No. Duster
  • 20 No. Mark pens
  • 2 No. Whiteboard
Department of ICT, Education and Internship Completed Ksh 3,136,000 Kisau/Kiteta
Kimandi Borehole Construction of 2No. Water kiosks, installation of 2No. 10cm cubic metres plastic storage tanks, water distribution pipeline to kyambusya and rehabilitation of rising main. Department of Water and Sanitation Completed Ksh 3,710,279 Kisau/Kiteta
Songeni Water Project Drilling of borehole, equipping and solarizing, construction of 0.6 km rising main to Itulu water kiosk Department of Water and Sanitation Completed Ksh 4,900,000 Kisau/Kiteta
Kwa Matinga Water Project Drilling of borehole, equipping and solarizing, construction of 1.0km rising main to kwa Matinga storage tank, rehabilitation of 3.4km distribution pipeline ,construction of 1No. water kiosk and installation 2No.5 cubic metres plastic storage tank Department of Water and Sanitation Completed Ksh 4,794,228 Kisau/Kiteta
Mulasya Ecde
  • 2No. ECDE Classrooms with an office and Store
  • Electrical Works (conduits only)
  • Shelves
  • 2No. Wooden Desks
  • 2No. Wooden Arm Chairs
  • Water harvesting goods (5,000Ltrs Water Tank)
  • Play equipment - 4 piece set (double swing, slide, climbing frame and double see-saw)
  • Display Pinned board
  • Branding, Publicity and Signwriting
  • 2 No. Black board retained
  • 4 No. Duster
  • 20 No. Mark pens
  • 2 No, Whiteboard
Department of ICT, Education and Internship Completed Ksh 3,136,000 Kisau/Kiteta
Road Improvement Programme Mechanical Road widening and heavy grading of 9Kms  on selected roads ie  Ikundu- Kwa male - kwa Maingi Thwake road, Malili -Kuku-Thwake road, Kwa Chief Ndiku- Mwaani- Kingathuni road, Malatani - Miseleni -kwa kianga road, Nguumo- MBA road.Non vented masonry drift-25m by 5m and 35m by 5m and installation of culverts 16m by 600mm DIA along Matalani - Miseleleni - Kwa Kianga road. Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 7,180,720 Kako/Waia
Kyang'ondu Stock Yard Kyang'ondu stock yard Department of Agriculture, Livestock, Fisheries & Cooperative Development Completed Ksh 3,000,000 Kako/Waia
Construction Of Kako - Kandulyu (savani) Drift FY2023/24 allocation was pending bill  Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 4,210,612 Kako/Waia
Grain And Pulse Value Chain Development Provision of certified maize and beans seeds to farmers Department of Agriculture, Livestock, Fisheries & Cooperative Development Completed Ksh 1,000,000 Kako/Waia
Boda Boda Shed - Kako/waia Construction of a bodaboda shed Department of Gender, Children, Youth, Sports and Social Services Completed Ksh 300,000 Kako/Waia
Waia Earth Dam Construction of 3No. Water Koisks and installation of 4No. 10Cubic metres plastic storage tanks. Water distribution extension from kavingo market to kyamangatu, kwa masai to Ilela market and Kwa masai to kwa mutava. Construction of 1No. Cattle trough at kwa Ilela market. Department of Water and Sanitation Completed Ksh 5,880,000 Kako/Waia
Nyaanyaa Earthdam Phase 2 Construction of 1.3km rising main, construction of 1No. Water kiosk and installation of 1No. 10Cubic metres plastic storage tank. Department of Water and Sanitation Completed Ksh 1,568,000 Kako/Waia
Kwa Mutombi Water Project Rehabilitation of rising main and installation of 2No. 10 Cubic metres platic storage tanks and constrcution of 2No. Platforms, Servicing of Genset and installation of new battery. Department of Water and Sanitation Completed Ksh 1,960,000 Kako/Waia
Kyaluma Bore Hole Water Project Solarization, replacement of pump end, flushing borehole, construction of elevated steel tower to hold 2No. 10CM plastict storage tanks, construction of kyaluma market water point, renovation of kyowani market water kiosk, water pipeline distribution distribution to kyowani and kyaluma market. Department of Water and Sanitation Completed Ksh 4,900,000 Kako/Waia
