1. County Attorney
# | Project Name | Status | Budget | Action |
---|---|---|---|---|
1 | Kasikeu Ward Support to Land Succession | Ongoing | Ksh 1,000,000 | |
2 | Kathonzweni Ward Support to Land Succession | Ongoing | Ksh 1,000,000 | |
3 | Kitise/Kithuki Ward Support to Land Succession | Ongoing | Ksh 700,000 | |
4 | Tulimani Ward Support to Land Succession | Ongoing | Ksh 1,000,000 | |
5 | Wote/Nziu Ward Support to Land Succession | Ongoing | Ksh 1,000,000 | |
6 | Kithungo/Kitundu ward Support to Land Succession | Ongoing | Ksh 500,000 |
2. Department of Health Services
# | Project Name | Status | Budget | Action |
---|---|---|---|---|
1 | Matiliku Subcounty Hospital (dental Chair, Accessories And Other Smal Equipment) | Completed | Ksh 46,007 | |
2 | Surgical Implants And Medical Bills | Completed | Ksh 553,412 | |
3 | Fencing Of Facility (katulye Dispensary) | Completed | Ksh 1,970,000 | |
4 | Purchase Of Tanks | Completed | Ksh 451,760 | |
5 | Upgrading Of Mbitini Dispensary | Completed | Ksh 3,000,000 | |
6 | Kikumini Model Health Center | Completed | Ksh 4,585,142 | |
7 | Kambi Mawe Dispensary | Completed | Ksh 979,389 | |
8 | Mumbuni Health Center | Completed | Ksh 70,021 | |
9 | Itumbule Dispensary – Fencing, Wiring, And Construction Of Soak Pit, Ash Pit And Incinerator At... | Completed | Ksh 1,274,000 | |
10 | Upgrading Kathonzweni Health Center. | Completed | Ksh 685,414 | |
11 | Construction Of Staff Quarters At Kiangini Dispensary | Completed | Ksh 2,960,000 | |
12 | Upgranding Of Mavindini Health Center | Completed | Ksh 4,312,000 | |
13 | Renovation Iani Dispensary | Completed | Ksh 4,000,000 | |
14 | Completion & Equipping Of Mbooni Isolation Ward | Completed | Ksh 474,000 | |
15 | Upgrading Ngai Health Center | Completed | Ksh 4,900,000 | |
16 | Utangwa Dispensary | Completed | Ksh 6,981,895 | |
17 | Ngai Health Centre -equipping Maternity Wing, Upgrading Septic Tank, Additional Staff, Electricity... | Completed | Ksh 4,000,000 | |
18 | Medical Bills And Surgical Implants | Completed | Ksh 172,464 | |
19 | Uvaani Dispensary | Completed | Ksh 1,404,736 | |
20 | Katangini Dispensary -completion Of Maternity Block And Incinerator | Completed | Ksh 1,390,450 | |
21 | Kathulumbi Model Health Centre.(fencing And Gate) | Completed | Ksh 30,544 | |
22 | Mutembuku Heath Centre (renovations) | Completed | Ksh 2,500,000 | |
23 | Upgrading Of Kathulumbi Health Center. | Completed | Ksh 29,040 | |
24 | Fencing And Gate At Kathongo Dispensary | Completed | Ksh 1,000,000 | |
25 | Kalawa Subcounty Hospital Fence And Gate | Completed | Ksh 1,470,000 | |
26 | Ulu Dispensary (construction Of A L-shaped Dispensary) - Dispensary Infrastructural Requirements... | Completed | Ksh 340,040 | |
27 | Construction Of Marternity And Laboratory In Kavuko Dispensary | Completed | Ksh 2,936,945 | |
28 | Fencing, Filling Of Ditch, Incinerator,ashpit And Placenta Pit For Kalanzoni Dispensary | Completed | Ksh 500,000 | |
29 | Upgrading Of Enzai Dispensary | Completed | Ksh 2,940,000 | |
30 | Upgrading Of Kamuthini Dispensary(completion Of Injection Room And Equipping Of Maternity) | Completed | Ksh 29,542 | |
31 | Fencing And Gate Installation Of Mutiluni Dispensary | Completed | Ksh 1,260,900 | |
32 | Equipping And Operationalization Of General Ward At Uvete Health Centre | Completed | Ksh 26,042 | |
33 | Renovation Of Maternity Wing And Upgrading Of Kasikeu Model Health Centre | Completed | Ksh 4,500,000 | |
34 | Completion Of Kiou Dispensary Block, Staff House And Water Tanks | Completed | Ksh 68,874 | |
35 | Completion Of Mbiini Dispensary | Completed | Ksh 2,450,000 | |
36 | Construction Of Kiou Top Dispensary | Completed | Ksh 11,508 | |
37 | Fencing Of Ngalana Dispensary | Completed | Ksh 498,890 | |
38 | Equipping Of Sultan Hamud Mortuary | Completed | Ksh 115,948 | |
39 | Upgrading Of Health Facilities In Kee Ward | Completed | Ksh 55,665 | |
40 | Upgrading Of Mang'ala Dispensary (facelift,incinerator And Equipping) | Completed | Ksh 367,398 | |
41 | Kithembe Sub-ward Dispensaries: Fencing, Solar Energy At Nyaani Dispensary, Health Facilities... | Completed | Ksh 1,960,000 | |
42 | Kyanganda Dispensary – Fencing, Solarization And Water Connectivity | Completed | Ksh 1,884,003 | |
43 | Kyambeke Health Centre – Upgrading Of The Facility | Completed | Ksh 934,702 | |
44 | Musalala Dispensary – Upgrading | Completed | Ksh 943,085 | |
45 | Upgrading Of Kyang’a Dispensary – Construction Of Staff Quarters | Completed | Ksh 3,430,000 | |
46 | Upgrading Of Nzukini Health Centre (renovations) | Completed | Ksh 980,000 | |
47 | Upgrading Of Kavatanzou Dispensary | Completed | Ksh 1,466,506 | |
48 | Upgrading Of Kyambeke Dispensary-construction Of Two Wards -male And Female | Completed | Ksh 15,783 | |
49 | Upgrading Of Nthangu Dispensary | Completed | Ksh 96,643 | |
50 | Kyuasini Health Centre | Completed | Ksh 400,113 | |
51 | Upgrading Of Kilala Dispensary; Staff House | Completed | Ksh 3,194,400 | |
52 | Electrification And Fencing Of Kai Dispensary | Completed | Ksh 2,999,266 | |
53 | Installation Of Fence And Chain Link At Kiboko Dispensary. | Completed | Ksh 1,500,000 | |
54 | Medical Bills And Surgical Implants | Completed | Ksh 42,610 | |
55 | Construction Of Pwd Empowered Structures At Kalulini Health Centre | Completed | Ksh 980,000 | |
56 | Surgical Implants And Medical Bills | Completed | Ksh 734,566 | |
57 | Construction Of Kyanginywa Dispensary- Equipping | Completed | Ksh 1,038,362 | |
58 | Kalungu Dispensary -construction Of Staff Quarters And Upgrading | Completed | Ksh 3,920,000 | |
59 | Lab And Matternity Equipping Of Mbuinzau Dispensary | Completed | Ksh 30,000 | |
60 | Renovation Of Kalulini Health Center | Completed | Ksh 1,271,703 | |
61 | Fence Kyanginywa And Electricity | Completed | Ksh 1,500,000 | |
62 | Fencing Of Kwa-kotoe Dispensary (katune Disp) | Completed | Ksh 980,000 | |
63 | Construction Of X-ray Block And Equipping At Emali Model Health Centre | Completed | Ksh 240,205 | |
64 | Fencing Of Tutini Dispensary | Completed | Ksh 500,000 | |
65 | Tutini Dispensary – Fencing | Completed | Ksh 500,000 | |
66 | Ndovoini Dispensary (fencing, Installation Of A Gate, Electrification(drop), Ceiling, And Supply Of... | Completed | Ksh 3,000,000 | |
67 | Upgrading Kithyululu Model Health Centre | Completed | Ksh 1,775,636 | |
68 | Upgrading Ngwata Maternity Centre | Completed | Ksh 5,350,000 | |
69 | construction of maternity at masimbani health center | Completed | Ksh 4,800,000 | |
70 | Construction & Equipping Of X-ray Block And Theatre At Kambu Sub County Hospital | Completed | Ksh 249,974 | |
71 | Fencing & Installation Of Electricity At Ivoleni Dispensary | Completed | Ksh 428,787 | |
72 | Construction & Equipping Of Ward And Mortuary At Nthongoni Dispensary | Completed | Ksh 650,000 | |
73 | Construction Of A New Hospital Block At Ivingoni Dispensary | Completed | Ksh 3,268,824 | |
74 | Upgrading Of Kitende Dispensary(fencing And Gate) | Completed | Ksh 1,500,000 | |
75 | Upgrading Of Makasa Dispensary(fencing And Gate) | Completed | Ksh 1,470,000 | |
76 | Construction Of Kwa Ndava Dispensary | Completed | Ksh 18,885 | |
77 | Thithi Dispensary | Completed | Ksh 2,706,465 | |
78 | Masumba Dispensary -rehabilitation & Renovation Works | Completed | Ksh 2,000,000 | |
79 | Conditional Allocation For Leasing Of Medical Equipment | Completed | Ksh 124,723,404 | |
80 | Danida – Matching Grant For Level 2 And 3 Facilities | Completed | Ksh 10,530,000 | |
81 | Danida- Primary Healthcare In Devolved Context | Completed | Ksh 11,407,500 | |
82 | Facility Infrastructure Improvement Including Makueni Mortuary, Sultan Hospital, Theatre For... | Completed | Ksh 12,000,000 | |
83 | Nutrition International Donor Funding | Completed | Ksh 42,027,560 | |
84 | Nutrition Programme - Matching Grant | Completed | Ksh 5,386,965 | |
85 | Purchase Of Medical Equipment | Completed | Ksh 1,159,977 | |
86 | Universal Health Care Programme | Completed | Ksh 100,000,000 | |
87 | Transforming Health Systems For Universal Care Project (wb) | Completed | Ksh 261,683 | |
88 | Purchase Of Ambulances | Completed | Ksh 20,000,000 | |
89 | Fencing Of Ndumoni Dispensary | Completed | Ksh 1,000,000 | |
90 | Infrastructure Improvement For Makueni Referral Hospital - Mortuary, Gate And Medical Equipment | Ongoing | Ksh 21,467,879 | |
91 | Surgical Implants | Ongoing | Ksh 2,000,000 | |
92 | Fencing Of Mutyambua Health Center | Ongoing | Ksh 1,000,000 | |
93 | Kathonzweni Health Centre -construction And Equipping Of Laboratory | Ongoing | Ksh 2,200,000 | |
94 | Upgrading Of Mbuvo Health Centre To Model Health Centreupgrading Of Mbuvo Health Centre To Model... | Ongoing | Ksh 2,000,000 | |
95 | Construction Of Septic Tank And Waste Pipe Installation From The Staff House And From The Maternity... | Ongoing | Ksh 500,000 | |
96 | Conditional Grant - For Covid 19 Emergency Response - | Ongoing | Ksh 27,257,613 | |
97 | Completion & Equipping Of Mbooni Isolation Ward | Ongoing | Ksh 30,000,000 | |
98 | Renovation And Extension Of Waiting Bay And Furniture Mbavani Dispensary | Ongoing | Ksh 1,500,000 | |
99 | Kwale Dispensary -construction Of A Septic Tank, Provision Of Electricity Back Up, Construction Of... | Ongoing | Ksh 2,000,000 | |
100 | Payings Of Medical Bills For Patients In The Ward | Ongoing | Ksh 1,000,000 | |
101 | Upgrading Of Mutulani Dispensary- | Ongoing | Ksh 1,313,911 | |
102 | Upgrading Of Mutulani Dispensary With Ashpit, Incinerator,laboratory Eqquipping And Staff Quarters | Ongoing | Ksh 1,347,992 | |
103 | Construction Of Kivani Staff Quarters | Ongoing | Ksh 3,222,450 | |
104 | Renovation Of Ngiluni Dispensary | Ongoing | Ksh 1,500,000 | |
105 | Mutungu Health Centre - Medical Bills For The Needy Cases And Pwds | Ongoing | Ksh 500,000 | |
106 | Mwaani Dispensary – Construction Of Galley | Ongoing | Ksh 1,000,000 | |
107 | Upgrading/construction Of Ward At Mukuyuni Sub County Hospital | Ongoing | Ksh 3,920,000 | |
108 | Nzouni Dispensary-construction Of Staff Quarters, Placenta Pit, Ash Pit, Electrification And Fencing | Ongoing | Ksh 4,500,000 | |
109 | Hospital Bills And Implants | Ongoing | Ksh 1,000,000 | |
110 | Medical Cards (nhif And Makueni Care Card) | Ongoing | Ksh 1,000,000 | |
111 | Health Implants -kikumbulyu North | Ongoing | Ksh 200,000 | |
112 | Upgrading Of Mikuyuni Dispensary – Wiring, Water Connection And Construction Of Waste Management... | Ongoing | Ksh 1,000,000 | |
113 | Implants And Hospital Bills | Ongoing | Ksh 1,297,800 | |
114 | Hospitals Bills And Implants | Ongoing | Ksh 1,000,000 | |
115 | Emali/mulala -medical Bills | Ongoing | Ksh 1,000,000 | |
116 | Mwanyani Health Centre | Ongoing | Ksh 3,000,000 | |
117 | Medical Bills | Ongoing | Ksh 500,000 | |
118 | Medical Bills | Ongoing | Ksh 700,000 | |
119 | Medical Bills | Ongoing | Ksh 500,000 | |
120 | Medical Bills | Ongoing | Ksh 800,000 | |
121 | Yikivumbu Dispensary | Ongoing | Ksh 1,500,000 | |
122 | Universal Health Care Programme - Hospital | Ongoing | Ksh 70,000,000 | |
123 | Nutrition Programme - Matching Grant | Ongoing | Ksh 10,780,775 | |
124 | Danida – Matching Grant For Level 2 And 3 Facilities | Ongoing | Ksh 12,636,000 | |
125 | Danida- Primary Healthcare In Devolved Context | Ongoing | Ksh 11,407,500 | |
126 | Universal Healthcare Registration Fees | Ongoing | Ksh 7,350,000 | |
127 | Infrastructure Improvement For Health Facilities-aia | Ongoing | Ksh 14,905,700 | |
128 | Medical Health Services Fees - Facility Improvement Fee(cash Collection) - Hospitals | Ongoing | Ksh 176,430,000 | |
129 | Nhif And Linda Mama Reimbursement Edu Afya Fees | Ongoing | Ksh 367,570,000 | |
130 | Construction Of Male Wards And Theatre At Mukuyuni Sub County Hospital | Not Started | Ksh 3,920,000 | |
131 | Equipping Of Kathulumbi Hospital Laboratory | Under Procurement | Ksh 998,000 | |
132 | Kalawa Subcounty Hospital Solarization | Under Procurement | Ksh 4,000,000 | |
133 | Muua Dispensary -equipping Of A Laboratory. | Under Procurement | Ksh 1,000,000 | |
134 | Kee Health Centre Solarization | Under Procurement | Ksh 400,000 | |
135 | Purchase Of Medical Equipment | Under Procurement | Ksh 8,000,000 |
3. Department of Devolution, Public Service, Public Participation and Special Programs
# | Project Name | Status | Budget | Action |
---|---|---|---|---|
1 | Kilome Sub-county Administration Office | Completed | Ksh 9,000,000 | |
2 | Fire Fighting Equipment | Completed | Ksh 2,000,000 | |
3 | Wote Fire Station | Completed | Ksh 800,000 | |
4 | Kithuki Sub-ward Administrator's Office | Completed | Ksh 651,580 | |
5 | Makindu Fire Station | Completed | Ksh 300,000 | |
6 | Ivingoni/nzambani Ward Administrator's Office | Completed | Ksh 3,780,000 | |
7 | Mavindini Ward Administrator's Office | Completed | Ksh 6,258,066 | |
8 | Kdsp | Under Procurement | Ksh 37,500,000 |
4. Department of Agriculture, Irrigation, Livestock, Fisheries & Cooperative Development
# | Project Name | Status | Budget | Action |
---|---|---|---|---|
1 | Fruit Value Chain Development | Completed | Ksh 3,000,000 | |
2 | Establishment Of Low Pest Zones | Completed | Ksh 14,200,000 | |
3 | Fruit Value Chain Development (seedlings) Matching Grant | Completed | Ksh 2,000,000 | |
4 | Kavuthu Coldroom | Completed | Ksh 100,000 | |
5 | Grain And Pulse Value Chain Development | Completed | Ksh 2,000,000 | |
6 | Issuance Of Certified Maize Seeds | Completed | Ksh 4,000,000 | |
7 | Agricultural Training Institute - Kwa Kathoka | Completed | Ksh 6,898,299 | |
8 | Green Grams Value Chain Addition | Completed | Ksh 1,500,000 | |
9 | Kathonzweni Dairy | Completed | Ksh 9,500,000 | |
