Ongoing Projects In FY 2023/2024
Go BackProject | Scope | Department | Status | Budget | Ward | Action |
---|---|---|---|---|---|---|
Extension Service Delivery | Support establishment of one model youth community led extension service delivery (Malooi Youth Demonstration Farm and Kanoto Farmers society - Tulimani) |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Ongoing | Ksh 3,404,444 | Wote/Nziu | |
Kituasi Water Project | Construction of new sump, solarization, installation of pumpset and distribution |
Department of Water and Sanitation | Ongoing | Ksh 3,430,000 | Wote/Nziu | |
Yiuma Ecde |
|
Department of ICT, Education and Internship | Ongoing | Ksh 2,940,000 | Nzaui/Kilili/Kalamba | |
Forest conservation and awareness (tree planting/water weirs/sand dams) |
|
Department of Lands, Urban Planning and Development, Environment and Climate Change | Ongoing | Ksh 2,085,000 | Nzaui/Kilili/Kalamba | |
Mbiuni Borehole | Drilling and Caping |
Department of Water and Sanitation | Ongoing | Ksh 1,000,000 | Nzaui/Kilili/Kalamba | |
Kanzili Borehole | Drilling and Caping |
Department of Water and Sanitation | Ongoing | Ksh 1,500,000 | Nzaui/Kilili/Kalamba | |
Ngaa Borehole | Drilling and Caping |
Department of Water and Sanitation | Ongoing | Ksh 1,500,000 | Nzaui/Kilili/Kalamba | |
Isololo Kwakoki Bh Pipeline Extention | Construction of isololo and kwa koki BH an pipeline extention |
Department of Water and Sanitation | Ongoing | Ksh 5,390,000 | Nzaui/Kilili/Kalamba | |
Rehabilitation Of Ikuyuni Ndauni Road | Construction of a retaining wall and installation of gabion boxes |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 400,000 | Mbitini | |
Mbitini Borehole | HGS, Drilling |
Department of Water and Sanitation | Ongoing | Ksh 1,360,000 | Mbitini | |
Mbuthani Water Project | Construction of RC Sump,Upgrading of pumping system and rehabilitation |
Department of Water and Sanitation | Ongoing | Ksh 3,920,000 | Mbitini | |
Ilengeni Water Project | Intake and treatment works, pumping systems, pipeline, water points and storage |
Department of Water and Sanitation | Ongoing | Ksh 6,870,000 | Mbitini | |
Kimuumo Ecde |
|
Department of ICT, Education and Internship | Ongoing | Ksh 1,960,000 | Kikumini/Muvau | |
Kikumini Model Health Center | Construction of new Outpatient block |
Department of Health Services | Ongoing | Ksh 4,585,142 | Kikumini/Muvau | |
Kwa Mutemwa Borehole | Drilling and development of borehole |
Department of Water and Sanitation | Ongoing | Ksh 3,920,000 | Kikumini/Muvau | |
Fuel For Grading Using County Machinery | Grading of kathonzweni – kathamboni – yembondo – 11.5km Kathonzweni – itumbule – kiluluini – kwamanthi - 7.5km Mbuvo – kwa kavisi – kaasya – ngomano – kyunyu – 12.5km Kateiko – kwa ng’ondu primary – 2.4km Mbuvo – mbuvo nzau – kanthiitu – tamutamu – 13km Kwa kavisi – kithoni primary – 5.3km kiangini – kiteei – mutini – 8.8km 4. Kathonzweni - Kathamboni 5.4km |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 1,470,000 | Kathonzweni | |
Upgrading Kathonzweni Health Center. | Upgrading of the facility |
Department of Health Services | Ongoing | Ksh 685,414 | Kathonzweni | |
Drilling And Develovement Of Kiteei Mutini Bh | DRILLING AND DEVELOPMENT OF BOREHOLE |
Department of Water and Sanitation | Ongoing | Ksh 2,837,000 | Kathonzweni | |
Rehabilitation Of Kaiani Borehole | Department of Water and Sanitation | Ongoing | Ksh 931,750 | Kathonzweni | ||
Athi-mavindini Water Project | Solaraization/KPLC Grid |
Department of Water and Sanitation | Ongoing | Ksh 7,668,213 | Mavindini | |
Ivinga Nzia Ctti | Electrification, fencing and construction of a workshop |
Department of ICT, Education and Internship | Ongoing | Ksh 3,430,000 | Mavindini | |
Yekanga Borehole | Drilling |
