Ongoing Projects In FY 2025/2026

Go Back

Project Scope Department Status Budget Ward Action
Construction Of A New Sump Tank And Construction Of A Latrine At Kaiti 2 Construction of a new sump tank and construction of a latrine at Kaiti 2 Department of Water and Sanitation Ongoing Ksh 5,000,000 Wote/Nziu
Completion Of Kamunyolo Sump And Relocation Of The Pipes Completion of Kamunyolo Sump and relocation of the pipes  Department of Water and Sanitation Ongoing Ksh 3,500,000 Wote/Nziu
Drilling Of Seku Wote University Borehole Drilling of SEKU Wote University borehole  Department of Water and Sanitation Ongoing Ksh 2,000,000 Wote/Nziu
Electicity Back-up And Distribution Of Kituasi Water Project To Six Designated Water Points Electicity Back-up and distribution of Kituasi water project to six designated  water points Department of Water and Sanitation Ongoing Ksh 6,000,000 Wote/Nziu
Construction Of Kyambui Drift Construction of 120m by 6m drift and 80cm mitre drains Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 5,000,000 Wote/Nziu
Kwa Ndule Water Sum(new Project) -construction Of Sump And Distribution Of Water To Kasevini Kwa Ndule Water Sum(New Project) -Construction of sump and distribution of water to Kasevini Department of Water and Sanitation Ongoing Ksh 3,000,000 Nzaui/Kilili/Kalamba
Distribution Of Ithetheni Water Project To Maviaume,kwa Kitengi And Nthiiani Distribution of Ithetheni water project to maviaume,kwa kitengi and nthiiani Department of Water and Sanitation Ongoing Ksh 900,000 Nzaui/Kilili/Kalamba
Market Lighting -installation Of Lighting At Jasho, Kalima, Wee, Mathanguni, Kwa Mutavi And Kwa Kalui Markets Installation 10.5M (2*150) new solar market lights at Jasho, Kalima, Wee, Mathanguni, Kwa Mutavi and Kwa Kalui Markets Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 1,665,000 Nzaui/Kilili/Kalamba
Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Nzaui Kilili Kalamba Ward Youth Empowerment - 2Jiajiri Programme (KCB Matching Grant) Department of ICT, Education and Internship Ongoing Ksh 1,000,000 Nzaui/Kilili/Kalamba
Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Mbitini Ward Youth Empowerment - 2Jiajiri Programme (KCB Matching Grant) Department of ICT, Education and Internship Ongoing Ksh 1,000,000 Mbitini
Kambi Mawe Borehole (eni Csr) -distribution Line From Kambi Mawe Catholic To Nursery, Raising Pipeline From Source To Kwa Metho Hill, Rehabilitation Of Storage Tanks And Kiosks And Return Pipe For Community Distribution Kambi mawe borehole (ENI CSR) -Distribution line from Kambi Mawe catholic to Nursery, raising pipeline from source to kwa metho hill, rehabilitation of storage tanks and kiosks and return pipe for community distribution  Department of Water and Sanitation Ongoing Ksh 3,000,000 Kikumini/Muvau
Mantainance And Fueling Of Ward Backhoe Mantainance and fueling of Ward backhoe  Department of Water and Sanitation Ongoing Ksh 2,000,000 Kathonzweni
Kwa Mbila Dam -distribute Water To Kyunyu Market,ikaasu,katangi, Kwa Kisumo And Mbuvo Health Centre Kwa Mbila dam -Distribute water to Kyunyu market,Ikaasu,katangi, Kwa Kisumo and Mbuvo Health centre  Department of Water and Sanitation Ongoing Ksh 3,000,000 Kathonzweni
Matinga 1 Dam -additional Solar, Plastic Elevated Tank-24m3, Rehabiliation Of The Rising Main And Distribute Water To Ikaasu,kwa Kilai And Ituka Villages Matinga 1 dam -Additional solar, Plastic elevated tank-24M3, Rehabiliation of the rising main and distribute water to Ikaasu,kwa Kilai and Ituka Villages Department of Water and Sanitation Ongoing Ksh 3,000,000 Kathonzweni
Machine Hire For Opening Of Roads Across Kathonzweni Ward Machine hire for opening of roads across Kathonzweni  ward Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 2,300,000 Kathonzweni
Installation Of Security Lights At Ikaasu Market Installation 12.5M (2*150) new solar market lights at Ikaasu Market Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 450,000 Kathonzweni
Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Kathonzweni Ward Youth Empowerment - 2Jiajiri Programme (KCB Matching Grant) Department of ICT, Education and Internship Ongoing Ksh 1,000,000 Kathonzweni
Construction Of Kathwonzeni Market Toilet  Construction of Kathwonzeni Market Toilet  Department of Trade, Marketing, Industry, Culture and Tourism. Ongoing Ksh 1,000,000 Kathonzweni
Kwa Ngoka Borehole - Drilling, Equipping And Distribution Of Kwa Ngoka Borehole, Construction Of A Water Kiosk At Point Source, Installation Of 10 000 M3 Plastic Tank Kwa Ngoka Borehole - Drilling, equipping and distribution of Kwa Ngoka borehole, Construction of a water kiosk at point source, installation of 10 000 m3 plastic tank Department of Water and Sanitation Ongoing Ksh 3,182,060 Mavindini
Drilling Of Kitumbai Borehole Drilling of Kitumbai Borehole Department of Water and Sanitation Ongoing Ksh 2,000,000 Mavindini
Soko Muyo/msambweni Borehole -drilling, Distribution And Solarization Of Soko Muyo Borehole Soko Muyo/Msambweni Borehole -Drilling, distribution and solarization of Soko Muyo borehole Department of Water and Sanitation Ongoing Ksh 5,000,000 Mavindini
Nthunguni Borehole -drilling And Solarization Of Nthunguni Borehole Nthunguni Borehole -Drilling and solarization of Nthunguni borehole Department of Water and Sanitation Ongoing Ksh 4,000,000 Mavindini
Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Mavindini Ward Youth Empowerment - 2Jiajiri Programme (KCB Matching Grant) Department of ICT, Education and Internship Ongoing Ksh 1,000,000 Mavindini
Solarization And Installation Of Water Pump At Kwambila Earth Dam And Extension Of The Same Project From Kiuuku Market To Kasayani Market And Also From Kiuuku Market To Bosnia Solarization and installation of water Pump at Kwambila Earth Dam and extension of the same project from Kiuuku Market to Kasayani Market and also from Kiuuku Market to Bosnia Department of Water and Sanitation Ongoing Ksh 4,200,000 Kitise/Kithuki
Foodlight At Kasayani Market Installation 12.5M (2*150) new solar market lights at Kasayani Market Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 1,000,000 Kitise/Kithuki
Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Kitise/kithuki Ward Youth Empowerment - 2Jiajiri Programme (KCB Matching Grant) Department of ICT, Education and Internship Ongoing Ksh 1,000,000 Kitise/Kithuki
Construction Of Yakanga Pit Latrine  Construction Of Yakanga Pit Latrine  Department of Trade, Marketing, Industry, Culture and Tourism. Ongoing Ksh 750,000 Kitise/Kithuki
Construction of Keywall and culvert along Kwa Syoni- Londokwe Mikwani road Construction keywall and culvert along Kwa Syoni- Londokwe Mikwani road Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 7,500,000 Kitise/Kithuki
Kyambui Water Project -construction Of Masonry Tank At Misakwani And Water Distribution To Mutwii- Nguunguu- Coffee Factory - Mutea And Thaathaini Kyambui Water Project -Construction of masonry tank at Misakwani and water distribution to Mutwii- Nguunguu- coffee factory - Mutea and Thaathaini Department of Water and Sanitation Ongoing Ksh 3,000,000 Mbooni
Kikima Town/markets Development Program -phased Programme.- Cabro Paving Kikima Victoria Hotel- Knut Offices, Machakos And Tawa Busparks, Walkway Construction From Kcb To Amazon Petrol Station And Markets Street Lighting 1. Installation of 20M (6*400W) high floodlight at Kali and Nzeveni markets 2. Installation of streetlights at Kwa Mbisu market (15M concrete pole, 4No.lantern c/w all accessories, bolts and nuts, 400W LED fittings)3. Installation of the streetlights at Ithamaa Junction (10M concrete pole, 1No.lantern  c/w all accessories, bolts and nuts, 120W LED fittings)4. 5km parking/access road Cabro paving Kikima victoria hotel- KNUT offices section Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 10,000,000 Mbooni
Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Mbooni Youth Empowerment - 2Jiajiri Programme (KCB Matching Grant) Department of ICT, Education and Internship Ongoing Ksh 1,000,000 Mbooni
Mutooni Borehole Water Project-equipping And Distribution Of Water To Kithungo Primary,secondary And Market,mutooni Village And Munyuuka Primary Mutooni borehole water project-Equipping and distribution of water to Kithungo primary,secondary and market,Mutooni village and Munyuuka primary Department of Water and Sanitation Ongoing Ksh 4,000,000 Kithungo/Kitundu
Nthaani Ecde Construction of 1no. ECDE Classroom with an office & store, Electrical conduit, shelving to the stores, lockable metallic cabinet, Wooden Desk, Wooden Arm Chairs, Water harvesting goods (10,000Ltrs Water Tank and base), 40 No. Kiddy chairs and 20. No. Kiddy tables, Play equipment 4 piece set (double swing, slide, climbing frame and double see-saw), Display soft board and Branding, Publicity and Signwriting Department of ICT, Education and Internship Ongoing Ksh 2,500,000 Kithungo/Kitundu
Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Kithungo/ Kitundu Youth Empowerment - 2Jiajiri Programme (KCB Matching Grant) Department of ICT, Education and Internship Ongoing Ksh 1,000,000 Kithungo/Kitundu
Thwake Sand Dam Water Project -construction Of Sump, Pumping, Distribution Tank (50m3), Pumping Line And Distribution Line To Uvaani Thwake sand dam water project -Construction of sump, pumping, distribution tank (50M3), pumping line and distribution line to Uvaani Department of Water and Sanitation Ongoing Ksh 7,000,000 Tulimani
Kango Borehole Distribution - Pipeline Extension From Kango Borehole To Kwa Mutisya Market (pipeline, Water Kiosk And 10,000l Tank On Platform) Kango Borehole distribution - Pipeline extension from Kango borehole to Kwa Mutisya market (pipeline, water kiosk and 10,000L tank on platform) Department of Water and Sanitation Ongoing Ksh 1,500,000 Tulimani
Support To Youth Groups- Tulimani Driving training and issuance of licenses Department of Gender, Children, Youth, Sports and Social Services Ongoing Ksh 1,000,000 Tulimani
Distribution Of Kinze Water Project/mbumbuni Scheme Distribution of Kinze Water Project/Mbumbuni Scheme  Department of Water and Sanitation Ongoing Ksh 5,770,750 Kisau/Kiteta
Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Kisau/ Kiteta Youth Empowerment - 2Jiajiri Programme (KCB Matching Grant) Department of ICT, Education and Internship Ongoing Ksh 1,000,000 Kisau/Kiteta
Rehabilitation And Extension Of Kwa Makaia Borehole Water Project. Rehabilitation Of Kisoi Munyao Health Center And Muiu Market Water Line And Extension To Kwa Mutumba Mwaani To Sofia Towards Kyangondu Market Rehabilitation and extension of kwa Makaia Borehole water project. Rehabilitation of kisoi Munyao Health center and Muiu Market water line and extension to kwa Mutumba Mwaani to Sofia towards Kyangondu Market Department of Water and Sanitation Ongoing Ksh 4,000,000 Kako/Waia
Distribution Of Miau Earthdam Water Project, Distribution To Kwa Katheo,construction Of Masonry Tank And Extension To Mba, Nthangathini Amd Ngovu Distribution of Miau earthdam water project, Distribution to Kwa katheo,Construction of masonry tank and extension to Mba, Nthangathini amd Ngovu Department of Water and Sanitation Ongoing Ksh 4,000,000 Kako/Waia
Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Kako/waia Youth Empowerment - 2Jiajiri Programme (KCB Matching Grant) Department of ICT, Education and Internship Ongoing Ksh 1,000,000 Kako/Waia
Akwash Project – (a. Extension Line From Katoloka To Kathongo (1 Kiosk At Kathongo); B. Extension Line From Kwa Kaoka To Kyanganga Aic (1 Kiosk); C. Extension Line From Katoloka To Kakuli; And D. Extension Line From Syongungi Market To Munyuni Market) AKWASH Project – (a. Extension line from Katoloka to Kathongo (1 Kiosk at Kathongo); b. Extension line from Kwa Kaoka to Kyanganga AIC (1 Kiosk); c. Extension line from Katoloka to Kakuli; and d. Extension line from Syongungi Market to Munyuni Market) Department of Water and Sanitation Ongoing Ksh 4,000,000 Kalawa
