All Financial Years Projects

Go Back

Project Scope Department Status Budget Ward Action
Kwa Kyai Ecde
  • 2No. ECDE Classrooms with an office and Store
  •  3-Door Pit Latrine with Urinal
  • Electrical Works (conduits only)
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  • Display Pinned board
  • Branding, Publicity and Signwriting
  • 2No. Black Board
Department of ICT, Education and Internship Completed Ksh 3,430,000 Kikumbulyu South
Makusu Ecde
  • 1No. ECDE Classroom
  • 1No.lockable metallic cabinet
  • 1No. Wooden Desk
  • 1No. Wooden Arm Chair
  • Water harvesting goods (5,000Ltrs Water Tank and Base)
  •  Full Electrical Works
  • Display Pinned board
  • Branding, Publicity and Signwriting
Department of ICT, Education and Internship Completed Ksh 1,420,000 Nguumo
Kyaani Ecde
  • 2No. ECDE Classrooms with an office and Store
  • 3-Door Pit Latrine with Urinal
  • Electrical Works (conduits only)
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  • Display Pinned board
  • Branding, Publicity and Signwriting
  • 2No. Black Board
Department of ICT, Education and Internship Completed Ksh 3,430,000 Kikumbulyu North
Ngokolani Ecde
  • 1No. ECDE Classroom with an office and store
  • 1No. Wooden Desk
  • 1No. Wooden Arm Chair
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  • Electrical Works (conduits only)
  • Display Pinned board
  • 20 No. Kiddy chairs
  • 10 No. Kiddy tables
  • Branding, Publicity and Signwriting
  • 1No. whiteboard
  • 1No. blackboard
  • 2 No. duster
  • 10 No. Mark pens
  • Shelves
Department of ICT, Education and Internship Completed Ksh 1,960,000 Thange
Katilamuni Ecde
  • 2No. ECDE Classrooms with an office and Store
  • 3-Door Pit Latrine with Urinal
  • Electrical Works (conduits only)
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  • Display Pinned board
  • Branding, Publicity and Signwriting
  • 2No. Black Board
Department of ICT, Education and Internship Completed Ksh 3,430,000 Kikumbulyu North
Ng'etha Ctti

Construction of a twin workshop and equipping

Department of ICT, Education and Internship Completed Ksh 6,860,000 Emali/Mulala
Nguluni Ecde
  • 2No. ECDE Classrooms with an office and Store
  • 3-Door Pit Latrine with Urinal
  • Electrical Works (conduits only)
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  • Display Pinned board
  • Branding, Publicity and Signwriting
  • 2No. Black Board
Department of ICT, Education and Internship Completed Ksh 3,430,000 Kee
Isovya Ctti

Construction of a dormitory and fencing

Department of ICT, Education and Internship Completed Ksh 4,900,000 Ilima
Kauti Ctti Equipping

Equipping

Department of ICT, Education and Internship Completed Ksh 1,470,000 Kilungu
Mutongu Ecde
  • 2No. ECDE Classrooms with an office and Store
  • Electrical Works (conduits only)
  • 2No. Wooden Desks
  • 2No. Wooden Arm Chairs
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  • Display Pinned board
  • Branding, Publicity and Signwriting
  • 2No. Black board
Department of ICT, Education and Internship Completed Ksh 2,940,000 Kilungu
Mavindini Ecde
  • 1No. ECDE Classroom with an office and Store
  • 1No.lockable metallic cabinet
  • 1No. Wooden Desk
  • 1No. Wooden Arm Chair
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  • Electrical Works (conduits only)
  •  Display Pinned board
  • 20 No. Kiddy chairs
  • 10 No. Kiddy tables
  • Branding, Publicity and Signwriting
  • 1No. whiteboard
  • 1No. blackboard
  • 2 No. duster
  • 10 No. Mark pens
  • Shelves
Department of ICT, Education and Internship Completed Ksh 1,960,000 Mtito Andei
Kiumoni Ctti Equipping