Solarization And Distribution Of Makaia Borehole Solarization and Distribution of Makaia borehole - Installation of solar panels, Water distribution to Kathamba market, kathamba schools, mba market, Mba schools, Mwaani market, Sakai primary school, Kwa mutumba and Mavitini Department of Water and Sanitation Completed Ksh 6,860,000 Kako/Waia
Kavingiliti Earthdam ( Miau earthdam) Kavingiliti earthdam - in house machines Department of Water and Sanitation Completed Ksh 2,940,000 Kako/Waia
Construction Of Kwa Malai Earthdam,enlargement Spillway Checkdam,drawal System Department of Water and Sanitation Completed Ksh 284,274 Kako/Waia
Kavumbu Public Toilet (kalawa) construction of  2-Door pit latrine and urinal Department of Trade, Marketing, Industry, Culture and Tourism. Completed Ksh 500,000 Kalawa
Planning and survey of Kathulumbi market Preparation of local physical development plan Department of Lands, Urban Planning and Development, Environment and Climate Change Completed Ksh 1,000,000 Kalawa
Planning and survey of Kalawa market
  • Preparation of local physical development plan
Department of Lands, Urban Planning and Development, Environment and Climate Change Completed Ksh 1,000,000 Kalawa
Road Improvent Programme Road improvement programme through mechanical Road Opening, Light Grading and  installation of cut-off drains on selected roads across the ward - 101 hours on crawler dozers- 245 hours on motor grader Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 9,750,000 Kalawa
Katangini Dispensary -completion Of Maternity Block And Incinerator Construction of new maternity block Department of Health Services Completed Ksh 1,390,450 Kalawa
Kathulumbi Model Health Centre.(fencing And Gate) Fencing of the facility and installation of gate Department of Health Services Completed Ksh 30,544 Kalawa
Mutembuku Heath Centre (renovations) Renovation of OPD block - New roof and iron sheets, painting, tiles and eletrical installations Department of Health Services Completed Ksh 2,500,000 Kalawa
Syongungi Ecde
  • 2 No. ECDE Classrooms with an office and Store
  • Electrical Works (conduits only)
  • 2 No. Wooden Desks
  • 2 No. Wooden Arm Chairs
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  •  Display Pinned board
  • Branding, Publicity and Signwriting
  • 2 No. Black board
Department of ICT, Education and Internship Completed Ksh 2,940,000 Kalawa
Athi Kalawa Wash Programme Department of Water and Sanitation Completed Ksh 2,430,000 Kalawa
Hire Of Machines For Roadworks; Katangini – Ngunini Rd, Murramuni -kavumbu-miangeni-mbavani-mutembuko-syongungi-kwa Mareka Junction Rd And Kalawa Health Cetre – Kathiani Market Rd, FY2023/24 allocation was pending bill Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 3,000,000 Kalawa
Mweleli Ecde Construction of one classroom Department of ICT, Education and Internship Completed Ksh 527,367 Kalawa
Sports Development Kalawa Purchase of sports items Department of Gender, Children, Youth, Sports and Social Services Completed Ksh 200,000 Kalawa
Social Protection Kalawa Purchase and distribution of food and non food items Department of Gender, Children, Youth, Sports and Social Services Completed Ksh 887,500 Kalawa
Athi-miangeni- Kalawa Water Project. Athi-Miangeni- Kalawa water project. Phase 1-Construction of pump house, treatment, pump the water to Wii hills and piping for distribution. Department of Water and Sanitation Completed Ksh 1,000,000 Kalawa
Kyamakuthi Earth Dam Desilting of kyamakuthi reservoir Department of Water and Sanitation Completed Ksh 14,910,012 Kalawa
Akwash Water Project AKWASH water project- Extension of AKWASH and distribution  to kathongo  kavumbu and Mweleli clusters Department of Water and Sanitation Completed Ksh 1,312,182 Kalawa
Kwa Muthama Earthdam Desilting Kwa Muthama Earthdam  Department of Water and Sanitation Completed Ksh 2,450,000 Kalawa
Kwa Ivali Earthdam Desiling reservoir and rehabilitation of spillway Department of Water and Sanitation Completed Ksh 4,900,000 Kalawa
Drilling And Equipping Of 5 No. Boreholes In The Ward Using Own Machines Department of Water and Sanitation Completed Ksh 7,000,000 Kalawa