Youth Empowerment - 2jiajiri Programme (kcb Matching Grant) Youth Empowerment - 2Jiajiri Programme (KCB Matching Grant) Department of ICT, Education and Internship Ongoing Ksh 1,000,000 Kalawa
Kima Public Toilet -construction Of Kima Market Public Toilet Kima Public Toilet  -Construction of Kima Market Public toilet Department of Trade, Marketing, Industry, Culture and Tourism. Ongoing Ksh 750,000 Kiima Kiu/Kalanzoni
Rehabilitation Of Mbondoni Borehole-purchase And Installation Of Solar Panels And Rewiring Rehabilitation of Mbondoni borehole-Purchase and installation of solar panels and Rewiring Department of Water and Sanitation Ongoing Ksh 500,000 Kiima Kiu/Kalanzoni
Rehabilitation And Catchment Conservation Of Ikaasu Earthdam
  • Preparation of embankment and breach section
  • Backfilling of breach section with compaction
  • Raising of the embankment wall by 1 meter
  • Desilting of the dam
  • Relocation of spillway from LHS to RHS
  • Construction of 26 gabion units
  • Stone pitching works covering 60 m²
Department of Lands, Urban Planning and Development, Environment and Climate Change Ongoing Ksh 5,000,000 Kiima Kiu/Kalanzoni
Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Kiima Kiu/kalanzoni Youth Empowerment - 2Jiajiri Programme (KCB Matching Grant) Department of ICT, Education and Internship Ongoing Ksh 1,000,000 Kiima Kiu/Kalanzoni
Rehabilitation Of Kwa Kulundu Water Project Rehabilitation of Kwa Kulundu water project  Department of Water and Sanitation Ongoing Ksh 792,471 Mukaa
Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Mukaa Ward Youth Empowerment - 2Jiajiri Programme (KCB Matching Grant) Department of ICT, Education and Internship Ongoing Ksh 1,000,000 Mukaa
Kasikeu Stockyard Public Toilet -construction Of Kasikeu Stock Yard Public Toilet  Construction of Kasikeu stock yard public toilet Department of Trade, Marketing, Industry, Culture and Tourism. Ongoing Ksh 750,000 Kasikeu
Mumela Borehole -drilling, Equipping And Distribution Mumela Borehole  -Drilling, Equipping and Distribution Department of Water and Sanitation Ongoing Ksh 3,500,000 Kasikeu
Mutanda Borehole -drilling, Equipping And Distribution Mutanda Borehole  -Drilling, Equipping and Distribution Department of Water and Sanitation Ongoing Ksh 3,500,000 Kasikeu
Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)-kasikeu Ward Youth Empowerment - 2Jiajiri Programme (KCB Matching Grant) Department of ICT, Education and Internship Ongoing Ksh 1,000,000 Kasikeu
Mulolongo Borehole -drilling, Equipping, Distribution To Matangi, Maviameu And Kathanzi Villages Mulolongo Borehole -Drilling, Equipping, distribution to Matangi, Maviameu and Kathanzi villages Department of Water and Sanitation Ongoing Ksh 4,000,000 Kee
Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Kee Ward Youth Empowerment - 2Jiajiri Programme (KCB Matching Grant) Department of ICT, Education and Internship Ongoing Ksh 1,000,000 Kee
Ikuma Water Project -ikuma To Ndeini Rising Main Rehabilitation And Distribution To Kisekini And Its Environs Ikuma Water Project  -Ikuma to Ndeini Rising main rehabilitation and distribution to Kisekini and its environs Department of Water and Sanitation Ongoing Ksh 2,500,000 Kilungu
Routine maintenance of Kithioni - Kyakithuku - Kivani Road  3km road widening, 3km road grading, 1km graveling, Installation of 24m culvert, 22.No gabiond and 80m drift along Kithioni -Kyakithuku -Kivani Road Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 15,000,000 Kilungu
Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Kilungu Ward Youth Empowerment - 2Jiajiri Programme (KCB Matching Grant) Department of ICT, Education and Internship Ongoing Ksh 500,000 Kilungu
Purchase Of Institutional E.g Churches And Schools Water Tanks Purchase of institutional e.g churches and schools water tanks  Department of Water and Sanitation Ongoing Ksh 2,000,000 Ilima
