Ongoing Projects In FY 2023/2024

Go Back

Project Scope Department Status Budget Ward Action
Improvement Of Water In Kikumbulyu North Ward By Kibmawasco-kasayani Market To Cutline, Kwa Kakumi To Kwa Rose Muambani, Kasayani Market To Kwa Presillah Mutinda , Ndetani Ccti To Aic Kalinga To Kwa Kitheka, Kathyaka Market To Kilisa To King’uutheni And Nyayo Market To Soko Muyo

. Rehabilitation of Kathyaka – Nyayo water pipeline extension 1.32km
ii. Cutline Makaani  pipeline extension 4km 

Department of Water and Sanitation Ongoing Ksh 4,300,000 Kikumbulyu North
Construction Of Kathyaka Masonry Tank/ Under Kibmawasco

. Rehabilitation of Kathyaka – Nyayo water pipeline extension 1.32km
ii. Cutline Makaani  pipeline extension 4km 

Department of Water and Sanitation Ongoing Ksh 4,410,000 Kikumbulyu North
Athi-tunguni Water Project

1. EXISTING INTAKE IMPROVEMENTS AND REHABILITATION
• Expansion 

of Intake Galleries pipe OD63mm Perforated infiltration pipe to OD250mm.1. EXISTING INTAKE IMPROVEMENTS AND REHABILITATION

• Expansion of Intake Galleries pipe OD63mm Perforated infiltration pipe to OD250mm.
2. EXISTING TREATMENT PLANT IMPROVEMENTS AND REHABILITATION
• Commissioning of treatment plant
• Introduce air blowers 
• Expand wash water collector
• Scour water to soak any pit
• Filter sand washing 
• Solar streetlighting
• Injector pump with accessories before flocculation channel and at contact tank 
• New Flocculation basin 
• Clear water Stand tap with pipe accessories 
• Painting to elevated tank, access ladders  
• Gauge repair for the contact tank
• Provide, install commission a second submersible Pump at the contact tank   with the same specifications, with all accessories for   rising main to Mukononi .
3. RIASING MAIN TO MUKONONI RESERVOIR 7277 KILOMETERS OD110
• With all Appurtenances 
4. 250m3 MUKONONI TANK
5. DISTRIBUTION NETWORK FOR MAKINDU, KIKUMBULYU NORTH AND NGUUMO WARDS 27KILOMETERS 
• Mukononi Musingini Kamboo line 11.8km OD90
• Mukononi Kathyaka Nyayo shopping cefxdvv  ftnter 10.9km OD90
• Mukononi Symule 4.30km OD90
• With all Appurtenances 

8NO. WATER KIOSKS

Department of Water and Sanitation Ongoing Ksh 6,000,000 Kikumbulyu North
Makindu-kiu Catchment Borehole

Drilling and developing the borehole and capping

Department of Water and Sanitation Ongoing Ksh 1,500,000 Makindu
Athi Tunguni Water Project

1. EXISTING INTAKE IMPROVEMENTS AND REHABILITATION
• Expansion of Intake Galleries pipe OD63mm Perforated infiltration pipe to OD250mm.
2. EXISTING TREATMENT PLANT IMPROVEMENTS AND REHABILITATION
• Commissioning of treatment plant
• Introduce air blowers 
• Expand wash water collector
• Scour water to soak any pit
• Filter sand washing 
• Solar streetlighting
• Injector pump with accessories before flocculation channel and at contact tank 
• New Flocculation basin 
• Clear water Stand tap with pipe accessories 
• Painting to elevated tank, access ladders  
• Gauge repair for the contact tank
• Provide, install commission a second submersible Pump at the contact tank   with the same specifications, with all accessories for   rising main to Mukononi .
3. RIASING MAIN TO MUKONONI RESERVOIR 7277 KILOMETERS OD110
• With all Appurtenances 
4. 250m3 MUKONONI TANK
5. DISTRIBUTION NETWORK FOR MAKINDU, KIKUMBULYU NORTH AND NGUUMO WARDS 27KILOMETERS 
• Mukononi Musingini Kamboo line 11.8km OD90
• Mukononi Kathyaka Nyayo shopping cefxdvv  ftnter 10.9km OD90
• Mukononi Symule 4.30km OD90
• With all Appurtenances 