Equipping

Department of ICT, Education and Internship Completed Ksh 980,000 Thange
Nzouni Ecde
  • 1No. ECDE Classroom with an office and Store
  • 1No. Wooden Desk
  • 1No. Wooden Arm Chair
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  • Electrical Works (conduits only)
  • Display Pinned board
  • 20 No. Kiddy chairs
  • 10 No. Kiddy tables
  • Branding, Publicity and Signwriting
  • 1No. whiteboard
  • 1No. blackboard
  • 2 No. duster
  • 10 No. Mark pens
  • Shelves
Department of ICT, Education and Internship Completed Ksh 1,960,000 Thange
Ulilinzi Ecde
  • 1No. ECDE Classroom
  • 1No.lockable metallic cabinet
  • 1No. Wooden Desk
  • 1No. Wooden Arm Chair
  • Water harvesting goods (5,000Ltrs Water Tank and Base)
  • Full Electrical Works
  • Display Pinned board
  • Branding, Publicity and Signwriting

Department of ICT, Education and Internship Completed Ksh 1,470,000 Masongaleni
Yikitaa ECDE
  • 2No. ECDE Classrooms with an office and Store
  • Electrical Works (conduits only)
  • Shelves
  • 2No. Wooden Desks
  • 2No. Wooden Arm Chairs
  • Water harvesting goods (5,000Ltrs Water Tank)
  •  Play equipment - 4 piece set (double swing, slide, climbing frame and double see-saw)
  • Display Pinned board
  • Branding, Publicity and Signwriting
  • 2 No. Black board
  • 4 No. Duster
  • 20 No. Mark pens
  • 2 No. Whiteboard
Department of ICT, Education and Internship Completed Ksh 1,470,000 Masongaleni
Kavungwa ECDE
  • 1No. ECDE Classroom with an office and Store
  • 1No. Wooden Desk
  • 1No. Wooden Arm Chair
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  • Electrical Works (conduits only)
  •  Display Pinned board
  • 20 No. Kiddy chair
  • 10 No. Kiddy tables
  • Branding, Publicity and Signwriting
  • 1No. whiteboard
  • 1No. blackboard
  • 2 No. duster
  • 10 No. Mark pens
  • Shelves
Department of ICT, Education and Internship Completed Ksh 1,960,000 Mtito Andei
Kwa Kea Ecde
  • 2No. ECDE Classrooms with an office and Store
  • 3-Door Pit Latrine with Urinal
  • Electrical Works (conduits only)
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  • Display Pinned board
  • Branding, Publicity and Signwriting
  • 2No. Black Board
Department of ICT, Education and Internship Completed Ksh 3,430,000 Kiima Kiu/Kalanzoni
Ndivu Ecde
  • 2 No. ECDE Classrooms with an office and Store
  • 3-Door Pit Latrine with Urinal
  •  Full Electrical Works
  • Shelves
  • 2 No. Wooden Desks
  • 2 No. Wooden Arm Chairs
  • Water harvesting goods (10,000Ltrs Water Tank and base)
  • 40 No. Kiddy chairs and 20. No. Kiddy tables
  • Play equipment 4 piece set (double swing, slide, climbing frame and double see-saw)
  • Display pin board
  • Branding, Publicity and Signwriting
  • 2 No. Blackboard
Department of ICT, Education and Internship Completed Ksh 3,920,000 Kasikeu
Mavindini Ctti Dormitory

Construction of a dormitory

Department of ICT, Education and Internship Completed Ksh 3,430,000 Mavindini
Kalamba Ecde
  • 1No. ECDE Classroom
  • 1No.lockable metallic cabinet
  • 1No. Wooden Desk
  • 1No. Wooden Arm Chair
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  •  Full Electrical Works
  • Display Pinned board
  • Branding, Publicity and Signwriting
  • 20 No. Kiddy chairs
  • 10 No. Kiddy tables
  • Play equipment - 3 piece set (double swing, slide and climbing frame)
Department of ICT, Education and Internship Completed Ksh 1,568,000 Nzaui/Kilili/Kalamba
Kambi Mawe Ecde
  • 1No. ECDE Classroom with an office and Store
  • 1No. Wooden Desk
  • 1No. Wooden Arm Chair
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  • Electrical Works (conduits only)
  • Display Pinned board
  • 20 No. Kiddy chairs
  • 10 No. Kiddy tables
  • Branding, Publicity and Signwriting
  • 1 No. whiteboard
  • 1No. blackboard
  • 2 No. duster
  • 10 No. Mark pens
  • Shelves
Department of ICT, Education and Internship Completed Ksh 1,960,000 Kikumini/Muvau
Kiangi Youth Empowerment Centre