10 | Training Of Young Agripreneurs | Completed | Ksh 500,000 | |
11 | Agricultural Development( Supply Of Certified Pasture Seeds) | Completed | Ksh 1,000,000 | |
12 | Pasture Development | Completed | Ksh 1,000,000 | |
13 | Fuel For Backhoe | Completed | Ksh 500,000 | |
14 | Kikome Irrigation Scheme Phase 11 | Completed | Ksh 7,000,000 | |
15 | Kikome Irrigation Scheme | Completed | Ksh 7,932,953 | |
16 | Training Of Young Agripreneurs | Completed | Ksh 500,000 | |
17 | Operationalization Of Kikima Dairy Processing Plant | Completed | Ksh 500,000 | |
18 | Dairy Farming And Livestock Keeping | Completed | Ksh 2,000,000 | |
19 | Grain And Pulse Value Chain Development | Completed | Ksh 2,000,000 | |
20 | Supply Of Certified Seeds | Completed | Ksh 1,000,000 | |
21 | Revitalize Kikima Dairy Cooperative And Provision Of Ai Services | Completed | Ksh 2,000,000 | |
22 | Hay Stands | Completed | Ksh 490,408 | |
23 | Kathambalani Irrigation Project. | Completed | Ksh 8,000,000 | |
24 | Vegetable Value Chain Developement | Completed | Ksh 3,500,000 | |
25 | Provision Of Mango And Avocado Seedlings | Completed | Ksh 2,500,000 | |
26 | Development Of Sustainable Value Chains | Completed | Ksh 1,000,000 | |
27 | Kyang'ondu Stock Yard | Completed | Ksh 3,000,000 | |
28 | Grain And Pulse Value Chain Development | Completed | Ksh 1,000,000 | |
29 | Establish Satellite Fertiliser | Completed | Ksh 500,000 | |
30 | Provision Of Certified Seeds | Completed | Ksh 1,000,000 | |
31 | Seed Bulking | Completed | Ksh 1,000,000 | |
32 | Distribution Of Certified Seed | Completed | Ksh 1,000,000 | |
33 | Grain And Pulse Value Chain Development | Completed | Ksh 2,000,000 | |
34 | Agricultural Productivity Programme | Completed | Ksh 1,342,800 | |
35 | Kasikeu Grain Milling Facility | Completed | Ksh 19,950 | |
36 | Provision Of Certified Seeds | Completed | Ksh 1,500,000 | |
37 | Provision Of Certified Mango, Avocado Seedlings, Certified Seeds, Fertilizer And Other Farm Inputs | Completed | Ksh 4,000,000 | |
38 | Avocado Value Chain Development | Completed | Ksh 2,000,000 | |
39 | Purchase Of Certified Maize Seeds | Completed | Ksh 5,000,000 | |
40 | Avocado Value Chain Development | Completed | Ksh 1,500,000 | |
41 | Supply Of Certified Seeds | Completed | Ksh 1,500,000 | |
42 | Development Of Farm Ponds- Fuel | Completed | Ksh 1,412,400 | |
43 | Centralized Small-scale Farming | Completed | Ksh 2,500,000 | |
44 | Goat Rearing Programme - Distribution Of Galla Goats | Completed | Ksh 172,150 | |
45 | Goat Value Chain Development | Completed | Ksh 2,000,000 | |
46 | Nguumo Poultry Aggregation Centre | Completed | Ksh 80,343 | |
47 | Makueni Integrated Grain Value Addition Plant | Completed | Ksh 4,000,000 | |
48 | Goat Value Chain Development- Pwds | Completed | Ksh 1,243,000 | |
49 | Green Grams Value Chain Development | Completed | Ksh 2,500,000 | |
50 | Agriculture Development Programme | Completed | Ksh 127,160 | |
51 | Agricultural And Livestock Productivity | Completed | Ksh 2,000,000 | |
52 | Green Grams Value Chain Development | Completed | Ksh 2,500,000 | |
53 | Green Grams Value Chain Development | Completed | Ksh 1,000,000 | |
54 | Supplyof The Galla Goats | Completed | Ksh 1,000,000 | |
55 | Livestock Development | Completed | Ksh 1,000,000 | |
56 | Green Grams Value Chain Development | Completed | Ksh 1,500,000 | |
57 | Farmers Trainings And Timely Provision Of Certified Seeds | Completed | Ksh 1,000,000 | |
58 | Fisheries Development Programme | Completed | Ksh 1,500,000 | |
59 | Agriculture Extension Programme | Completed | Ksh 10,587,436 | |
60 | Agriculture Mechanzation Services(ams) | Completed | Ksh 1,000,000 | |
61 | Co-operative Development And Management | Completed | Ksh 4,583,930 | |
62 | Ready To Drink Juice(rtd) Production | Completed | Ksh 27,587,000 | |
63 | Purified Drinking Water Production | Completed | Ksh 1,513,505 | |
64 | Purchase Of Mangoes | Completed | Ksh 14,400,000 | |
65 | Kenya Devolution Support Programme | Completed | Ksh 8,525,054 | |
66 | National Agricultural And Rural Inclusive Growth Project (narigp) | Completed | Ksh 60,000,000 | |
67 | Rabies Elimination Programme | Completed | Ksh 6,168,500 | |
68 | Livestock Disease Control | Completed | Ksh 5,308,526 | |
69 | Makueni Integrated Grain Value Chain Development Project | Completed | Ksh 4,000,000 | |
70 | Ida(world Bank) Credit National Agricultural Value Chain Development Project(navcdp) | Completed | Ksh 200,000,000 | |
71 | Fruit Development Programme | Completed | Ksh 234,032 | |
72 | Extension Service Delivery | Completed | Ksh 244,714 | |
73 | Installation Of Pallets At Satellite Fertiliser Stores | Completed | Ksh 500,000 | |
74 | Sweden- Agricultural Sector Development Support Programme (asdsp) Ii | Completed | Ksh 1,101,751 | |
75 | Irrigation Development Programmes | Completed | Ksh 1,795,800 | |
76 | Food Security Initiatives | Completed | Ksh 296,001 | |
77 | Atc-kwa Kathoka | Completed | Ksh 375,550 | |
78 | Makueni Agricultural Extension Programme | Completed | Ksh 399,600 | |
79 | Livestock Disease Control | Completed | Ksh 5,308,526 | |
80 | Puree Production | Completed | Ksh 13,549,224 | |
81 | Ida (world Bank) Credit (national Agricultural And Rural Inclusive Growth Project (narigp) Pending... | Completed | Ksh 14,344,221 | |
82 | De-risking And Value Enhancement (drive) Project | Completed | Ksh 63,341,980 | |
83 | National Agricultural Value Chain Development Project(navcdp) | Completed | Ksh 5,000,000 | |
84 | Mbavani Irrigation Scheme | Completed | Ksh 4,101,300 | |
85 | Artificial Insemination (ai) | Completed | Ksh 1,045,048 | |
86 | Rtd Line Arrears | Completed | Ksh 1,000,000 | |
87 | Agriculture Mechanzation Services(ams) | Completed | Ksh 1,000,000 | |
88 | Implement Animal Health And Breeding Program For All 30 Wards For Dairy And Beef Animals | Completed | Ksh 7,780,000 | |
89 | De-risking And Value Enhancement (drive) Project | Completed | Ksh 7,500,000 | |
90 | Purchase Of Mangoes | Completed | Ksh 13,400,000 | |
91 | Puree Production | Completed | Ksh 11,561,000 | |
92 | Ready To Drink Juice | Completed | Ksh 10,891,765 | |
93 | Purified Drinking Water | Completed | Ksh 10,269,682 | |
94 | Installation Of An Epoxy Floor Repair | Completed | Ksh 1,276,917 | |
95 | Maintance Of Low Pest Zones - Procurement Of Low Pest Management Technologies, And Training Farmers | Completed | Ksh 3,500,000 | |
96 | Industrial Crops Development (coffee, Macadamia) | Completed | Ksh 3,180,000 | |
97 | Quality Management Certifications | Completed | Ksh 2,950,000 | |
98 | Effluent Treatment Plant(etp) | Completed | Ksh 600,000 | |
99 | Feasibility Study And Designs For Kathonzweni Livestock Abattoir | Completed | Ksh 1,300,000 | |
100 | Establishment Of 10 Aggregation Centeres To Facilitate Market Linkages For Agricultural Produce And... | Completed | Ksh 2,500,000 | |
101 | Grains Development | Completed | Ksh 2,500,000 | |
102 | Rtd Line Repairs | Completed | Ksh 1,000,000 | |
103 | Ulilinzi Mkt Livestock Yard | Completed | Ksh 2,000,000 | |
104 | Extension Service Delivery | Ongoing | Ksh 3,404,444 | |
105 | Transportation Of Manure (fuel) | Ongoing | Ksh 1,000,000 | |
106 | Agricultural Development( Subsidized Ai Services) | Ongoing | Ksh 900,000 | |
107 | Youth In Agriculture Project | Ongoing | Ksh 1,000,000 | |
108 | Utangwa Coffee Factory,rehabilitation Of Infrastructure And Establishment Of Coffee Nursery | Ongoing | Ksh 3,000,000 | |
109 | Procurement Of Fuel And Lubricant In The Department Of Agriculture | Ongoing | Ksh 909,000 | |
110 | Establish Satellite Fertiliser Depot | Ongoing | Ksh 500,000 | |
111 | Avocado Development Programme | Ongoing | Ksh 241,408 | |
112 | Mukaa Ward Tree Nurseries | Ongoing | Ksh 702,585 | |
113 | Kasikeu Stock Yard And Toilet. | Ongoing | Ksh 478,184 | |
114 | Fruit Development- Avocado And Mango Value Chains | Ongoing | Ksh 2,500,000 | |
115 | Establish Satellite Fertilizer Depot At Kee | Ongoing | Ksh 500,000 | |
116 | Ward Based Sacco | Ongoing | Ksh 340,511 | |
117 | Development Of Makueni Ask Show | Ongoing | Ksh 4,663,000 | |
118 | Matching Grant To The Ward Agricultural Sacco | Ongoing | Ksh 500,000 | |
119 | Subsidized Farm Pond Development | Ongoing | Ksh 600,000 | |
120 | Provision Of Gala Goat | Ongoing | Ksh 1,000,000 | |
121 | Purchase Of Gala Goats And Distribution To Farmers | Ongoing | Ksh 1,000,000 | |
122 | Matching Grant To The Ward Agricultural Sacco | Ongoing | Ksh 150,000 | |
123 | Conditional Grant For Provision Of Fertilizer Subsidy Programme | Ongoing | Ksh 162,562,856 | |
124 | Ida(world Bank) Credit National Agricultural Value Chain Development Project(navcdp) | Ongoing | Ksh 151,515,152 | |
125 | Matching Grant-ida(world Bank) Credit National Agricultural Value Chain Development Project(navcdp) | Ongoing | Ksh 5,000,000 | |
126 | Erp System And Cctv Enhancement | Ongoing | Ksh 4,000,000 | |
127 | Community Water Distribution | Ongoing | Ksh 550,000 | |
128 | Technical Evaluation Of Flagship Projects | Ongoing | Ksh 1,500,000 | |
129 | Feasibility Study And Designs For Kathonzweni Livestock Abattoir | Ongoing | Ksh 1,300,000 | |
130 | Livestock Value Chain Support Project | Not Started | Ksh 21,485,520 | |
131 | Agriculture Development Programme | Under Procurement | Ksh 1,510,000 | |
132 | Kenya Agricultural Business Development Project (kabdp) | Under Procurement | Ksh 10,918,919 | |
133 | Matching Grant - Kenya Agricultural Business Development Project (kabdp) | Under Procurement | Ksh 10,000,000 |
5. Department of Finance, Planning, Budget and Revenue
# | Project Name | Status | Budget | Action |
---|---|---|---|---|
1 | Kdsp Level 1 | Completed | Ksh 4,956,232 | |
2 | Kdsp Level 2 Grant | Completed | Ksh 37,129,123 | |
3 | County Treasury Office Block | Completed | Ksh 4,074,246 | |
4 | Supplementary Projects | Completed | Ksh 6,127,951 | |
5 | County Treasury Office Block | Completed | Ksh 2,500,000 | |
6 | Supplementary Projects | Under Procurement | Ksh 20,000,000 | |
7 | Skauti -kisyulya Road | Under Procurement | Ksh 3,904,677 |
6. Department of Gender, Children, Youth, Sports and Social Services
# | Project Name | Status | Budget | Action |
---|---|---|---|---|
1 | Kitikyumu Playground | Completed | Ksh 142,032 | |
2 | Sports Development Wote/nziu | Completed | Ksh 925,000 | |
3 | Nziu Playground | Completed | Ksh 1,500,000 | |
4 | Support To Organized Groups Including Pwds In Nziu Sub-ward | Completed | Ksh 5,096,000 | |
5 | Sports Development - Wote/nziu Ward | Completed | Ksh 300,000 | |
6 | Social groups - Tents And Chairs Nzaui/kilili/kalamba | Completed | Ksh 5,635,000 | |
7 | Sports And Youth Development Programme -nzaui/kilili/kalamba | Completed | Ksh 405,000 | |
8 | Manooni Play Ground | Completed | Ksh 3,688,468 | |
9 | Sports And Youth Development Programme -mbitini | Completed | Ksh 450,000 | |
10 | Sports And Youth Development Programme -kikumini/muvau | Completed | Ksh 300,000 | |
11 | Youth Sports Tournament Kathonzweni | Completed | Ksh 397,500 | |
12 | Wheelchairs And Assistive Devices To Pwd Kathonzweni | Completed | Ksh 500,000 | |
13 | Support To Special Groups With Tents And Chairs-kathonzweni Ward | Completed | Ksh 1,000,000 | |
14 | Sports And Youth Development Programme - Kathonzweni Ward | Completed | Ksh 300,000 | |
15 | Sports Development Mavindini | Completed | Ksh 700,000 | |
16 | Mavindini Playground | Completed | Ksh 2,849,234 | |
17 | Support To Organised Groups -tents And Chairs-mavindini Ward. | Completed | Ksh 1,500,000 | |
18 | Sports Development Kitise/kithuki | Completed | Ksh 340,000 | |
19 | Dias At Kisite Market | Completed | Ksh 1,000,000 | |
20 | Kyangoma Stadium | Completed | Ksh 1,025,000 | |
21 | Social Protection - Pwds Empowerment - Mbooni | Completed | Ksh 918,400 | |
22 | Youth Empowerment Programme Bodaboda Sacco Mbooni Ward | Completed | Ksh 800,000 | |
23 | Rehabilitation Of Kyangoma Playground Mbooni | Completed | Ksh 2,000,000 | |
24 | Sports-youth Development Programme,tulimani | Completed | Ksh 600,000 | |
25 | Support To Registered Groups( Tents And Chairs)-kithungo/kitundu | Completed | Ksh 1,500,000 | |
26 | Kusyongali Playground | Completed | Ksh 4,000,000 | |
27 | Youth Empowerment Programme -kithungo/kitundu | Completed | Ksh 900,000 | |
28 | Sport Development Programme- Tulimani ward | Completed | Ksh 150,000 | |
29 | Youth Empowerment Programme- Tulimani ward | Completed | Ksh 810,000 | |
30 | Social Groups Tents And Chairs Tulimani | Completed | Ksh 2,450,000 | |
31 | Iviani, Kivani And Kiteta Playgrounds | Completed | Ksh 1,900,000 | |
32 | Support To Groups(tents And Chairs)- Kisau Kiteta ward | Completed | Ksh 3,000,000 | |
33 | Kiteta Playground Kisau/kiteta | Completed | Ksh 2,100,000 | |
34 | Boda Boda Shed - Kako/waia | Completed | Ksh 300,000 | |
35 | Sports Development Kalawa | Completed | Ksh 200,000 | |
36 | Social Protection Kalawa | Completed | Ksh 887,500 | |
37 | Sports And Youth Development Programme - Kalawa | Completed | Ksh 300,000 | |
38 | Kiu Primary Play Ground And Toilet | Completed | Ksh 2,000,000 | |
39 | Tents And Chairs- Kiima Kiu Kalanzoni Ward | Completed | Ksh 1,500,000 | |
40 | Sports Development Mukaa | Completed | Ksh 245,000 | |
41 | Uvete Playground | Completed | Ksh 2,000,000 | |
42 | Youth Empowerment Programme- Kee ward (Driving course training) | Completed | Ksh 378,000 | |
43 | Ujuzi Teke Teke Kee Ward | Completed | Ksh 198,630 | |
44 | Nguluni Bodaboda | Completed | Ksh 270,000 | |
45 | Sports Development Kilungu | Completed | Ksh 520,000 | |
46 | Social Groups - Tents And Chairs Kilungu | Completed | Ksh 3,000,000 | |