Kyambeke Borehole Water Project -distribution To Kyambeke Level Iv Hospital, Markets Up To Ndolo School Kyambeke Borehole water Project -Distribution to kyambeke level iv hospital, markets up to ndolo School Department of Water and Sanitation Ongoing Ksh 4,000,000 Ilima
Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Ilima Ward Youth Empowerment - 2Jiajiri Programme (KCB Matching Grant) Department of ICT, Education and Internship Ongoing Ksh 1,000,000 Ilima
Kithamba Borehole -solarization And Extension Of Pipeline To Kinyuani Areas Kithamba Borehole  -Solarization and extension of pipeline to kinyuani areas Department of Water and Sanitation Ongoing Ksh 2,000,000 Ukia
Yinzau Borehole -drilling, Equipping Solarization Of New Borehole & Rehabilitation Of Kiu Muuni Water Project Yinzau borehole -Drilling, equipping solarization of new borehole & rehabilitation of kiu muuni water project Department of Water and Sanitation Ongoing Ksh 5,700,000 Makindu
Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Makindu Youth Empowerment - 2Jiajiri Programme (KCB Matching Grant) Department of ICT, Education and Internship Ongoing Ksh 1,000,000 Makindu
Galla Goats For Pwds  Galla goats for PWDs -Galla goats for PWDs in the ward  Department of Agriculture, Livestock, Fisheries & Cooperative Development Ongoing Ksh 1,000,000 Kikumbulyu North
Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Kikumbulyu North Youth Empowerment - 2Jiajiri Programme (KCB Matching Grant) Department of ICT, Education and Internship Ongoing Ksh 1,000,000 Kikumbulyu North
Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Kikumbulyu South Youth Empowerment - 2Jiajiri Programme (KCB Matching Grant) Department of ICT, Education and Internship Ongoing Ksh 1,000,000 Kikumbulyu South
Kwa Kathoka Borehole Water Project -distribution To Ilatu Health Facility And The Surrounding Cutting Across Yikisemei Cluster Kwa Kathoka borehole water project -Distribution to Ilatu health facility and the surrounding cutting across Yikisemei cluster Department of Water and Sanitation Ongoing Ksh 4,000,000 Nguumo
Kyandulu Borehole - Pipeline Extension To Kibarani -kyusyani - Syiembeni Villages Kyandulu Borehole - Pipeline extension to Kibarani -Kyusyani - Syiembeni villages Department of Water and Sanitation Ongoing Ksh 3,000,000 Nguumo
Installation Of Drift At Tutini-kwa Maima Road Installation of 45M by 6mdrift  and 20 No. gabions along Tutini-Kwa Maima road  Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 5,500,000 Emali/Mulala
Road Improvement Along Kwa Masauti - Mung'ethele Road Road improvement through 4kmHeavy grading,0.4km murraming and installation of 56m culvert,22No. gabions,45M keywall  along Kwa Masauti-Muselele-Mung’ethele road  Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 4,000,000 Emali/Mulala
Installation Of Road Structures Along Kwa Kausha Mulala Road Installation of 8m culvert, 8 No. gabions and 35M keywall along Kwa Kausha Mulala Road  Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 1,000,000 Emali/Mulala
Mulala Primary Borehole - Borehole Drilling And Development With Casing, Solar Pumping System, 50cum Main Reservoir. Communal Water Point And Connection To Mulala Girls Mulala primary borehole - Borehole drilling and development with Casing, Solar Pumping System, 50CuM Main reservoir. Communal Water point and connection to Mulala girls Department of Water and Sanitation Ongoing Ksh 3,994,680 Emali/Mulala
Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Masongaleni Youth Empowerment - 2Jiajiri Programme (KCB Matching Grant) Department of ICT, Education and Internship Ongoing Ksh 1,000,000 Masongaleni
Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)-mtito Andei Youth Empowerment - 2Jiajiri Programme (KCB Matching Grant) Department of ICT, Education and Internship Ongoing Ksh 1,000,000 Mtito Andei