Phase 1: construction of 2 No classrooms, office and reception

Phase 2: Construction of a lecture room and 2 door pit latrine

Department of ICT, Education and Internship Completed Ksh 4,910,388 Kathonzweni
Ndukuma Ecde
  • 1No. ECDE Classroom with an office and Store
  • 1No.lockable metallic cabinet
  • 1No. Wooden Desk
  • 1No. Wooden Arm Chair
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  • Electrical Works (conduits only)
  • Display Pinned board
  • 20 No. Kiddy chairs
  • 10 No. Kiddy tables
  • Branding, Publicity and Signwriting
  • 1No. whiteboard
  • 1No. blackboard
  • 2 No. duster
  • 10 No. Mark pens
  • Shelves
Department of ICT, Education and Internship Completed Ksh 1,960,000 Kikumini/Muvau
Ngomano Ecde
  • 2No. ECDE Classrooms with an office and Store
  • 3-Door Pit Latrine with Urinal
  • Electrical Works (conduits only)
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  • Display Pinned board
  • Branding, Publicity and Signwriting
  • 2No. Black Board
Department of ICT, Education and Internship Completed Ksh 3,430,000 Kathonzweni
Masokani Ctti & Kithumani Ctti - Water Tanks

Installation of gutters and water tanks

Department of ICT, Education and Internship Completed Ksh 1,470,000 Mbitini
Kathonzweni Ctti - Pit Latrine

Construction of a pit latrine

Department of ICT, Education and Internship Completed Ksh 980,000 Kathonzweni
Kyumbuni Ecde
  • 2No. ECDE Classrooms with an office and Store
  • 3-Door Pit Latrine with Urinal
  • Electrical Works (conduits only)
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  • Display Pinned board
  • Branding, Publicity and Signwriting
  • 2No. Black Board

Department of ICT, Education and Internship Completed Ksh 3,430,000 Mbitini
Ngunguuni Ecde
  • 2 No. ECDE Classrooms with an office and Store
  • 3-Door Pit Latrine with Urinal
  •  Full Electrical Works
  • Shelves
  • 2 No. Wooden Desks
  • 2 No. Wooden Arm Chairs
  • Water harvesting goods (10,000Ltrs Water Tank and base)
  • 40 No. Kiddy chairs and 20. No. Kiddy tables
  • Play equipment 4 piece set (double swing, slide, climbing frame and double see-saw)
  • Display soft board
  • Branding, Publicity and Signwriting
  • 2 No. Blackboard
  • 4 No. duster
  • 20 No. Mark pens
  • 2 No. White board
Department of ICT, Education and Internship Completed Ksh 3,920,000 Kitise/Kithuki
Ngaa Ecde
  • 2 No. ECDE Classrooms with an office and Store
  • Electrical Works (conduits only)
  • Shelves
  • 2 No. Wooden Desks
  • 2 No. Wooden Arm Chairs
  • Water harvesting goods (5,000Ltrs Water Tank)
  • Play equipment - 4 piece set (double swing, slide, climbing frame and double see-saw)
  • Display Pinned board
  • Branding, Publicity and Signwriting
  • 2 No. Black board retained
  • 4 No. Duster
  • 20 No. Mark pens
  • 2No. Whiteboard
Department of ICT, Education and Internship Completed Ksh 3,136,000 Kisau/Kiteta
Mulooni Ecde