47 | Support To Groups – Kilungu | Completed | Ksh 3,000,000 | |
48 | Ilima Water Tanks For Elderly | Completed | Ksh 1,000,000 | |
49 | Gbv –ilima | Completed | Ksh 1,000,000 | |
50 | Purchase Of Tents And Chairs For Organized Groups-ilima | Completed | Ksh 1,500,000 | |
51 | Sports Development – Ward Tournament Ilima | Completed | Ksh 300,000 | |
52 | Social Protection Ukia | Completed | Ksh 233,100 | |
53 | Kwa Kamoli (utaati) Talent Centre | Completed | Ksh 737,350 | |
54 | Sports And Youth Development Programme Ukia | Completed | Ksh 300,000 | |
55 | Youth Empowerment ; Ajira Kwa Vijana, Ujuzi Teketeke- Makindu | Completed | Ksh 500,000 | |
56 | Sports And Youth Development Program-youth, Talent And Infrastructure Development For Athletics,... | Completed | Ksh 100,000 | |
57 | Tents And Chairs- Kikumbulyu North | Completed | Ksh 2,000,000 | |
58 | Youth empowerment and Sports Development Kikumbulyu North | Completed | Ksh 450,000 | |
59 | Purchase Of Water Tanks For Women Groups - Kikumbulyu North | Completed | Ksh 500,000 | |
60 | Sports And Youth Development Programme -youth, Talent And Infrastructure Development For... | Completed | Ksh 300,000 | |
61 | Social groups Tents And Chairs- Kikumbulyu South | Completed | Ksh 2,000,000 | |
62 | Youth empowerment programme Kikumbulyu South | Completed | Ksh 1,361,346 | |
63 | Sports And Youth Development Programme -youth, Talent And Infrastructure Development For... | Completed | Ksh 200,000 | |
64 | Support To Groups With Gas Cylinders -kikumbulyu South | Completed | Ksh 2,000,000 | |
65 | Food stuff and non-food stuff; Nguumo ward | Completed | Ksh 1,000,000 | |
66 | Sports And Youth Development Programme Youth, Talent And Infrastructure Development For Athletics,... | Completed | Ksh 300,000 | |
67 | Mulala Play Ground | Completed | Ksh 3,497,204 | |
68 | Makueni Child Protection Centre | Completed | Ksh 6,348,220 | |
69 | Kiuani Playground | Completed | Ksh 880,000 | |
70 | Support To Groups With Chairs And Tents-emali/mulala | Completed | Ksh 2,500,000 | |
71 | Sports Development- Emali/Mulala ward | Completed | Ksh 300,000 | |
72 | Ujuzi Teke Teke - Masongaleni | Completed | Ksh 293,420 | |
73 | Support Groups - Masongaleni | Completed | Ksh 800,000 | |
74 | Social Groups Development -masongaleni | Completed | Ksh 1,500,000 | |
75 | Youth Empowerment And Sports - Masongaleni | Completed | Ksh 700,000 | |
76 | Purchase Of Tents-masongaleni Ward | Completed | Ksh 2,000,000 | |
77 | Sports And Youth Development Programme - masongaleni | Completed | Ksh 450,000 | |
78 | Sports Development Mtito Andei | Completed | Ksh 380,000 | |
79 | Social Groups Development Programme- Mtito Andei | Completed | Ksh 2,205,000 | |
80 | Support To Social Welfare Groups Tents And Chairs-mtito Andei Ward | Completed | Ksh 2,750,000 | |
81 | Sports development - Mtito Andei Ward | Completed | Ksh 300,000 | |
82 | Sports Development Thange | Completed | Ksh 679,000 | |
83 | Kyaani Bodaboda Shed | Completed | Ksh 200,000 | |
84 | Social Protection Tents And Chairs Thange | Completed | Ksh 1,409,210 | |
85 | Youth Empowerment Programme - Thange Ward (Driving course training and purchase of tools of trade) | Completed | Ksh 1,361,223 | |
86 | Purchase Of Tents And Chairs For Registered Groups-thange Ward. | Completed | Ksh 2,500,000 | |
87 | Sports And Youth Development Programme -thange | Completed | Ksh 450,000 | |
88 | Sports Development Ivingoni/nzambani | Completed | Ksh 114,000 | |
89 | Sports And Youth Development Programme-ligi Mashinani/supa Cup-ivingoni/nzambani Ward | Completed | Ksh 450,000 | |
90 | Masumba Playground (fencing, Shade, Levelling And Construction Of A Toilet)-nguu/masumba | Completed | Ksh 3,000,000 | |
91 | Sport Development- Nguu/masumba | Completed | Ksh 600,000 | |
92 | Sport Development HQ | Completed | Ksh 5,135,200 | |
93 | Kyisa Games | Completed | Ksh 3,716,048 | |
94 | Youth Empowerment Programme Hq | Completed | Ksh 3,787,205 | |
95 | Gender Based Violence Programmes Hq | Completed | Ksh 3,212,700 | |
96 | Makueni Child Protection Centre-hq | Completed | Ksh 3,000,000 | |
97 | Sports Development Programme | Completed | Ksh 10,615,000 | |
98 | Pwd Support-assistive Devices -support Pwds With Assorted Assistive Devices Wote/nziu | Ongoing | Ksh 500,000 | |
99 | Tents And Chairs To Five Groups-nzaui/kilili/kalamba | Ongoing | Ksh 1,250,000 | |
100 | Pwd Support-assistive Devices -support Pwds With Assorted Assistive Devices Nzaui/kilili/kalamba | Ongoing | Ksh 500,000 | |
101 | Issuance Of Birth Certificates | Ongoing | Ksh 200,000 | |
102 | Support To Groups-chairs And Tents (nzaui Region, Catholic Parish Matiliku, Ndumoni Welfare, Kikui... | Ongoing | Ksh 1,250,000 | |
103 | Mbeletu Playground -levelling And Protection Works-mbitini Ward | Ongoing | Ksh 4,000,000 | |
104 | Pwd Support-assistive Devices -support Pwds With Assorted Assistive Devices Mbitini | Ongoing | Ksh 500,000 | |
105 | Pa System- Mbitini Ward | Ongoing | Ksh 1,000,000 | |
106 | Pa System- Emali/mulala Ward | Ongoing | Ksh 1,000,000 | |
107 | Pwd Support-assistive Devices -support Pwds With Assorted Assistive Devices Kikumini/muvau | Ongoing | Ksh 500,000 | |
108 | Pwd Support-assistive Devices -support Pwds With Assorted Assistive Devices Kathonzweni | Ongoing | Ksh 500,000 | |
109 | Completion Of Mavindini Play Ground- Drainage Structures And Sporting Infrastructure-mavindini Ward | Ongoing | Ksh 2,000,000 | |
110 | Sports And Youth Development Programme - Youth, Talent And Infrastructure Development For... | Ongoing | Ksh 450,000 | |
111 | Rehabilitation Of Kitise Market Public Dias-kitise/kithuki | Ongoing | Ksh 1,000,000 | |
112 | Sports And Youth Development Programme - Kitise/kithuki | Ongoing | Ksh 300,000 | |
113 | Pwd Support-assistive Devices -support Pwds With Assorted Assistive Devices Kitise/kithuki | Ongoing | Ksh 500,000 | |
114 | Sports And Youth Development Programme -mbooni | Ongoing | Ksh 330,000 | |
115 | Support To Organized Groups-mbooni | Ongoing | Ksh 1,000,000 | |
116 | Pwd Spport-assistive Devices -support Pwds With Assorted Assistive Devices - Mbooni ward | Ongoing | Ksh 500,000 | |
117 | Sports And Youth Development Programme -kithungo/kitundu | Ongoing | Ksh 300,000 | |
118 | Pwd Support-assistive Devices -kithungo/kitundu | Ongoing | Ksh 500,000 | |
119 | Youth Empowerment-licensing Tulimani | Ongoing | Ksh 1,000,000 | |
120 | Pwd Support-assistive Devices -support Pwds With Assorted Assistive Devices Tulimani | Ongoing | Ksh 500,000 | |
121 | Sports And Youth Development Programme -kisau/kiteta | Ongoing | Ksh 300,000 | |
122 | Ligi Mashinani Kako/waia | Ongoing | Ksh 1,000,000 | |
123 | Pwds Mapping Kako/waia | Ongoing | Ksh 500,000 | |
124 | Pwd Support-assistive Devices -kalawa | Ongoing | Ksh 500,000 | |
125 | Sports And Youth Development Programme Kiimakiu/kalanzoni | Ongoing | Ksh 300,000 | |
126 | Pwd Assistive Devices - Kiima Kiu Kalanzoni Ward | Ongoing | Ksh 500,000 | |
127 | Sports And Youth Development Programme Mukaa | Ongoing | Ksh 300,000 | |
128 | Pwd Support-assistive Devicesmukaa | Ongoing | Ksh 500,000 | |
129 | Purchase Of Tents And Chairs To 10 Groups Mukaa | Ongoing | Ksh 2,500,000 | |
130 | Sports And Youth Development Programme Kasikeu | Ongoing | Ksh 450,000 | |
131 | Pwd Support-assistive Devices Kasikeu | Ongoing | Ksh 500,000 | |
132 | Sports And Youth Development Programme Kee | Ongoing | Ksh 300,000 | |
133 | Tents And Chairs- Kee ward | Ongoing | Ksh 1,600,000 | |
134 | Driving Course Training- Kee Ward | Ongoing | Ksh 500,000 | |
135 | Boda Boda Training And Licensing Ilima | Ongoing | Ksh 1,000,000 | |
136 | Chairs - Ukia Ward | Ongoing | Ksh 266,900 | |
137 | Kwa Kamoli Talent Center Ukia | Ongoing | Ksh 1,500,000 | |
138 | Pwd Support-assistive Devises Ukia | Ongoing | Ksh 500,000 | |
139 | Supply Of 500 Chairs To Organized Groups - Ukia ward | Ongoing | Ksh 500,000 | |
140 | Pwd Support-assistive Devices -support Pwds With Assorted Assistive Devices-kikumbulyu North | Ongoing | Ksh 500,000 | |
141 | Plastic Chairs For Fbos-kikumbulyu South | Ongoing | Ksh 1,500,000 | |
142 | Support To Elderly- Kikumbulyu South | Ongoing | Ksh 500,000 | |
143 | Pwd Support – Support Pwds With Assorted Assistive Devices -emali/mulala | Ongoing | Ksh 500,000 | |
144 | Emali Mechanics Support Program | Ongoing | Ksh 500,000 | |
145 | Pwd Support-assistive Devices -support Pwds With Assorted Assistive Devices-mtito Andei | Ongoing | Ksh 500,000 | |
146 | Social Support-purchase Of Mattresses And Blankets-thange Ward | Ongoing | Ksh 1,000,000 | |
147 | Pwd Support-assistive Devices -support Pwds With Assorted Assistive Devices-ivingoni/nzambani | Ongoing | Ksh 500,000 | |
148 | Ujuzi teke teke- Nguu Masumba ward | Ongoing | Ksh 700,000 | |
149 | Pwd Support – Assistive Devices -nguu/masumba | Ongoing | Ksh 500,000 | |
150 | Kyisa Games-hq | Ongoing | Ksh 3,000,000 | |
151 | Pwd Support-assistive Devices Kee | Ongoing | Ksh 500,000 | |
152 | Youth Ujuzi Teketeke-nzaui/kilili/kalamba | Not Started | Ksh 850,000 | |
153 | Purchase Of Chairs And Tents-mbitini Ward | Not Started | Ksh 3,000,000 | |
154 | Youth Economic Empowerment (ujuzi Teke Teke) Kathonzweni | Not Started | Ksh 400,000 | |
155 | Youth Empowerment- Driving course training- Kitise/kithuki | Not Started | Ksh 800,000 | |
156 | Youth Empowerment-kilungu | Not Started | Ksh 1,400,000 | |
157 | Sports Development Field levelling- Ilima | Not Started | Ksh 384,850 | |
158 | Sports Development Programmes- Wote Nziu Ward | Under Procurement | Ksh 350,000 | |
159 | Support To Women Groups - Nzui/kilili/kalamba | Under Procurement | Ksh 500,000 | |
160 | Birth Certificates And Registration- Tulimani Ward | Under Procurement | Ksh 267,983 | |
161 | Musalala/akatch Stadium | Under Procurement | Ksh 984,850 | |
162 | Ujuzi Teketeke - Kikumbulyu North | Under Procurement | Ksh 300,000 | |
163 | Youth Empowerment- Kikumbulyu South Ward | Under Procurement | Ksh 1,000,000 | |
164 | Boda-boda Shades -emali/mulala | Under Procurement | Ksh 500,000 | |
165 | Purchase Of Blankets-heavy Duty- Masongaleni Ward | Under Procurement | Ksh 115,608 | |
166 | Ujuzi Tekete-thange Ward | Under Procurement | Ksh 800,000 | |
167 | Youth Empowerment Programme (ujuzi Teke Teke)-ivingoni Nzambani | Under Procurement | Ksh 1,000,000 | |
168 | Gbv Protection -anti Gbv Campaigns And Awareness Creation; Legal Aid And Justice Suppoty: ... | Under Procurement | Ksh 925,000 | |
169 | Support To Bodaboda (purchase Of Motorbikes For Bodaboda-)-kikumbulyu South | Under Procurement | Ksh 2,500,000 |
7. Department of ICT, Education and Internship
# | Project Name | Status | Budget | Action |
---|---|---|---|---|
1 | Nziu Ecde | Completed | Ksh 70,000 | |
2 | St. Johns Malivani Ecde | Completed | Ksh 231,339 | |
3 | Kavila Ecde | Completed | Ksh 226,219 | |
4 | Makueni Integrated Vocation Education Centre - Dormitory | Completed | Ksh 2,536,001 | |
5 | Kalamba Ecde | Completed | Ksh 1,568,000 | |
6 | Yiuma Ecde | Completed | Ksh 2,940,000 | |
7 | Nzeeni Ctti | Completed | Ksh 214,407 | |
8 | Kwa Kalui Ecde | Completed | Ksh 2,400,000 | |
9 | Maatha Ecde | Completed | Ksh 2,400,000 | |
10 | Masokani Ctti & Kithumani Ctti - Water Tanks | Completed | Ksh 1,470,000 | |
11 | Kyumbuni Ecde | Completed | Ksh 3,430,000 | |
12 | Muambwani ECDE | Completed | Ksh 3,500,000 | |
13 | Ngoto Ecde | Completed | Ksh 3,600,000 | |
14 | Kyaka Ecde | Completed | Ksh 145,996 | |
15 | Ngosini Ecde | Completed | Ksh 10,000 | |
16 | Kithoni Ecde Centre | Completed | Ksh 2,500,000 | |
17 | Kavuthu Ecde | Completed | Ksh 3,600,000 | |
18 | Kambi Mawe Ecde | Completed | Ksh 1,960,000 | |
19 | Kiangi Youth Empowerment Centre | Completed | Ksh 4,910,388 | |
20 | Kathonzweni Ctti - Pit Latrine | Completed | Ksh 980,000 | |
21 | Kiangini Ict Centre - Equipping | Completed | Ksh 1,500,000 | |
22 | Mavindini Ctti Dormitory | Completed | Ksh 3,430,000 | |
23 | Kimuumo Ecde | Completed | Ksh 1,960,000 | |
24 | Ngomano Ecde | Completed | Ksh 3,430,000 | |
25 | Muusini Ecde | Completed | Ksh 70,000 | |
26 | Yinthungu Ctti | Completed | Ksh 1,960,000 | |
27 | Athiani Ctti Renovation | Completed | Ksh 1,000,000 | |
28 | Ndukuma Ecde | Completed | Ksh 1,960,000 | |
29 | Ukala Ctti Equipping | Completed | Ksh 3,000 | |
30 | Ngunguuni Ecde | Completed | Ksh 3,920,000 | |
31 | Ngaani Ecde | Completed | Ksh 2,000,000 | |
32 | Nzueni Ecde | Completed | Ksh 3,920,000 | |
33 | Mulooni Ecde | Completed | Ksh 490,000 | |
34 | Kyamithengi Library | Completed | Ksh 1,000,000 | |
35 | Kango Ecde | Completed | Ksh 70,000 | |
36 | Kathokani Ecde | Completed | Ksh 943,210 | |
37 | Kiatineni Ecde | Completed | Ksh 660,540 | |
38 | Wambuli Ecde | Completed | Ksh 4,400,000 | |
39 | Kakuswi Ctti Dormitory | Completed | Ksh 6,860,000 | |
40 | Kalimani Ecde | Completed | Ksh 781,534 | |
41 | Kyooni Ecde | Completed | Ksh 3,200,000 | |
42 | Muluti Ecde | Completed | Ksh 3,200,000 | |
43 | Kilungu Ecde | Completed | Ksh 125,424 | |
44 | Kyaume Ecde | Completed | Ksh 621,294 | |
45 | Ngaa Ecde | Completed | Ksh 3,136,000 | |
46 | Itulu Ecde | Completed | Ksh 4,300,000 | |
47 | Kitandi Ctti Fencing | Completed | Ksh 356,302 | |
48 | Ndauni Ecde | Completed | Ksh 24,000 | |
49 | Mililuni Ecde | Completed | Ksh 30,000 | |
50 | Mwaani Ecde | Completed | Ksh 79,074 | |
51 | Songeni Ecde | Completed | Ksh 3,136,000 | |
52 | Syongungi Ecde | Completed | Ksh 2,940,000 | |
53 | Syokilati Ecde | Completed | Ksh 83,181 | |
54 | Ngungi Ecde | Completed | Ksh 1,500,000 | |
55 | Mulasya Ecde | Completed | Ksh 3,136,000 | |