8NO. WATER KIOSKS

Department of Water and Sanitation Ongoing Ksh 8,820,000 Makindu
Kalungu-ngambi Ya Myunzyu Extension Of Water Pipeline

Construction of  Kalungu-Ilingoni-Kamunzyu line 
a. Equipping with Solar power and pump
b. 4.5km DN63 HDPE pipeline
c. Rehabilitation of 2No. existing Kiosks and tank

Department of Water and Sanitation Ongoing Ksh 2,940,000 Nguumo
Athi Water Project

1. EXISTING INTAKE IMPROVEMENTS AND REHABILITATION
• Expansion of Intake Galleries pipe OD63mm Perforated infiltration pipe to OD250mm.
2. EXISTING TREATMENT PLANT IMPROVEMENTS AND REHABILITATION
• Commissioning of treatment plant
• Introduce air blowers 
• Expand wash water collector
• Scour water to soak any pit
• Filter sand washing 
• Solar streetlighting
• Injector pump with accessories before flocculation channel and at contact tank 
• New Flocculation basin 
• Clear water Stand tap with pipe accessories 
• Painting to elevated tank, access ladders  
• Gauge repair for the contact tank
• Provide, install commission a second submersible Pump at the contact tank   with the same specifications, with all accessories for   rising main to Mukononi .
3. RIASING MAIN TO MUKONONI RESERVOIR 7277 KILOMETERS OD110
• With all Appurtenances 
4. 250m3 MUKONONI TANK
5. DISTRIBUTION NETWORK FOR MAKINDU, KIKUMBULYU NORTH AND NGUUMO WARDS 27KILOMETERS 
• Mukononi Musingini Kamboo line 11.8km OD90
• Mukononi Kathyaka Nyayo shopping cefxdvv  ftnter 10.9km OD90
• Mukononi Symule 4.30km OD90
• With all Appurtenances 

8NO. WATER KIOSKS

Department of Water and Sanitation Ongoing Ksh 4,900,000 Nguumo
Athi-tunguni Water Project

1. EXISTING INTAKE IMPROVEMENTS AND REHABILITATION
• Expansion of Intake Galleries pipe OD63mm Perforated infiltration pipe to OD250mm.
2. EXISTING TREATMENT PLANT IMPROVEMENTS AND REHABILITATION
• Commissioning of treatment plant
• Introduce air blowers 
• Expand wash water collector
• Scour water to soak any pit
• Filter sand washing 
• Solar streetlighting
• Injector pump with accessories before flocculation channel and at contact tank 
• New Flocculation basin 
• Clear water Stand tap with pipe accessories 
• Painting to elevated tank, access ladders  
• Gauge repair for the contact tank
• Provide, install commission a second submersible Pump at the contact tank   with the same specifications, with all accessories for   rising main to Mukononi .
3. RIASING MAIN TO MUKONONI RESERVOIR 7277 KILOMETERS OD110
• With all Appurtenances 
4. 250m3 MUKONONI TANK
5. DISTRIBUTION NETWORK FOR MAKINDU, KIKUMBULYU NORTH AND NGUUMO WARDS 27KILOMETERS 
• Mukononi Musingini Kamboo line 11.8km OD90
• Mukononi Kathyaka Nyayo shopping cefxdvv  ftnter 10.9km OD90
• Mukononi Symule 4.30km OD90
• With all Appurtenances 

8NO. WATER KIOSKS

Department of Water and Sanitation Ongoing Ksh 9,506,000 Nguumo
Mbata Borehole Department of Water and Sanitation Ongoing Ksh 150,000 Kitise/Kithuki
Ward Motorcycle

Purchase of motorcycle

Department of Water and Sanitation Ongoing Ksh 276,600 Mbitini
Kwa Muthama Borehole

Rehabilitation of Kwa Muthama borehole

Department of Water and Sanitation Ongoing Ksh 343,000 Nzaui/Kilili/Kalamba
Yandia Kalatu To Kakuswi- Pipeline Extension

Distribution to Kaukuswi, water kiosk, platform and 1000lt storage tank

Department of Water and Sanitation Ongoing Ksh 980,000 Nzaui/Kilili/Kalamba
Mbiuni Borehole

Drilling and Caping

Department of Water and Sanitation Ongoing Ksh 1,000,000 Nzaui/Kilili/Kalamba
Water Tanks