Grading And Installation Of Drainage Structures Along Ngaamba-marwa Road Installation ofCulverts and drainage works,  -Spot grading -Spot gravelling Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 3,920,000 Kiima Kiu/Kalanzoni
Kwa Kea Ecde
  • 2No. ECDE Classrooms with an office and Store
  • 3-Door Pit Latrine with Urinal
  • Electrical Works (conduits only)
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  • Display Pinned board
  • Branding, Publicity and Signwriting
  • 2No. Black Board
Department of ICT, Education and Internship Completed Ksh 3,430,000 Kiima Kiu/Kalanzoni
Control Of Gulleys At Kwe Kuyu Kalembwani
  • Excavation 
  • Concrete works and protection works 
Department of Lands, Urban Planning and Development, Environment and Climate Change Completed Ksh 1,000,000 Kiima Kiu/Kalanzoni
Rehabilitation of Kwa Tuva - Ngiini- Kalanzoni - Yaitha Road Heavy grading, spot murraming and drainage works from Ngiini- Kalanzoni - Yaitha road Construction of gabions at Kwa Malonga - Mulumini road Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 9,860,000 Kiima Kiu/Kalanzoni
Construction Of A Public Toilet At Marwa Market
  • Construction of  Pit latrine block and urinal at Marwa Market
  • Ticket booth
  • Rain water goods
  • 5000 lts plastic water tank and base
Department of Trade, Marketing, Industry, Culture and Tourism. Completed Ksh 1,000,000 Kiima Kiu/Kalanzoni
Construction Of Public Toilet At Ngiini Playground Construction of public toilet at Ngiini Playground Department of Trade, Marketing, Industry, Culture and Tourism. Completed Ksh 1,000,000 Kiima Kiu/Kalanzoni
Installation Of 8.5m Double Arm Integrated Solar Lights System Mavivye Market Installation of double arm metallic pole 8.5m high , fixing of 150W integrated solar streetlight system at Mavivye market Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 245,000 Kiima Kiu/Kalanzoni
Ulu Dispensary (construction Of A L-shaped Dispensary) - Dispensary Infrastructural Requirements (construction Of Consultation Room, Reception, Pharmacy, Store, Observation And Sterilization Room). Sanitary Infrastructure - Construction Of Latrine, Septic Tank, Soak Pit, Placenta Pit, Ash Pit And Burning Chamber.  (construction of a L-shaped dispensary) - Dispensary infrastructural requirements (construction of consultation room, reception, pharmacy, store, observation and sterilization room). Sanitary infrastructure - construction of latrine, septic tank, soak pit, placenta pit, ash pit and burning chamber.  Department of Health Services Completed Ksh 340,040 Kiima Kiu/Kalanzoni
Kisse Ecde Construction of 2 No. classrooms, 3 door pit latrine Department of ICT, Education and Internship Completed Ksh 3,500,000 Kiima Kiu/Kalanzoni
Construction Of Marternity And Laboratory In Kavuko Dispensary Construction of marternity and laboratory Department of Health Services Completed Ksh 2,936,945 Kiima Kiu/Kalanzoni
Fencing, Filling Of Ditch, Incinerator,ashpit And Placenta Pit For Kalanzoni Dispensary installation of solar power at kalanzoni dispensary Department of Health Services Completed Ksh 500,000 Kiima Kiu/Kalanzoni
Kiu Primary Play Ground And Toilet Levelling of the field and construction of a toilet Department of Gender, Children, Youth, Sports and Social Services Completed Ksh 2,000,000 Kiima Kiu/Kalanzoni
Kwa Makaa Earthdam i.    Reservoir desilting.ii.    Making good of the embankment.iii.    Making good of the spillway.iv.    Check dam construction Department of Water and Sanitation Completed Ksh 2,940,000 Kiima Kiu/Kalanzoni
Katatu Dam i.    Desilting and expansion of the reservoirii.    Making good of the spillway and embankmentiii.    Construction of a check dams and cut off drains. Department of Water and Sanitation Completed Ksh 3,920,000 Kiima Kiu/Kalanzoni
Machines For Hire -road Improvement Road opening and widening - Kima-Nzeveni – Kalembwani rd,- Ndovoini-Kalembwani road,-Kithea-Kalembwani road,- Kathetheni-Kathungu road, -Malili -Eka Ili road, -Dalani – Kiu road Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 3,995,000 Kiima Kiu/Kalanzoni
