Ongoing Projects In FY 2023/2024

Go Back

Project Scope Department Status Budget Ward Action
Extension Service Delivery

Support establishment of one model youth community led extension service delivery (Malooi Youth Demonstration Farm and Kanoto Farmers society - Tulimani)

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 3,404,444 Wote/Nziu    
Kituasi Water Project

Construction of new sump, solarization, installation of pumpset and distribution

Department of Water and Sanitation Ongoing Ksh 3,430,000 Wote/Nziu    
Yiuma Ecde
  • 2 No. ECDE Classrooms with an office and Store
  • Electrical Works (conduits only)
  • 2 No. Wooden Desks
  • 2 No. Wooden Arm Chairs
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  • Display Pinned board
  •   Branding, Publicity and Signwriting
  •   2 No. Black board
Department of ICT, Education and Internship Ongoing Ksh 2,940,000 Nzaui/Kilili/Kalamba    
Forest conservation and awareness (tree planting/water weirs/sand dams)
  • Planting of trees 
  • Construction of water retention wall at Kalela Dam 
Department of Lands, Urban Planning and Development, Environment and Climate Change Ongoing Ksh 2,085,000 Nzaui/Kilili/Kalamba    
Mbiuni Borehole

Drilling and Caping

Department of Water and Sanitation Ongoing Ksh 1,000,000 Nzaui/Kilili/Kalamba    
Kanzili Borehole

Drilling and Caping

Department of Water and Sanitation Ongoing Ksh 1,500,000 Nzaui/Kilili/Kalamba    
Ngaa Borehole

Drilling and Caping

Department of Water and Sanitation Ongoing Ksh 1,500,000 Nzaui/Kilili/Kalamba    
Isololo Kwakoki Bh Pipeline Extention

Construction of isololo and kwa koki BH an pipeline extention

Department of Water and Sanitation Ongoing Ksh 5,390,000 Nzaui/Kilili/Kalamba    
Rehabilitation Of Ikuyuni Ndauni Road

Construction of a retaining wall and installation of gabion boxes

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 400,000 Mbitini    
Mbitini Borehole

HGS, Drilling

Department of Water and Sanitation Ongoing Ksh 1,360,000 Mbitini    
Mbuthani Water Project

Construction of RC Sump,Upgrading of pumping system and rehabilitation

Department of Water and Sanitation Ongoing Ksh 3,920,000 Mbitini    
Ilengeni Water Project

Intake and treatment works, pumping systems, pipeline, water points and storage

Department of Water and Sanitation Ongoing Ksh 6,870,000 Mbitini    
Kimuumo Ecde
  • 1No. ECDE Classroom with an office and Store
  • 1No.lockable metallic cabinet
  • 1No. Wooden Desk
  • 1No. Wooden Arm Chair
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  • Electrical Works (conduits only)
  • Display Pinned board
  • 20 No. Kiddy chairs
  • 10 No. Kiddy tables
  • Branding, Publicity and Signwriting
  • 1No. whiteboard
  • 1No. blackboard
  • 2 No. duster
  • 10 No. Mark pens
  • Shelves
Department of ICT, Education and Internship Ongoing Ksh 1,960,000 Kikumini/Muvau    
Kikumini Model Health Center

Construction of new Outpatient block

Department of Health Services Ongoing Ksh 4,585,142 Kikumini/Muvau    
Kwa Mutemwa Borehole

Drilling and development of borehole

Department of Water and Sanitation Ongoing Ksh 3,920,000 Kikumini/Muvau    
Fuel For Grading Using County Machinery

Grading of  kathonzweni – kathamboni – yembondo – 11.5km

Kathonzweni – itumbule – kiluluini – kwamanthi - 7.5km

Mbuvo – kwa kavisi – kaasya – ngomano – kyunyu – 12.5km

Kateiko – kwa ng’ondu primary – 2.4km

Mbuvo – mbuvo nzau – kanthiitu – tamutamu – 13km

Kwa kavisi – kithoni primary – 5.3km

  kiangini – kiteei – mutini – 8.8km

4. Kathonzweni - Kathamboni 5.4km

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 1,470,000 Kathonzweni    
Upgrading Kathonzweni Health Center.