Supply of 5No: 1000lts Water Tanks

Department of Water and Sanitation Ongoing Ksh 1,201,499 Nzaui/Kilili/Kalamba
Mbitini Borehole

HGS, Drilling

Department of Water and Sanitation Ongoing Ksh 1,360,000 Mbitini
Kanzili Borehole

Drilling and Caping

Department of Water and Sanitation Ongoing Ksh 1,500,000 Nzaui/Kilili/Kalamba
Ngaa Borehole

Drilling and Caping

Department of Water and Sanitation Ongoing Ksh 1,500,000 Nzaui/Kilili/Kalamba
Kwa Mbila Water Project

Supply and installation of 42 Salor Panel 280Watts

Department of Water and Sanitation Ongoing Ksh 1,960,000 Kathonzweni
Yekanga Borehole

Drilling

Department of Water and Sanitation Ongoing Ksh 1,960,000 Mavindini
Kamunyolo Earth Dam

Operationalization of distribution line to Wote, installation of new pumpset, rehabilitation of raising main. Operationalization of Mwambani pipeline, installation of new pumpset, fencing, treatment plant, pipeline extension of 1.1km and connection to KPLC

Department of Water and Sanitation Ongoing Ksh 2,500,000 Wote/Nziu
Kikunduku Borehole Department of Water and Sanitation Ongoing Ksh 3,430,000 Thange
Kwa Mutemwa Borehole

Drilling and development of borehole

Department of Water and Sanitation Ongoing Ksh 3,920,000 Kikumini/Muvau
Mbuthani Water Project

Construction of RC Sump,Upgrading of pumping system and rehabilitation

Department of Water and Sanitation Ongoing Ksh 3,920,000 Mbitini
Kathuma Borehole

Power installation, distribution line extension, 1 No: water kiosk and two plastic storage tanks 1000lts

Department of Water and Sanitation Ongoing Ksh 4,900,000 Wote/Nziu
Kiimani Borehole

Drilling and development of borehole, equipping of borehole, solarization, supply of 10000 ltrs plastic tank

Department of Water and Sanitation Ongoing Ksh 5,380,000 Mavindini
Muusini Borehole

Pipeline extension to Syandoo and Ngosini (Distribution and Storage tanks)

Department of Water and Sanitation Ongoing Ksh 6,380,000 Mavindini
Ilengeni Water Project

Intake and treatment works, pumping systems, pipeline, water points and storage

Department of Water and Sanitation Ongoing Ksh 6,870,000 Mbitini
Ndueni-mulima Water Project

Rehabilitation of Mulima - Ndueni water distribution network

Department of Water and Sanitation Ongoing Ksh 4,900,000 Mbooni
Backhoe

Purchase of fuel for Kathonzweni Backhoe

Department of Water and Sanitation Ongoing Ksh 1,960,000 Kathonzweni
Drilling And Develovement Of Kiteei Mutini Bh

DRILLING AND DEVELOPMENT OF BOREHOLE

Department of Water and Sanitation Ongoing Ksh 2,837,000 Kathonzweni
Muthenyenze Borehole Department of Water and Sanitation Ongoing Ksh 1,160,000 Masongaleni
Masyonyeki Earth Dam Department of Water and Sanitation Ongoing Ksh 4,900,000 Tulimani
Distribution Of Kyandumbi Water

Drilling and Development of Kyandumbi replacement Borehole, Equipping and distribution.

Department of Water and Sanitation Ongoing Ksh 3,500,000 Kee
Miradi Kwa Jamii (sand Dam/drift At Kileani Iiani)

CDD works at watema borehole water project

Department of Water and Sanitation Ongoing Ksh 500,000 Kee
Fisheries Development Programme

 fibre glass fishing motor boat and nets

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 1,500,000 Headquaters
Agriculture Extension Programme

 Implementation of value chain strategies extension, ksh40,000 anual staff facilitation of field activities targetting 60,000 house holds

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 10,587,436 Headquaters
Agriculture Mechanzation Services(ams)

the monies are divided into 2
1. 515,000ksh to be used for fuel for, excavation, bailing and ploughing (10,000bails, 80 farm ponds and 300 acre of land ploughing)
2. the other 485,000ksh will be for repairs and maintaince

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 1,000,000 Headquaters
Co-operative Development And Management

procurement of two items (laptop and printer) the balance shall be used for fuel and facilatation for m&e activities 

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 4,583,930 Headquaters
Kasikeu Stock Yard And Toilet.