56 | Mweleli Ecde | Completed | Ksh 527,367 | |
57 | Ngamu Ecde | Completed | Ksh 110,497 | |
58 | Kathulumbi Ctti Twin Workshop | Completed | Ksh 3,000,000 | |
59 | Kasooni Ecde | Completed | Ksh 3,000,000 | |
60 | Kwa Kea Ecde | Completed | Ksh 3,430,000 | |
61 | Tangu Primary School Ecde | Completed | Ksh 3,926 | |
62 | Ulu Ecde | Completed | Ksh 782,690 | |
63 | Kilombo Ecde | Completed | Ksh 224,816 | |
64 | Kisse Ecde | Completed | Ksh 3,500,000 | |
65 | Kiuusini Ecde | Completed | Ksh 175,126 | |
66 | Kwa Ndeke Ecde | Completed | Ksh 3,600,000 | |
67 | Mwanyani Ecde | Completed | Ksh 3,600,000 | |
68 | Enzai Ctti Dormitory | Completed | Ksh 80,000 | |
69 | Kwa Kaseke Ecde | Completed | Ksh 235,359 | |
70 | Kwa Muatha Ecde | Completed | Ksh 2,940,000 | |
71 | Kyandue Ecde | Completed | Ksh 147,533 | |
72 | Kitaingo Ctti | Completed | Ksh 1,129,280 | |
73 | Wathini Ecde | Completed | Ksh 70,000 | |
74 | Kwa Mbumbu Ecde | Completed | Ksh 533,472 | |
75 | Katuliani Ecde | Completed | Ksh 73,539 | |
76 | Kathikwani Ecde | Completed | Ksh 911,453 | |
77 | Ndivu Ecde | Completed | Ksh 3,920,000 | |
78 | Ngiluni Ecde | Completed | Ksh 4,300,000 | |
79 | Kee Ctti | Completed | Ksh 2,000,000 | |
80 | Mutulani Ecde | Completed | Ksh 171,584 | |
81 | Kwa Kalelo Ecde | Completed | Ksh 4,300,000 | |
82 | Nguluni Ecde | Completed | Ksh 3,430,000 | |
83 | Kivaku Ecde | Completed | Ksh 211,938 | |
84 | Kyandumbi Ecde | Completed | Ksh 3,700,000 | |
85 | Kasunguni Ecde | Completed | Ksh 4,300,000 | |
86 | Kyanduya Ctti-fencing | Completed | Ksh 1,500,000 | |
87 | Kauti Ctti Equipping | Completed | Ksh 1,470,000 | |
88 | Mutongu Ecde | Completed | Ksh 2,940,000 | |
89 | Mutungu Ecde | Completed | Ksh 2,940,000 | |
90 | Kyakathungu Ecde | Completed | Ksh 70,000 | |
91 | Kiseeni Ctti Access Road | Completed | Ksh 144,308 | |
92 | Kyakituku Ecde | Completed | Ksh 372,506 | |
93 | Mutanda Ecde | Completed | Ksh 2,950,000 | |
94 | Kauti Ctti Renovation | Completed | Ksh 166,060 | |
95 | Isovya Ctti | Completed | Ksh 4,900,000 | |
96 | Kyang'a Ecde | Completed | Ksh 30,879 | |
97 | Mwaani Ecde | Completed | Ksh 3,500,000 | |
98 | Inyokoni Ecde | Completed | Ksh 3,500,000 | |
99 | Kiluluini Ecde | Completed | Ksh 3,500,000 | |
100 | Kathangathini Ecde | Completed | Ksh 2,500,000 | |
101 | Ukaatuni Ctti | Completed | Ksh 1,751,882 | |
102 | Kisyungii Ecde | Completed | Ksh 3,300,000 | |
103 | Makindu A Ecde | Completed | Ksh 305,133 | |
104 | Mumbuni Ecde | Completed | Ksh 1,470,000 | |
105 | Kyaani Ecde | Completed | Ksh 3,430,000 | |
106 | Kiaoni Ecde | Completed | Ksh 1,500,000 | |
107 | Kalulini Ecde | Completed | Ksh 10,000 | |
108 | Kibwezi Township Ecde Toilet | Completed | Ksh 124,350 | |
109 | Kanundu Ctti Electrification | Completed | Ksh 138,529 | |
110 | Katilamuni Ecde | Completed | Ksh 3,430,000 | |
111 | Mukononi Ecde | Completed | Ksh 3,430,000 | |
112 | Ithumula Ecde | Completed | Ksh 4,300,000 | |
113 | Uvileni Ctti- Toilet | Completed | Ksh 686,000 | |
114 | Kilongoni Ecde | Completed | Ksh 10,000 | |
115 | Kwa Kyai Ecde | Completed | Ksh 3,430,000 | |
116 | Makusu Ecde | Completed | Ksh 1,420,000 | |
117 | Ng'etha Ctti | Completed | Ksh 6,860,000 | |
118 | Spring Hill Kwa Kakulu Ctti Workshop | Completed | Ksh 3,073,613 | |
119 | Ngomongo Ecde | Completed | Ksh 10,000 | |
120 | Ulilinzi Ecde | Completed | Ksh 1,470,000 | |
121 | Mwasa Ng'ombe Ecde | Completed | Ksh 3,430,000 | |
122 | Emali Township Ecde | Completed | Ksh 3,430,000 | |
123 | Kithito Ecde | Completed | Ksh 88,807 | |
124 | Kiange Ecde | Completed | Ksh 85,180 | |
125 | Utini Ctti Equipping | Completed | Ksh 31,400 | |
126 | Kalima Koi Ecde | Completed | Ksh 80,829 | |
127 | Mitooni Ecde | Completed | Ksh 4,000 | |
128 | Mtito Andei Resource Centre- Equipping | Completed | Ksh 649,000 | |
129 | Kikwasuni Ecde | Completed | Ksh 135,809 | |
130 | Kathekani Ecde | Completed | Ksh 244,054 | |
131 | Nzoila Ecde | Completed | Ksh 222,581 | |
132 | Yikitaa ECDE | Completed | Ksh 1,470,000 | |
133 | Yindundu Ecde | Completed | Ksh 2,500,000 | |
134 | Miangeni Ecde | Completed | Ksh 382,478 | |
135 | Kiumoni Ctti Equipping | Completed | Ksh 980,000 | |
136 | Kikunduku Ecde | Completed | Ksh 40,000 | |
137 | Kinyambu Ecde | Completed | Ksh 2,668 | |
138 | Yikitaa Ecde | Completed | Ksh 1,500,000 | |
139 | Mavindini Ecde | Completed | Ksh 1,960,000 | |
140 | Mwaani Ecde | Completed | Ksh 2,500,000 | |
141 | California Ecde | Completed | Ksh 74,000 | |
142 | Kativani Ctti | Completed | Ksh 40,000 | |
143 | Mukanda Ctti | Completed | Ksh 216,855 | |
144 | Ndivuni Ecde | Completed | Ksh 225,059 | |
145 | Syandani Ecde | Completed | Ksh 269,162 | |
146 | Kavungwa ECDE | Completed | Ksh 1,960,000 | |
147 | Silanga Ecde Class | Completed | Ksh 2,500,000 | |
148 | Kwa Matungu Ctti | Completed | Ksh 110,213 | |
149 | Thithi Ecde | Completed | Ksh 780,000 | |
150 | Muangeni Ecde | Completed | Ksh 3,500,000 | |
151 | Ngokolani Ecde | Completed | Ksh 1,960,000 | |
152 | Thange Ecde | Completed | Ksh 2,100,000 | |
153 | Kithasyu Ecde | Completed | Ksh 2,100,000 | |
154 | Uutini Ecde | Completed | Ksh 223,202 | |
155 | Kwa Matungu Ctti - Equipping | Completed | Ksh 300,000 | |
156 | Ndunguni Ecde | Completed | Ksh 10,000 | |
157 | Nzouni Ecde | Completed | Ksh 1,960,000 | |
158 | Iiani Ecde | Completed | Ksh 3,600,000 | |
159 | Ctti Capitation | Completed | Ksh 20,553,968 | |
160 | Government Automation- Cihmis | Completed | Ksh 28,420,000 | |
161 | Ict Development Programmes | Completed | Ksh 470,408 | |
162 | Ict Connectivity | Completed | Ksh 1,431,621 | |
163 | Kikwasuni Ecde | Completed | Ksh 2,450,000 | |
164 | Ngongweni Ecde | Completed | Ksh 3,430,000 | |
165 | Kwa-mukonyo Ecde | Completed | Ksh 3,600,000 | |
166 | Ecde Capitation | Completed | Ksh 310,400 | |
167 | Internship, Mentoring & Volunteer Programme | Completed | Ksh 2,904,785 | |
168 | Ngwata Ctti Workshop | Completed | Ksh 1,529,485 | |
169 | Darajani Cic Centre | Completed | Ksh 2,504,053 | |
170 | Wote/nziu Ward Bursary | Ongoing | Ksh 3,000,000 | |
171 | Nzaui/kilili/kalamba Ward Bursary | Ongoing | Ksh 7,000,000 | |
172 | Matiliku Ecde | Ongoing | Ksh 1,568,000 | |
173 | Yuuni Ecde | Ongoing | Ksh 1,255,660 | |
174 | Mbitini Ward Bursary | Ongoing | Ksh 4,000,000 | |
175 | Kikumini/muvau Bursary | Ongoing | Ksh 3,000,000 | |
176 | Kathonzweni Ward Bursary | Ongoing | Ksh 3,000,000 | |
177 | Ivinga Nzia Ctti | Ongoing | Ksh 3,430,000 | |
178 | Mavindini Bursary | Ongoing | Ksh 3,000,000 | |
179 | Kaiani Ecde | Ongoing | Ksh 3,500,000 | |
180 | Kitise/kithuki Bursary | Ongoing | Ksh 4,000,000 | |
181 | Mukaatini Ctti | Ongoing | Ksh 3,920,000 | |
182 | Mbooni Ward Bursary | Ongoing | Ksh 2,000,000 | |
183 | Kithungo/kitundu Ward Bursary | Ongoing | Ksh 3,000,000 | |
184 | Methovini Ecde | Ongoing | Ksh 4,300,000 | |
185 | Yatwa Ecde | Ongoing | Ksh 4,400,000 | |
186 | Tulimani Ward Bursary | Ongoing | Ksh 5,000,000 | |
187 | Kisau/kiteta Ward Bursary | Ongoing | Ksh 3,950,000 | |
188 | Kako/waia Bursary | Ongoing | Ksh 3,000,000 | |
189 | Mutanda Ctti Twin Workshop | Ongoing | Ksh 3,000,000 | |
190 | Kalawa Ward Bursary | Ongoing | Ksh 2,000,000 | |
191 | Kiimakiu/kalanzoni Ward Bursary | Ongoing | Ksh 2,000,000 | |
192 | Mukaa Ward Bursary | Ongoing | Ksh 3,000,000 | |
193 | Uthini Ecde | Ongoing | Ksh 2,500,000 | |
194 | Kitumbini Ctti Fencing | Ongoing | Ksh 1,470,000 | |
195 | Kasikeu Ward Bursary | Ongoing | Ksh 3,000,000 | |
196 | Kee Ward Bursary | Ongoing | Ksh 3,500,000 | |
197 | Kivai Ecde | Ongoing | Ksh 2,300,000 | |
198 | Kivaku Ecde Toilet And Water Installation | Ongoing | Ksh 800,000 | |
199 | Muthethe Ecde | Ongoing | Ksh 3,500,000 | |
200 | Kilungu Ward Bursary | Ongoing | Ksh 5,000,000 | |
201 | Ilima Ward Bursary | Ongoing | Ksh 5,000,000 | |
202 | Ukia Ward Bursary | Ongoing | Ksh 4,000,000 | |
203 | Makindu Ward Bursary | Ongoing | Ksh 7,000,000 | |
204 | Kai Ecde | Ongoing | Ksh 2,400,000 | |
205 | Kikumbulyu North Ward Bursary | Ongoing | Ksh 5,000,000 | |
206 | Kikumbulyu South Bursary | Ongoing | Ksh 4,950,000 | |
207 | Ndeini Ctti Electricity | Ongoing | Ksh 490,000 | |
208 | Katangini Ecde | Ongoing | Ksh 2,470,000 | |
209 | Nguumo Bursary | Ongoing | Ksh 4,000,000 | |
210 | Emali/mulala Ward Bursary | Ongoing | Ksh 4,500,000 | |
211 | Masongaleni Bursary | Ongoing | Ksh 3,000,000 | |
212 | Mtito Andei Ward Bursary | Ongoing | Ksh 3,000,000 | |
213 | Thange Ward Bursary | Ongoing | Ksh 3,000,000 | |
214 | Ivingoni/nzambani Ward Bursary | Ongoing | Ksh 3,000,000 | |
215 | Kwa Matungu Ctti | Ongoing | Ksh 712,400 | |
216 | Nguu Masumba Bursary | Ongoing | Ksh 6,000,000 | |
217 | Matulani Ecde | Ongoing | Ksh 3,600,000 | |
218 | Ctti Capitation | Ongoing | Ksh 15,020,000 | |
219 | Budget Automation And Education System | Ongoing | Ksh 3,000,000 | |
220 | Matutu Ecde | Ongoing | Ksh 3,600,000 | |
221 | Government Automation - Other Ict Programmes | Ongoing | Ksh 3,576,875 | |
222 | Government Automation - Cihmis Phase Two | Ongoing | Ksh 14,135,445 | |
223 | Kalamba Ecde | Not Started | Ksh 1,200,000 | |
224 | Maumi Ecde | Stalled | Ksh 1,568,000 |
8. Department of Infrastructure, Transport, Public Works, Housing and Energy
# | Project Name | Status | Budget | Action |
---|---|---|---|---|
1 | Construction Of Muaani Drift And Murraming Of Jones To Muaani Girls Road | Completed | Ksh 4,900,000 | |
2 | Kwa Kitingi -kwa Joel -kwa Mwaniki Road Opening And Grading | Completed | Ksh 3,430,000 | |
3 | Road Opening (ndivuni- Kisemeini- Kwamukosi- Nziu Market) Road Opening And Grading | Completed | Ksh 2,940,000 | |
4 | Unoa Grounds Floodlights | Completed | Ksh 2,300,000 | |
5 | Road Improvement Programme | Completed | Ksh 300,000 | |
6 | Roads Improvement | Completed | Ksh 1,940,000 | |
7 | Road Improvement | Completed | Ksh 1,960,000 | |
8 | Grading along Makolongo-kwa Juda- Kaiti Road | Completed | Ksh 5,000,000 | |
9 | Opening And Grading Of Mutinda- Mbalu-kitheini Pri-makuli-nichodemus-kwa Matheka Road | Completed | Ksh 4,000,000 | |
10 | Maintenance of Kivandini- Yathonza road, mikwani -Kombai road &Febi-Makuli road | Completed | Ksh 4,000,000 | |
11 | Roads Improvement Across The Ward | Completed | Ksh 4,900,000 | |
12 | Mechanical Road Opening And Widening | Completed | Ksh 2,970,000 | |
13 | Kithumani- Mbalani-Katundu Drift | Completed | Ksh 3,920,000 | |
14 | Kwa Kitei Drift | Completed | Ksh 3,430,000 | |
15 | Road Improvement (fuel) | Completed | Ksh 50,000 | |
16 | Gravelling Works; Mutiambua-kavuthu-muswii Rd | Completed | Ksh 16,000 | |
17 | Road Improvements | Completed | Ksh 4,900,000 | |
18 | Kwa Kateli Drift | Completed | Ksh 2,940,000 | |
19 | Kwa Kisoi Gulley | Completed | Ksh 1,470,000 | |
20 | Kwa Mulinge Drift | Completed | Ksh 1,470,000 | |
21 | Kwa Mwenga Culverts | Completed | Ksh 1,470,000 | |
22 | Opening Of Ward Roads In Muvau Kikumini Ward | Completed | Ksh 155,000 | |
23 | Road Improvement Programme | Completed | Ksh 100,000 | |
24 | Grading Of Kilisa – Mandoi – Neema – Muambani – Kivani – Kangutheni – Corner Baridi –... | Completed | Ksh 10,215 | |
25 | Road Improvement | Completed | Ksh 1,000,000 | |
26 | Machine Hire For Opening Of Feeder Roads | Completed | Ksh 1,960,000 | |
27 | Fuel For Grading Using County Machinery | Completed | Ksh 1,470,000 | |
28 | Six (6) Market Lights At Mutini, Kiangini, Kyunyu, Ngomano, Thavu, And Ikaasu Markets. | Completed | Ksh 1,470,000 | |
29 | Gravelling, Installation Of Culverts, Gabions And Drifts Along Kathamboni Spill Way | Completed | Ksh 3,000,000 | |
30 | High Mast Street Lighting At Iiani Market | Completed | Ksh 1,960,000 | |
31 | Road Structures And Protection Works | Completed | Ksh 2,940,000 | |
32 | Road Improvements | Completed | Ksh 1,300,000 | |
33 | Upgrading Yeemulwa- Ivinganzia- Kavilila Road | Completed | Ksh 10,000 | |
34 | Methovini-kyangwasi- Kwakivandi-kasayani Rd, Mathemba-musuuni-st. Jude Rd And Kithathaini-katungu... | Completed | Ksh 1,884,799 | |
35 | Mantainance And Installation Of Drainage Structres Of Nzeveni-kwa Ndungulu-kwa Joelkwa... | Completed | Ksh 3,000,000 | |
36 | Opening Of Matheani Kwa Nyaa Road | Completed | Ksh 2,500,000 | |
37 | Opening And Grading Of Kalembu- Mulango Road Through Kwa Kavilu | Completed | Ksh 2,000,000 | |
38 | Construction Of Road Structures (culverts And Drifts) | Completed | Ksh 1,960,000 | |
39 | Road Improvement Program – Fuel For Inhouse Works | Completed | Ksh 900,000 | |
40 | Rerec Matching Grant (for Kitise And Kithuki Subwards) | Completed | Ksh 2,000,000 | |
41 | Installation Of Floodlights | Completed | Ksh 1,960,000 | |
42 | Roads Improvement (fuel) | Completed | Ksh 344,689 | |
43 | In-house Road Improvement Works | Completed | Ksh 144,000 | |
44 | Construction Of Kwa Kalelo - Winzeni Drift | Completed | Ksh 4,000,000 | |
45 | Installation Of Road Structures And Culverts - Mbata - Mayuu - Manza - Ngunguuni - Athiani Road | Completed | Ksh 4,000,000 | |
46 | Road Improvement Program | Completed | Ksh 3,430,000 | |
47 | Opening & Grading Of Athiani-kithaayoni-mwania-kwa Nzula-kwa Kimasyu-kikome- Kwa Nyaa Road | Completed | Ksh 3,500,000 | |
48 | Construction Of Key Wall At Londokwe Along Nzouni- Manza Road | Completed | Ksh 2,000,000 | |
49 | Construction Of Key Wall At Londokwe Along Matheani -kwa Nyaa Road | Completed | Ksh 2,000,000 | |
50 | Upgrading Of Kalamani- Nzaini Road | Completed | Ksh 2,940,000 | |
51 | Road Improvement | Completed | Ksh 7,000,000 | |
52 | Kikima Market Improvement Programme | Completed | Ksh 9,410,000 | |
53 | Kikima Market Development | Completed | Ksh 980,000 | |
54 | Roads Improvement/maintenance | Completed | Ksh 36,000 | |