Upgrading of the facility

Department of Health Services Ongoing Ksh 685,414 Kathonzweni    
Drilling And Develovement Of Kiteei Mutini Bh

DRILLING AND DEVELOPMENT OF BOREHOLE

Department of Water and Sanitation Ongoing Ksh 2,837,000 Kathonzweni    
Rehabilitation Of Kaiani Borehole Department of Water and Sanitation Ongoing Ksh 931,750 Kathonzweni    
Athi-mavindini Water Project

Solaraization/KPLC Grid

Department of Water and Sanitation Ongoing Ksh 7,668,213 Mavindini    
Ivinga Nzia Ctti

Electrification, fencing and construction of a workshop

Department of ICT, Education and Internship Ongoing Ksh 3,430,000 Mavindini    
Yekanga Borehole

Drilling

Department of Water and Sanitation Ongoing Ksh 1,960,000 Mavindini    
Yinthungu Ctti

Construction of a dormitory for the male trainees

Department of ICT, Education and Internship Ongoing Ksh 1,960,000 Kitise/Kithuki    
Kwa Kaivu Borehole Department of Water and Sanitation Ongoing Ksh 150,000 Kitise/Kithuki    
Kikome Irrigation Scheme

. Operationalization of Kikome Irrigation scheme sump tank & galleries,  3 distribution line,rehabilitation distribution tank

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 7,932,953 Kitise/Kithuki    
Mukaatini Ctti

Construction of a dormitory

Department of ICT, Education and Internship Ongoing Ksh 3,920,000 Mbooni    
Rehabilitation Of Water Tank And Pipeline Rehabilitation To Yatwa-itaani Village( Uviuni)

Rehabilitation of rising main to Yatwa Primary school, rehabilitation of yatwa - Itaani pipeline and rehabilitation masonry tank collapsed roof slab.

Department of Water and Sanitation Ongoing Ksh 1,960,000 Mbooni    
Nzueni Ecde
  • 2 No. ECDE Classrooms with an office and Store
  • 3-Door Pit Latrine with Urinal
  •  Full Electrical Works
  • Shelves
  • 2 No. Wooden Desks
  • 2 No. Wooden Arm Chairs
  • Water harvesting goods (10,000Ltrs Water Tank and base)
  • 40 No. Kiddy chairs and 20. No. Kiddy tables
  • Play equipment 4 piece set (double swing, slide, climbing frame and double see-saw)
  • Display soft board
  • Branding, Publicity and Signwriting
  • 2 No. Blackboard
  • 4 No. duster
  • 20 No. Markpens
  • 2 No. White board
Department of ICT, Education and Internship Ongoing Ksh 3,920,000 Kithungo/Kitundu    
Drilling Of Mutooni Borehole

Drilling borehole and test pumping

Department of Water and Sanitation Ongoing Ksh 1,660,000 Kithungo/Kitundu    
Water Improvement Programme

Repair of Boreholes

Department of Water and Sanitation Ongoing Ksh 57,556 Kithungo/Kitundu    
Kamwinzi Earthdam

Kamwinzi Earthdam-County machinery desilting

Department of Water and Sanitation Ongoing Ksh 490,000 Tulimani    
Kakuswi Ctti Dormitory

Construction of a domitory

Department of ICT, Education and Internship Ongoing Ksh 6,860,000 Kisau/Kiteta    
Lungu Borehole

Drilling of borehole and test pumping

Department of Water and Sanitation Ongoing Ksh 2,374,220 Kisau/Kiteta    
Kithongo Borehole

Drilling of borehole and test pumping

Department of Water and Sanitation Ongoing Ksh 2,374,221 Kisau/Kiteta    
Kimandi Borehole

Construction of 2No. Water kiosks, installation of 2No. 10cm cubic metres plastic storage tanks, water distribution pipeline to kyambusya and rehabilitation of rising main.