Rehabilitation of Kasikeu stock yard and toilet.

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 478,184 Kasikeu
Kathambalani Irrigation Project.

survey and design of the high breed weir done. the project activities include training of 56 household on good agricultural practices and formation irrigation user association. 

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 8,000,000 Kithungo/Kitundu
Ida(world Bank) Credit National Agricultural Value Chain Development Project(navcdp)

Farmer profiling: 187,327 farmers, 387 agrodealers and 373 Agrostockists were registered in September 2023. A total 573 Agripreneurs were trained and engaged in the farmer profiling exercise. 2 CTAC and 1 CPSC meemtings.Participatory Intergrated Community Development process, supporting SACCOs and Farmer Producer Organizations with Enetprise Matching grants, Establishment of County Irrigation Development Unit, Implementation of Farmer Led-Development

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 200,000,000 Headquaters
Kikome Irrigation Scheme Phase 11

Phase 11 project activities which include; raising main, solarization and T- point on the 3 distribution lines.

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 7,000,000 Kitise/Kithuki
Agricultural Training Institute - Kwa Kathoka

 Funds intent to for Implementation of damliner, shednet, poultry drinkers, poultry feeders, green house, payment of casuals inter connection and purchase of projectors

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 6,898,299 Kikumini/Muvau
Livestock Disease Control

 procure vaccination equipments

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 5,308,526 Headquaters
Makueni Integrated Grain Value Chain Development Project

Purchase and installation of retail packaging machine and purchase of pulses 

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 4,000,000 Headquaters
Extension Service Delivery

Support establishment of one model youth community led extension service delivery (Malooi Youth Demonstration Farm and Kanoto Farmers society - Tulimani)

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 3,404,444 Wote/Nziu
Avocado Development Programme

Funds to be used to develop new avocado nurseries, 

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 241,408 Mukaa
Goat Rearing Programme - Distribution Of Galla Goats

Goat rearing programme - Distribution of galla goats

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 172,150 Kikumbulyu South
Installation Of Pallets At Satellite Fertiliser Stores

equiping subsidy fertilizer satellite depots with pallets

 

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 500,000 Headquaters
Operationalization Of Kikima Dairy Processing Plant

Operationalization of Kikima Dairy Processing Plant

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 500,000 Mbooni
Supplyof The Galla Goats

supplyof the Galla goats to 30 households

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 1,000,000 Thange
Goat Value Chain Development- Pwds

supply Galla goats for breeding. With estimated beneficiary of 83 household

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 1,243,000 Nguumo
Green Grams Value Chain Development

Provision of certified green grams seeds to farmers 

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 1,500,000 Ivingoni/Nzambani
Green Grams Value Chain Addition

Provision of certified green grams seeds to farmers 

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 1,500,000 Kikumini/Muvau
Goat Value Chain Development

supplyof the Galla goats. Estimated number of beneficiaries 166 house hold.

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 2,000,000 Kikumbulyu South
Agricultural And Livestock Productivity

Agricultural and livestock productivity- Provision of subsidized AI services , Extension programme and construction of 5 cattle crushes

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 2,000,000 Emali/Mulala
Kyang'ondu Stock Yard

Kyang'ondu stock yard

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 3,000,000 Kako/Waia
Atc-kwa Kathoka

Operationalization of  dairy unit(thorough purchase of 6 heifers dairy cattle feed) livestock disease control  which is being established by AgriFI

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 375,550 Headquaters
Makindu Stock Yard

rehabilitation of fence(post n chain link and running tiber) contruction of loading ramp with collecting boma and replacement of gate

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 381,172 Makindu
Livestock Development

Livestock development - supplyof the Galla goats.To benefit 30 households

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 1,000,000 Thange
Ida (world Bank) Credit (national Agricultural And Rural Inclusive Growth Project (narigp) Pending Matching Grant For Fy 2021/22

facilitate closure activities of the programme

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 14,344,221 Headquaters
De-risking And Value Enhancement (drive) Project

the funds are held at national treasury and is meant to support livestock insurance and development loans. to done in five phased years

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 63,341,980 Headquaters
Conditional Grant For Provision Of Fertilizer Subsidy Programme

the monies is held at national treasury and is meant to offset the fertilizer subsidy programme
Subsidised fertilizer delivered through the 3 NCPB main and 7 Satellite depots

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 162,562,856 Headquaters
National Agricultural Value Chain Development Project(navcdp)

Funds to be used to purchase  10 motorbikes for the wards which were not covered by NARIGP.

