Masonry Drift Riding Slab 70m by 5m Cut off drains for road run off harvesting Mechanical Road Widening- 10kms
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 4,410,000
Kisau/Kiteta
Iviani, Kivani And Kiteta Playgrounds
Levelling of the play ground
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 1,900,000
Kisau/Kiteta
Lungu Borehole
Drilling of borehole and test pumping
Department of Water and Sanitation
Completed
Ksh 2,374,220
Kisau/Kiteta
Kithongo Borehole
Drilling of borehole and test pumping
Department of Water and Sanitation
Completed
Ksh 2,374,221
Kisau/Kiteta
Songeni Ecde
2 No. ECDE Classrooms with an office and Store
Electrical Works (conduits only)
Shelves
2 No. Wooden Desks
2 No. Wooden Arm Chairs
Water harvesting goods (5,000Ltrs Water Tank)
Play equipment - 4 piece set (double swing, slide, climbing frame and double see-saw)
Display Pinned board
Branding, Publicity and Signwriting
2 No. Black board retained
4 No. Duster
20 No. Mark pens
2 No. Whiteboard
Department of ICT, Education and Internship
Completed
Ksh 3,136,000
Kisau/Kiteta
Kimandi Borehole
Construction of 2No. Water kiosks, installation of 2No. 10cm cubic metres plastic storage tanks, water distribution pipeline to kyambusya and rehabilitation of rising main.
Department of Water and Sanitation
Completed
Ksh 3,710,279
Kisau/Kiteta
Songeni Water Project
Drilling of borehole, equipping and solarizing, construction of 0.6 km rising main to Itulu water kiosk
Department of Water and Sanitation
Completed
Ksh 4,900,000
Kisau/Kiteta
Kwa Matinga Water Project
Drilling of borehole, equipping and solarizing, construction of 1.0km rising main to kwa Matinga storage tank, rehabilitation of 3.4km distribution pipeline ,construction of 1No. water kiosk and installation 2No.5 cubic metres plastic storage tank
Department of Water and Sanitation
Completed
Ksh 4,794,228
Kisau/Kiteta
Mulasya Ecde
2No. ECDE Classrooms with an office and Store
Electrical Works (conduits only)
Shelves
2No. Wooden Desks
2No. Wooden Arm Chairs
Water harvesting goods (5,000Ltrs Water Tank)
Play equipment - 4 piece set (double swing, slide, climbing frame and double see-saw)
Display Pinned board
Branding, Publicity and Signwriting
2 No. Black board retained
4 No. Duster
20 No. Mark pens
2 No, Whiteboard
Department of ICT, Education and Internship
Completed
Ksh 3,136,000
Kisau/Kiteta
Road Improvement Programme
Mechanical Road widening and heavy grading of 9Kms on selected roads ie Ikundu- Kwa male - kwa Maingi Thwake road, Malili -Kuku-Thwake road, Kwa Chief Ndiku- Mwaani- Kingathuni road, Malatani - Miseleni -kwa kianga road, Nguumo- MBA road.Non vented masonry drift-25m by 5m and 35m by 5m and installation of culverts 16m by 600mm DIA along Matalani - Miseleleni - Kwa Kianga road.
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 7,180,720
Kako/Waia
Kyang'ondu Stock Yard
Kyang'ondu stock yard
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 3,000,000
Kako/Waia
Construction Of Kako - Kandulyu (savani) Drift
FY2023/24 allocation was pending bill
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 4,210,612
Kako/Waia
Grain And Pulse Value Chain Development
Provision of certified maize and beans seeds to farmers
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 1,000,000
Kako/Waia
Boda Boda Shed - Kako/waia
Construction of a bodaboda shed
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 300,000
Kako/Waia
Waia Earth Dam
Construction of 3No. Water Koisks and installation of 4No. 10Cubic metres plastic storage tanks. Water distribution extension from kavingo market to kyamangatu, kwa masai to Ilela market and Kwa masai to kwa mutava. Construction of 1No. Cattle trough at kwa Ilela market.
Department of Water and Sanitation
Completed
Ksh 5,880,000
Kako/Waia
Nyaanyaa Earthdam Phase 2
Construction of 1.3km rising main, construction of 1No. Water kiosk and installation of 1No. 10Cubic metres plastic storage tank.