Department of Water and Sanitation Ongoing Ksh 3,710,279 Kisau/Kiteta    
Mulasya Ecde
  • 2No. ECDE Classrooms with an office and Store
  • Electrical Works (conduits only)
  • Shelves
  • 2No. Wooden Desks
  • 2No. Wooden Arm Chairs
  • Water harvesting goods (5,000Ltrs Water Tank)
  • Play equipment - 4 piece set (double swing, slide, climbing frame and double see-saw)
  • Display Pinned board
  • Branding, Publicity and Signwriting
  • 2 No. Black board retained
  • 4 No. Duster
  • 20 No. Mark pens
  • 2 No, Whiteboard
Department of ICT, Education and Internship Ongoing Ksh 3,136,000 Kisau/Kiteta    
Kavingiliti Earthdam

Kavingiliti earthdam - in house machines

Department of Water and Sanitation Ongoing Ksh 2,940,000 Kako/Waia    
Katangini Dispensary -completion Of Maternity Block And Incinerator Construction of new maternity block Department of Health Services Ongoing Ksh 1,390,450 Kalawa    
Akwash Water Project

AKWASH water project- Extension of AKWASH and distribution  to kathongo  kavumbu and Mweleli clusters

Department of Water and Sanitation Ongoing Ksh 1,312,182 Kalawa    
Avocado Development Programme

Funds to be used to develop new avocado nurseries, 

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 241,408 Mukaa    
Maiani Borehole

  Drilling, casing, and capping.

Department of Water and Sanitation Ongoing Ksh 4,900,000 Mukaa    
Kasikeu Stock Yard And Toilet.

Rehabilitation of Kasikeu stock yard and toilet.

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 478,184 Kasikeu    
Maintainence Of Other Assets - Markets, Tourism Centres.
  • payment of utility bills for market sheds (electricity); Upgrading of  Makongo view point.Kitchen Extension, Construction of washroom with a PWD toilet, Walling with EPS panels, Floor Tiling  and Finishes 
Department of Trade, Marketing, Industry, Culture and Tourism. Ongoing Ksh 263,097 Kee    
Upgrading Of Mutulani Dispensary-

Construction of staff house and incinerator


Department of Health Services Ongoing Ksh 1,313,911 Kee    
Rehabilitation Of Nzalani Earth Dam- Scooping Of The Dam Construction Of Embankment Wall

Construction of Nzalani  Earth Dam; Embankment, Desilting of reservoir

Department of Water and Sanitation Ongoing Ksh 3,500,000 Kee    
Water Improvement Programme

Installation of pumping system at Kithuni BH, Distribution

Department of Water and Sanitation Ongoing Ksh 700,000 Kee    
Upgrading Of Mutulani Dispensary With Ashpit, Incinerator,laboratory Eqquipping And Staff Quarters

Fencing, renovation of maternity and drainage system 

Department of Health Services Ongoing Ksh 1,347,992 Kee    
Distribution Of Kyandumbi Water

Drilling and Development of Kyandumbi replacement Borehole, Equipping and distribution.

Department of Water and Sanitation Ongoing Ksh 3,500,000 Kee    
Kwa Kikungu Earth Dam Desilting And Kikonde Earthdam Spillway

Kwa kikungu Earth dam desilting and Kikonde Earthdam spillway

Department of Water and Sanitation Ongoing Ksh 3,429,848 Kee    
Mutungu Ecde
  • 2 No. ECDE Classrooms with an office and Store
  • Electrical Works (conduits only)
  • 2 No. Wooden Desks
  • 2 No. Wooden Arm Chairs
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  • Display Pinned board
  • Branding, Publicity and Signwriting
  • 2 No. Black board
Department of ICT, Education and Internship Ongoing Ksh 2,940,000 Kilungu    
Kithembe Sub-ward Dispensaries: Fencing, Solar Energy At Nyaani Dispensary, Health Facilities Upgrading

