All Projects In FY 2023/2024

Go Back

Project Scope Department Status Budget Ward Action
Songeni Water Project

Drilling of borehole, equipping and solarizing, construction of 0.6 km rising main to Itulu water kiosk

Department of Water and Sanitation Completed Ksh 4,900,000 Kisau/Kiteta    
Kwa Matinga Water Project

Drilling of borehole, equipping and solarizing, construction of 1.0km rising main to kwa Matinga storage tank, rehabilitation of 3.4km distribution pipeline ,construction of 1No. water kiosk and installation 2No.5 cubic metres plastic storage tank

Department of Water and Sanitation Completed Ksh 4,794,228 Kisau/Kiteta    
Mulasya Ecde
  • 2No. ECDE Classrooms with an office and Store
  • Electrical Works (conduits only)
  • Shelves
  • 2No. Wooden Desks
  • 2No. Wooden Arm Chairs
  • Water harvesting goods (5,000Ltrs Water Tank)
  • Play equipment - 4 piece set (double swing, slide, climbing frame and double see-saw)
  • Display Pinned board
  • Branding, Publicity and Signwriting
  • 2 No. Black board retained
  • 4 No. Duster
  • 20 No. Mark pens
  • 2 No, Whiteboard
Department of ICT, Education and Internship Completed Ksh 3,136,000 Kisau/Kiteta    
Road Improvement Programme

Mechanical Road widening and heavy grading of 9Kms  on selected roads ie  Ikundu- Kwa male - kwa Maingi Thwake road, Malili -Kuku-Thwake road, Kwa Chief Ndiku- Mwaani- Kingathuni road, Malatani - Miseleni -kwa kianga road, Nguumo- MBA road.
Non vented masonry drift-25m by 5m and 35m by 5m and installation of culverts 16m by 600mm DIA along Matalani - Miseleleni - Kwa Kianga road.

Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 7,180,720 Kako/Waia    
Kyang'ondu Stock Yard

Kyang'ondu stock yard

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Completed Ksh 3,000,000 Kako/Waia    
Construction Of Kako - Kandulyu (savani) Drift

FY2023/24 allocation was pending bill 

Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 4,210,612 Kako/Waia    
Grain And Pulse Value Chain Development

Provision of certified maize and beans seeds to farmers

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Completed Ksh 1,000,000 Kako/Waia    
Boda Boda Shed - Kako/waia

Construction of a bodaboda shed

Department of Gender, Children, Youth, Sports and Social Services Completed Ksh 300,000 Kako/Waia    
Waia Earth Dam

Construction of 3No. Water Koisks and installation of 4No. 10Cubic metres plastic storage tanks. Water distribution extension from kavingo market to kyamangatu, kwa masai to Ilela market and Kwa masai to kwa mutava. Construction of 1No. Cattle trough at kwa Ilela market.

Department of Water and Sanitation Completed Ksh 5,880,000 Kako/Waia    
Nyaanyaa Earthdam Phase 2

Construction of 1.3km rising main, construction of 1No. Water kiosk and installation of 1No. 10Cubic metres plastic storage tank.

Department of Water and Sanitation Completed Ksh 1,568,000 Kako/Waia    
Kyaluma Bore Hole Water Project

Solarization, replacement of pump end, flushing borehole, construction of elevated steel tower to hold 2No. 10CM plastict storage tanks, construction of kyaluma market water point, renovation of kyowani market water kiosk, water pipeline distribution distribution to kyowani and kyaluma market.