55 | Muisyo-ngomeni River Drift | Completed | Ksh 9,815,000 | |
56 | Kitituni-nthaene Kwa Ngoa | Completed | Ksh 2,500,000 | |
57 | Rehabilitation Of Kalamani- Nzaini Road | Completed | Ksh 980,000 | |
58 | Road improvement programme through road opening in Mbooni ward | Completed | Ksh 2,000,000 | |
59 | Nzueni, Muvaa, Kusyokithoiand Ndandini Road Improvement | Completed | Ksh 4,900,000 | |
60 | Isuuni Drift | Completed | Ksh 11,000,000 | |
61 | Road Improvement Kithungo Kitundu | Completed | Ksh 3,300,000 | |
62 | Kikima Market Improvement Programme | Completed | Ksh 4,000,000 | |
63 | Kilyungi Hybrid High Mast Floodlight | Completed | Ksh 2,940,000 | |
64 | Isuuni – Kyamwata – Kwa Kimae Rd, grading And Gravelling @ Kshs. 2,500,000.00, community... | Completed | Ksh 3,000,000 | |
65 | Drainage Works Along Mwanyani-kwa Kyole Road | Completed | Ksh 1,380,040 | |
66 | Survey, Road Opening And Widening And Murraming Of Kwa Titus-aic Mbiuni-kwa Iwaikanga Road | Completed | Ksh 4,000,000 | |
67 | Road Grading And Culvert Installation Along Kwa Nzelu-ndandini-kyevutula-munyeetani | Completed | Ksh 2,000,000 | |
68 | Installation Of Flood Lights At Kalawani | Completed | Ksh 1,000,000 | |
69 | Routine Maintenance Works; Ngetha – Vyaa - Utumoni Rd | Completed | Ksh 4,696,661 | |
70 | Road Improvement In The Ward | Completed | Ksh 10,000,000 | |
71 | Heavy Grading, Construction Protection Works And Installation Of Culverts At Kwa Ikavi-musoa... | Completed | Ksh 6,861,200 | |
72 | Rehabilitation Of Vengea-kakima-kwa Boss-abc Thwake Road | Completed | Ksh 5,400,000 | |
73 | Kwa Ithitu – Itetani – Kikumbo Road | Completed | Ksh 3,100,000 | |
74 | Road Improvement Program (fuel For Road Maintanance) | Completed | Ksh 1,000,000 | |
75 | Construction Of Ngwani River Drift | Completed | Ksh 8,106,722 | |
76 | In-house Road Improvement Works | Completed | Ksh 50,000 | |
77 | Road Improvement Program | Completed | Ksh 4,410,000 | |
78 | Routine maintenance of Kisau/Kiteta ward access roads | Completed | Ksh 5,000,000 | |
79 | Road Improvement Programme | Completed | Ksh 7,180,720 | |
80 | Construction Of Kako - Kandulyu (savani) Drift | Completed | Ksh 4,210,612 | |
81 | Road Improvement Programme | Completed | Ksh 473,931 | |
82 | Road Improvement Programme In Kako/waia Ward -mtf | Completed | Ksh 2,200,000 | |
83 | Rehabilitation Of Kwa Mwanzau And Muia Drifts | Completed | Ksh 1,000,000 | |
84 | Road Improvent Programme | Completed | Ksh 9,750,000 | |
85 | Rehabilitation of Malamuni-Miangeni-Mwenethe-Kinze-Mbavani- Ngaanwa-Mutembuko -Syongungi-Kwa Maseka... | Completed | Ksh 3,509,550 | |
86 | Road Improvement Programme Through Machine Hire In Kalawa Ward | Completed | Ksh 3,000,000 | |
87 | Hire Of Machines For Roadworks; Katangini – Ngunini Rd, Murramuni... | Completed | Ksh 3,000,000 | |
88 | Grading And Murraming From Malamuni - Miangeni -kinze- Mbavani- Mutembuku- Syongungi To Kwa Maseka... | Completed | Ksh 3,509,550 | |
89 | Grading And Installation Of Drainage Structures Along Ngaamba-marwa Road | Completed | Ksh 3,920,000 | |
90 | Rehabilitation of Kwa Tuva - Ngiini- Kalanzoni - Yaitha Road | Completed | Ksh 9,860,000 | |
91 | In-house Road Improvement Works | Completed | Ksh 19,521 | |
92 | Installation Of 8.5m Double Arm Integrated Solar Lights System Mavivye Market | Completed | Ksh 245,000 | |
93 | Machines For Hire -road Improvement | Completed | Ksh 3,995,000 | |
94 | Road Improvement Programme | Completed | Ksh 2,965,200 | |
95 | Mukaa-uvete Road | Completed | Ksh 5,385,000 | |
96 | Mukaa Road Improvement | Completed | Ksh 1,500,000 | |
97 | Hire Of Machinery | Completed | Ksh 1,176,000 | |
98 | Installation Of Integrated Solar Light System ( Kamuthini, Kiongwani,kyandue, Kyangala, Mutiluni... | Completed | Ksh 1,470,000 | |
99 | Kiongwani- Mwaani- Kitonguni- Uvete Road | Completed | Ksh 4,500,000 | |
100 | Hire Of Machinery For Mukaa Ward Access Roads | Completed | Ksh 3,000,000 | |
101 | Rehabilitation Of Kasikeu – Mutweamboo – Kwa Ndiki – Ndumbini – Mombasa Road | Completed | Ksh 10,843,838 | |
102 | Road Improvement Programme | Completed | Ksh 2,940,000 | |
103 | Kwa Kavenzi-mitamboni-mwangini Road | Completed | Ksh 965,000 | |
104 | Road Improvement Programme | Completed | Ksh 330,000 | |
105 | Routine Maintenance Of Roads | Completed | Ksh 163,776 | |
106 | Kwa Katwae-kwa Nzae-mwenye Ivaa Road | Completed | Ksh 50,216 | |
107 | Road Improvement And Maintenance | Completed | Ksh 4,400,000 | |
108 | Heavy Grading And Murraming Of Kilome- Uvete- Kayata- Kasikeu- Mutweamboo- Lumu- Kiou Top- Kwa... | Completed | Ksh 9,310,000 | |
109 | Construction Of Kating'ila Drift | Completed | Ksh 4,500,000 | |
110 | Road Improvement Programme | Completed | Ksh 7,700,000 | |
111 | Miradi Kwa Jamii(mkj) Sand Dams/ Drift Labour At Muusini And Kya Kaleli | Completed | Ksh 490,000 | |
112 | Miradi Kwa Jamii(mkj) At Matangi And Kivani | Completed | Ksh 490,000 | |
113 | Installation Of Street Lights In Markets | Completed | Ksh 1,960,000 | |
114 | Drainage Works View Point -ngiluni- Mavia Meu Road | Completed | Ksh 1,496,583 | |
115 | Rehabilitation of Kyambalasi - Mwea Pri - mavia meu rd | Completed | Ksh 2,000,000 | |
116 | Kituiuni Junction – Mutanda Primary | Completed | Ksh 2,940,000 | |
117 | Itambani – Kyanganda Road | Completed | Ksh 3,920,000 | |
118 | Kituaimwe – Kyakathungu And Itambani - Kilisa Roads | Completed | Ksh 1,960,000 | |
119 | Kyaka Drift Construction | Completed | Ksh 1,000,000 | |
120 | Grading Of Roads (hire Of Machines); Upete/kilome – Kivuuni Borehole – Kithangathini Primary... | Completed | Ksh 3,789,075 | |
121 | Road Improvement | Completed | Ksh 15,511 | |
122 | Road Improvement along Kithangathini – Kisyani – nduu Sunday school road | Completed | Ksh 4,000,000 | |
123 | Rehabilitation of Muthethe road - ABC church Kalongo -Kyakathungu Primary road | Completed | Ksh 3,900,000 | |
124 | Road Improvement Programme along Kitituni -Nyaani road | Completed | Ksh 1,500,000 | |
125 | Road Improvement Programme Along Kilungu – Kimandeni Road | Completed | Ksh 1,500,000 | |
126 | Rehabilitation Of Kwa Sikauti- Kisyulya Road In Kilungu Ward | Completed | Ksh 3,904,677 | |
127 | Grading, Murraming And Installation Of Structures Along Mbaloni – Kyenzenzeni Road | Completed | Ksh 5,880,000 | |
128 | Road Improvement Programme | Completed | Ksh 3,430,000 | |
129 | Kaumoni - Nthangathi - Kitutu Road | Completed | Ksh 2,940,000 | |
130 | Kisimbi-mutanga/ Nthangathi- Muiu Road | Completed | Ksh 2,940,000 | |
131 | Nzouni - Mutambuukoni - Kavani Road | Completed | Ksh 1,960,000 | |
132 | Road Improvement | Completed | Ksh 1,960,000 | |
133 | Road Improvement | Completed | Ksh 1,960,000 | |
134 | Construction Of Concrete Slab 40m Long Along Makuli Forest Road At Kwa Mbunga | Completed | Ksh 1,800,000 | |
135 | Construction of road structures across Ukia sub ward | Completed | Ksh 1,500,000 | |
136 | Construction Of Concrete Slab 30m Long Along Kavani Kituluku Dispensary Road | Completed | Ksh 1,500,000 | |
137 | Machine Hire-grading Of Kwa Kasoli-kwa Nthoka Wote Road,kandengya-ndalani-junction (kisingo-ngomano... | Completed | Ksh 4,900,000 | |
138 | Roads Improvement Programme | Completed | Ksh 490,000 | |
139 | Streetlighting Kiambani Primary,secondary Schools And Makindu Town | Completed | Ksh 3,430,000 | |
140 | Installation Of Flood Light Masts At Makindu Upper Market | Completed | Ksh 2,940,000 | |
141 | Kisayani-kathyaka-mukononi-ngaikini Road | Completed | Ksh 4,410,000 | |
142 | Road Improvement Programme | Completed | Ksh 2,450,000 | |
143 | Road Improvement Programme | Completed | Ksh 147,032 | |
144 | Installation Of Kisayani Flood Light/ Mast | Completed | Ksh 2,058,000 | |
145 | Rehabilitation Of Kiboko Underpass-mbiuni-muuni River-ngakaa-kyanda-kawala Market Kalii Pri... | Completed | Ksh 9,800,000 | |
146 | Routine maintenance of MAkindu ward access roads | Completed | Ksh 3,500,000 | |
147 | Road Improvement Programme | Completed | Ksh 1,493,400 | |
148 | Street Lighting For Main Stage To Kisayani Health Centre | Completed | Ksh 980,000 | |
149 | Construction Of Muangeni Drift | Completed | Ksh 2,000,000 | |
150 | Road Improvement Programme in Kikumbulyu North | Completed | Ksh 7,000,000 | |
151 | Construction Of Muangeni Drift | Completed | Ksh 5,000,000 | |
152 | Opening Of And Ugrading Of Kwa Power, Kwa Solomon, Kasarani, Mikuyuni Secondary, Kyanzili Kavete... | Completed | Ksh 5,900,000 | |
153 | Kibwezi Town Roads Improvement | Completed | Ksh 4,410,000 | |
154 | Fuel For County Machinery | Completed | Ksh 1,414,720 | |
155 | Miradi Kwa Jamii(mkj) | Completed | Ksh 500,000 | |
156 | Fueling Of Machines For Grading Of Roads | Completed | Ksh 35,000 | |
157 | Kibwezi Town Lighting Programme ( Matundani Floodlight, Kibwezi Streetlighting) | Completed | Ksh 3,822,000 | |
158 | Market Solar Light Rehabilitation Programme( Siembeni, Mbui Nzau, Kyanginywa, Mikuyuni) | Completed | Ksh 588,000 | |
159 | Installation Of Road Structures Along Kwakitavu Road | Completed | Ksh 1,000,000 | |
160 | Fuel/machine Hire For Grading Of Sekeleni-ilatu-kalembe Raha Road | Completed | Ksh 1,960,000 | |
161 | Kangesu -– Ithambaume – Kwa Nzinga – Gff – Mutokwe Ecde Road | Completed | Ksh 5,000,000 | |
162 | Road Improvement Programme | Completed | Ksh 4,943,800 | |
163 | Ngambi Ya Munzyu- Tuanga Road | Completed | Ksh 4,410,000 | |
164 | Fuel/machine Hire For Grading And Murraming Of Mbui Nzau-yala-kalyakalya-kwa Kanyingi-kwa... | Completed | Ksh 3,963,520 | |
165 | Kilema-muundani-kwa Kanyasya-muuani Soko Muyo-mutantheeu Road | Completed | Ksh 4,500,000 | |
166 | Kwa Kivou Tala-kwa Kinyingi-kaunguni-tindima Road | Completed | Ksh 4,000,000 | |
167 | Kiunduani Market | Completed | Ksh 3,000,000 | |
168 | Murraming Of Jcc Kaunguni-kwa Muoka To Kwa Kivivye -3km Road. | Completed | Ksh 1,500,000 | |
169 | KALEMBE RAHA KIAMBANI ROAD | Completed | Ksh 1,000,000 | |
170 | In-house Road Improvement Works | Completed | Ksh 25,000 | |
171 | Kwa Kausha-kimbingo-mulala-makutano-kwa Kinuka-mwasang'ombe-ngomongo-thea-kwa Masauti-muselele-kwa... | Completed | Ksh 344,466 | |
172 | Masauti -muselele -mumbuni -mungetheele Road | Completed | Ksh 4,500,000 | |
173 | Road Improvement Programme | Completed | Ksh 4,500,000 | |
174 | Routine Maintenance Of Emali/mulala Ward Access Roads | Completed | Ksh 4,000,000 | |
175 | Road Improvement Programme | Completed | Ksh 490,000 | |
176 | Rehabilitation Of Isunguluni-cutline-kyanguli-masaku Ndogo Road | Completed | Ksh 7,400,000 | |
177 | Road Improvement Programme | Completed | Ksh 1,988,800 | |
178 | Kambaland Road, Ngomano – Nzembete Rd, Salama – Kwa Makete Rd, Mwaani – Wandei Rd,... | Completed | Ksh 1,217,954 | |
179 | Hire Of Machines For Opening And Grading; Lukenya – Utini Rd, Utini Junction - Yikivuthi Rd,... | Completed | Ksh 34,652 | |
180 | Solar Market Floodlights - 1m Kativani, Kavatini, Makutano, Ndauni Markets | Completed | Ksh 980,000 | |
181 | Miradi Kwa Jamii Programme | Completed | Ksh 490,000 | |
182 | Road Improvement Programme In Masongaleni Ward | Completed | Ksh 7,000,000 | |
183 | Installation Of Solar Market Lights At Munyenze, Kithiiani, Kithyululu And Kyanguli Markets | Completed | Ksh 1,400,000 | |
184 | Road Improvement | Completed | Ksh 10,617,604 | |
185 | Solar Market Flood Lights At Kyusyani, Mbeetwani,songea, Kalimani, Mavindini, Makutano, Misuuni And... | Completed | Ksh 1,960,000 | |
186 | Kalimani – Kitengei – Kilumilo road | Completed | Ksh 4,000,000 | |
187 | Hire Of Road Maintainance Equipment | Completed | Ksh 3,185,000 | |
188 | Hire Of Road Mantainance Equipment - Mtito Andei | Completed | Ksh 1,917,764 | |
189 | Nzavoni Drift | Completed | Ksh 2,940,000 | |
190 | Kwa Kavuu- Kwa Kyulu- Ithaayoni- Kasasule- Kwa Kolovoi Road | Completed | Ksh 2,500,000 | |
191 | Heavy Grading And Gravelling Of Machinery- Baptist – Makongenii – Nzavoni- Ndivuni –... | Completed | Ksh 1,960,000 | |
192 | Road Improvement Programme | Completed | Ksh 3,000,000 | |
193 | Road Improvement | Completed | Ksh 2,962,200 | |
194 | Culverts Across The Ward | Completed | Ksh 1,960,000 | |
195 | In-house Road Improvement Works | Completed | Ksh 210,000 | |
196 | Installation Of Flood Lights At All Markets | Completed | Ksh 2,940,000 | |
197 | Electrification Of Usalama Market(matching Grant) | Completed | Ksh 1,500,000 | |
198 | Grading And Marraming Kwa Jc – Muthungue Primary - Ituumo | Completed | Ksh 980,000 | |
199 | Grading Marraming Of Utithi- Kyumbi – Silanga – Kwa Mailu | Completed | Ksh 980,000 | |
200 | Kwa Agnes-St.Peter-Aic-St.Marys-Veneti Road | Completed | Ksh 3,000,000 | |
201 | Kikingini-usalama- Muusini-maikuu-kwa Malyungi-kwa Mwololo-kwa Nyaanya- Ituumo-utithi-kalulu-kwa... | Completed | Ksh 3,000,000 | |
202 | Murramming, Grading Of Kwa Agnes-st.peter-aic-st.marys-veneti-own Machinery And Installation Of... | Completed | Ksh 1,000,000 | |
203 | Marraming Of Kwa Kimasyu – Misuuni Road | Completed | Ksh 2,450,000 | |
204 | Marraming Of Kativani - Pastor Komu – Utu Roads | Completed | Ksh 1,960,000 | |
205 | Matingini – Kwa Kata – Kwa Muli – Kwa Mutuku – Sila Mulu | Completed | Ksh 1,960,000 | |
206 | Opening Of Kalikoni Borehole-kilokwe-mulu Ngomeli-kilongosi-wandia-mboyanganda-kwa Nduku-kwa... | Completed | Ksh 980,000 | |
207 | Opening Of Kwa Mbwika-ivingoni School-kwa Kimilu Road | Completed | Ksh 980,000 | |
208 | Opening Of Kyuasini- Kwa Nzekele Road | Completed | Ksh 980,000 | |
209 | Road Improvement | Completed | Ksh 1,470,000 | |
210 | Upgrading of road from Mang’elete- yumbuni- kitheini- katheka kai- kwa muma- mbotela- manyata-... | Completed | Ksh 4,900,000 | |