Kyunguni Earth Dam Department of Water and Sanitation Completed Ksh 2,189,243 Kiima Kiu/Kalanzoni
Kilome Sub-county Administration Office Construction of office block Department of Devolution, Public Service, Public Participation and Special Programs Completed Ksh 9,000,000 Mukaa
Road Improvement Programme Mechanical light grading and spot graveling of selected roads across the ward:- Domino- kyandue -Mbukuni road, Mwanyani-Kyangala road, AIC Kathemboni- Mukimani- Uvete Road, Kitondo- kwangole- Mangunguu- kwa nzalu road,Kyangalamkt- Matumbini - Enzai road, Kwa ndiku- kwa joshia- kwa kivila-maiani salvation army road, Kamuthini - kwa Nagai- Moyale- Kwa kakui dam road, Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 2,965,200 Mukaa
Kwa Muatha Ecde
  • 2 No. ECDE Classrooms with an office and Store
  • Electrical Works (conduits only)
  • 2 No. Wooden Desks
  • 2 No. Wooden Arm Chairs
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  • Display Pinned board
  • Branding, Publicity and Signwriting
  • 2 No. Black board
Department of ICT, Education and Internship Completed Ksh 2,940,000 Mukaa
Mukaa-uvete Road Road opening, grading/formation, spot murraming and drainage structures along  Mukaa-Uvete road Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 5,385,000 Mukaa
Mukaa Road Improvement Construction of culverts and drainage structures Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 1,500,000 Mukaa
Hire Of Machinery Road improvement programme through road grading on selected roads across the ward
  1. Kyangala-Matumbini road -1km
  2. Matumbini -Enzai    -4km
  3. Enzai-Kwa Kilingi  -4km
  4. Kikotoni-Kwa Mulandi -3.8km
  5. Kwa Mulandi -Chandui 3.9km
  6. Chandui-Mapopoani 4.1km
  7. Kwa Mtoto-Kwa Muatha 3.9km
Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 1,176,000 Mukaa
Installation Of Integrated Solar Light System ( Kamuthini, Kiongwani,kyandue, Kyangala, Mutiluni &maiani Installation of double arm metallic pole 8.5m high , fixing of 150W integrated solar streetlights fittings Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 1,470,000 Mukaa
Upgrading Of Enzai Dispensary proposed upgrading- including;
  • worktops
  • railing (balustranding)
  • ceiling and floor finishes
  • mechanical works- sanitary fittings, internal drainage, foul drainage system, water reticulation,
  • electrical works installation
Department of Health Services Completed Ksh 2,940,000 Mukaa
Upgrading Of Kamuthini Dispensary(completion Of Injection Room And Equipping Of Maternity) Completion of OPD Block and Injection room Department of Health Services Completed Ksh 29,542 Mukaa
Fencing And Gate Installation Of Mutiluni Dispensary Fencing and gate installation Department of Health Services Completed Ksh 1,260,900 Mukaa
Equipping And Operationalization Of General Ward At Uvete Health Centre Equipping and operationalization of general ward at Uvete health Centre Department of Health Services Completed Ksh 26,042 Mukaa
Sports Development Mukaa Purchase of sport items Department of Gender, Children, Youth, Sports and Social Services Completed Ksh 245,000 Mukaa
Uvete Playground Levelling of the field and construction of a toilet Department of Gender, Children, Youth, Sports and Social Services Completed Ksh 2,000,000 Mukaa
Mutiluni Borehole  i.    Borehole flushing and test pumping.ii.    Installation of 1.4km of pipeline.iii.    Construction of 1no. water kiosk.iv.    Installation of a borehole pump v.    Installation of a fence at source vi.    Drilling of a complementary borehole. Department of Water and Sanitation Completed Ksh 4,900,000 Mukaa
Maiani Borehole   Drilling, casing, and capping. Department of Water and Sanitation Completed Ksh 4,900,000 Mukaa
Kitumbini Ctti Fencing Fencing and gate installation Department of ICT, Education and Internship Completed Ksh 1,470,000 Kasikeu