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 5,000,000 Headquaters
Development Of Farm Ponds- Fuel

Funds used purchase fuel and repair of backhoe for farm ponds excavation. Targetting 60 farmponds per households( the project provides fuel and the farmer pays ksh3500 per hour on dry rate  ) the activities is implemented during dry spell.

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 1,412,400 Ukia
Kikome Irrigation Scheme

. Operationalization of Kikome Irrigation scheme sump tank & galleries,  3 distribution line,rehabilitation distribution tank

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 7,932,953 Kitise/Kithuki
Road Improvement Programme

Road opening and grading of :-

1. Mikimani -Kyapota road,Kikuswi-ivaini kwa Mbinda- Kyakithuku- kivani road, Ngunga- kyanga- Ngolomoko- kiumoni-Mitini road,

2. Wautu- Katikomu -Kyangala road,

3. St.Teresia -Inyokoni -Musalala road,

4.Kivani-Katondoloni- Kwa maoka -Mbusyani- Kwa Recho- Mwaani road

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 3,430,000 Ilima
Kwa Kavesa Drift &culvert, Heavy Grading And Murraming And Drainage Works From Ngiini- Kalanzoni - Yaitha And Rehabilitation And Construction Of Gabions At Kwa Malonga - Mulumini Road

Rehabilitation of Kwa Kavesa drift & installation of culvert alomg the road 

Heavy grading, spot murraming and drainage works from Ngiini- Kalanzoni - Yaitha

Construction of gabions at Kwa Malonga - Mulumini road

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 9,860,000 Kiima Kiu/Kalanzoni
Mukaa-uvete Road

Road opening, grading/formation, spot murraming and drainage structures along  Mukaa-Uvete road

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 5,385,000 Mukaa
Kituiuni Junction – Mutanda Primary

 Construction of culverts, road grading, 2.5kms road spot maruming and 5.5kms spot slabs along Kituiuni Junction – Mutanda primary road.

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 2,940,000 Kilungu
Opening Of And Ugrading Of Kwa Power, Kwa Solomon, Kasarani, Mikuyuni Secondary, Kyanzili Kavete Wayani Road

opening of and ugrading of Kwa power, Kwa Solomon, Kasarani, Mikuyuni Secondary, Kyanzili Kavete Wayani Road

-Road opening,

-8.5km grading,

-2km spot gravelling,

-Installation of culverts(900mm-1line, 600mm-4lines) 

- Cut off mitre drains for road run-off harvesting

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 5,900,000 Kikumbulyu South
Road Improvement Programme

Road improvement programme (Fuel for county machinery) -inhouse works road grading of roads

5km road grading  along Kwa mbithi-kisayani-masaku dogo-ulilinzi-kwa kamaya road

2km road grading alongNguuni-junction road

4km road grading along iongoni-kwa kithuka-lukenya road


6km road grading along  Kwa daud mweu-anna nzuki-kiambani-road

rock filling along Katulye –ulilinzi road and Yumbuni-ngangani road



Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 490,000 Masongaleni
Construction Of Muaani Drift And Murraming Of Jones To Muaani Girls Road Construction of Muaani drift, road grading, gravelling, Installation of culverts and gabions along Jones to Muaani Girls road Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 4,900,000 Wote/Nziu
Road Improvement And Maintenance

culverts installation and spot gravelling of Kwa somba - mulala- kithumani road

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 3,920,000 Mbitini
Kwa Kitingi -kwa Joel -kwa Mwaniki Road Opening And Grading

Opening, Grading, installation of culverts & excavation of roads for water structures along Kwa Kitingi -Kwa Joel -Kwa Mwaniki road

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 3,430,000 Wote/Nziu
Opening Of Matheani Kwa Nyaa Road

Road opening and grading of Matheani- kwa Nyaa road

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 2,500,000 Kitise/Kithuki
Construction Of Road Structures (culverts And Drifts)