Department of Water and Sanitation | Ongoing | Ksh 1,960,000 | Mavindini | |
Yinthungu Ctti | Construction of a dormitory for the male trainees |
Department of ICT, Education and Internship | Ongoing | Ksh 1,960,000 | Kitise/Kithuki | |
Kwa Kaivu Borehole | Department of Water and Sanitation | Ongoing | Ksh 150,000 | Kitise/Kithuki | ||
Kikome Irrigation Scheme | . Operationalization of Kikome Irrigation scheme sump tank & galleries, 3 distribution line,rehabilitation distribution tank |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Ongoing | Ksh 7,932,953 | Kitise/Kithuki | |
Mukaatini Ctti | Construction of a dormitory |
Department of ICT, Education and Internship | Ongoing | Ksh 3,920,000 | Mbooni | |
Rehabilitation Of Water Tank And Pipeline Rehabilitation To Yatwa-itaani Village( Uviuni) | Rehabilitation of rising main to Yatwa Primary school, rehabilitation of yatwa - Itaani pipeline and rehabilitation masonry tank collapsed roof slab. |
Department of Water and Sanitation | Ongoing | Ksh 1,960,000 | Mbooni | |
Nzueni Ecde |
|
Department of ICT, Education and Internship | Ongoing | Ksh 3,920,000 | Kithungo/Kitundu | |
Drilling Of Mutooni Borehole | Drilling borehole and test pumping |
Department of Water and Sanitation | Ongoing | Ksh 1,660,000 | Kithungo/Kitundu | |
Water Improvement Programme | Repair of Boreholes |
Department of Water and Sanitation | Ongoing | Ksh 57,556 | Kithungo/Kitundu | |
Kamwinzi Earthdam | Kamwinzi Earthdam-County machinery desilting |
Department of Water and Sanitation | Ongoing | Ksh 490,000 | Tulimani | |
Kakuswi Ctti Dormitory | Construction of a domitory |
Department of ICT, Education and Internship | Ongoing | Ksh 6,860,000 | Kisau/Kiteta | |
Lungu Borehole | Drilling of borehole and test pumping |
Department of Water and Sanitation | Ongoing | Ksh 2,374,220 | Kisau/Kiteta | |
Kithongo Borehole | Drilling of borehole and test pumping |
Department of Water and Sanitation | Ongoing | Ksh 2,374,221 | Kisau/Kiteta | |
Kimandi Borehole | Construction of 2No. Water kiosks, installation of 2No. 10cm cubic metres plastic storage tanks, water distribution pipeline to kyambusya and rehabilitation of rising main. |
Department of Water and Sanitation | Ongoing | Ksh 3,710,279 | Kisau/Kiteta | |
Mulasya Ecde |
|
Department of ICT, Education and Internship | Ongoing | Ksh 3,136,000 | Kisau/Kiteta | |
Kavingiliti Earthdam | Kavingiliti earthdam - in house machines |
Department of Water and Sanitation | Ongoing | Ksh 2,940,000 | Kako/Waia | |
Katangini Dispensary -completion Of Maternity Block And Incinerator | Construction of new maternity block | Department of Health Services | Ongoing | Ksh 1,390,450 | Kalawa | |
Akwash Water Project | AKWASH water project- Extension of AKWASH and distribution to kathongo kavumbu and Mweleli clusters |
Department of Water and Sanitation | Ongoing | Ksh 1,312,182 | Kalawa | |
Avocado Development Programme | Funds to be used to develop new avocado nurseries, |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Ongoing | Ksh 241,408 | Mukaa | |
Maiani Borehole | Drilling, casing, and capping. |
Department of Water and Sanitation | Ongoing | Ksh 4,900,000 | Mukaa | |
Kasikeu Stock Yard And Toilet. | Rehabilitation of Kasikeu stock yard and toilet. |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Ongoing | Ksh 478,184 | Kasikeu | |
Maintainence Of Other Assets - Markets, Tourism Centres. |
|
Department of Trade, Marketing, Industry, Culture and Tourism. | Ongoing | Ksh 263,097 | Kee | |
Upgrading Of Mutulani Dispensary- | Construction of staff house and incinerator |
Department of Health Services | Ongoing | Ksh 1,313,911 | Kee | |
Rehabilitation Of Nzalani Earth Dam- Scooping Of The Dam Construction Of Embankment Wall | Construction of Nzalani Earth Dam; Embankment, Desilting of reservoir |