Department of Water and Sanitation
Completed
Ksh 1,568,000
Kako/Waia
Kwa Mutombi Water Project
Rehabilitation of rising main and installation of 2No. 10 Cubic metres platic storage tanks and constrcution of 2No. Platforms, Servicing of Genset and installation of new battery.
Department of Water and Sanitation
Completed
Ksh 1,960,000
Kako/Waia
Kyaluma Bore Hole Water Project
Solarization, replacement of pump end, flushing borehole, construction of elevated steel tower to hold 2No. 10CM plastict storage tanks, construction of kyaluma market water point, renovation of kyowani market water kiosk, water pipeline distribution distribution to kyowani and kyaluma market.
Department of Water and Sanitation
Completed
Ksh 4,900,000
Kako/Waia
Solarization And Distribution Of Makaia Borehole
Solarization and Distribution of Makaia borehole - Installation of solar panels, Water distribution to Kathamba market, kathamba schools, mba market, Mba schools, Mwaani market, Sakai primary school, Kwa mutumba and Mavitini
Department of Water and Sanitation
Completed
Ksh 6,860,000
Kako/Waia
Kavingiliti Earthdam ( Miau earthdam)
Kavingiliti earthdam - in house machines
Department of Water and Sanitation
Completed
Ksh 2,940,000
Kako/Waia
Construction Of Kwa Malai Earthdam,enlargement Spillway Checkdam,drawal System
Department of Water and Sanitation
Completed
Ksh 284,274
Kako/Waia
Kavumbu Public Toilet (kalawa)
construction of 2-Door pit latrine and urinal
Department of Trade, Marketing, Industry, Culture and Tourism.
Completed
Ksh 500,000
Kalawa
Planning and survey of Kathulumbi market
Preparation of local physical development plan
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 1,000,000
Kalawa
Planning and survey of Kalawa market
Preparation of local physical development plan
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 1,000,000
Kalawa
Road Improvent Programme
Road improvement programme through mechanical Road Opening, Light Grading and installation of cut-off drains on selected roads across the ward - 101 hours on crawler dozers- 245 hours on motor grader
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 9,750,000
Kalawa
Katangini Dispensary -completion Of Maternity Block And Incinerator
Construction of new maternity block
Department of Health Services
Completed
Ksh 1,390,450
Kalawa
Kathulumbi Model Health Centre.(fencing And Gate)
Fencing of the facility and installation of gate
Department of Health Services
Completed
Ksh 30,544
Kalawa
Mutembuku Heath Centre (renovations)
Renovation of OPD block - New roof and iron sheets, painting, tiles and eletrical installations
Department of Health Services
Completed
Ksh 2,500,000
Kalawa
Syongungi Ecde
2 No. ECDE Classrooms with an office and Store
Electrical Works (conduits only)
2 No. Wooden Desks
2 No. Wooden Arm Chairs
Water harvesting goods (5,000Ltrs Water Tank and base)
Display Pinned board
Branding, Publicity and Signwriting
2 No. Black board
Department of ICT, Education and Internship
Completed
Ksh 2,940,000
Kalawa
Athi Kalawa Wash Programme
Department of Water and Sanitation
Completed
Ksh 2,430,000
Kalawa
Hire Of Machines For Roadworks; Katangini – Ngunini Rd, Murramuni -kavumbu-miangeni-mbavani-mutembuko-syongungi-kwa Mareka Junction Rd And Kalawa Health Cetre – Kathiani Market Rd,
FY2023/24 allocation was pending bill
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 3,000,000
Kalawa
Mweleli Ecde
Construction of one classroom
Department of ICT, Education and Internship
Completed
Ksh 527,367
Kalawa
Sports Development Kalawa
Purchase of sports items
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 200,000
Kalawa
Social Protection Kalawa
Purchase and distribution of food and non food items
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 887,500
Kalawa
Athi-miangeni- Kalawa Water Project.
Athi-Miangeni- Kalawa water project. Phase 1-Construction of pump house, treatment, pump the water to Wii hills and piping for distribution.