Fencing, solar installation at Nyaani dispensary

Department of Health Services Ongoing Ksh 1,960,000 Kilungu    
Kyanganda Dispensary – Fencing, Solarization And Water Connectivity

Fencing and renovations of OPD block

Department of Health Services Ongoing Ksh 1,884,003 Kilungu    
Water Supply To Nunguni-phase 1

Feasibility studies and design of Nunguni Water Supply Project (Consultancy)

Department of Water and Sanitation Ongoing Ksh 2,287,965 Kilungu    
Extension Of Kwa Mwilu Sand Dam Water Project – 3km Return Lines, 2no. 1.5km Katikomu Village Distribution Line And Kyangunzu-nzeveni Dl 2km 5tanks.

Desilting of Sump and Operationalization of the Pumping System
• Kyangunzu Distribution Line 
• Construction of 100CU.M Masonry Tank
• Return Pipeline
• Extension of Katikomu Distribution Line to Nzeveni
• Construction of 1No. Nzeveni Water Kiosk

Department of Water and Sanitation Ongoing Ksh 6,370,000 Ilima    
Hire Of Excavator For Unblocking Of Kangeeni -kyanga Road

Hired wheel loaders to breaking of rock and clearing of boulders for 22days

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 632,200 Ilima    
Kiusyi Wear Rehabilitation

Kiusyi wear rehabilitation

Department of Water and Sanitation Ongoing Ksh 1,475,624 Ilima    
Mumbuni Ecde
  • 1No. ECDE Classroom
  • 1No.lockable metallic cabinet
  • 1No. Wooden Desk
  • 1No. Wooden Arm Chair
  • Water harvesting goods (5,000Ltrs Water Tank and Base)
  •  Full Electrical Works
  • Display Pinned board
  • Branding, Publicity and Signwriting
Department of ICT, Education and Internship Ongoing Ksh 1,470,000 Ukia    
Riverine conservation and restoration
  •  Mapping,surveying and beaconing of wetlands in Ukia ward.
  •  Conservation of Ikangaani wetland .
Department of Lands, Urban Planning and Development, Environment and Climate Change Ongoing Ksh 99,720 Ukia    
Ukaatuni Ctti

Equipping 

Department of ICT, Education and Internship Ongoing Ksh 1,751,882 Ukia    
Water Boreholes Maintenance

Upgrading of Solar Pumping System - Ithanzeni BH Project

Department of Water and Sanitation Ongoing Ksh 980,000 Ukia    
Chairs - Ukia Ward

Purchase of 270 chairs

Department of Gender, Children, Youth, Sports and Social Services Ongoing Ksh 266,900 Ukia    
Kwa Kamoli (utaati) Talent Centre

Levelling of the field

Department of Gender, Children, Youth, Sports and Social Services Ongoing Ksh 737,350 Ukia    
Development Of Farm Ponds- Fuel

Funds used purchase fuel and repair of backhoe for farm ponds excavation. Targetting 60 farmponds per households( the project provides fuel and the farmer pays ksh3500 per hour on dry rate  ) the activities is implemented during dry spell.

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 1,412,400 Ukia    
Makindu Fire Station

Fencing of fire station

Department of Devolution, Public Service, Public Participation and Special Programs Ongoing Ksh 300,000 Makindu    
Makindu Stock Yard

rehabilitation of fence(post n chain link and running tiber) contruction of loading ramp with collecting boma and replacement of gate

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 381,172 Makindu    
Youth Empowerment ; Ajira Kwa Vijana, Ujuzi Teketeke- Makindu Purchase of Tools of trade and training of the youths Department of Gender, Children, Youth, Sports and Social Services Ongoing Ksh 500,000 Makindu    
Kalii Earth Dam