Department of Water and Sanitation Completed Ksh 4,900,000 Kako/Waia    
Solarization And Distribution Of Makaia Borehole

Solarization and Distribution of Makaia borehole - Installation of solar panels, Water distribution to Kathamba market, kathamba schools, mba market, Mba schools, Mwaani market, Sakai primary school, Kwa mutumba and Mavitini

Department of Water and Sanitation Completed Ksh 6,860,000 Kako/Waia    
Kavingiliti Earthdam ( Miau earthdam)

Kavingiliti earthdam - in house machines

Department of Water and Sanitation Completed Ksh 2,940,000 Kako/Waia    
Kwa Mutombi Water Project
Rehabilitation of rising main and installation of 2No. 10 Cubic metres platic storage tanks and constrcution of 2No. Platforms, Servicing of Genset and installation of new battery.
Department of Water and Sanitation Completed Ksh 1,960,000 Kako/Waia    
Construction Of Kwa Malai Earthdam,enlargement Spillway Checkdam,drawal System Department of Water and Sanitation Completed Ksh 284,274 Kako/Waia    
Kavumbu Public Toilet (kalawa)

construction of  2-Door pit latrine and urinal

Department of Trade, Marketing, Industry, Culture and Tourism. Completed Ksh 500,000 Kalawa    
Planning and survey of Kathulumbi market

Preparation of local physical development plan

Department of Lands, Urban Planning and Development, Environment and Climate Change Completed Ksh 1,000,000 Kalawa    
Planning and survey of Kalawa market
  • Preparation of local physical development plan
Department of Lands, Urban Planning and Development, Environment and Climate Change Completed Ksh 1,000,000 Kalawa    
Road Improvent Programme

Road improvement programme through mechanical Road Opening, Light Grading and  installation of cut-off drains on selected roads across the ward

- 101 hours on crawler dozers

- 245 hours on motor grader


Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 9,750,000 Kalawa    
Katangini Dispensary -completion Of Maternity Block And Incinerator Construction of new maternity block Department of Health Services Completed Ksh 1,390,450 Kalawa    
Kathulumbi Model Health Centre.(fencing And Gate)

Fencing of the facility and installation of gate

Department of Health Services Completed Ksh 30,544 Kalawa    
Mutembuku Heath Centre (renovations)

Renovation of OPD block - New roof and iron sheets, painting, tiles and eletrical installations

Department of Health Services Completed Ksh 2,500,000 Kalawa    
Athi Kalawa Wash Programme Department of Water and Sanitation Completed Ksh 2,430,000 Kalawa    
Mweleli Ecde

Construction of one classroom

Department of ICT, Education and Internship Completed Ksh 527,367 Kalawa    
Sports Development Kalawa

Purchase of sports items

Department of Gender, Children, Youth, Sports and Social Services Completed Ksh 200,000 Kalawa    
Syongungi Ecde
  • 2 No. ECDE Classrooms with an office and Store
  • Electrical Works (conduits only)
  • 2 No. Wooden Desks
  • 2 No. Wooden Arm Chairs
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  •  Display Pinned board
  • Branding, Publicity and Signwriting
  • 2 No. Black board
Department of ICT, Education and Internship Completed Ksh 2,940,000 Kalawa    
Hire Of Machines For Roadworks; Katangini – Ngunini Rd, Murramuni -kavumbu-miangeni-mbavani-mutembuko-syongungi-kwa Mareka Junction Rd And Kalawa Health Cetre – Kathiani Market Rd,

FY2023/24 allocation was pending bill

Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 3,000,000 Kalawa    
Social Protection Kalawa

Purchase and distribution of food and non food items

Department of Gender, Children, Youth, Sports and Social Services Completed Ksh 887,500 Kalawa    
Athi-miangeni- Kalawa Water Project.

Athi-Miangeni- Kalawa water project. Phase 1-Construction of pump house, treatment, pump the water to Wii hills and piping for distribution.