Construction of 3 Door No. toilet with urinal

Department of ICT, Education and Internship Completed Ksh 490,000 Tulimani
Songeni Ecde
  • 2 No. ECDE Classrooms with an office and Store
  • Electrical Works (conduits only)
  • Shelves
  • 2 No. Wooden Desks
  • 2 No. Wooden Arm Chairs
  • Water harvesting goods (5,000Ltrs Water Tank)
  •  Play equipment - 4 piece set (double swing, slide, climbing frame and double see-saw)
  • Display Pinned board
  • Branding, Publicity and Signwriting
  • 2 No. Black board retained
  • 4 No. Duster
  • 20 No. Mark pens
  • 2 No. Whiteboard
Department of ICT, Education and Internship Completed Ksh 3,136,000 Kisau/Kiteta
Syongungi Ecde
  • 2 No. ECDE Classrooms with an office and Store
  • Electrical Works (conduits only)
  • 2 No. Wooden Desks
  • 2 No. Wooden Arm Chairs
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  •  Display Pinned board
  • Branding, Publicity and Signwriting
  • 2 No. Black board
Department of ICT, Education and Internship Completed Ksh 2,940,000 Kalawa
Kyamithengi Library

Installation of LAN, structured cabling and furnishing

Department of ICT, Education and Internship Completed Ksh 1,000,000 Tulimani
Ctti Capitation

CTTI capitation

Department of ICT, Education and Internship Completed Ksh 20,553,968 Headquaters
Government Automation- Cihmis

1. Implementation of CIHMIS
2. Deployment of LAN at Mbooni Sub County Hospital
3. Deployment of LAN at Makueni county Referral hospital
4. Deployment of internet connectivity at 6 sub county hospitals 
5. Procurement of computers for MCRH

Department of ICT, Education and Internship Completed Ksh 28,420,000 Headquaters
Mwasa Ng'ombe Ecde
  • 2No. ECDE Classrooms with an office and Store
  • 3-Door Pit Latrine with Urinal
  • Electrical Works (conduits only)
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  • Display Pinned board
  • Branding, Publicity and Signwriting
  • 2No. Black Board
Department of ICT, Education and Internship Completed Ksh 3,430,000 Emali/Mulala
Emali Township Ecde
  • 2No. ECDE Classrooms with an office and Store
  • 3-Door Pit Latrine with Urinal
  • Electrical Works (conduits only)
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  • Display Pinned board
  • Branding, Publicity and Signwriting
  • 2No. Black Board
Department of ICT, Education and Internship Completed Ksh 3,430,000 Emali/Mulala
Ngongweni Ecde
  • 2No. ECDE Classrooms with an office and Store
  • 3-Door Pit Latrine with Urinal
  • Electrical Works (conduits only)
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  • Display Pinned board
  • Branding, Publicity and Signwriting
  • 2No. Black Board

Department of ICT, Education and Internship Completed Ksh 3,430,000 Nguu/Masumba
Uvileni Ctti- Toilet

Construction of a toilet

Department of ICT, Education and Internship Completed Ksh 686,000 Nguumo
Kwa Mbumbu Ecde

 Pending works include fixing of  few window panes. Contractor has been out of site since Novembers 2023.

Department of ICT, Education and Internship Completed Ksh 533,472 Kasikeu
Kisse Ecde

Construction of 2 No. classrooms, 3 door pit latrine

Department of ICT, Education and Internship Completed Ksh 3,500,000 Kiima Kiu/Kalanzoni
Spring Hill Kwa Kakulu Ctti Workshop

Construction of motor vehicle workshop and equipping with vehicle hoist machine

Department of ICT, Education and Internship Completed Ksh 3,073,613 Emali/Mulala
Muangeni Ecde

Construction of 2No. classrooms, office, store, 3 door pit latrine

Department of ICT, Education and Internship Completed Ksh 3,500,000 Nguu/Masumba
Muambwani ECDE

Construction of 2 No.classrooms and a 3 door pit latrine

Department of ICT, Education and Internship Completed Ksh 3,500,000 Mbitini
Makueni Integrated Vocation Education Centre - Dormitory

Construction of a dormitory

Department of ICT, Education and Internship Completed Ksh 2,536,001 Wote/Nziu
Mweleli Ecde

Construction of one classroom

Department of ICT, Education and Internship Completed Ksh 527,367 Kalawa
Conditional Allocation For Leasing Of Medical Equipment

Conditional Allocation for Leasing of Medical Equipment, this project is implemented from the national government.