Not viable

Department of Water and Sanitation Ongoing Ksh 2,940,000 Makindu    
Makindu-kiu Catchment Borehole

Drilling and developing the borehole and capping

Department of Water and Sanitation Ongoing Ksh 1,500,000 Makindu    
Athi Tunguni Water Project

1. EXISTING INTAKE IMPROVEMENTS AND REHABILITATION
• Expansion of Intake Galleries pipe OD63mm Perforated infiltration pipe to OD250mm.
2. EXISTING TREATMENT PLANT IMPROVEMENTS AND REHABILITATION
• Commissioning of treatment plant
• Introduce air blowers 
• Expand wash water collector
• Scour water to soak any pit
• Filter sand washing 
• Solar streetlighting
• Injector pump with accessories before flocculation channel and at contact tank 
• New Flocculation basin 
• Clear water Stand tap with pipe accessories 
• Painting to elevated tank, access ladders  
• Gauge repair for the contact tank
• Provide, install commission a second submersible Pump at the contact tank   with the same specifications, with all accessories for   rising main to Mukononi .
3. RIASING MAIN TO MUKONONI RESERVOIR 7277 KILOMETERS OD110
• With all Appurtenances 
4. 250m3 MUKONONI TANK
5. DISTRIBUTION NETWORK FOR MAKINDU, KIKUMBULYU NORTH AND NGUUMO WARDS 27KILOMETERS 
• Mukononi Musingini Kamboo line 11.8km OD90
• Mukononi Kathyaka Nyayo shopping cefxdvv  ftnter 10.9km OD90
• Mukononi Symule 4.30km OD90
• With all Appurtenances 

8NO. WATER KIOSKS

Department of Water and Sanitation Ongoing Ksh 8,820,000 Makindu    
Road Improvement Programme

Grading and spot improvement 

- Kisayani-Kisingo-Kathyaka road
- Kalulini-Kuethya road
- Ndetani CCTI-Nyaani road, Ndetani CCTI-Nthongoni road,Nthongoni -Tangaya road
- Kasayani-Kwa Ndetei, Kwa Chief Kisayani-Kwa Kilunda, Utafiti-Yikivala road
- Makaani-Kwa Mukata, Kiwanzani- Kyaani road
- Kisayani-Kwa Mutua-Ithumula , AIC Kivuuti-Nthongoni Mkt, - Kalulini Mkt-Kyandululu, Ithumula-Kanyungu Mkt
- Kisayani Sec-Kiembeni-Kwa Mulwa, Kalulini Mkt-Kwa Mbeva-Kwa Nzau Ilangu- funeral road

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 1,493,400 Kikumbulyu North    
Improvement Of Water In Kikumbulyu North Ward By Kibmawasco-kasayani Market To Cutline, Kwa Kakumi To Kwa Rose Muambani, Kasayani Market To Kwa Presillah Mutinda , Ndetani Ccti To Aic Kalinga To Kwa Kitheka, Kathyaka Market To Kilisa To King’uutheni And Nyayo Market To Soko Muyo

. Rehabilitation of Kathyaka – Nyayo water pipeline extension 1.32km
ii. Cutline Makaani  pipeline extension 4km 

Department of Water and Sanitation Ongoing Ksh 4,300,000 Kikumbulyu North    
Construction Of Kathyaka Masonry Tank/ Under Kibmawasco

. Rehabilitation of Kathyaka – Nyayo water pipeline extension 1.32km
ii. Cutline Makaani  pipeline extension 4km 

Department of Water and Sanitation Ongoing Ksh 4,410,000 Kikumbulyu North    
Athi-tunguni Water Project

1. EXISTING INTAKE IMPROVEMENTS AND REHABILITATION
• Expansion 

of Intake Galleries pipe OD63mm Perforated infiltration pipe to OD250mm.1. EXISTING INTAKE IMPROVEMENTS AND REHABILITATION