211 | Road Improvement( Matulani Roads) | Completed | Ksh 1,470,000 | |
212 | Migingo Parking | Completed | Ksh 980,000 | |
213 | Installation Of Street Lights Within The Makutano Talent Centre | Completed | Ksh 1,960,000 | |
214 | Kwa Skizana-kwa Kimangu-pondeni-kwa Jane To Katheini Road | Completed | Ksh 2,000,000 | |
215 | Kwa Mwambu-mbukoni-manyata-mbotela Market | Completed | Ksh 2,000,000 | |
216 | Muthingiini-Nzambani Roads | Completed | Ksh 2,000,000 | |
217 | Kiuukuni-kwa Malonza-yumbuni-rose Dominic-nzeveni-ndithini | Completed | Ksh 1,000,000 | |
218 | Kwa Masaa Road | Completed | Ksh 1,000,000 | |
219 | Installation Of Culverts At Chief Ngutu Road | Completed | Ksh 400,000 | |
220 | Murramig Of Nzeveni-selewa-kwa Matundu-kwa Willy Road | Completed | Ksh 1,250,000 | |
221 | Makasa primary - Thuti -Utini road | Completed | Ksh 4,900,000 | |
222 | Road Opening | Completed | Ksh 4,185,128 | |
223 | Vololo -Kemalili road | Completed | Ksh 2,940,000 | |
224 | Drift Construction; Kwa Matungu – Kanyenyoni – Kwa Carlos – Masumba Road And Grading And... | Completed | Ksh 2,252,302 | |
225 | Road Improvement | Completed | Ksh 1,550,000 | |
226 | Road Improvement Programme In Nguu/masumba Through Opening Across The Ward | Completed | Ksh 3,000,000 | |
227 | Makutano-Kyaani -Kiuani - Vololo road | Completed | Ksh 3,000,000 | |
228 | Rehabilitation Of Kwa Kiamba -makasa Aic -kwa Tumbo- Ngulai Road | Completed | Ksh 6,806,810 | |
229 | Rural Electrification Programme - Rerec Matching Grant | Completed | Ksh 30,000,000 | |
230 | Maintenance Of Street/flood Lights | Completed | Ksh 7,900,000 | |
231 | Green Energy Promotion | Completed | Ksh 28,420,000 | |
232 | Road Maintenance | Completed | Ksh 13,014,219 | |
233 | Road Improvement In Hilly Terrain Wards | Completed | Ksh 2,030,712 | |
234 | Roads Improvement Programme | Completed | Ksh 12,007,102 | |
235 | Road Improvement All Wards | Completed | Ksh 2,288,943 | |
236 | Maintenance Of Street/flood Lights- Climate Action | Completed | Ksh 8,386,455 | |
237 | Routine Maintenance Of Wote Ward Access Road | Ongoing | Ksh 3,000,000 | |
238 | Road Improvement Programme Along Shimo-kwa Maluna-kwa Ngulue-kamunyolo Dam | Ongoing | Ksh 1,000,000 | |
239 | Road Improvement Programme Through Road Opening And Grading Of Roads | Ongoing | Ksh 4,706,086 | |
240 | Mbulutini Drift- Construction Of A Drift | Ongoing | Ksh 12,550,000 | |
241 | Installation Of Highmast Floodlight At Mutyambua Market | Ongoing | Ksh 2,000,000 | |
242 | Road Improvement Programme In Mbitini Ward | Ongoing | Ksh 1,000,000 | |
243 | Road Maintenance in Mbitini ward– (fuel) | Ongoing | Ksh 986,944 | |
244 | Opening Of Roads Kithumani – Muamani Road | Ongoing | Ksh 2,000,000 | |
245 | Road Improvement - in Mbitini ward (mtf) | Ongoing | Ksh 1,446,336 | |
246 | Routine Maintenance Of Muvau/kikumini Ward Access Roads | Ongoing | Ksh 5,500,000 | |
247 | Road Improvement Programme - Kikumini/muvau Ward | Ongoing | Ksh 3,500,000 | |
248 | Installation Of Road Structures | Ongoing | Ksh 4,000,000 | |
249 | Construction Of A Keywall Along Ngomeni Road | Ongoing | Ksh 500,000 | |
250 | Opening,grading And Road Structures OfLondokwe- Mbuvo Nzau- Munathi- Syethe- Kwa Mbalya Road | Ongoing | Ksh 3,000,000 | |
251 | Installation And Rehabilitation Of Market Lights At Kiteei, Mbuvo Nzau,kavumbu And Kiluluini Markets | Ongoing | Ksh 1,100,000 | |
252 | Routine Maintenance Of Kathozweni Ward Access Roads | Ongoing | Ksh 500,000 | |
253 | Routine Maintenance Of Mavindini Ward Access Roads Opening Of Feeder Roads | Ongoing | Ksh 3,900,000 | |
254 | Opening And Grading Of Wito Farm-mbavini- Kaiani-sinai-ctti-nguthunu-nditiku-kwa Kaunda Road | Ongoing | Ksh 3,000,000 | |
255 | Road Works On Kavingoni-nduu Ndune - Syandoo - Ngosini Road | Ongoing | Ksh 2,500,000 | |
256 | Fuel For Grading Of Roads Using County Machinery in Mavindini ward | Ongoing | Ksh 80,000 | |
257 | Installation Of Flood Lights At Matheani Market | Ongoing | Ksh 500,000 | |
258 | Hire Of Machines -light Grading & Drainage Works Of Kiambani-kiuuku-kithuki-matheani-kitise Road | Ongoing | Ksh 3,500,000 | |
259 | Installation Of Floodlights in Kitise Kithuke markets | Ongoing | Ksh 3,000,000 | |
260 | Installation of High Mast Floodlight At Yinthungu Market | Ongoing | Ksh 2,000,000 | |
261 | Routine Maintenance Of Kitise Ward Access Roads | Ongoing | Ksh 1,500,000 | |
262 | Rehabilitation Of 4 Solar Floodlights in Kitise/Kithuki | Ongoing | Ksh 1,000,000 | |
263 | Installation Of Floodlights In Markets (mayuu, Kwa Nyaa, Kithayoni, Katangini, Mwakini ,nzouni,... | Ongoing | Ksh 3,000,000 | |
264 | Installation Of Street Lights Phase 2 Around Kikima Market | Ongoing | Ksh 12,000,000 | |
265 | Kitundu-mwea-kalala-ititu-ngai Health Centre Road | Ongoing | Ksh 4,000,000 | |
266 | Installation Of Floodlights At Kyanzuki, Katumani, Munyeetani And Muumani Markets | Ongoing | Ksh 3,000,000 | |
267 | Hire Of Grader For Routine Maintenance Of Kithungo/kitundu | Ongoing | Ksh 2,000,000 | |
268 | Installation of floodlights At Iiani Market,itetani Market,wanzauni Market And Mavindu Market | Ongoing | Ksh 4,000,000 | |
269 | Ndiangu-malaa- Kanoto Ndoo,kyanguma-ithemboni-mukangu- Mavindu Road | Ongoing | Ksh 4,000,000 | |
270 | Routine Maintenance Of Tulimani Ward Access Roads | Ongoing | Ksh 1,000,000 | |
271 | Roads Improvement Programme | Ongoing | Ksh 801,540 | |
272 | MTF Road Opening Kwa Kisingu - Kyome -Kwa Makenzi Kithetheni kwa Ndisya road | Ongoing | Ksh 5,000,000 | |
273 | Installation Of Floodlights At Mbiiani ,nthungoni,katungoli, Kwa Kulomba And Kavutini Markets | Ongoing | Ksh 3,000,000 | |
274 | Road Impovement Programme In Kako/waia Ward | Ongoing | Ksh 4,000,000 | |
275 | Road Improvement Programme - Mwani mkt - kwa chief Ndiku road | Ongoing | Ksh 4,000,000 | |
276 | Installation Of Floodlights In Kitongu Market | Ongoing | Ksh 2,000,000 | |
277 | Road Improvement Programme In Kalawa Ward | Ongoing | Ksh 1,900,000 | |
278 | Rerec Matching Grant At Kalawa | Ongoing | Ksh 1,000,000 | |
279 | Rehabilitation Tuvilani-kiongwani Girls-kavuko-kwawala-rubis Petrol Station Road | Ongoing | Ksh 3,100,000 | |
280 | Routine Maintenance In Kiima Kiu/kalanzoni | Ongoing | Ksh 3,782,995 | |
281 | Ngiini-kwa Mohamed-uiini Primary-kwa Kala-lake Oil- Kalanzoni Road-kwa Muthusi-kwa Atumia-mbondoni... | Ongoing | Ksh 1,500,000 | |
282 | Kanini Kaseo- Kwa Ngumu- Mt. Carmel- Kwa Wakata Road | Ongoing | Ksh 4,000,000 | |
283 | Installation Of Culverts Along Rubis Kwa Dky Mutio Kililuni Road | Ongoing | Ksh 1,280,346 | |
284 | Kwa Malenge - kayatta road | Ongoing | Ksh 7,000,000 | |
285 | Repair And Maintenance Of Floodlights in Kasikeu | Ongoing | Ksh 400,000 | |
286 | Drainage Works Kwa Malenge | Ongoing | Ksh 400,000 | |
287 | Road Improvement Programme - Kasikeu | Ongoing | Ksh 7,000,000 | |
288 | Installation Of 7No. Intergrated solar market and Rehabiliation of 1 No. Solar market lights | Ongoing | Ksh 2,100,000 | |
289 | Construction Of Drainage Structures At Kitandi-muusini-kakisya-munyuni-nguluni Road | Ongoing | Ksh 1,000,000 | |
290 | Machine Hire (wet Rate)-shovel Mtf, Opening Of Roads | Ongoing | Ksh 1,500,000 | |
291 | Machine Hire (wet Rate)-grader Mtf, Grading Of Roads | Ongoing | Ksh 1,000,000 | |
292 | Road Improvement Programme-fuel Kee ward | Ongoing | Ksh 850,000 | |
293 | Road Improvement Programme | Ongoing | Ksh 4,600,000 | |
294 | Routine Maintenance Of Kilungu Access Roads(fuel) | Ongoing | Ksh 1,000,000 | |
295 | Routine Maintenance Of Roads in Kilungu ward -Fuel | Ongoing | Ksh 327,229 | |
296 | Market lighting at Mutini, Musalala and Kwa Mwove markets | Ongoing | Ksh 1,500,000 | |
297 | Rerec Matching Grant (for Ukia -10 Villages In Upper Iuani Cluster) | Ongoing | Ksh 3,000,000 | |
298 | Road Improvement Programme Through Installation Of Road Structures Across Kilala/iuani | Ongoing | Ksh 1,500,000 | |
299 | Installation Of 2-15 M Concrete Pole Market Lights At Ikalyoni Market And Kyau Market | Ongoing | Ksh 1,400,000 | |
300 | Grading And Murraming Of Road Across Kilala/iuani - Fuel | Ongoing | Ksh 1,500,000 | |
301 | Grading And Spot Murraming Of Road Across Ukia Sub Ward - Mtf | Ongoing | Ksh 1,500,000 | |
302 | Roads Improvement Programme(fuel) Makindu ward | Ongoing | Ksh 500,000 | |
303 | Rerec Matching Grant In Makindu Ward | Ongoing | Ksh 3,000,000 | |
304 | Kiaoni Floodlights | Ongoing | Ksh 2,000,000 | |
305 | Kisayani Street Light | Ongoing | Ksh 2,000,000 | |
306 | Kathyaka Floodlights | Ongoing | Ksh 2,000,000 | |
307 | Routine Maintenance Of Kikumbulyu South Ward Access Roads | Ongoing | Ksh 3,000,000 | |
308 | Rerec Matching Grant Kikumbulyu South | Ongoing | Ksh 2,000,000 | |
309 | Kibwezi-bpp Streetlights | Ongoing | Ksh 1,000,000 | |
310 | Kibarani-wivia-kiuani Road | Ongoing | Ksh 2,500,000 | |
311 | Emali Street Lights Rehabilitation | Ongoing | Ksh 500,000 | |
312 | Rehabilitation As Integrated Lights At Yikitaa And Ulilinzi Markets And Installation Of A New... | Ongoing | Ksh 779,708 | |
313 | Rerec Matching Grant- Masongaleni ward | Ongoing | Ksh 4,000,000 | |
314 | Repair Of Solar Market Lights (intregrated Model) At Katulye, Masaku Ndogo And Kyumani Markets | Ongoing | Ksh 650,000 | |
315 | Construction Of Culverts In Masongaleni Ward | Ongoing | Ksh 1,000,000 | |
316 | Road Improvement Programme (fuel For County Machinery) | Ongoing | Ksh 490,000 | |
317 | Installation Of Street Lighting In Subati, Kilumilo And Kwa Kinyuti, Nzoila, Ngiluni, Iviani And... | Ongoing | Ksh 3,000,000 | |
318 | Rehabilitation Of Market Solar Lights-nthunguni, Kathekani, Darajani, Kiteng'ei And Mwakila Markets | Ongoing | Ksh 1,065,000 | |
319 | Instalation Of Street Lighting In Mikomani, Kilumilo And Kwa Kinyuti, Nzoila, Ngiluni, Iviani And... | Ongoing | Ksh 3,000,000 | |
320 | Roads Improvement Programme-hire Of Equipment in Mtito Andei | Ongoing | Ksh 2,500,000 | |
321 | Hire Of Dozer For Opening Of New Roads | Ongoing | Ksh 2,500,000 | |
322 | Maintenance Of Thange Ward Access Roads | Ongoing | Ksh 1,000,000 | |
323 | Construction Of Culverts At Kikingini-usalama- Muusini-maikuu-kwa Malyungi-kwa Mwololo-kwa Nyaanya-... | Ongoing | Ksh 1,000,000 | |
324 | Installation Of Floodlight At Matulani And Rehabilitation Of Unworking Floodlights At Masonga... | Ongoing | Ksh 3,000,000 | |
325 | Routine Maintenance Of Ivingoni /nzambani Ward Access Roads | Ongoing | Ksh 2,000,000 | |
326 | Yimbuvu-kwa Muma-mbotela Market | Ongoing | Ksh 1,000,000 | |
327 | Kwa Ngolo-kwa Mbithi-kwa Kitosya-kwa Muthusi-kitheini | Ongoing | Ksh 1,000,000 | |
328 | Construction Of A Culvert At Matongoleni | Ongoing | Ksh 2,000,000 | |
329 | Road Improvement, Light Grading in Nguu Masumba | Ongoing | Ksh 2,000,000 | |
330 | Kanyiliilya - Ilivini Road- Installation Of Culverts | Ongoing | Ksh 1,004,213 | |
331 | Rural Electrification Programme - Rerec Matching Grant | Ongoing | Ksh 30,000,000 | |
332 | Enhancement Of Infrastructure Projects(to Facilitate Payment Of Project Components Removed During... | Ongoing | Ksh 8,386,455 | |
333 | Installation Of A Flood Light At Kiunduani Market | Ongoing | Ksh 3,000,000 | |
334 | Road Improvements | Under Procurement | Ksh 3,430,000 | |
335 | Road Improvement – Fuel/machine Hire | Under Procurement | Ksh 3,929,600 |
9. Department of Lands, Urban Planning and Development, Environment and Climate Change
# | Project Name | Status | Budget | Action |
---|---|---|---|---|
1 | Ida (world Bank) Credit: Kenya Urban Support Project (kusp)- Urban Institutional Grants (uig) | Completed | Ksh 203,215 | |
2 | Ida (world Bank) Credit: Kenya Urban Support Project(kusp) - Urban Development Grant (udg) | Completed | Ksh 6,669,716 | |
3 | Cabro Paving Of Wote Township Parking Zones | Completed | Ksh 3,000,000 | |
4 | Opening And Unclogging Of Drainage Systems | Completed | Ksh 1,196,192 | |
5 | Construction Of Upendo Toilet Nziu | Completed | Ksh 786,052 | |
6 | Construction Of Toilet Kuku Market Acacia | Completed | Ksh 650,000 | |
7 | Repair Of Green Park Borehole | Completed | Ksh 1,000,000 | |
8 | Tree Planting | Completed | Ksh 1,000,000 | |
9 | Kwa Kathoka Town Planning | Completed | Ksh 1,000,000 | |
10 | Demarcation Of Riparian Land Within Ndukuma | Completed | Ksh 730,113 | |
11 | Climate Change Intiative | Completed | Ksh 1,000,000 | |
12 | Market Survey, Preparation of Deed Plan and issuance of Leasehold Title Deeds, Lims and opening of... | Completed | Ksh 7,700,000 | |
13 | Construction Of Modern Toilets In Kathonzweni Town | Completed | Ksh 1,980,546 | |
14 | Land Compensation - Kwa Mbila Earth Dam | Completed | Ksh 1,800,000 | |
15 | Construction Of Tuvilani Toilet | Completed | Ksh 59,000 | |
16 | Construction Of Toilet Kikima Market | Completed | Ksh 25,000 | |
17 | Conservation Of Kwa Kithue Wetland | Completed | Ksh 1,500,000 | |
18 | Feasibility Study On Mining | Completed | Ksh 2,500,000 | |
19 | Water And Sanitation -desilting Of Kyambulu Earth Dam | Completed | Ksh 498,680 | |
20 | Planning and survey of Kathulumbi market | Completed | Ksh 1,000,000 | |
21 | Planning and survey of Kalawa market | Completed | Ksh 1,000,000 | |
22 | Control Of Gulleys At Kwe Kuyu Kalembwani | Completed | Ksh 1,000,000 | |
23 | Planning of Kayata Market | Completed | Ksh 1,622,600 | |
24 | Rehabilitation of gulleys and road bush clearing and drainage | Completed | Ksh 500,000 | |
25 | Plot Validation And Market Survey Of Nunguni Town: Plot Validation, Market Survey, Preparation Of... | Completed | Ksh 407,500 | |
26 | Construction Of Wautu Toilet | Completed | Ksh 80,000 | |