Department of Water and Sanitation | Ongoing | Ksh 3,500,000 | Kee | |
Water Improvement Programme | Installation of pumping system at Kithuni BH, Distribution |
Department of Water and Sanitation | Ongoing | Ksh 700,000 | Kee | |
Upgrading Of Mutulani Dispensary With Ashpit, Incinerator,laboratory Eqquipping And Staff Quarters | Fencing, renovation of maternity and drainage system |
Department of Health Services | Ongoing | Ksh 1,347,992 | Kee | |
Distribution Of Kyandumbi Water | Drilling and Development of Kyandumbi replacement Borehole, Equipping and distribution. |
Department of Water and Sanitation | Ongoing | Ksh 3,500,000 | Kee | |
Kwa Kikungu Earth Dam Desilting And Kikonde Earthdam Spillway | Kwa kikungu Earth dam desilting and Kikonde Earthdam spillway |
Department of Water and Sanitation | Ongoing | Ksh 3,429,848 | Kee | |
Mutungu Ecde |
|
Department of ICT, Education and Internship | Ongoing | Ksh 2,940,000 | Kilungu | |
Kithembe Sub-ward Dispensaries: Fencing, Solar Energy At Nyaani Dispensary, Health Facilities Upgrading | Fencing, solar installation at Nyaani dispensary |
Department of Health Services | Ongoing | Ksh 1,960,000 | Kilungu | |
Kyanganda Dispensary – Fencing, Solarization And Water Connectivity | Fencing and renovations of OPD block |
Department of Health Services | Ongoing | Ksh 1,884,003 | Kilungu | |
Water Supply To Nunguni-phase 1 | Feasibility studies and design of Nunguni Water Supply Project (Consultancy) |
Department of Water and Sanitation | Ongoing | Ksh 2,287,965 | Kilungu | |
Extension Of Kwa Mwilu Sand Dam Water Project – 3km Return Lines, 2no. 1.5km Katikomu Village Distribution Line And Kyangunzu-nzeveni Dl 2km 5tanks. | Desilting of Sump and Operationalization of the Pumping System |
Department of Water and Sanitation | Ongoing | Ksh 6,370,000 | Ilima | |
Hire Of Excavator For Unblocking Of Kangeeni -kyanga Road | Hired wheel loaders to breaking of rock and clearing of boulders for 22days |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 632,200 | Ilima | |
Kiusyi Wear Rehabilitation | Kiusyi wear rehabilitation |
Department of Water and Sanitation | Ongoing | Ksh 1,475,624 | Ilima | |
Mumbuni Ecde |
|
Department of ICT, Education and Internship | Ongoing | Ksh 1,470,000 | Ukia | |
Riverine conservation and restoration |
|
Department of Lands, Urban Planning and Development, Environment and Climate Change | Ongoing | Ksh 99,720 | Ukia | |
Ukaatuni Ctti | Equipping |
Department of ICT, Education and Internship | Ongoing | Ksh 1,751,882 | Ukia | |
Water Boreholes Maintenance | Upgrading of Solar Pumping System - Ithanzeni BH Project |
Department of Water and Sanitation | Ongoing | Ksh 980,000 | Ukia | |
Chairs - Ukia Ward | Purchase of 270 chairs |
Department of Gender, Children, Youth, Sports and Social Services | Ongoing | Ksh 266,900 | Ukia | |
Kwa Kamoli (utaati) Talent Centre | Levelling of the field |
Department of Gender, Children, Youth, Sports and Social Services | Ongoing | Ksh 737,350 | Ukia | |
Development Of Farm Ponds- Fuel | Funds used purchase fuel and repair of backhoe for farm ponds excavation. Targetting 60 farmponds per households( the project provides fuel and the farmer pays ksh3500 per hour on dry rate ) the activities is implemented during dry spell. |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Ongoing | Ksh 1,412,400 | Ukia | |
Makindu Fire Station | Fencing of fire station |
Department of Devolution, Public Service, Public Participation and Special Programs | Ongoing | Ksh 300,000 | Makindu | |
Makindu Stock Yard | rehabilitation of fence(post n chain link and running tiber) contruction of loading ramp with collecting boma and replacement of gate |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Ongoing | Ksh 381,172 | Makindu | |