Department of Health Services Completed Ksh 124,723,404 Headquaters
Construction Of Pwd Empowered Structures At Kalulini Health Centre

Construction of PWD friendly toilet, walkways and ramp

Department of Health Services Completed Ksh 980,000 Kikumbulyu South
Danida – Matching Grant For Level 2 And 3 Facilities

Funds used for Primary healthcare facilities funding

Department of Health Services Completed Ksh 10,530,000 Headquaters
Fencing Of Kwa-kotoe Dispensary (katune Disp)

Chainlink fencing of the facility

Department of Health Services Completed Ksh 980,000 Emali/Mulala
Itumbule Dispensary – Fencing, Wiring, And Construction Of Soak Pit, Ash Pit And Incinerator At Itumbule Dispensary.

 Fencing, wiring, and construction of soak pit, ash pit and incinerator at Itumbule Dispensary. 

Department of Health Services Completed Ksh 1,274,000 Kathonzweni
Kathulumbi Model Health Centre.(fencing And Gate)

Fencing of the facility and installation of gate

Department of Health Services Completed Ksh 1,470,000 Kalawa
Matiliku Subcounty Hospital (dental Chair, Accessories And Other Smal Equipment)

Renovation works and supply of dental chair

Department of Health Services Completed Ksh 2,500,000 Nzaui/Kilili/Kalamba
Medical Bills And Surgical Implants

payment of medical bills and procurement of surigcal

Department of Health Services Completed Ksh 172,464 Tulimani
Medical Bills And Surgical Implants

payment of medical bills and procurement of surigcal implants

Department of Health Services Completed Ksh 42,610 Kikumbulyu North
Mutembuku Heath Centre (renovations)

Renovation of OPD block - New roof and iron sheets, painting, tiles and eletrical installations

Department of Health Services Completed Ksh 2,500,000 Kalawa
Purchase Of Medical Equipment

Procurement and delivery of Biosafety Cabinet for Makindu , Mbooni Biosafety cabinet , Ventilator for MCRH , Kwa Ndava Dispensary equipment 

Department of Health Services Completed Ksh 10,006,149 Headquaters
Renovation Of Maternity Wing And Upgrading Of Kasikeu Model Health Centre

Renovation of OPD and maternity block

Department of Health Services Completed Ksh 4,500,000 Kasikeu
Surgical Implants And Medical Bills

payment of medical bills and procurement of surigcal implants

Department of Health Services Completed Ksh 734,566 Kikumbulyu South
Surgical Implants And Medical Bills

payment of medical bills and procurement of surigcal implants

Department of Health Services Completed Ksh 553,412 Nzaui/Kilili/Kalamba
Ulu Dispensary (construction Of A L-shaped Dispensary) - Dispensary Infrastructural Requirements (construction Of Consultation Room, Reception, Pharmacy, Store, Observation And Sterilization Room). Sanitary Infrastructure - Construction Of Latrine, Septic Tank, Soak Pit, Placenta Pit, Ash Pit And Burning Chamber.

 (construction of a L-shaped dispensary) - Dispensary infrastructural requirements (construction of consultation room, reception, pharmacy, store, observation and sterilization room). Sanitary infrastructure - construction of latrine, septic tank, soak pit, placenta pit, ash pit and burning chamber. 