Department of Water and Sanitation Completed Ksh 1,000,000 Kalawa    
Kyamakuthi Earth Dam

Desilting of kyamakuthi reservoir

Department of Water and Sanitation Completed Ksh 14,910,012 Kalawa    
Akwash Water Project

AKWASH water project- Extension of AKWASH and distribution  to kathongo  kavumbu and Mweleli clusters

Department of Water and Sanitation Completed Ksh 1,312,182 Kalawa    
Kwa Muthama Earthdam

Desilting Kwa Muthama Earthdam 

Department of Water and Sanitation Completed Ksh 2,450,000 Kalawa    
Kwa Ivali Earthdam

Desiling reservoir and rehabilitation of spillway

Department of Water and Sanitation Completed Ksh 4,900,000 Kalawa    
Drilling And Equipping Of 5 No. Boreholes In The Ward Using Own Machines Department of Water and Sanitation Completed Ksh 7,000,000 Kalawa    
Grading And Installation Of Drainage Structures Along Ngaamba-marwa Road

Installation ofCulverts and drainage works,

 -Spot grading

-Spot gravelling

Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 3,920,000 Kiima Kiu/Kalanzoni    
Control Of Gulleys At Kwe Kuyu Kalembwani
  • Excavation 
  • Concrete works and protection works 
Department of Lands, Urban Planning and Development, Environment and Climate Change Completed Ksh 1,000,000 Kiima Kiu/Kalanzoni    
Rehabilitation of Kwa Tuva - Ngiini- Kalanzoni - Yaitha Road

Heavy grading, spot murraming and drainage works from Ngiini- Kalanzoni - Yaitha road

Construction of gabions at Kwa Malonga - Mulumini road

Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 9,860,000 Kiima Kiu/Kalanzoni    
Construction Of A Public Toilet At Marwa Market
  • Construction of  Pit latrine block and urinal at Marwa Market
  • Ticket booth
  • Rain water goods
  • 5000 lts plastic water tank and base
Department of Trade, Marketing, Industry, Culture and Tourism. Completed Ksh 1,000,000 Kiima Kiu/Kalanzoni    
Construction Of Public Toilet At Ngiini Playground

Construction of public toilet at Ngiini Playground

Department of Trade, Marketing, Industry, Culture and Tourism. Completed Ksh 1,000,000 Kiima Kiu/Kalanzoni    
Kwa Kea Ecde
  • 2No. ECDE Classrooms with an office and Store
  • 3-Door Pit Latrine with Urinal
  • Electrical Works (conduits only)
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  • Display Pinned board
  • Branding, Publicity and Signwriting
  • 2No. Black Board
Department of ICT, Education and Internship Completed Ksh 3,430,000 Kiima Kiu/Kalanzoni    
Installation Of 8.5m Double Arm Integrated Solar Lights System Mavivye Market

Installation of double arm metallic pole 8.5m high , fixing of 150W integrated solar streetlight system at Mavivye market

Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 245,000 Kiima Kiu/Kalanzoni    
Ulu Dispensary (construction Of A L-shaped Dispensary) - Dispensary Infrastructural Requirements (construction Of Consultation Room, Reception, Pharmacy, Store, Observation And Sterilization Room). Sanitary Infrastructure - Construction Of Latrine, Septic Tank, Soak Pit, Placenta Pit, Ash Pit And Burning Chamber.

 (construction of a L-shaped dispensary) - Dispensary infrastructural requirements (construction of consultation room, reception, pharmacy, store, observation and sterilization room). Sanitary infrastructure - construction of latrine, septic tank, soak pit, placenta pit, ash pit and burning chamber. 

Department of Health Services Completed Ksh 340,040 Kiima Kiu/Kalanzoni    
Kisse Ecde

Construction of 2 No. classrooms, 3 door pit latrine

Department of ICT, Education and Internship Completed Ksh 3,500,000 Kiima Kiu/Kalanzoni    
Construction Of Marternity And Laboratory In Kavuko Dispensary

Construction of marternity and laboratory

Department of Health Services Completed Ksh 2,936,945 Kiima Kiu/Kalanzoni    
Fencing, Filling Of Ditch, Incinerator,ashpit And Placenta Pit For Kalanzoni Dispensary

installation of solar power at kalanzoni dispensary

Department of Health Services Completed Ksh 500,000 Kiima Kiu/Kalanzoni    
Kiu Primary Play Ground And Toilet

Levelling of the field and construction of a toilet

Department of Gender, Children, Youth, Sports and Social Services Completed Ksh 2,000,000 Kiima Kiu/Kalanzoni    
Katatu Dam

i.    Desilting and expansion of the reservoir
ii.    Making good of the spillway and embankment
iii.    Construction of a check dams and cut off drains.