Department of Water and Sanitation
Completed
Ksh 1,000,000
Kalawa
Kyamakuthi Earth Dam
Desilting of kyamakuthi reservoir
Department of Water and Sanitation
Completed
Ksh 14,910,012
Kalawa
Akwash Water Project
AKWASH water project- Extension of AKWASH and distribution to kathongo kavumbu and Mweleli clusters
Department of Water and Sanitation
Completed
Ksh 1,312,182
Kalawa
Kwa Muthama Earthdam
Desilting Kwa Muthama Earthdam
Department of Water and Sanitation
Completed
Ksh 2,450,000
Kalawa
Kwa Ivali Earthdam
Desiling reservoir and rehabilitation of spillway
Department of Water and Sanitation
Completed
Ksh 4,900,000
Kalawa
Drilling And Equipping Of 5 No. Boreholes In The Ward Using Own Machines
Department of Water and Sanitation
Completed
Ksh 7,000,000
Kalawa
Grading And Installation Of Drainage Structures Along Ngaamba-marwa Road
Installation ofCulverts and drainage works,
-Spot grading
-Spot gravelling
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 3,920,000
Kiima Kiu/Kalanzoni
Kwa Kea Ecde
2No. ECDE Classrooms with an office and Store
3-Door Pit Latrine with Urinal
Electrical Works (conduits only)
Water harvesting goods (5,000Ltrs Water Tank and base)
Display Pinned board
Branding, Publicity and Signwriting
2No. Black Board
Department of ICT, Education and Internship
Completed
Ksh 3,430,000
Kiima Kiu/Kalanzoni
Control Of Gulleys At Kwe Kuyu Kalembwani
Excavation
Concrete works and protection works
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 1,000,000
Kiima Kiu/Kalanzoni
Rehabilitation of Kwa Tuva - Ngiini- Kalanzoni - Yaitha Road
Heavy grading, spot murraming and drainage works from Ngiini- Kalanzoni - Yaitha road
Construction of gabions at Kwa Malonga - Mulumini road
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 9,860,000
Kiima Kiu/Kalanzoni
Construction Of A Public Toilet At Marwa Market
Construction of Pit latrine block and urinal at Marwa Market
Ticket booth
Rain water goods
5000 lts plastic water tank and base
Department of Trade, Marketing, Industry, Culture and Tourism.
Completed
Ksh 1,000,000
Kiima Kiu/Kalanzoni
Construction Of Public Toilet At Ngiini Playground
Construction of public toilet at Ngiini Playground
Department of Trade, Marketing, Industry, Culture and Tourism.
Completed
Ksh 1,000,000
Kiima Kiu/Kalanzoni
Installation Of 8.5m Double Arm Integrated Solar Lights System Mavivye Market
Installation of double arm metallic pole 8.5m high , fixing of 150W integrated solar streetlight system at Mavivye market
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 245,000
Kiima Kiu/Kalanzoni
Ulu Dispensary (construction Of A L-shaped Dispensary) - Dispensary Infrastructural Requirements (construction Of Consultation Room, Reception, Pharmacy, Store, Observation And Sterilization Room). Sanitary Infrastructure - Construction Of Latrine, Septic Tank, Soak Pit, Placenta Pit, Ash Pit And Burning Chamber.
(construction of a L-shaped dispensary) - Dispensary infrastructural requirements (construction of consultation room, reception, pharmacy, store, observation and sterilization room). Sanitary infrastructure - construction of latrine, septic tank, soak pit, placenta pit, ash pit and burning chamber.
Department of Health Services
Completed
Ksh 340,040
Kiima Kiu/Kalanzoni
Kisse Ecde
Construction of 2 No. classrooms, 3 door pit latrine
Department of ICT, Education and Internship
Completed
Ksh 3,500,000
Kiima Kiu/Kalanzoni
Construction Of Marternity And Laboratory In Kavuko Dispensary
Construction of marternity and laboratory
Department of Health Services
Completed
Ksh 2,936,945
Kiima Kiu/Kalanzoni
Fencing, Filling Of Ditch, Incinerator,ashpit And Placenta Pit For Kalanzoni Dispensary
installation of solar power at kalanzoni dispensary
Department of Health Services
Completed
Ksh 500,000
Kiima Kiu/Kalanzoni
Kiu Primary Play Ground And Toilet
Levelling of the field and construction of a toilet
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 2,000,000
Kiima Kiu/Kalanzoni
Kwa Makaa Earthdam
i. Reservoir desilting.ii. Making good of the embankment.iii. Making good of the spillway.iv. Check dam construction
Department of Water and Sanitation
Completed
Ksh 2,940,000
Kiima Kiu/Kalanzoni
Katatu Dam
i. Desilting and expansion of the reservoirii. Making good of the spillway and embankmentiii. Construction of a check dams and cut off drains.