• Expansion of Intake Galleries pipe OD63mm Perforated infiltration pipe to OD250mm.
2. EXISTING TREATMENT PLANT IMPROVEMENTS AND REHABILITATION
• Commissioning of treatment plant
• Introduce air blowers 
• Expand wash water collector
• Scour water to soak any pit
• Filter sand washing 
• Solar streetlighting
• Injector pump with accessories before flocculation channel and at contact tank 
• New Flocculation basin 
• Clear water Stand tap with pipe accessories 
• Painting to elevated tank, access ladders  
• Gauge repair for the contact tank
• Provide, install commission a second submersible Pump at the contact tank   with the same specifications, with all accessories for   rising main to Mukononi .
3. RIASING MAIN TO MUKONONI RESERVOIR 7277 KILOMETERS OD110
• With all Appurtenances 
4. 250m3 MUKONONI TANK
5. DISTRIBUTION NETWORK FOR MAKINDU, KIKUMBULYU NORTH AND NGUUMO WARDS 27KILOMETERS 
• Mukononi Musingini Kamboo line 11.8km OD90
• Mukononi Kathyaka Nyayo shopping cefxdvv  ftnter 10.9km OD90
• Mukononi Symule 4.30km OD90
• With all Appurtenances 

8NO. WATER KIOSKS

Department of Water and Sanitation Ongoing Ksh 6,000,000 Kikumbulyu North    
Goat Rearing Programme - Distribution Of Galla Goats

Goat rearing programme - Distribution of galla goats

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 172,150 Kikumbulyu South    
Goat Value Chain Development

supplyof the Galla goats. Estimated number of beneficiaries 166 house hold.

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 2,000,000 Kikumbulyu South    
Fuel For County Machinery

Inhouse works, road grading of county roads

- Grading and spot improvement of Marikiti open Air market and access roads
- 42-Ithambaume-kalungu-road
- Barrier Kyanginywa road
- Matinga-Kwa Kilai road
-Kalungu Mkt-Nthunguni
- Kalungu Sec-Kwa Chief office-Kawala-Kwa Kimote
- Kwa Chief kalungu office- Siembeni shopping Center

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 1,414,720 Kikumbulyu South    
Athi Tunguni Water Project

1. EXISTING INTAKE IMPROVEMENTS AND REHABILITATION
• Expansion of Intake Galleries pipe OD63mm Perforated infiltration pipe to OD250mm.
2. EXISTING TREATMENT PLANT IMPROVEMENTS AND REHABILITATION
• Commissioning of treatment plant
• Introduce air blowers 
• Expand wash water collector
• Scour water to soak any pit
• Filter sand washing 
• Solar streetlighting
• Injector pump with accessories before flocculation channel and at contact tank 
• New Flocculation basin 
• Clear water Stand tap with pipe accessories 
• Painting to elevated tank, access ladders  
• Gauge repair for the contact tank
• Provide, install commission a second submersible Pump at the contact tank   with the same specifications, with all accessories for   rising main to Mukononi .
3. RIASING MAIN TO MUKONONI RESERVOIR 7277 KILOMETERS OD110
• With all Appurtenances 
4. 250m3 MUKONONI TANK
5. DISTRIBUTION NETWORK FOR MAKINDU, KIKUMBULYU NORTH AND NGUUMO WARDS 27KILOMETERS 
• Mukononi Musingini Kamboo line 11.8km OD90
• Mukononi Kathyaka Nyayo shopping cefxdvv  ftnter 10.9km OD90
• Mukononi Symule 4.30km OD90
• With all Appurtenances 

8NO. WATER KIOSKS

Department of Water and Sanitation Ongoing Ksh 37,500,000 Kikumbulyu South    
Social groups Tents And Chairs- Kikumbulyu South

Purchase of tents and plastic chairs

Department of Gender, Children, Youth, Sports and Social Services Ongoing Ksh 2,000,000 Kikumbulyu South    
Youth empowerment programme Kikumbulyu South