Department of Health Services Completed Ksh 6,860,000 Kiima Kiu/Kalanzoni
Universal Health Care Programme

Funds used for support of Makueni Care

Department of Health Services Completed Ksh 100,000,000 Headquaters
Upgrading Ngai Health Center

PROPOSED CONSTRUCTION OF MATERNITY BLOCK 

Department of Health Services Completed Ksh 4,900,000 Kithungo/Kitundu
Upgrading Ngwata Maternity Centre

Construction of new OPD block

Department of Health Services Completed Ksh 5,350,000 Masongaleni
Upgrading Of Enzai Dispensary

proposed upgrading- including;

  • worktops
  • railing (balustranding)
  • ceiling and floor finishes
  • mechanical works- sanitary fittings, internal drainage, foul drainage system, water reticulation,
  • electrical works installation
Department of Health Services Completed Ksh 2,940,000 Mukaa
Upgrading Of Health Facilities In Kee Ward

Renovation of OPD and Maternity block at Kee H.C

Department of Health Services Completed Ksh 2,450,000 Kee
Upgrading Of Kamuthini Dispensary(completion Of Injection Room And Equipping Of Maternity)

Completion of OPD Block and Injection room

Department of Health Services Completed Ksh 2,940,000 Mukaa
Upgrading Of Kitende Dispensary(fencing And Gate)

Fencing and Gate installation

Department of Health Services Completed Ksh 1,500,000 Nguu/Masumba
Upgrading Of Kyang’a Dispensary – Construction Of Staff Quarters

Construction of staff house

Department of Health Services Completed Ksh 3,430,000 Ilima
Purchase Of Tanks

Purchase and supply of 3 of water tanks

Department of Health Services Completed Ksh 451,760 Nzaui/Kilili/Kalamba
Purchase Of A Backhoe

Purchase of a Backhoe

Department of Water and Sanitation Completed Ksh 13,000,000 Kathonzweni
Makueni Girls Borehole

Equipping of Makueni Girls borehole, pipeline extension, solarization

Department of Water and Sanitation Completed Ksh 2,940,000 Wote/Nziu
Athi Kalawa Wash Programme Department of Water and Sanitation Completed Ksh 2,430,000 Kalawa
Water Development Programs Department of Water and Sanitation Completed Ksh 2,303,000 Headquaters
Kithuni Borehole

Drilling and development of Kithuni BH

Department of Water and Sanitation Completed Ksh 949,000 Kee
Machine Hire For Desilting Of Kya Nduu Earth Dam

NA

Department of Water and Sanitation Completed Ksh 2,700,000 Kee
Ithanzeni Borehole- Extension And Water Distribution

• Rising Main
• Ithanzeni Return Line
• Construction of 100CU.M Masonry Tank

Department of Water and Sanitation Completed Ksh 3,920,000 Ukia
Kwa Matolo Earth Dam

• Earth dam expansion 
• Spillway protection.
• Construction of a check dam.

Department of Water and Sanitation Completed Ksh 5,482,000 Ilima
Ndiani Water Project – Solarization, 2km Distribution Line With Water Kiosks

NA

Department of Water and Sanitation Completed Ksh 5,880,000 Kilungu
Ithanzeni Bore Hole: Upgrading Of Solar Pump System

Upgrading of Solar Pumping System - Ithanzeni BH Project

Department of Water and Sanitation Completed Ksh 1,960,000 Ukia
Kilala Bh Water Project

Extension of Mbalani Pipeline, Extension of Kilala Project line to Kyumu, Kyumu Water Kiosk, Mbalani Water Kiosk

Department of Water and Sanitation Completed Ksh 1,470,000 Ukia
Kaiti Miting'ani Sand Dam : Construction Of Sump, Increase Sand Dam Height By 1.5m And Construction Of Raised Main Ms Panel Tank At Yiumo Kwa Mukosi

Raising of sand dam wall, construction of 100Cu.M Sump Tank, Construction of Yiumo Elevated 50Cu.M steel tank

Department of Water and Sanitation Completed Ksh 7,840,000 Ukia
Uyi Earth Dam

Uyi Earth Dam-Counter Funding with NDMA

Department of Water and Sanitation Completed Ksh 10,000,000 Masongaleni
Equipment Hire For Desilting Earth Dams(kwa Kitwa,kwa Manza, Kwa Kasau And Victoria Earth Dams)

Scope change to desilt Kwa Mutungwa earth dam)

Department of Water and Sanitation Completed Ksh 2,940,000 Mtito Andei
Kwa Kalekye Borehole