Department of Water and Sanitation
Completed
Ksh 3,920,000
Kiima Kiu/Kalanzoni
Machines For Hire -road Improvement
Road opening and widening - Kima-Nzeveni – Kalembwani rd,- Ndovoini-Kalembwani road,-Kithea-Kalembwani road,- Kathetheni-Kathungu road, -Malili -Eka Ili road, -Dalani – Kiu road
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 3,995,000
Kiima Kiu/Kalanzoni
Kyunguni Earth Dam
Department of Water and Sanitation
Completed
Ksh 2,189,243
Kiima Kiu/Kalanzoni
Kilome Sub-county Administration Office
Construction of office block
Department of Devolution, Public Service, Public Participation and Special Programs
Completed
Ksh 9,000,000
Mukaa
Road Improvement Programme
Mechanical light grading and spot graveling of selected roads across the ward:- Domino- kyandue -Mbukuni road, Mwanyani-Kyangala road, AIC Kathemboni- Mukimani- Uvete Road, Kitondo- kwangole- Mangunguu- kwa nzalu road,Kyangalamkt- Matumbini - Enzai road, Kwa ndiku- kwa joshia- kwa kivila-maiani salvation army road, Kamuthini - kwa Nagai- Moyale- Kwa kakui dam road,
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 2,965,200
Mukaa
Kwa Muatha Ecde
2 No. ECDE Classrooms with an office and Store
Electrical Works (conduits only)
2 No. Wooden Desks
2 No. Wooden Arm Chairs
Water harvesting goods (5,000Ltrs Water Tank and base)
Display Pinned board
Branding, Publicity and Signwriting
2 No. Black board
Department of ICT, Education and Internship
Completed
Ksh 2,940,000
Mukaa
Mukaa-uvete Road
Road opening, grading/formation, spot murraming and drainage structures along Mukaa-Uvete road
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 5,385,000
Mukaa
Mukaa Road Improvement
Construction of culverts and drainage structures
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,500,000
Mukaa
Hire Of Machinery
Road improvement programme through road grading on selected roads across the ward
Kyangala-Matumbini road -1km
Matumbini -Enzai -4km
Enzai-Kwa Kilingi -4km
Kikotoni-Kwa Mulandi -3.8km
Kwa Mulandi -Chandui 3.9km
Chandui-Mapopoani 4.1km
Kwa Mtoto-Kwa Muatha 3.9km
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,176,000
Mukaa
Installation Of Integrated Solar Light System ( Kamuthini, Kiongwani,kyandue, Kyangala, Mutiluni &maiani
Installation of double arm metallic pole 8.5m high , fixing of 150W integrated solar streetlights fittings
Department of Infrastructure, Transport, Public Works, Housing and Energy
Upgrading Of Kamuthini Dispensary(completion Of Injection Room And Equipping Of Maternity)
Completion of OPD Block and Injection room
Department of Health Services
Completed
Ksh 29,542
Mukaa
Fencing And Gate Installation Of Mutiluni Dispensary
Fencing and gate installation
Department of Health Services
Completed
Ksh 1,260,900
Mukaa
Equipping And Operationalization Of General Ward At Uvete Health Centre
Equipping and operationalization of general ward at Uvete health Centre
Department of Health Services
Completed
Ksh 26,042
Mukaa
Sports Development Mukaa
Purchase of sport items
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 245,000
Mukaa
Uvete Playground
Levelling of the field and construction of a toilet
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 2,000,000
Mukaa
Mutiluni Borehole
i. Borehole flushing and test pumping.ii. Installation of 1.4km of pipeline.iii. Construction of 1no. water kiosk.iv. Installation of a borehole pump v. Installation of a fence at source vi. Drilling of a complementary borehole.
Department of Water and Sanitation
Completed
Ksh 4,900,000
Mukaa
Maiani Borehole
Drilling, casing, and capping.
Department of Water and Sanitation
Completed
Ksh 4,900,000
Mukaa
Kitumbini Ctti Fencing
Fencing and gate installation
Department of ICT, Education and Internship
Completed
Ksh 1,470,000
Kasikeu
Kasikeu Stock Yard And Toilet.