27 | Development and enforcement of Municipal Plans and development control | Completed | Ksh 500,000 | |
28 | Kiboko Town Planning | Completed | Ksh 3,320,000 | |
29 | Town Planning of Thithi/simba Market | Completed | Ksh 1,000,000 | |
30 | Urban Infrastructure Development | Completed | Ksh 1,985,493 | |
31 | Preparation Of Kisip Designs For County Informal Settlement Improved Plan | Completed | Ksh 420,000 | |
32 | Construction Of Gabions Along Mbeetwani Road | Completed | Ksh 1,000,000 | |
33 | Draining System Along Kibwezi Town | Completed | Ksh 221,760 | |
34 | Ict Inftrastructure - Lan | Completed | Ksh 2,000,000 | |
35 | Development of Municipal Integrated Development Plan (IDEP) and Municipal Spatial Plan | Completed | Ksh 10,000,000 | |
36 | Opening And Unclogging Of Drainage Systems | Completed | Ksh 2,000,000 | |
37 | Opening And Sport Murraming Of Roads At Emali And Sultan Towns | Completed | Ksh 5,546,800 | |
38 | Partitioning And Equiping Of Emali-sultan Municipality Office | Completed | Ksh 3,000,000 | |
39 | Equiping Of Emali-sultan Municipality Office | Completed | Ksh 3,000,000 | |
40 | Emali Town Plots Verification And Validation | Completed | Ksh 399,826 | |
41 | Wildlife conservation and management | Completed | Ksh 454,380 | |
42 | Market survey of Mtito Andei market: Market survey, Preparation of perimeter and picking... | Completed | Ksh 4,900,000 | |
43 | EIA and Exision of Ngai Ndethya settlement scheme | Completed | Ksh 2,370,600 | |
44 | Cleaning Of The Town And Trenching Of Storm Water Management System. | Completed | Ksh 264,320 | |
45 | Construction Of Eco Toilet At Nthongoni Market | Completed | Ksh 15,000 | |
46 | Plot Registration - Data Collection For Registering Plots To Lims Countywide | Completed | Ksh 2,000,000 | |
47 | Enhancement Of Lims System And Data Clerks | Completed | Ksh 2,000,000 | |
48 | Urban Development -resoulution Of Boundary And Land Ownership Disputes | Completed | Ksh 3,711,550 | |
49 | Financing locally-led climate actions(FLLoCA) program County Climate Risk Assessment (CCIS) Grant | Completed | Ksh 21,000,000 | |
50 | Climate Change Fund Board | Completed | Ksh 10,906,480 | |
51 | Flloca Funding | Completed | Ksh 3,387,873 | |
52 | Development And Enforcement Of Municipal Plans And Development Control - Kilala And Kalamba Markets | Completed | Ksh 3,000,000 | |
53 | Road Upgrading - Cabro Paving Access Roads In Wote Township -a Thousand Palms - Kwa Nguku - Equity... | Completed | Ksh 10,000,000 | |
54 | Erection Of Integrated Solar Flood Light High Mast 20 Metre (bangladesh- Wote Town) -20 Metre High... | Completed | Ksh 3,000,000 | |
55 | Construction Of Modern Toilet At Kalamba - Construction Of 5 Door Wc With Urinal, Septic, Water... | Completed | Ksh 2,300,000 | |
56 | Construction Of Exhaistible Pit Latrine At Mituvu Market And Ikalyoni Market | Completed | Ksh 2,000,000 | |
57 | Climate Change Adaptation Initiative - Municipality Greening Programme | Completed | Ksh 1,500,000 | |
58 | Old Mukuyuni Marikiti Market | Completed | Ksh 1,000,000 | |
59 | Drainage improvement and Murrumingof Old slaughter to Kwa Kitindo Road -Construction of Culverts,... | Completed | Ksh 4,000,000 | |
60 | Ccf Administrative Cost- Proposal Development, Vetting, Projects Grievances Committees, Eia,... | Completed | Ksh 1,176,600 | |
61 | Mbooni – Kee Municipality | Completed | Ksh 4,000,000 | |
62 | Forest conservation and awareness (tree planting/water weirs/sand dams) | Ongoing | Ksh 2,085,000 | |
63 | Rehabilitation Of Kwa Ngwili/ndilo Gulley | Ongoing | Ksh 3,642,828 | |
64 | Construction Of 2 Sand Dams At Kwa Maundu,musau Ndati To Londokwe River | Ongoing | Ksh 2,000,000 | |
65 | Kyaavua Village Land Clinic,mapping And Titling | Ongoing | Ksh 1,000,000 | |
66 | Purchase Of Land For Mwaani Dispensary | Ongoing | Ksh 1,000,000 | |
67 | Riverine conservation and restoration | Ongoing | Ksh 99,720 | |
68 | Purchase of land for Itangini market | Ongoing | Ksh 4,200,000 | |
69 | Beaconing And Issuance Of Title Deeds. | Ongoing | Ksh 2,000,000 | |
70 | Survey of Muuni Subward | Ongoing | Ksh 304,620 | |
71 | Rehabilitation Of Sultan Hamud Decentralized Treatment Facility(dtf) | Ongoing | Ksh 3,000,000 | |
72 | Purchase of ERP system | Ongoing | Ksh 5,000,000 | |
73 | Opening And Unclogging Of Drainage Systems | Ongoing | Ksh 561,798 | |
74 | Purchase Of Market Cleaning Equipment And Protective Gear | Ongoing | Ksh 1,000,000 | |
75 | Purchase Of Cleaning Machinery | Ongoing | Ksh 6,000,000 | |
76 | Security Of Land Tenure - Provision Of Title Deeds For Ngai Ndethya Settlement Scheme. | Ongoing | Ksh 2,000,000 | |
77 | Surveying of Machinery and Kinyambu Markets | Ongoing | Ksh 1,661,620 | |
78 | Yikivumbu Survey And Titling | Ongoing | Ksh 2,000,000 | |
79 | Sand Value Addition And Construction Of Sand Dams | Ongoing | Ksh 4,000,000 | |
80 | Sand Conservation Programmes | Ongoing | Ksh 6,228,589 | |
81 | Mapping, Surveying And Beaconing Of County Forests At Nzueni, Kitundu A&b, Mutungu And Kathekani | Ongoing | Ksh 577,600 | |
82 | Ida (world Bank) Credit Financing Locally-led Climate Action (flloca) Program, County Climate... | Ongoing | Ksh 285,492,870 | |
83 | Climate Change Fund Board | Ongoing | Ksh 6,000,000 | |
84 | Urban Planning- Preparation And Implementation Of Urban Land Use Plan For Tawa Market | Ongoing | Ksh 3,500,000 | |
85 | Operationalization Of Kee-mbooni Municipality | Ongoing | Ksh 4,422,400 | |
86 | Ccis(county Climate Instistutional Institutional Support) Flloca Matching Grant | Ongoing | Ksh 22,000,000 | |
87 | Purchase Of Erp System | Ongoing | Ksh 3,000,000 | |
88 | Ida (world Bank) Credit Financing Locally-led Climate Action (flloca) Program, County Climate... | Ongoing | Ksh 14,792,940 | |
89 | Ccis(county Climate Instistutional Institutional Support) Flloca Matching Grant | Ongoing | Ksh 11,000,000 | |
90 | Planting Of Trees -climate Change Fund | Not Started | Ksh 700,000 | |
91 | Verification Of Beneficiaries For Issuance Of Titledeeds For Kiboko B | Stalled | Ksh 643,500 | |
92 | Ndumoni Dispensary (purchase Of Land) | Under Procurement | Ksh 200,000 | |
93 | Mulata Dispensary (purchase Of Land) | Under Procurement | Ksh 75,000 | |
94 | Erection Of A Perimeter Wall At Kingutheni | Under Procurement | Ksh 1,541,500 | |
95 | Fuel For Desilting Of Londokwe Dam Using County Machinery | Under Procurement | Ksh 1,500,000 | |
96 | Desilting Of Londokwe Earthdam Under Climate Change (fuel) | Under Procurement | Ksh 2,000,000 | |
97 | Rehabilitation And Catchment Conservation Of Kwa Kaveki Earthdam | Under Procurement | Ksh 5,000,000 | |
98 | Operationalization Of Kee-mbooni Municipality | Under Procurement | Ksh 2,000,000 | |
99 | Rehabilitation Of Nthunguni Gulley And Tree Compensation During Road Reopening | Under Procurement | Ksh 400,000 | |
100 | Construction Of Sultan Hamud Open Air Market - Phase 1 | Under Procurement | Ksh 2,000,000 | |
101 | Survey Of Ward Road Network And Ward Public Utilities | Under Procurement | Ksh 500,000 | |
102 | Rehabilitation Of Emali Recreation Park | Under Procurement | Ksh 500,000 | |
103 | Opening And Ssport Murraming Of Roads At Emali And Sultan Towns | Under Procurement | Ksh 1,600,162 | |
104 | Purchase of land for Kambu market shed | Under Procurement | Ksh 1,936,352 | |
105 | Ida (world Bank) Credit Financing Locally-led Climate Action (flloca) Program, County Climate... | Under Procurement | Ksh 181,246,435 | |
106 | Conditionall Allocation ; 20% Share Of Mineral Royalties | Under Procurement | Ksh 99,857 | |
107 | Resolution Of Boundary And Land Ownership Disputes And Issuance Of Public Utilities' Title | Under Procurement | Ksh 9,000,000 | |
108 | Ida (world Bank Credit Financing Locally- Led Climate Action (FLLoCA) Program, (CCRI) Matching grant | Under Procurement | Ksh 86,823,400 | |
109 | Ida (world Bank Credit: Kenya Urban Support Project(kusp)- Urban Development Grant (uig) | Under Procurement | Ksh 35,000,000 | |
110 | Ida (world Bank) Credit: Kenya Urban Support Project(kusp) - Urban Development Grant (udg) | Under Procurement | Ksh 20,085,060 |
10. Department of Trade, Marketing, Industry, Culture and Tourism.
# | Project Name | Status | Budget | Action |
---|---|---|---|---|
1 | Construction Of A Public Toilet At Ikaasu Market | Completed | Ksh 500,000 | |
2 | Construction Of A Public Toilet At Kavumbu Market(kathonzweni) | Completed | Ksh 500,000 | |
3 | Kavumbu Public Toilet (kalawa) | Completed | Ksh 500,000 | |
4 | Syokilati Market Toilet | Completed | Ksh 500,000 | |
5 | Construction Of A Public Toilet At Marwa Market | Completed | Ksh 1,000,000 | |
6 | Construction Of Public Toilet At Ngiini Playground | Completed | Ksh 1,000,000 | |
7 | Construction Of Pit Latrine Block At Kwa Dc Market | Completed | Ksh 1,000,000 | |
8 | Construction Of Kiu Market Public Toilet | Completed | Ksh 1,000,000 | |
9 | Maintainence Of Other Assets - Markets, Tourism Centres. | Completed | Ksh 263,097 | |
10 | Construction Of Kola Sanitation Block (shelved) And Water Storage | Completed | Ksh 1,600,000 | |
11 | Nunguni Business Centre And Town Infrastructure Upgrade | Completed | Ksh 5,000,000 | |
12 | Uvileni Market Toilet | Completed | Ksh 1,000,000 | |
13 | Emali Wholesale Market( Kdsp Project) | Completed | Ksh 3,375,725 | |
14 | Kenya Music And Cultural Festivals | Completed | Ksh 1,000,000 | |
15 | Exhibitions And Trade Fairs | Completed | Ksh 311,600 | |
16 | Msmes Development Programme | Completed | Ksh 488,100 | |
17 | Consumer Protection Programme | Completed | Ksh 216,300 | |
18 | Trade And Marketing Development Programmes | Completed | Ksh 678,200 | |
19 | Small Business Development Centres Usaid Matching Grant | Completed | Ksh 2,420,100 | |
20 | Tourism Sector Development and Promotion | Completed | Ksh 940,600 | |
21 | Supply and Delivery 4 No of Skip bins | Completed | Ksh 2,000,000 | |
22 | Construction of Yemulwa Market Public Block | Ongoing | Ksh 700,000 | |
23 | Construction of A 4- Door Pit Latrine and Urinal At Kitundu Market And Kilyungi Market | Ongoing | Ksh 2,000,000 | |
24 | Cottage Industry Support For Kingongi-mivuko Women Group | Ongoing | Ksh 700,000 | |
25 | Kinze Market Toilet | Ongoing | Ksh 500,000 | |
26 | Syotuvali Market Toilet | Ongoing | Ksh 500,000 | |
27 | Construction Of Pit latrine Block at Ulu Market | Ongoing | Ksh 1,000,000 | |
28 | Construction Of Pit latrine Block at Mavivye Market | Ongoing | Ksh 1,000,000 | |
29 | Uvete Market Shed (construction Of Worktops, Compartments) | Ongoing | Ksh 2,000,000 | |
30 | Construction Of Sanitation Block At Kilome Market | Ongoing | Ksh 1,000,000 | |
31 | Construction Of A Three Door Latrine At Utini Market | Ongoing | Ksh 650,000 | |
32 | Kyaani and Ngokolani toilets | Ongoing | Ksh 1,300,000 | |
33 | Market Infrastructure Improvement | Ongoing | Ksh 8,000,000 | |
34 | Special Economic Zone(prefeasibility Study-eia,master Plan ) At Kwa Kathoka | Ongoing | Ksh 2,000,000 | |
35 | Esp Markets | Ongoing | Ksh 1,000,000 | |
36 | Tourism Infrastructure Improvement | Ongoing | Ksh 1,500,000 |
11. Department of Water and Sanitation
# | Project Name | Status | Budget | Action |
---|---|---|---|---|
1 | Makueni Girls Borehole | Completed | Ksh 2,940,000 | |
2 | Kamunyolo Earthdam | Completed | Ksh 605,680 | |
3 | Kaiti/kamunyii Water Project | Completed | Ksh 921,928 | |
4 | Katoloni Pipeline Extension | Completed | Ksh 980,000 | |
5 | Kwa Musila Earth Dam | Completed | Ksh 1,470,000 | |
6 | Kamunyolo Earth Dam | Completed | Ksh 2,500,000 | |
7 | Kituasi Water Project | Completed | Ksh 3,430,000 | |
8 | Kwa Kamende Borehole | Completed | Ksh 3,920,000 | |
9 | Kathuma Borehole | Completed | Ksh 4,900,000 | |
10 | Kaiti-kamunyii Water Project | Completed | Ksh 5,000,000 | |
11 | Mwaani Water Project | Completed | Ksh 9,917,000 | |
12 | Kwa Muthama Borehole | Completed | Ksh 343,000 | |
13 | Yandia Kalatu To Kakuswi- Pipeline Extension | Completed | Ksh 980,000 | |
14 | Mbiuni Borehole | Completed | Ksh 1,000,000 | |
15 | Water Tanks | Completed | Ksh 1,201,499 | |
16 | Kwa Moto Water Sump | Completed | Ksh 1,470,000 | |
17 | Kanzili Borehole | Completed | Ksh 1,500,000 | |
18 | Ngaa Borehole | Completed | Ksh 1,500,000 | |
19 | Kikuu Kalima Water Project | Completed | Ksh 2,400,000 | |
20 | Njau Earth Dam | Completed | Ksh 3,000,000 | |
21 | Isololo Kwakoki Bh Pipeline Extention | Completed | Ksh 5,390,000 | |
22 | Supply Of Water Tanks And Piping | Completed | Ksh 4,000,000 | |
23 | Supply Of Water Tanks And Distribution Pipes For Mandela, Kweleli, Syaolwe, Kwa Moto And Isololo... | Completed | Ksh 4,000,000 | |
24 | Rehabilitation Of Mandela Sump And Muthini Borehole | Completed | Ksh 609,736 | |
25 | Kwa Moto Electrical And Rehabilitation Works | Completed | Ksh 3,787,578 | |
26 | Rehabilitation Of Kalima Sump | Completed | Ksh 609,737 | |
27 | Ward Motorcycle | Completed | Ksh 276,600 | |
28 | Mbitini Borehole | Completed | Ksh 1,360,000 | |
29 | Ilengeni Water Project | Completed | Ksh 6,870,000 | |
30 | Kwa Kathoka Community Borehole | Completed | Ksh 90,000 | |
31 | Kwa Mutemwa Borehole | Completed | Ksh 3,920,000 | |
32 | Kwa Malombe Earth Dam | Completed | Ksh 1,982,000 | |
33 | Feasibility Study For Distribution Of Ndukuma Earthdam | Completed | Ksh 15,000,000 | |
34 | Purchase Of A Backhoe | Completed | Ksh 14,960,000 | |
35 | Kwa Mbila Water Project | Completed | Ksh 1,960,000 | |
36 | Itumbule Bh | Completed | Ksh 2,450,000 | |
37 | Kaiani Borehole | Completed | Ksh 175,448 | |
38 | Kwa Kioko Kiluluini Village Kavingoni Borehole | Completed | Ksh 39,825 | |