Department of Water and Sanitation Completed Ksh 3,920,000 Kiima Kiu/Kalanzoni    
Machines For Hire -road Improvement

Road opening and widening

 - Kima-Nzeveni – Kalembwani rd,

- Ndovoini-Kalembwani road,

-Kithea-Kalembwani road,

- Kathetheni-Kathungu road,

-Malili -Eka Ili road,

-Dalani – Kiu road


Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 3,995,000 Kiima Kiu/Kalanzoni    
Kyunguni Earth Dam Department of Water and Sanitation Completed Ksh 2,189,243 Kiima Kiu/Kalanzoni    
Kwa Makaa Earthdam

i.    Reservoir desilting.
ii.    Making good of the embankment.
iii.    Making good of the spillway.
iv.    Check dam construction

Department of Water and Sanitation Completed Ksh 2,940,000 Kiima Kiu/Kalanzoni    
Kilome Sub-county Administration Office

Construction of office block

Department of Devolution, Public Service, Public Participation and Special Programs Completed Ksh 9,000,000 Mukaa    
Road Improvement Programme

Mechanical light grading and spot graveling of selected roads across the ward:- Domino- kyandue -Mbukuni road, Mwanyani-Kyangala road, AIC Kathemboni- Mukimani- Uvete Road, Kitondo- kwangole- Mangunguu- kwa nzalu road,Kyangalamkt- Matumbini - Enzai road, Kwa ndiku- kwa joshia- kwa kivila-maiani salvation army road, Kamuthini - kwa Nagai- Moyale- Kwa kakui dam road,

Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 2,965,200 Mukaa    
Mukaa-uvete Road

Road opening, grading/formation, spot murraming and drainage structures along  Mukaa-Uvete road

Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 5,385,000 Mukaa    
Mukaa Road Improvement

Construction of culverts and drainage structures

Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 1,500,000 Mukaa    
Hire Of Machinery

Road improvement programme through road grading on selected roads across the ward

  1. Kyangala-Matumbini road -1km
  2. Matumbini -Enzai    -4km
  3. Enzai-Kwa Kilingi  -4km
  4. Kikotoni-Kwa Mulandi -3.8km
  5. Kwa Mulandi -Chandui 3.9km
  6. Chandui-Mapopoani 4.1km
  7. Kwa Mtoto-Kwa Muatha 3.9km


Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 1,176,000 Mukaa    
Kwa Muatha Ecde
  • 2 No. ECDE Classrooms with an office and Store
  • Electrical Works (conduits only)
  • 2 No. Wooden Desks
  • 2 No. Wooden Arm Chairs
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  • Display Pinned board
  • Branding, Publicity and Signwriting
  • 2 No. Black board
Department of ICT, Education and Internship Completed Ksh 2,940,000 Mukaa    
Installation Of Integrated Solar Light System ( Kamuthini, Kiongwani,kyandue, Kyangala, Mutiluni &maiani

Installation of double arm metallic pole 8.5m high , fixing of 150W integrated solar streetlights fittings

Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 1,470,000 Mukaa    
Upgrading Of Enzai Dispensary

proposed upgrading- including;

  • worktops
  • railing (balustranding)
  • ceiling and floor finishes
  • mechanical works- sanitary fittings, internal drainage, foul drainage system, water reticulation,
  • electrical works installation
Department of Health Services Completed Ksh 2,940,000 Mukaa    
Upgrading Of Kamuthini Dispensary(completion Of Injection Room And Equipping Of Maternity)