Youth Empowerment ; Ajira Kwa Vijana, Ujuzi Teketeke- Makindu | Purchase of Tools of trade and training of the youths | Department of Gender, Children, Youth, Sports and Social Services | Ongoing | Ksh 500,000 | Makindu | |
Kalii Earth Dam | Not viable |
Department of Water and Sanitation | Ongoing | Ksh 2,940,000 | Makindu | |
Makindu-kiu Catchment Borehole | Drilling and developing the borehole and capping |
Department of Water and Sanitation | Ongoing | Ksh 1,500,000 | Makindu | |
Athi Tunguni Water Project | 1. EXISTING INTAKE IMPROVEMENTS AND REHABILITATION 8NO. WATER KIOSKS |
Department of Water and Sanitation | Ongoing | Ksh 8,820,000 | Makindu | |
Road Improvement Programme | Grading and spot improvement - Kisayani-Kisingo-Kathyaka road |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 1,493,400 | Kikumbulyu North | |
Improvement Of Water In Kikumbulyu North Ward By Kibmawasco-kasayani Market To Cutline, Kwa Kakumi To Kwa Rose Muambani, Kasayani Market To Kwa Presillah Mutinda , Ndetani Ccti To Aic Kalinga To Kwa Kitheka, Kathyaka Market To Kilisa To King’uutheni And Nyayo Market To Soko Muyo | . Rehabilitation of Kathyaka – Nyayo water pipeline extension 1.32km |
Department of Water and Sanitation | Ongoing | Ksh 4,300,000 | Kikumbulyu North | |
Construction Of Kathyaka Masonry Tank/ Under Kibmawasco | . Rehabilitation of Kathyaka – Nyayo water pipeline extension 1.32km |
Department of Water and Sanitation | Ongoing | Ksh 4,410,000 | Kikumbulyu North | |
Athi-tunguni Water Project | 1. EXISTING INTAKE IMPROVEMENTS AND REHABILITATION of Intake Galleries pipe OD63mm Perforated infiltration pipe to OD250mm.1. EXISTING INTAKE IMPROVEMENTS AND REHABILITATION • Expansion of Intake Galleries pipe OD63mm Perforated infiltration pipe to OD250mm. 8NO. WATER KIOSKS |
Department of Water and Sanitation | Ongoing | Ksh 6,000,000 | Kikumbulyu North | |
Goat Rearing Programme - Distribution Of Galla Goats | Goat rearing programme - Distribution of galla goats |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Ongoing | Ksh 172,150 | Kikumbulyu South | |
Goat Value Chain Development | supplyof the Galla goats. Estimated number of beneficiaries 166 house hold. |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Ongoing | Ksh 2,000,000 | Kikumbulyu South | |
Fuel For County Machinery | Inhouse works, road grading of county roads - Grading and spot improvement of Marikiti open Air market and access roads |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 1,414,720 | Kikumbulyu South | |
Athi Tunguni Water Project | 1. EXISTING INTAKE IMPROVEMENTS AND REHABILITATION 8NO. WATER KIOSKS |
Department of Water and Sanitation | Ongoing | Ksh 37,500,000 | Kikumbulyu South | |
Social groups Tents And Chairs- Kikumbulyu South | Purchase of tents and plastic chairs |
Department of Gender, Children, Youth, Sports and Social Services | Ongoing | Ksh 2,000,000 | Kikumbulyu South | |
Youth empowerment programme Kikumbulyu South | Purchase of tools of trade |
Department of Gender, Children, Youth, Sports and Social Services | Ongoing | Ksh 1,361,346 | Kikumbulyu South | |
Kibmawasco– Kilui Water Extension To Ngolomoki – Kwa Sunza -kalulini -matinga Line, Mikuyuni – Kasarani Line , Mitundu – Malatani Line , Kalungu-ilingoni-kamunzyu Line And Matundani One Main Line, Matua-kwa Kimote Line | KIBMAWASCO– Kilui water extension to Ngolomoki – Kwa Sunza -Kalulini -Matinga Line, Mikuyuni – Kasarani Line , Mitundu – Malatani line , Kalungu-Ilingoni-Kamunzyu line and Matundani One main Line, Matua-Kwa Kimote line |
Department of Water and Sanitation | Ongoing | Ksh 8,000,000 | Kikumbulyu South | |
Survey of Muuni Subward |
|
Department of Lands, Urban Planning and Development, Environment and Climate Change | Ongoing | Ksh 304,620 | Nguumo | |