Kasikeu Stock Yard And Toilet. Rehabilitation of Kasikeu stock yard and toilet. Department of Agriculture, Livestock, Fisheries & Cooperative Development Completed Ksh 478,184 Kasikeu
Road Improvement Programme Road improvement programme through road opening 1) Kwa nzai ivia yiu isika road 2)kitivo kithina mwanya ivaa road3)kitivo masokani road 4)chunguni primary kaseve road 5)kawese railway road 6)wathini kalaani road Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 2,940,000 Kasikeu
Grain And Pulse Value Chain Development Provision of certified green grams, maize, cowpeas and beans seeds to farmers  Department of Agriculture, Livestock, Fisheries & Cooperative Development Completed Ksh 2,000,000 Kasikeu
Planning of Kayata Market Planning of Kayata Market  Department of Lands, Urban Planning and Development, Environment and Climate Change Completed Ksh 1,622,600 Kasikeu
Kwa Kavenzi-mitamboni-mwangini Road culvert construction Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 965,000 Kasikeu
Kwa Mbumbu Ecde  Pending works include fixing of  few window panes. Contractor has been out of site since Novembers 2023. Department of ICT, Education and Internship Completed Ksh 533,472 Kasikeu
Ndivu Ecde
  • 2 No. ECDE Classrooms with an office and Store
  • 3-Door Pit Latrine with Urinal
  •  Full Electrical Works
  • Shelves
  • 2 No. Wooden Desks
  • 2 No. Wooden Arm Chairs
  • Water harvesting goods (10,000Ltrs Water Tank and base)
  • 40 No. Kiddy chairs and 20. No. Kiddy tables
  • Play equipment 4 piece set (double swing, slide, climbing frame and double see-saw)
  • Display pin board
  • Branding, Publicity and Signwriting
  • 2 No. Blackboard
Department of ICT, Education and Internship Completed Ksh 3,920,000 Kasikeu
Rehabilitation Of Kasikeu – Mutweamboo – Kwa Ndiki – Ndumbini – Mombasa Road Drift construction, box culverts reinstatement spot murraming and drainage structures along Kasikeu – Mutweamboo – Kwa Ndiki – Ndumbini – Mombasa roadConstruction of 75m*6m drift240m2 Stone pitchingDemolishing structureGraveling on 500mconstruction of 150 scour checks Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 10,843,838 Kasikeu
Renovation Of Maternity Wing And Upgrading Of Kasikeu Model Health Centre Renovation of OPD and maternity block Department of Health Services Completed Ksh 4,500,000 Kasikeu
Completion Of Kiou Dispensary Block, Staff House And Water Tanks Completion of staff house and new facility. Department of Health Services Completed Ksh 68,874 Kasikeu
Completion Of Mbiini Dispensary completion of the OPD block Department of Health Services Completed Ksh 2,450,000 Kasikeu
Construction Of Kiou Top Dispensary Construction of a new dispensary at Kiou top Hill. Department of Health Services Completed Ksh 11,508 Kasikeu
Road Improvement And Maintenance Grading and spot gravelling of
  1. Kasikeu town roads 4.5km
  2. Kasikeu - Masokani – Mbyani  6km
  3. Kwa Nzai Mkt – Nduluni – Isika 3km
  4. Chief Kiamba Earth dam – Kandolo – Kwa Ndolo  4.3km
  5. Kwa Mavia Kathanga – Kwa Kavali 1.6km
  6. Enguli – Ngomeni – Kwa Kavali 3km
  7. Mitamboni – Mwangini 7km
  8. Mbiini – Masaani – Ianduni 5km
  9. Kasikeu – Kwa Nzae – Mwenyeivaa Road 7.5km
  10. Enguli – Masive – Ndungani Road  6km
  11. Kayata – Nduluni Hills 4km
Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 4,400,000 Kasikeu
Heavy Grading And Murraming Of Kilome- Uvete- Kayata- Kasikeu- Mutweamboo- Lumu- Kiou Top- Kwa Kalelo- Off Mombasa Road- Kima Dairy- Marwa Road (kasikeu Ward Section)and Heavy Grading And Murraming Of Muangeni,ngalana,mutyemboolumu,kiou Top ,kwa Kalelo Off Mombasa Road ,kima Diary –marwa Road And Kwa Mikate Road At Muani . Drift construction, box culverts reinstatement spot murraming and drainage structures along Kilome- Uvete- Kayata- Kasikeu- Mutweamboo- Lumu- Kiou top- Kwa kalelo- Off Mombasa road-  Kima dairy- Marwa road (Kasikeu Ward section)and heavy grading and murraming of Muangeni,Ngalana,MutyembooLumu,Kiou top ,Kwa Kalelo  Off Mombasa road ,Kima Diary –Marwa Road and Kwa Mikate road at Muani  Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 9,310,000 Kasikeu