Construction of a retaining wall and rockfilling at Kalembu 

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 1,960,000 Kitise/Kithuki
Fuel For Grading Using County Machinery

Grading of  kathonzweni – kathamboni – yembondo – 11.5km

Kathonzweni – itumbule – kiluluini – kwamanthi - 7.5km

Mbuvo – kwa kavisi – kaasya – ngomano – kyunyu – 12.5km

Kateiko – kwa ng’ondu primary – 2.4km

Mbuvo – mbuvo nzau – kanthiitu – tamutamu – 13km

Kwa kavisi – kithoni primary – 5.3km

  kiangini – kiteei – mutini – 8.8km

4. Kathonzweni - Kathamboni 5.4km

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 1,470,000 Kathonzweni
Kwa Mulinge Drift

Kwa Mulinge drift- construction of a drift, culverts, installation of gabions and excavation of roads for water structures

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 1,470,000 Kikumini/Muvau
Road Improvements

Inhouse works

1. Opening and grading of  3.2km at Nthunguni - Ngosini

2.Grading and graveling of 1.8km at Ung’atani – Kwa Kasyuki 1.8km

3.Opening and Grading of 3.8km at Mathangathi - Thwake

4. Opening and Grading of 4.6km at Sinai – Kwa David

5. Opening of  5.6km at Kwa Kavilu – Kwa Mboo - Kwa Mbindyo – Kwa Ndule

6. opening of 6.3km at Kwa Ngumu – Kwa Kajiwe – Kwa Matikitiki – Syandoo – Nduu Ndune


Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 1,300,000 Mavindini
Road Improvement Program – Fuel For Inhouse Works

Grading of Munathi - Kyuasi

Kitise – Ngunguuni – Kiangini river

Kiangini  River – Maau Eli 

Mbata – Mayuu – Manza – Ngunguuni – Ukokolani – Athiani

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 900,000 Kitise/Kithuki
Rehabilitation Of Ikuyuni Ndauni Road

Construction of a retaining wall and installation of gabion boxes

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 400,000 Mbitini
Road Improvement Programme

Road  opening, grading and graveling of :-

1. Ngiluni AIC – Kwa Kaleli road & Makongo, Makongo View Point – Ngiluni primary road and leveling of Nngiluni Primary paly ground (2.8Kms),

2. Opening and spot graveling of ikalyoni access road ,

3. Grading And Graveling Of Kivani – Kivaku Road, Kivani  Town Access Road And Kivani – Kyandumbi Road ,

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 7,700,000 Kee
Road Improvement

Road improvement -MTF (inhouse works)

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 1,960,000 Ukia
Road Improvement

Road improvement -light grading

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 1,960,000 Ukia
Miradi Kwa Jamii(mkj) Sand Dams/ Drift Labour At Muusini And Kya Kaleli

Light grading,bush clearing and cut off mitre drains to harvest the rainy water at muusini and kya kaleli

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 490,000 Kee
Miradi Kwa Jamii(mkj) At Matangi And Kivani

Light grading, bush clearing and cut-off mitre drains at matangi and Kivani

1. bush clearing, road formation and excavation of catch water drains along Kwa Ngolia - Kathanzi - Mwea road 5.0km
2. Kivani - Kitheuni - Kilolo road 6.0km
3. Masaani primary - Kya Nduu eartdam road 3.0
4. Kivani - Munyuni - Kathini SA - Kiva

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 490,000 Kee
Road Improvement Programme

Road grading

spot murraming  and installation of drainage structures

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 3,160,000 Thange
Culverts Across The Ward

Installation of culverts

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 1,960,000 Thange
Road Improvement

heavy grading of

- Ndulu primary -kwa mavindu roads, Kikumini –Ngongweni roads, Simba-Thithi-Mbukani-Ngangani raod- 14Km

- Kikumini-kwa mutunga, AIC Utatha - Masumba, Ndungunu-, Katangi SCH
- Katangi Sch (levelling school play ground)
- Masumba-Kakili-katulyani rd, Masumba-katulyani- mwalili

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 1,550,000 Nguu/Masumba
Road Improvement Programme