Rehabilitation of Kasikeu stock yard and toilet.
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 2,940,000
Kasikeu
Grain And Pulse Value Chain Development
Provision of certified green grams, maize, cowpeas and beans seeds to farmers
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 2,000,000
Kasikeu
Planning of Kayata Market
Planning of Kayata Market
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 1,622,600
Kasikeu
Kwa Kavenzi-mitamboni-mwangini Road
culvert construction
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 965,000
Kasikeu
Kwa Mbumbu Ecde
Pending works include fixing of few window panes. Contractor has been out of site since Novembers 2023.
Department of ICT, Education and Internship
Completed
Ksh 533,472
Kasikeu
Ndivu Ecde
2 No. ECDE Classrooms with an office and Store
3-Door Pit Latrine with Urinal
Full Electrical Works
Shelves
2 No. Wooden Desks
2 No. Wooden Arm Chairs
Water harvesting goods (10,000Ltrs Water Tank and base)
40 No. Kiddy chairs and 20. No. Kiddy tables
Play equipment 4 piece set (double swing, slide, climbing frame and double see-saw)
Display pin board
Branding, Publicity and Signwriting
2 No. Blackboard
Department of ICT, Education and Internship
Completed
Ksh 3,920,000
Kasikeu
Rehabilitation Of Kasikeu – Mutweamboo – Kwa Ndiki – Ndumbini – Mombasa Road
Drift construction, box culverts reinstatement spot murraming and drainage structures along Kasikeu – Mutweamboo – Kwa Ndiki – Ndumbini – Mombasa roadConstruction of 75m*6m drift240m2 Stone pitchingDemolishing structureGraveling on 500mconstruction of 150 scour checks
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 10,843,838
Kasikeu
Renovation Of Maternity Wing And Upgrading Of Kasikeu Model Health Centre
Renovation of OPD and maternity block
Department of Health Services
Completed
Ksh 4,500,000
Kasikeu
Completion Of Kiou Dispensary Block, Staff House And Water Tanks
Completion of staff house and new facility.
Department of Health Services
Completed
Ksh 68,874
Kasikeu
Completion Of Mbiini Dispensary
completion of the OPD block
Department of Health Services
Completed
Ksh 2,450,000
Kasikeu
Construction Of Kiou Top Dispensary
Construction of a new dispensary at Kiou top Hill.
Department of Health Services
Completed
Ksh 11,508
Kasikeu
Road Improvement And Maintenance
Grading and spot gravelling of
Kasikeu town roads 4.5km
Kasikeu - Masokani – Mbyani 6km
Kwa Nzai Mkt – Nduluni – Isika 3km
Chief Kiamba Earth dam – Kandolo – Kwa Ndolo 4.3km
Kwa Mavia Kathanga – Kwa Kavali 1.6km
Enguli – Ngomeni – Kwa Kavali 3km
Mitamboni – Mwangini 7km
Mbiini – Masaani – Ianduni 5km
Kasikeu – Kwa Nzae – Mwenyeivaa Road 7.5km
Enguli – Masive – Ndungani Road 6km
Kayata – Nduluni Hills 4km
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 4,400,000
Kasikeu
Heavy Grading And Murraming Of Kilome- Uvete- Kayata- Kasikeu- Mutweamboo- Lumu- Kiou Top- Kwa Kalelo- Off Mombasa Road- Kima Dairy- Marwa Road (kasikeu Ward Section)and Heavy Grading And Murraming Of Muangeni,ngalana,mutyemboolumu,kiou Top ,kwa Kalelo Off Mombasa Road ,kima Diary –marwa Road And Kwa Mikate Road At Muani .