Fencing Of Ngalana Dispensary fencing of Ngalana Dispensary Department of Health Services Completed Ksh 498,890 Kasikeu
Mbiini - Isika Pipeline The were diverted to Kisaulu water project to Kwa Musyoki water kiosk.-1.5km pipeline installation.-Rehabilitation of 1no. Kiosk-Supply and installation of 10,000L tank on platform Department of Water and Sanitation Completed Ksh 98,000 Kasikeu
Kayata Borehole Borehole equipping Department of Water and Sanitation Completed Ksh 161,882 Kasikeu
Mikuyu II Water Project Phased scopes:i. Pumping system rehabilitation.ii. Rising main rehabilitation.iii.    Installation of a 1.4km HDPE & GI pipeline through Uvilani to Kayumbi.Iv.    Construction of a Kiosk at Kwa Kivuthi in Kayumbi area. Department of Water and Sanitation Completed Ksh 1,470,000 Kasikeu
Muatineni Borehole   Equipping and distribution of Muatineni borehole Department of Water and Sanitation Completed Ksh 3,920,000 Kasikeu
Masokani Borehole i.    Solarisation ii.    Pumping system installationiii.    Water distribution to 1 kiosk and 2 schools – Masokani primary and Masokani secondary schools.Iv. Borehole drilling, casing, caping.V. Borehole test pumping. Department of Water and Sanitation Completed Ksh 4,900,000 Kasikeu
Nguluni Ecde
  • 2No. ECDE Classrooms with an office and Store
  • 3-Door Pit Latrine with Urinal
  • Electrical Works (conduits only)
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  • Display Pinned board
  • Branding, Publicity and Signwriting
  • 2No. Black Board
Department of ICT, Education and Internship Completed Ksh 3,430,000 Kee
Rehabilitation of gulleys and road bush clearing and drainage Rehabilitation and repair of Kee Matwiku Gulley 
  • Excavation and filing of structures
  • Culverts and drainage works
  • Health, Safety and Environment (H.S.E)
 
Department of Lands, Urban Planning and Development, Environment and Climate Change Completed Ksh 500,000 Kee
Provision Of Certified Mango, Avocado Seedlings, Certified Seeds, Fertilizer And Other Farm Inputs Provision of certified avocado seedlings, certified seeds, fertilizer and other farm inputs Department of Agriculture, Livestock, Fisheries & Cooperative Development Completed Ksh 4,000,000 Kee
Maintainence Of Other Assets - Markets, Tourism Centres.
  • payment of utility bills for market sheds (electricity); Upgrading of  Makongo view point.Kitchen Extension, Construction of washroom with a PWD toilet, Walling with EPS panels, Floor Tiling  and Finishes 
Department of Trade, Marketing, Industry, Culture and Tourism. Completed Ksh 263,097 Kee
Road Improvement Programme Road  opening, grading and graveling of :-1. Ngiluni AIC – Kwa Kaleli road & Makongo, Makongo View Point – Ngiluni primary road and leveling of Nngiluni Primary paly ground (2.8Kms), 2. Opening and spot graveling of ikalyoni access road ,3. Grading And Graveling Of Kivani – Kivaku Road, Kivani  Town Access Road And Kivani – Kyandumbi Road , Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 7,700,000 Kee
Miradi Kwa Jamii(mkj) Sand Dams/ Drift Labour At Muusini And Kya Kaleli Light grading,bush clearing and cut off mitre drains to harvest the rainy water at muusini and kya kaleli Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 490,000 Kee
Miradi Kwa Jamii(mkj) At Matangi And Kivani Light grading, bush clearing and cut-off mitre drains at matangi and Kivani1. bush clearing, road formation and excavation of catch water drains along Kwa Ngolia - Kathanzi - Mwea road 5.0km2. Kivani - Kitheuni - Kilolo road 6.0km3. Masaani primary - Kya Nduu eartdam road 3.04. Kivani - Munyuni - Kathini SA - Kiva Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 490,000 Kee
Installation Of Street Lights In Markets Installation of double arm metallic pole 8.5m high , fixing of 150W integrated solar streetlights fittings Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 1,960,000 Kee