Grading and spot improvement 

- Kisayani-Kisingo-Kathyaka road
- Kalulini-Kuethya road
- Ndetani CCTI-Nyaani road, Ndetani CCTI-Nthongoni road,Nthongoni -Tangaya road
- Kasayani-Kwa Ndetei, Kwa Chief Kisayani-Kwa Kilunda, Utafiti-Yikivala road
- Makaani-Kwa Mukata, Kiwanzani- Kyaani road
- Kisayani-Kwa Mutua-Ithumula , AIC Kivuuti-Nthongoni Mkt, - Kalulini Mkt-Kyandululu, Ithumula-Kanyungu Mkt
- Kisayani Sec-Kiembeni-Kwa Mulwa, Kalulini Mkt-Kwa Mbeva-Kwa Nzau Ilangu- funeral road

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 1,493,400 Kikumbulyu North
Fuel For County Machinery

Inhouse works, road grading of county roads

- Grading and spot improvement of Marikiti open Air market and access roads
- 42-Ithambaume-kalungu-road
- Barrier Kyanginywa road
- Matinga-Kwa Kilai road
-Kalungu Mkt-Nthunguni
- Kalungu Sec-Kwa Chief office-Kawala-Kwa Kimote
- Kwa Chief kalungu office- Siembeni shopping Center

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 1,414,720 Kikumbulyu South
Roads Improvement Programme

Roads improvement programme within the ward using county machines

Grading of Kwa kethi-kwa kisambi –kwa ngala-rombo
- Makindu stock yard-kwa selu-mulili-wote road
- Masalani-kalindiloni-nduluni
- Kwa kijana-kwa kamanda-syusyani-kisingo-kai road
- Shine star-kwa esther-kwa malungu-back to abc kai
- Kwa karanja-kwa malembwa-kwa agnes-kyanda kikauni

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 490,000 Makindu
Road Improvement Program (fuel For Road Maintanance)

Grading of Mbumbuni-Kalimani Road, Ngoni-Kisekini, Mbumbuni-Kalimani-Mukimwani Road through county machines.

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 1,000,000 Kisau/Kiteta
Road Improvement

Road opening , grading and spot murraming on selected roads across the ward

- Kivandini market-Winzeni market-Nzaini Road
- Kivandini-Ngaa-Mukasi Primary School Road
- Kyangoma-Forest-Mulima dam-Nthungoni Road
- Nthungoni-Kivale Forest
- Kivale forest-Tulimani
- Kwa Joel-Mweani Primary School Road
- Ithamaa-Kwa Nthawa-Kitue Road
- Kinyee-Mulima Road
- Kivandini-Police Grounds Road
- Tuvilani-Yambae-Makuu Road
- Nthungoni-Mbuvuni Road
- Kwa Mavoko-Ndueni Road
- Kiveetyo Forest-ABC Nthungoni Road
- Mweani-Kitoo Junction Road
- Mbooni Girls-Kalima-Ithemboni Road
-Mutitu-Kyamuloi Road
- Ndueni-Uvaa Road
- Red sea-Matondoni Primary School-Kwa Nzasi Road
- Kwa Nzasi-Kyumbuni Road
- Nthungoni-Ndueni Primary School Road


This budget line entails both contracted and inhouse works

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 7,000,000 Mbooni
Rural Electrification Programme - Rerec Matching Grant

Installation of transformers, construction and extension of HV lines, construction of distribution lv lines networks to house holds,Public institutions/facilities and churches. 

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 30,000,000 Headquaters
Maintenance Of Street/flood Lights

Replacement of faulty floodlights fittings in mulika mwizi, Replacement of faulty streetlights fittings, Replacement of faulty streetlights/floodlights controls ( contactors ,photocell,  double pole, cut out and earthrod),Replacement of control boxes, Replacement of faulty solar batteries , charger controllers and panels 

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 7,900,000 Headquaters
Rerec Matching Grant (for Kitise And Kithuki Subwards)

Installation of transformers, construction of HV lines, construction of distribution lv lines networks to house holds,Public institutions/facilities and churches.

 

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 2,000,000 Kitise/Kithuki
Installation Of Street Lights Within The Makutano Talent Centre

Installation of double arm metallic pole 8.5m high , fixing of 150W integrated solar streetlights fittings

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 1,960,000 Ivingoni/Nzambani
Installation Of Flood Lights At Kalawani

Installation of 10meters high concrete pole ,stringing of conductors 10mm,fixing of 1.5m long streetlighting arm, Installation of 120W light

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 1,000,000 Tulimani