Completion of OPD Block and Injection room

Department of Health Services Completed Ksh 29,542 Mukaa    
Fencing And Gate Installation Of Mutiluni Dispensary

Fencing and gate installation

Department of Health Services Completed Ksh 1,260,900 Mukaa    
Equipping And Operationalization Of General Ward At Uvete Health Centre

Equipping and operationalization of general ward at Uvete health Centre

Department of Health Services Completed Ksh 26,042 Mukaa    
Sports Development Mukaa

Purchase of sport items

Department of Gender, Children, Youth, Sports and Social Services Completed Ksh 245,000 Mukaa    
Uvete Playground

Levelling of the field and construction of a toilet

Department of Gender, Children, Youth, Sports and Social Services Completed Ksh 2,000,000 Mukaa    
Mutiluni Borehole

 i.    Borehole flushing and test pumping.
ii.    Installation of 1.4km of pipeline.
iii.    Construction of 1no. water kiosk.
iv.    Installation of a borehole pump 
v.    Installation of a fence at source 
vi.    Drilling of a complementary borehole.

Department of Water and Sanitation Completed Ksh 4,900,000 Mukaa    
Maiani Borehole

  Drilling, casing, and capping.

Department of Water and Sanitation Completed Ksh 4,900,000 Mukaa    
Kitumbini Ctti Fencing

Fencing and gate installation

Department of ICT, Education and Internship Completed Ksh 1,470,000 Kasikeu    
Rehabilitation Of Kasikeu – Mutweamboo – Kwa Ndiki – Ndumbini – Mombasa Road

Drift construction, box culverts reinstatement spot murraming and drainage structures along Kasikeu – Mutweamboo – Kwa Ndiki – Ndumbini – Mombasa road

Construction of 75m*6m drift

240m2 Stone pitching

Demolishing structure

Graveling on 500m

construction of 150 scour checks

Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 10,843,838 Kasikeu    
Road Improvement Programme

Road improvement programme through road opening

 1) Kwa nzai ivia yiu isika road
 2)kitivo kithina mwanya ivaa road

3)kitivo masokani road
4)chunguni primary kaseve road
5)kawese railway road

6)wathini kalaani road

Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 2,940,000 Kasikeu    
Grain And Pulse Value Chain Development

Provision of certified green grams, maize, cowpeas and beans seeds to farmers 

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Completed Ksh 2,000,000 Kasikeu    
Planning of Kayata Market

Planning of Kayata Market 

Department of Lands, Urban Planning and Development, Environment and Climate Change Completed Ksh 1,622,600 Kasikeu    
Kwa Kavenzi-mitamboni-mwangini Road

culvert construction

Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 965,000 Kasikeu    
Kwa Mbumbu Ecde

 Pending works include fixing of  few window panes. Contractor has been out of site since Novembers 2023.

Department of ICT, Education and Internship Completed Ksh 533,472 Kasikeu    
Renovation Of Maternity Wing And Upgrading Of Kasikeu Model Health Centre

Renovation of OPD and maternity block

Department of Health Services Completed Ksh 4,500,000 Kasikeu    
Completion Of Kiou Dispensary Block, Staff House And Water Tanks

Completion of staff house and new facility.

Department of Health Services Completed Ksh 68,874 Kasikeu    
Ndivu Ecde
  • 2 No. ECDE Classrooms with an office and Store
  • 3-Door Pit Latrine with Urinal
  •  Full Electrical Works
  • Shelves
  • 2 No. Wooden Desks
  • 2 No. Wooden Arm Chairs
  • Water harvesting goods (10,000Ltrs Water Tank and base)
  • 40 No. Kiddy chairs and 20. No. Kiddy tables
  • Play equipment 4 piece set (double swing, slide, climbing frame and double see-saw)
  • Display pin board
  • Branding, Publicity and Signwriting
  • 2 No. Blackboard
Department of ICT, Education and Internship Completed Ksh 3,920,000 Kasikeu    
Heavy Grading And Murraming Of Kilome- Uvete- Kayata- Kasikeu- Mutweamboo- Lumu- Kiou Top- Kwa Kalelo- Off Mombasa Road- Kima Dairy- Marwa Road (kasikeu Ward Section)and Heavy Grading And Murraming Of Muangeni,ngalana,mutyemboolumu,kiou Top ,kwa Kalelo Off Mombasa Road ,kima Diary –marwa Road And Kwa Mikate Road At Muani .