Drift construction, box culverts reinstatement spot murraming and drainage structures along Kilome- Uvete- Kayata- Kasikeu- Mutweamboo- Lumu- Kiou top- Kwa kalelo- Off Mombasa road- Kima dairy- Marwa road (Kasikeu Ward section)and heavy grading and murraming of Muangeni,Ngalana,MutyembooLumu,Kiou top ,Kwa Kalelo Off Mombasa road ,Kima Diary –Marwa Road and Kwa Mikate road at Muani
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 9,310,000
Kasikeu
Fencing Of Ngalana Dispensary
fencing of Ngalana Dispensary
Department of Health Services
Completed
Ksh 498,890
Kasikeu
Mbiini - Isika Pipeline
The were diverted to Kisaulu water project to Kwa Musyoki water kiosk.-1.5km pipeline installation.-Rehabilitation of 1no. Kiosk-Supply and installation of 10,000L tank on platform
Department of Water and Sanitation
Completed
Ksh 98,000
Kasikeu
Kayata Borehole
Borehole equipping
Department of Water and Sanitation
Completed
Ksh 161,882
Kasikeu
Mikuyu II Water Project
Phased scopes:i. Pumping system rehabilitation.ii. Rising main rehabilitation.iii. Installation of a 1.4km HDPE & GI pipeline through Uvilani to Kayumbi.Iv. Construction of a Kiosk at Kwa Kivuthi in Kayumbi area.
Department of Water and Sanitation
Completed
Ksh 1,470,000
Kasikeu
Muatineni Borehole
Equipping and distribution of Muatineni borehole
Department of Water and Sanitation
Completed
Ksh 3,920,000
Kasikeu
Masokani Borehole
i. Solarisation ii. Pumping system installationiii. Water distribution to 1 kiosk and 2 schools – Masokani primary and Masokani secondary schools.Iv. Borehole drilling, casing, caping.V. Borehole test pumping.
Department of Water and Sanitation
Completed
Ksh 4,900,000
Kasikeu
Nguluni Ecde
2No. ECDE Classrooms with an office and Store
3-Door Pit Latrine with Urinal
Electrical Works (conduits only)
Water harvesting goods (5,000Ltrs Water Tank and base)
Display Pinned board
Branding, Publicity and Signwriting
2No. Black Board
Department of ICT, Education and Internship
Completed
Ksh 3,430,000
Kee
Rehabilitation of gulleys and road bush clearing and drainage
Rehabilitation and repair of Kee Matwiku Gulley
Excavation and filing of structures
Culverts and drainage works
Health, Safety and Environment (H.S.E)
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 500,000
Kee
Provision Of Certified Mango, Avocado Seedlings, Certified Seeds, Fertilizer And Other Farm Inputs
Provision of certified avocado seedlings, certified seeds, fertilizer and other farm inputs
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 4,000,000
Kee
Maintainence Of Other Assets - Markets, Tourism Centres.
payment of utility bills for market sheds (electricity); Upgrading of Makongo view point.Kitchen Extension, Construction of washroom with a PWD toilet, Walling with EPS panels, Floor Tiling and Finishes
Department of Trade, Marketing, Industry, Culture and Tourism.
Completed
Ksh 263,097
Kee
Road Improvement Programme
Road opening, grading and graveling of :-1. Ngiluni AIC – Kwa Kaleli road & Makongo, Makongo View Point – Ngiluni primary road and leveling of Nngiluni Primary paly ground (2.8Kms), 2. Opening and spot graveling of ikalyoni access road ,3. Grading And Graveling Of Kivani – Kivaku Road, Kivani Town Access Road And Kivani – Kyandumbi Road ,
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 7,700,000
Kee
Miradi Kwa Jamii(mkj) Sand Dams/ Drift Labour At Muusini And Kya Kaleli
Light grading,bush clearing and cut off mitre drains to harvest the rainy water at muusini and kya kaleli
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 490,000
Kee
Miradi Kwa Jamii(mkj) At Matangi And Kivani
Light grading, bush clearing and cut-off mitre drains at matangi and Kivani1. bush clearing, road formation and excavation of catch water drains along Kwa Ngolia - Kathanzi - Mwea road 5.0km2. Kivani - Kitheuni - Kilolo road 6.0km3. Masaani primary - Kya Nduu eartdam road 3.04. Kivani - Munyuni - Kathini SA - Kiva
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 490,000
Kee
Installation Of Street Lights In Markets
Installation of double arm metallic pole 8.5m high , fixing of 150W integrated solar streetlights fittings
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,960,000
Kee
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
Project Awarded more funds in FY2024/25 and redesigned. Current it's at procurement level.
Has additional funds in 2024/25.
To be implemented in FY 2024/25
Construction works stopped for re-designing and addition of funds.
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
For in house works 2 Trips Rockfilling along Nthangu –Watuka and 0.9km Road opening along Kwa Kamuya – Kaiti were done