Purchase And Distribution Of Galla Goats  Purchase and distribution of Galla goats  Department of Agriculture, Livestock, Fisheries & Cooperative Development Ongoing Ksh 2,000,000 Thange
Construction Of Public Toilet At Utithi Market Construction of public toilet at Utithi Market Department of Trade, Marketing, Industry, Culture and Tourism. Ongoing Ksh 500,000 Thange
Mbulutini Springs-sump Rehabilitation ,solarisation, Storage Tanks, Distribution And Construction Of Return Pipe Mbulutini springs-Sump rehabilitation ,solarisation, storage tanks, distribution and construction of return pipe Department of Water and Sanitation Ongoing Ksh 2,000,000 Thange
Borehole Drilling -borehole To Supply Water To Ivoleni Area Borehole Drilling -Borehole To Supply water to Ivoleni Area Department of Water and Sanitation Ongoing Ksh 1,800,000 Thange
Distribution Of Mikuyuni Bh Distribution of Mikuyuni BH  Department of Water and Sanitation Ongoing Ksh 3,000,000 Ivingoni/Nzambani
Drilling Of Manyatta Bh Drilling of manyatta BH Department of Water and Sanitation Ongoing Ksh 2,000,000 Ivingoni/Nzambani
Equipping Nzambani Bh With Pump , Solarisation, Tank And Kiosks Equipping Nzambani BH with Pump , solarisation, tank and kiosks Department of Water and Sanitation Ongoing Ksh 3,000,000 Ivingoni/Nzambani
Utu Distribution To Yumbuni Market ( Water Kiosk ) UTU distribution to Yumbuni Market ( water kiosk ) Department of Water and Sanitation Ongoing Ksh 2,000,000 Ivingoni/Nzambani
Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Ivingoni/nzambani Ward Youth Empowerment - 2Jiajiri Programme (KCB Matching Grant) Department of ICT, Education and Internship Ongoing Ksh 1,000,000 Ivingoni/Nzambani
Kakili Borehole-installation Of Submassive Pump And Soalrization Kakili Borehole-installation of submassive pump and Soalrization Department of Water and Sanitation Ongoing Ksh 3,500,000 Nguu/Masumba
"kwa Malika Sump Rehabilitation, Solarization And Distribution -sump, Rehabilitation, Solarization, Equipping Distribution Line To Kitende,kwa Mtungu And Mii Rehabilitation Of Itulu Line" Kwa Malika Sump Rehabilitation, solarization and distribution -Sump, rehabilitation, solarization, equipping Distribution line to Kitende,Kwa Mtungu and Mii Rehabilitation of Itulu line Department of Water and Sanitation Ongoing Ksh 3,500,000 Nguu/Masumba
Rehabilitation Of Kwa Waita-itulu-kitende Road (kitende Drift) Rehabilitation of Kwa Waita-Itulu-Kitende road (Kitende drift) through 3km road widening, 7.4km grading, 0.9km graveling, installation of 20No. gabions, 140M drift and 500cm catch water drain Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 14,000,000 Nguu/Masumba
Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)-nguu/masumba Youth Empowerment - 2Jiajiri Programme (KCB Matching Grant) Department of ICT, Education and Internship Ongoing Ksh 1,000,000 Nguu/Masumba
Purchase Of Mangoes For Puree Production Purchase  of mangoes for puree production Department of Agriculture, Livestock, Fisheries & Cooperative Development Ongoing Ksh 13,920,000 Headquaters
Livestock Disease Control Livestock Disease Control  Department of Agriculture, Livestock, Fisheries & Cooperative Development Ongoing Ksh 7,000,000 Headquaters
Ida(world Bank) Credit National Agricultural Value Chain Development Project(NAVCDP) NAVCDP is a five year project that covers five value chains, namely Poultry, Mango, Tomatoes, Dairy, and Apiculture, and being implemented across all the 30 wards. the project thematic areas; T1.      Farmer Capacity Building and E-Voucher Support2.      Farmer producer organization (FPO) level climate smart value chain investment3.      Improving Credit worthiness of CIGs and FPOs4.      Farmer Led Irrigation Development (FLID)5.      Market access and infrastructure development6.      Data and Digital Investments7.      Research Linkages, Technical Assistance and Institutional Capacity   Department of Agriculture, Livestock, Fisheries & Cooperative Development Ongoing Ksh 290,096,655 Headquaters