Drift construction, box culverts reinstatement spot murraming and drainage structures along Kilome- Uvete- Kayata- Kasikeu- Mutweamboo- Lumu- Kiou top- Kwa kalelo- Off Mombasa road-  Kima dairy- Marwa road (Kasikeu Ward section)and heavy grading and murraming of Muangeni,Ngalana,MutyembooLumu,Kiou top ,Kwa Kalelo  Off Mombasa road ,Kima Diary –Marwa Road and Kwa Mikate road at Muani 

Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 9,310,000 Kasikeu    
Completion Of Mbiini Dispensary

completion of the OPD block

Department of Health Services Completed Ksh 2,450,000 Kasikeu    
Construction Of Kiou Top Dispensary

Construction of a new dispensary at Kiou top Hill.

Department of Health Services Completed Ksh 11,508 Kasikeu    
Fencing Of Ngalana Dispensary

fencing of Ngalana Dispensary

Department of Health Services Completed Ksh 498,890 Kasikeu    
Road Improvement And Maintenance

Grading and spot gravelling of

  1. Kasikeu town roads 4.5km
  2. Kasikeu - Masokani – Mbyani  6km
  3. Kwa Nzai Mkt – Nduluni – Isika 3km
  4. Chief Kiamba Earth dam – Kandolo – Kwa Ndolo  4.3km
  5. Kwa Mavia Kathanga – Kwa Kavali 1.6km
  6. Enguli – Ngomeni – Kwa Kavali 3km
  7. Mitamboni – Mwangini 7km
  8. Mbiini – Masaani – Ianduni 5km
  9. Kasikeu – Kwa Nzae – Mwenyeivaa Road 7.5km
  10. Enguli – Masive – Ndungani Road  6km
  11. Kayata – Nduluni Hills 4km
Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 4,400,000 Kasikeu    
Mbiini - Isika Pipeline

The were diverted to Kisaulu water project to Kwa Musyoki water kiosk.
-1.5km pipeline installation.
-Rehabilitation of 1no. Kiosk
-Supply and installation of 10,000L tank on platform

Department of Water and Sanitation Completed Ksh 98,000 Kasikeu    
Kayata Borehole

Borehole equipping

Department of Water and Sanitation Completed Ksh 161,882 Kasikeu    
Mikuyu II Water Project

Phased scopes:
i. Pumping system rehabilitation.
ii. Rising main rehabilitation.
iii.    Installation of a 1.4km HDPE & GI pipeline through Uvilani to Kayumbi.
Iv.    Construction of a Kiosk at Kwa Kivuthi in Kayumbi area.

Department of Water and Sanitation Completed Ksh 1,470,000 Kasikeu    
Muatineni Borehole

  Equipping and distribution of Muatineni borehole

Department of Water and Sanitation Completed Ksh 3,920,000 Kasikeu    
Masokani Borehole

i.    Solarisation 
ii.    Pumping system installation
iii.    Water distribution to 1 kiosk and 2 schools – Masokani primary and Masokani secondary schools.
Iv. Borehole drilling, casing, caping.
V. Borehole test pumping.