Purchase of tools of trade

Department of Gender, Children, Youth, Sports and Social Services Ongoing Ksh 1,361,346 Kikumbulyu South    
Kibmawasco– Kilui Water Extension To Ngolomoki – Kwa Sunza -kalulini -matinga Line, Mikuyuni – Kasarani Line , Mitundu – Malatani Line , Kalungu-ilingoni-kamunzyu Line And Matundani One Main Line, Matua-kwa Kimote Line

KIBMAWASCO– Kilui water extension to Ngolomoki – Kwa Sunza -Kalulini -Matinga Line, Mikuyuni  – Kasarani Line , Mitundu – Malatani line , Kalungu-Ilingoni-Kamunzyu line and Matundani One main Line, Matua-Kwa Kimote line

Department of Water and Sanitation Ongoing Ksh 8,000,000 Kikumbulyu South    
Survey of Muuni Subward
  • Survey of Muuni Subward
Department of Lands, Urban Planning and Development, Environment and Climate Change Ongoing Ksh 304,620 Nguumo    
Goat Value Chain Development- Pwds

supply Galla goats for breeding. With estimated beneficiary of 83 household

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 1,243,000 Nguumo    
Ndeini Ctti Electricity

Electrification

Department of ICT, Education and Internship Ongoing Ksh 490,000 Nguumo    
Kalungu-ngambi Ya Myunzyu Extension Of Water Pipeline

Construction of  Kalungu-Ilingoni-Kamunzyu line 
a. Equipping with Solar power and pump
b. 4.5km DN63 HDPE pipeline
c. Rehabilitation of 2No. existing Kiosks and tank

Department of Water and Sanitation Ongoing Ksh 2,940,000 Nguumo    
Athi Water Project

1. EXISTING INTAKE IMPROVEMENTS AND REHABILITATION
• Expansion of Intake Galleries pipe OD63mm Perforated infiltration pipe to OD250mm.
2. EXISTING TREATMENT PLANT IMPROVEMENTS AND REHABILITATION
• Commissioning of treatment plant
• Introduce air blowers 
• Expand wash water collector
• Scour water to soak any pit
• Filter sand washing 
• Solar streetlighting
• Injector pump with accessories before flocculation channel and at contact tank 
• New Flocculation basin 
• Clear water Stand tap with pipe accessories 
• Painting to elevated tank, access ladders  
• Gauge repair for the contact tank
• Provide, install commission a second submersible Pump at the contact tank   with the same specifications, with all accessories for   rising main to Mukononi .
3. RIASING MAIN TO MUKONONI RESERVOIR 7277 KILOMETERS OD110
• With all Appurtenances 
4. 250m3 MUKONONI TANK
5. DISTRIBUTION NETWORK FOR MAKINDU, KIKUMBULYU NORTH AND NGUUMO WARDS 27KILOMETERS 
• Mukononi Musingini Kamboo line 11.8km OD90
• Mukononi Kathyaka Nyayo shopping cefxdvv  ftnter 10.9km OD90
• Mukononi Symule 4.30km OD90
• With all Appurtenances 

8NO. WATER KIOSKS

Department of Water and Sanitation Ongoing Ksh 4,900,000 Nguumo    
Athi-tunguni Water Project

1. EXISTING INTAKE IMPROVEMENTS AND REHABILITATION
• Expansion of Intake Galleries pipe OD63mm Perforated infiltration pipe to OD250mm.
2. EXISTING TREATMENT PLANT IMPROVEMENTS AND REHABILITATION
• Commissioning of treatment plant
• Introduce air blowers 
• Expand wash water collector
• Scour water to soak any pit
• Filter sand washing 
• Solar streetlighting
• Injector pump with accessories before flocculation channel and at contact tank 
• New Flocculation basin 
• Clear water Stand tap with pipe accessories 
• Painting to elevated tank, access ladders  
• Gauge repair for the contact tank
• Provide, install commission a second submersible Pump at the contact tank   with the same specifications, with all accessories for   rising main to Mukononi .
3. RIASING MAIN TO MUKONONI RESERVOIR 7277 KILOMETERS OD110
• With all Appurtenances 
4. 250m3 MUKONONI TANK
5. DISTRIBUTION NETWORK FOR MAKINDU, KIKUMBULYU NORTH AND NGUUMO WARDS 27KILOMETERS 
• Mukononi Musingini Kamboo line 11.8km OD90
• Mukononi Kathyaka Nyayo shopping cefxdvv  ftnter 10.9km OD90
• Mukononi Symule 4.30km OD90
• With all Appurtenances 