Drilling and Equipping (solarization, kiosk, tank) of Kwa Kalekye borehole 

Department of Water and Sanitation Completed Ksh 2,940,000 Ivingoni/Nzambani
Mang’elete Borehole (Changed to equip Kalekye borehole)

Drilling and Equipping (solarization, kiosk, tank) of Mang’elete Borehole

Department of Water and Sanitation Completed Ksh 2,940,000 Ivingoni/Nzambani
Drilling Of Kwa Maundu

Drilling of kwa Maundu borehole- Drilling and equipping of the borehole

Department of Water and Sanitation Completed Ksh 2,036,680 Ivingoni/Nzambani
Kiambani Borehole

Kiambani borehole –Drilling , equipping with Solar, and distribution

Department of Water and Sanitation Completed Ksh 3,430,000 Masongaleni
Nzouni Borehole

Drilling and equipping of Nzouni borehole 

Department of Water and Sanitation Completed Ksh 3,430,000 Thange
Maintenance Of Boreholes In Masongaleni Ward

Maintenance of boreholes in Masongaleni ward 

Department of Water and Sanitation Completed Ksh 490,000 Masongaleni
Waia Earth Dam

Construction of 3No. Water Koisks and installation of 4No. 10Cubic metres plastic storage tanks. Water distribution extension from kavingo market to kyamangatu, kwa masai to Ilela market and Kwa masai to kwa mutava. Construction of 1No. Cattle trough at kwa Ilela market.

Department of Water and Sanitation Completed Ksh 5,880,000 Kako/Waia
Kwa Mutombi Water Project
Rehabilitation of rising main and installation of 2No. 10 Cubic metres platic storage tanks and constrcution of 2No. Platforms, Servicing of Genset and installation of new battery.
Department of Water and Sanitation Completed Ksh 1,960,000 Kako/Waia
Kyamakuthi Earth Dam

Desilting of kyamakuthi reservoir

Department of Water and Sanitation Completed Ksh 14,910,012 Kalawa
Kinyongo Water Project

Construction of 4No. Water Kiosks and installation of 10 Cubic metres for each kiosks. Water extension to Kilenge primary school from katunyoni market and water distribution extension from Kwa musyoka to Ngaani Market.

Department of Water and Sanitation Completed Ksh 3,920,000 Kithungo/Kitundu
Kiumi Water Project

Rehabilitation of Kitundu-syathani pipeline and pipeline extension to Nthumbini, Rehabilitation of Kitundu-Kalambya pipeline and pipeline extension from kalala to Ngomangoni, construction of 2N. Water kiosks and installation of 2No. 10 Cubic metres plastic storage tanks.

Department of Water and Sanitation Completed Ksh 3,920,000 Kithungo/Kitundu
Kyambui Water Project

construction of 4km gravity pipeline, 2No. Water kiosks, installation of 2No. 10 Cubic metres plastic storage tanks for each kiosk constructed and platforms.

Department of Water and Sanitation Completed Ksh 3,920,000 Mbooni
Kooi Earth Dam

Kooi earth dam -   Desilting of the reservoir and construction of check dams

Department of Water and Sanitation Completed Ksh 4,900,000 Tulimani
Lower Ngwani Water Project

Replacement of motor, inverter, desilting sump and replacement of vandalized power cables.

Department of Water and Sanitation Completed Ksh 980,000 Tulimani
Nyaanyaa Earthdam Phase 2

Construction of 1.3km rising main, construction of 1No. Water kiosk and installation of 1No. 10Cubic metres plastic storage tank.

Department of Water and Sanitation Completed Ksh 1,568,000 Kako/Waia
Kyaluma Bore Hole Water Project

Solarization, replacement of pump end, flushing borehole, construction of elevated steel tower to hold 2No. 10CM plastict storage tanks, construction of kyaluma market water point, renovation of kyowani market water kiosk, water pipeline distribution distribution to kyowani and kyaluma market.

Department of Water and Sanitation Completed Ksh 4,900,000 Kako/Waia