Goat Value Chain Development- Pwds | supply Galla goats for breeding. With estimated beneficiary of 83 household |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Ongoing | Ksh 1,243,000 | Nguumo | |
Ndeini Ctti Electricity | Electrification |
Department of ICT, Education and Internship | Ongoing | Ksh 490,000 | Nguumo | |
Kalungu-ngambi Ya Myunzyu Extension Of Water Pipeline | Construction of Kalungu-Ilingoni-Kamunzyu line |
Department of Water and Sanitation | Ongoing | Ksh 2,940,000 | Nguumo | |
Athi Water Project | 1. EXISTING INTAKE IMPROVEMENTS AND REHABILITATION 8NO. WATER KIOSKS |
Department of Water and Sanitation | Ongoing | Ksh 4,900,000 | Nguumo | |
Athi-tunguni Water Project | 1. EXISTING INTAKE IMPROVEMENTS AND REHABILITATION 8NO. WATER KIOSKS |
Department of Water and Sanitation | Ongoing | Ksh 9,506,000 | Nguumo | |
Makueni Child Protection Centre | Construction of a building, street lighting and land scaping |
Department of Gender, Children, Youth, Sports and Social Services | Ongoing | Ksh 6,348,220 | Emali/Mulala | |
Distribution Of Water At Ilengeni Springs | Distribution of water at Ilengeni Springs |
Department of Water and Sanitation | Ongoing | Ksh 5,900,000 | Emali/Mulala | |
Feasibility Study Of Muooni Mega Dam | a) Community Mobilization and engagement |
Department of Water and Sanitation | Ongoing | Ksh 1,000,000 | Emali/Mulala | |
Upgrading Kithyululu Model Health Centre | Renovation of maternity block, construction of staff house, construction of soak pit. | Department of Health Services | Ongoing | Ksh 1,775,636 | Masongaleni | |
Extension Of Ngwata, Kativani, Kiange, Yumbuni, And Kyuasini By KIBWAWASCO | Extension of Ngwata, Kativani, Kiange, Yumbuni, and Kyuasini by KIBMAWASCO. |
Department of Water and Sanitation | Ongoing | Ksh 4,116,000 | Masongaleni | |
Extension Of Water By 4kms Makutano- Makongeni- Masimbani- Mbondeni (kwa Kalee) To Mwaani Market And Construction Of Kiosks By Kibmawasco | Extension of water by 4Kms Makutano- Makongeni- Masimbani- Mbondeni (Kwa Kalee) to Mwaani market and Construction of kiosks by KIBMAWASCO |
Department of Water and Sanitation | Ongoing | Ksh 3,920,000 | Masongaleni | |
Miradi Kwa Jamii Programme | Light grading, bush clearing and cut off mitre drains |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 490,000 | Masongaleni | |
Uyi Earth Dam-counter Funding With Ndma | Uyi Earth dam-counter funding with NDMA |
Department of Water and Sanitation | Ongoing | Ksh 9,137,889 | Masongaleni | |
New Extension Of Ngai Ndethya River Sump Water To Nthungunu -- Construction Of A Tank, Installation Of A Submersible Pump, Elevated Tank And Distribution Lines | Distribution of Ngai Ndethya river sump water to Nthungunu -- Construction of a tank, installation of a submersible pump, elevated tank and distribution--------- lines |
Department of Water and Sanitation | Ongoing | Ksh 7,506,800 | Mtito Andei | |
Kambu-kiteng'ei Water Project | Rehabilitation of Kambu-Kiteng'ei Water project- Rehabilitation of tanks, distribution lines and revival of closed kiosks.- KIMAWASCO |
Department of Water and Sanitation | Ongoing | Ksh 4,000,000 | Mtito Andei | |
Surveying of Machinery and Kinyambu Markets |
|
Department of Lands, Urban Planning and Development, Environment and Climate Change | Ongoing | Ksh 1,661,620 | Thange | |
Supplyof The Galla Goats | supplyof the Galla goats to 30 households |
Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development | Ongoing | Ksh 1,000,000 | Thange | |
Road Improvement Programme | Road grading spot murraming and installation of drainage structures |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 3,160,000 | Thange | |
Culverts Across The Ward | Installation of culverts |
Department of Infrastructure, Transport, Public Works, Housing and Energy | Ongoing | Ksh 1,960,000 | Thange |