8NO. WATER KIOSKS

Department of Water and Sanitation Ongoing Ksh 9,506,000 Nguumo    
Makueni Child Protection Centre

Construction of a building, street lighting and land scaping

Department of Gender, Children, Youth, Sports and Social Services Ongoing Ksh 6,348,220 Emali/Mulala    
Distribution Of Water At Ilengeni Springs

Distribution of water at Ilengeni Springs

Department of Water and Sanitation Ongoing Ksh 5,900,000 Emali/Mulala    
Feasibility Study Of Muooni Mega Dam

a) Community Mobilization and engagement
b) Feasibility study 
c) Workshops 

Department of Water and Sanitation Ongoing Ksh 1,000,000 Emali/Mulala    
Upgrading Kithyululu Model Health Centre Renovation of maternity block, construction of staff house, construction of soak pit. Department of Health Services Ongoing Ksh 1,775,636 Masongaleni    
Extension Of Ngwata, Kativani, Kiange, Yumbuni, And Kyuasini By KIBWAWASCO

Extension of Ngwata, Kativani, Kiange, Yumbuni, and Kyuasini by KIBMAWASCO.

Department of Water and Sanitation Ongoing Ksh 4,116,000 Masongaleni    
Extension Of Water By 4kms Makutano- Makongeni- Masimbani- Mbondeni (kwa Kalee) To Mwaani Market And Construction Of Kiosks By Kibmawasco

Extension of water by 4Kms Makutano- Makongeni- Masimbani- Mbondeni (Kwa Kalee) to Mwaani market and Construction of kiosks by KIBMAWASCO

Department of Water and Sanitation Ongoing Ksh 3,920,000 Masongaleni    
Miradi Kwa Jamii Programme

Light grading, bush clearing and cut off mitre drains

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 490,000 Masongaleni    
Uyi Earth Dam-counter Funding With Ndma

Uyi Earth dam-counter funding with NDMA

Department of Water and Sanitation Ongoing Ksh 9,137,889 Masongaleni    
New Extension Of Ngai Ndethya River Sump Water To Nthungunu -- Construction Of A Tank, Installation Of A Submersible Pump, Elevated Tank And Distribution Lines

Distribution of Ngai Ndethya river sump water to Nthungunu -- Construction of a tank, installation of a submersible pump, elevated tank and distribution--------- lines

Department of Water and Sanitation Ongoing Ksh 7,506,800 Mtito Andei    
Kambu-kiteng'ei Water Project

Rehabilitation of Kambu-Kiteng'ei Water project- Rehabilitation of tanks, distribution lines and revival of closed kiosks.- KIMAWASCO

Department of Water and Sanitation Ongoing Ksh 4,000,000 Mtito Andei    
Surveying of Machinery and Kinyambu Markets
  • Surveying of Machinery Market 
  • Surveying of Kinyambu Market
Department of Lands, Urban Planning and Development, Environment and Climate Change Ongoing Ksh 1,661,620 Thange    
Supplyof The Galla Goats

supplyof the Galla goats to 30 households

Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development Ongoing Ksh 1,000,000 Thange    
Road Improvement Programme

Road grading

spot murraming  and installation of drainage structures

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 3,160,000 Thange    
Culverts Across The Ward

Installation of culverts

Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 1,960,000 Thange