Department of Water and Sanitation Completed Ksh 4,900,000 Kasikeu    
Nguluni Ecde
  • 2No. ECDE Classrooms with an office and Store
  • 3-Door Pit Latrine with Urinal
  • Electrical Works (conduits only)
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  • Display Pinned board
  • Branding, Publicity and Signwriting
  • 2No. Black Board
Department of ICT, Education and Internship Completed Ksh 3,430,000 Kee    
Rehabilitation of gulleys and road bush clearing and drainage

Rehabilitation and repair of Kee Matwiku Gulley 

  • Excavation and filing of structures
  • Culverts and drainage works
  • Health, Safety and Environment (H.S.E)

 

Department of Lands, Urban Planning and Development, Environment and Climate Change Completed Ksh 500,000 Kee    
Provision Of Certified Mango, Avocado Seedlings, Certified Seeds, Fertilizer And Other Farm Inputs

Provision of certified avocado seedlings, certified seeds, fertilizer and other farm inputs

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Completed Ksh 4,000,000 Kee    
Maintainence Of Other Assets - Markets, Tourism Centres.
  • payment of utility bills for market sheds (electricity); Upgrading of  Makongo view point.Kitchen Extension, Construction of washroom with a PWD toilet, Walling with EPS panels, Floor Tiling  and Finishes 
Department of Trade, Marketing, Industry, Culture and Tourism. Completed Ksh 263,097 Kee    
Road Improvement Programme

Road  opening, grading and graveling of :-

1. Ngiluni AIC – Kwa Kaleli road & Makongo, Makongo View Point – Ngiluni primary road and leveling of Nngiluni Primary paly ground (2.8Kms),

2. Opening and spot graveling of ikalyoni access road ,

3. Grading And Graveling Of Kivani – Kivaku Road, Kivani  Town Access Road And Kivani – Kyandumbi Road ,

Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 7,700,000 Kee    
Miradi Kwa Jamii(mkj) Sand Dams/ Drift Labour At Muusini And Kya Kaleli

Light grading,bush clearing and cut off mitre drains to harvest the rainy water at muusini and kya kaleli

Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 490,000 Kee    
Miradi Kwa Jamii(mkj) At Matangi And Kivani

Light grading, bush clearing and cut-off mitre drains at matangi and Kivani

1. bush clearing, road formation and excavation of catch water drains along Kwa Ngolia - Kathanzi - Mwea road 5.0km
2. Kivani - Kitheuni - Kilolo road 6.0km
3. Masaani primary - Kya Nduu eartdam road 3.0
4. Kivani - Munyuni - Kathini SA - Kiva

Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 490,000 Kee    
Installation Of Street Lights In Markets

Installation of double arm metallic pole 8.5m high , fixing of 150W integrated solar streetlights fittings

Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 1,960,000 Kee    
Upgrading Of Health Facilities In Kee Ward

Renovation of OPD and Maternity block at Kee H.C

Department of Health Services Completed Ksh 55,665 Kee    
Kithuni Borehole

Drilling and development of Kithuni BH

Department of Water and Sanitation Completed Ksh 1,500,000 Kee    
Machine Hire For Desilting Of Kya Nduu Earth Dam

NA

Department of Water and Sanitation Completed Ksh 2,700,000 Kee    
Thoma Borehole-drilling And Distribution

Drilling and Development of Borehole

Department of Water and Sanitation Completed Ksh 176,314 Kee    
Kilia Borehole

Augmentation of Pipeline Section on Mavila Line & Kwa Mwandi Area Pipeline Extension
• Pumping System Solarization and accessories
• Completion of Kilia Water Kiosk and Installation of Water Storage 
• Installation of Dam liner to the Main Masonry Storage Tank

Department of Water and Sanitation Completed Ksh 70,547 Kee    
Mwitiko Sand Dam

Supply of an AC Solar Pump control Module
• Supply and installation of 68No solar panels of 275W
• Installation of level solar probe sensor cable
• Installation of fabricated steel tower for solar array system

Department of Water and Sanitation Completed Ksh 139,023 Kee    
Flashing And Solarisation Of Kyandumbi Borehole

Pumping system solarization and accessories, Expansion of main storage tank, Flushing of the borehole (cleaning)

Department of Water and Sanitation Completed Ksh 141,407 Kee