39 | Kwa Mbila Earth Dam | Completed | Ksh 271,116 | |
40 | Yemulwa/kitutu Borehole | Completed | Ksh 100,380 | |
41 | Kikuu-kiangini Water Project | Completed | Ksh 202,500 | |
42 | Desilting Of Matinga 2 And Kyambusya Earth Dams | Completed | Ksh 3,857,180 | |
43 | Water Improvement And Borehole Maintenance | Completed | Ksh 524,207 | |
44 | Kwa Mbila Water Project | Completed | Ksh 1,960,000 | |
45 | Drilling And Develovement Of Kiteei Mutini Bh | Completed | Ksh 2,837,000 | |
46 | Desilting Of Mitooni Earthdam In Kitise Kithuki Ward | Completed | Ksh 1,491,000 | |
47 | Rehabilitation Of Kaiani Borehole | Completed | Ksh 931,750 | |
48 | Makutano Water Project | Completed | Ksh 1,500,000 | |
49 | Kwa Mbila Water Project | Completed | Ksh 4,000,000 | |
50 | Requisition For Equipping Of Kiteei Mutini Borehole | Completed | Ksh 3,138,700 | |
51 | Athi-mavindini Water Project | Completed | Ksh 7,668,213 | |
52 | Water Improvement Programme | Completed | Ksh 2,184,800 | |
53 | Katuluni / Nzeveni Water Pipeline | Completed | Ksh 2,940,000 | |
54 | Kamuithi -ungatani Water Project | Completed | Ksh 2,450,000 | |
55 | Kiimani Borehole | Completed | Ksh 5,380,000 | |
56 | Athi Mavindini Water Project | Completed | Ksh 5,880,000 | |
57 | Muusini Borehole | Completed | Ksh 6,380,000 | |
58 | Drilling And Equipping Of Kwa Ngoka Borehole | Completed | Ksh 6,000,000 | |
59 | Kimundi Sump | Completed | Ksh 2,500,000 | |
60 | Kwa-kamaso Sand Dam And Sump | Completed | Ksh 196,480 | |
61 | Kwetui Water Dam | Completed | Ksh 1,477,000 | |
62 | Kwanyaa Borehole | Completed | Ksh 24,000 | |
63 | Mbata Borehole | Completed | Ksh 150,000 | |
64 | Kwa Kaivu Borehole | Completed | Ksh 150,000 | |
65 | Kitise Water Project | Completed | Ksh 600,000 | |
66 | Mukameni B Borehole - Purchase And Installation Of Motor | Completed | Ksh 500,000 | |
67 | Kwanyaa Borehole - Purchase And Installation Of Motor | Completed | Ksh 500,000 | |
68 | Kitise Water Project | Completed | Ksh 1,000,000 | |
69 | Kimundi Water Project | Completed | Ksh 1,500,000 | |
70 | Kwa Mbila Earthdam | Completed | Ksh 1,500,000 | |
71 | Rehabilitation Of Kitise Water Project | Completed | Ksh 8,000,000 | |
72 | Kyambui Water Project | Completed | Ksh 3,920,000 | |
73 | Rehabilitation Of Water Tank And Pipeline Rehabilitation To Yatwa-itaani Village( Uviuni) | Completed | Ksh 1,960,000 | |
74 | Ndueni-mulima Water Project | Completed | Ksh 4,900,000 | |
75 | Mulima Water Project | Completed | Ksh 10,176,660 | |
76 | Mulima Phase 1 | Completed | Ksh 1,905,334 | |
77 | Kiumi Water Project | Completed | Ksh 94,129 | |
78 | Ngunini Water Project | Completed | Ksh 59,494 | |
79 | Kiumi Water Project | Completed | Ksh 3,920,000 | |
80 | Drilling Of Mutooni Borehole | Completed | Ksh 1,660,000 | |
81 | Water Improvement Programme | Completed | Ksh 57,556 | |
82 | Kiumi Water Project | Completed | Ksh 64,250 | |
83 | Kinyongo Water Project | Completed | Ksh 3,920,000 | |
84 | Kooi Earth Dam | Completed | Ksh 4,900,000 | |
85 | Lower Ngwani Water Project | Completed | Ksh 980,000 | |
86 | Rehabilitation Of Wanzauni Kikima Pipeline | Completed | Ksh 686,000 | |
87 | Upper Ngwani Water Project | Completed | Ksh 2,509,811 | |
88 | Masyonyeki Earth Dam | Completed | Ksh 4,900,000 | |
89 | Kyamuata Water Project-distribution Tokyambwika Ecde And Kyamuata Market | Completed | Ksh 3,000,000 | |
90 | Lungu Borehole | Completed | Ksh 2,374,220 | |
91 | Kithongo Borehole | Completed | Ksh 2,374,221 | |
92 | Extension Of Upper Ngwani Water Project | Completed | Ksh 4,000,000 | |
93 | Ikokani Water Project | Completed | Ksh 7,000,000 | |
94 | Kimandi Borehole | Completed | Ksh 3,710,279 | |
95 | Songeni Water Project | Completed | Ksh 4,900,000 | |
96 | Kwa Matinga Water Project | Completed | Ksh 4,794,228 | |
97 | Ndumanu Earth Dam | Completed | Ksh 3,000,000 | |
98 | Kithongo Borehole | Completed | Ksh 2,500,000 | |
99 | Lungu Borehole | Completed | Ksh 1,500,000 | |
100 | Nyaanyaa A Earthdam | Completed | Ksh 159,900 | |
101 | Kaiti -kwakitila Water Project | Completed | Ksh 159,448 | |
102 | Miau Earth Dam | Completed | Ksh 495,900 | |
103 | Waia Earth Dam | Completed | Ksh 5,880,000 | |
104 | Kwa Mutombi Water Project | Completed | Ksh 1,960,000 | |
105 | Nyaanyaa Earthdam Phase 2 | Completed | Ksh 1,568,000 | |
106 | Kyaluma Bore Hole Water Project | Completed | Ksh 4,900,000 | |
107 | Solarization And Distribution Of Makaia Borehole | Completed | Ksh 6,860,000 | |
108 | Kavingiliti Earthdam ( Miau earthdam) | Completed | Ksh 2,940,000 | |
109 | Construction Of Kwa Malai Earthdam,enlargement Spillway Checkdam,drawal System | Completed | Ksh 284,274 | |
110 | Athi Kalawa Wash Programme | Completed | Ksh 2,430,000 | |
111 | Muambe Earth Dam | Completed | Ksh 2,500,000 | |
112 | Athi-miangeni- Kalawa Water Project. | Completed | Ksh 1,000,000 | |
113 | Kyamakuthi Earth Dam | Completed | Ksh 14,910,012 | |
114 | Akwash Water Project | Completed | Ksh 1,312,182 | |
115 | Kwa Muthama Earthdam | Completed | Ksh 2,450,000 | |
116 | Kwa Ivali Earthdam | Completed | Ksh 4,900,000 | |
117 | Drilling And Equipping Of 5 No. Boreholes In The Ward Using Own Machines | Completed | Ksh 7,000,000 | |
118 | Katatu Dam | Completed | Ksh 3,920,000 | |
119 | Kyunguni Earth Dam | Completed | Ksh 2,189,243 | |
120 | Desilting Of Kwa Loa Earthdam | Completed | Ksh 3,500,000 | |
121 | Kwa Makaa Earthdam | Completed | Ksh 2,940,000 | |
122 | Kaangi Borehole | Completed | Ksh 91,823 | |
123 | Kwa Malului Borehole | Completed | Ksh 114,842 | |
124 | Kavesa Shallow Well Test Pumping | Completed | Ksh 3,787,578 | |
125 | Kyamuumba Earth Dam - Rehabilitation | Completed | Ksh 40,000,000 | |
126 | Requisition For Testpumping And Water Analysis For Kwa Wala Borehole | Completed | Ksh 3,500,000 | |
127 | Ngomeni Earth Dam | Completed | Ksh 484,492 | |
128 | Kwa Kakui Earth Dam | Completed | Ksh 6,000 | |
129 | Kwa Muulu Weir | Completed | Ksh 3,975,700 | |
130 | Kwa Ng’oku Earth Dam | Completed | Ksh 3,724,000 | |
131 | Mutiluni Borehole | Completed | Ksh 4,900,000 | |
132 | Maiani Borehole | Completed | Ksh 4,900,000 | |
133 | Kamuthini Borehole | Completed | Ksh 3,920,000 | |
134 | Drilling And Equipping Borehole In Mukaa Boys | Completed | Ksh 5,000,000 | |
135 | Mbiini - Isika Pipeline | Completed | Ksh 98,000 | |
136 | Kayata Borehole | Completed | Ksh 161,882 | |
137 | Mikuyu II Water Project | Completed | Ksh 1,470,000 | |
138 | Muatineni Borehole | Completed | Ksh 3,920,000 | |
139 | Masokani Borehole | Completed | Ksh 4,900,000 | |
140 | Kisaulu Community Borehole | Completed | Ksh 162,640 | |
141 | Kisaulu Borehole | Completed | Ksh 29,800 | |
142 | Muatinini Borehole | Completed | Ksh 1,504,600 | |
143 | Mikuyu 2 Water Project | Completed | Ksh 3,172,700 | |
144 | Kithuni Borehole | Completed | Ksh 1,500,000 | |
145 | Machine Hire For Desilting Of Kya Nduu Earth Dam | Completed | Ksh 2,700,000 | |
146 | Thoma Borehole-drilling And Distribution | Completed | Ksh 176,314 | |
147 | Kilia Borehole | Completed | Ksh 70,547 | |
148 | Mwitiko Sand Dam | Completed | Ksh 139,023 | |
149 | Flashing And Solarisation Of Kyandumbi Borehole | Completed | Ksh 141,407 | |
150 | Rehabilitation Of Nzalani Earth Dam- Scooping Of The Dam Construction Of Embankment Wall | Completed | Ksh 3,500,000 | |
151 | Drilling And Extension Of Kyambalasi | Completed | Ksh 137,299 | |
152 | Water Improvement Programme | Completed | Ksh 700,000 | |
153 | Rehabilitation Of Dams( Kivaku, And Kikonde Earth Dams) | Completed | Ksh 5,978,000 | |
154 | Distribution Of Kyandumbi Water | Completed | Ksh 3,500,000 | |
155 | Miradi Kwa Jamii (sand Dam/drift At Kileani Iiani) | Completed | Ksh 500,000 | |
156 | Ngiitini Borehole Solarization And Distribution | Completed | Ksh 4,000,000 | |
157 | Equipping And Distribution Kithuni Borehole | Completed | Ksh 1,500,000 | |
158 | Kwa Kikungu Earth Dam Desilting And Kikonde Earthdam Spillway | Completed | Ksh 3,429,848 | |
159 | Distribution Of Usi Wasa Project(kyanganda And Kyathani) | Completed | Ksh 89,691 | |
160 | Piping Of Ilovoto-kisekini Water( Ilovoto Water Project) | Completed | Ksh 116,171 | |
161 | Rehabilitation Of Nduu Water Project | Completed | Ksh 1,960,000 | |
162 | Ndiani Water Project – Solarization, 2km Distribution Line With Water Kiosks | Completed | Ksh 5,880,000 | |
163 | Kwa Mwilu Sand Dam | Completed | Ksh 553,860 | |
164 | Ikaasu Kyamandi Water Project- | Completed | Ksh 54,231 | |
165 | Construction Of Sand Dam And Sump Tank At Mukilitwa River | Completed | Ksh 92,734 | |
166 | Kyakithuku Borehole | Completed | Ksh 184,510 | |
167 | Kwa Matolo Earth Dam | Completed | Ksh 5,482,000 | |
168 | Kiusyi Water Project | Completed | Ksh 5,000,000 | |
169 | Kiusyi Wear Rehabilitation | Completed | Ksh 1,475,624 | |
170 | Ithanzeni Borehole- Extension And Water Distribution | Completed | Ksh 3,920,000 | |
171 | Water Extension Line From Kyau Kwa Munanga To Kwa Kitili | Completed | Ksh 102,052 | |
172 | Construction Of Sump Tank And Piping Of Mbaani Water Project | Completed | Ksh 305,355 | |
173 | Kaumoni Earth Dam- Expansion Of Shallow Well And Water Treatmen | Completed | Ksh 602,200 | |
174 | Itenge Water Project- Water Distribution | Completed | Ksh 1,960,000 | |
175 | Kyeng'eethe Water Project- Extension And Distribution And Solar Installation | Completed | Ksh 114,371 | |
176 | Water Boreholes Maintenance | Completed | Ksh 980,000 | |
177 | Ithanzeni Bore Hole: Upgrading Of Solar Pump System | Completed | Ksh 1,960,000 | |
178 | Kilala Bh Water Project | Completed | Ksh 1,470,000 | |
179 | Kaiti Miting'ani Sand Dam : Construction Of Sump, Increase Sand Dam Height By 1.5m And Construction... | Completed | Ksh 7,840,000 | |
180 | Drilling And Equipping Borehole In Ukia Girls Secondary School | Completed | Ksh 5,000,000 | |
181 | Itenge Water Project | Completed | Ksh 5,000,000 | |
182 | Ithanze Water Project | Completed | Ksh 3,000,000 | |
183 | Makindu Town Water Project – Grant To Kimawasco To Boost Water Supply In Makindu (a Borehole) | Completed | Ksh 142,000 | |
184 | Makindu-kiu Catchment Borehole | Completed | Ksh 1,500,000 | |
185 | Mulilii Earth Dam | Completed | Ksh 2,940,000 | |
186 | Syengoni Borehole- Testpumbing | Completed | Ksh 3,000,000 | |
187 | Pipeline Extension To Kiaoni Market (kibmawasco) | Completed | Ksh 1,000,000 | |
188 | Service Line Rehabilitation Milu-kimawasco | Completed | Ksh 355,100 | |
189 | Improvement Of Water In Kikumbulyu North Ward By Kibmawasco-kasayani Market To Cutline, Kwa Kakumi... | Completed | Ksh 4,300,000 | |
190 | Construction Of Kathyaka Masonry Tank/ Under Kibmawasco | Completed | Ksh 4,410,000 | |
191 | Construction Of Sump Tank Reservoir, Water Treatment And Distribution To 10 Clusters From Athi... | Completed | Ksh 1,410,250 | |
192 | Kilisa Water Tank Reseivoir.reseivoir. | Completed | Ksh 2,000,000 | |
193 | Kithokoosyo – Miambani Water Project | Completed | Ksh 77,000 | |
194 | Kibmawasco– Kilui Water Extension To Ngolomoki – Kwa Sunza -kalulini -matinga Line, Mikuyuni ... | Completed | Ksh 8,000,000 | |
195 | Kimawasco Line Extension-mbeetwani (water) | Completed | Ksh 1,500,000 | |
196 | Electrification Of Kilui Water Project- Electrification - By Kimawasco | Completed | Ksh 3,500,000 | |
197 | Rehabilitation And Distribution Of Kithokoosyo Water Project | Completed | Ksh 6,000,000 | |
198 | Syumile Borehole- Re-drilling With County Own Machine,test Pumping, Casing And Solar Power... | Completed | Ksh 90,000 | |
199 | Repair Of Mukameni, Kyandulu, Maumbuni Boreholes | Completed | Ksh 1,000,000 | |
200 | Aligon Pumping Set | Completed | Ksh 1,500,000 | |
201 | Kaunguni Dispensary Borehole | Completed | Ksh 140,623 | |
202 | Yikisemei Bohehole | Completed | Ksh 1,500,000 | |
203 | Makusu Borehole | Completed | Ksh 111,852 | |
204 | Kwa Kathoka Borehole | Completed | Ksh 2,113,755 | |
205 | Syumile Borehole | Completed | Ksh 1,960,000 | |
206 | Kalakalya Borehole | Completed | Ksh 1,500,000 | |
207 | Sekeleni Earthdam | Completed | Ksh 3,430,000 | |
208 | Kalungu-ngambi Ya Myunzyu Extension Of Water Pipeline | Completed | Ksh 2,940,000 | |
209 | Mivuyuni Borehole | Completed | Ksh 1,563,600 | |
210 | Drilling Of Ngaamba Borehole | Completed | Ksh 2,979,200 | |
211 | Matiku Borehole | Completed | Ksh 1,409,940 | |
212 | Emali Town Borehole | Completed | Ksh 2,021,860 | |
213 | Tutini Water Project | Completed | Ksh 55,300 | |
214 | Nguasini Water Earth Dam | Completed | Ksh 84,000 | |
215 | Emali Police Station Borehole | Completed | Ksh 35,784 | |
216 | Katune Borehole -distribution To Kwa Kotoe | Completed | Ksh 25,200 | |
217 | Rehabilitation Of Stalled Boreholes In The Ward ( Kwa Kimulu, Kiiwai, Emali, Nduuduni Etc) | Completed | Ksh 1,960,000 | |
218 | Distribution Of Water At Ilengeni Springs | Completed | Ksh 5,900,000 | |
219 | Feasibility Study Of Muooni Mega Dam | Completed | Ksh 1,000,000 | |
220 | Distribution Of Mumbuni Samp(solarisation And Distribution At Source) | Completed | Ksh 4,900,000 | |
221 | Emali Police Station Borehole | Completed | Ksh 61,110 | |
222 | Emali Rehabilitation Centre Borehole | Completed | Ksh 100,000 | |
223 | Restoring Water At Emali | Completed | Ksh 4,345,016 | |
224 | Emali Township Borehole | Completed | Ksh 2,000,000 | |
225 | Mulala Primary School Borehole | Completed | Ksh 6,000,000 | |
226 | Extension Of Ngwata, Kativani, Kiange, Yumbuni, And Kyuasini By KIBWAWASCO | Completed | Ksh 4,116,000 | |
227 | Kiambani Borehole | Completed | Ksh 3,430,000 | |
228 | Extension Of Water By 4kms Makutano- Makongeni- Masimbani- Mbondeni (kwa Kalee) To Mwaani Market... | Completed | Ksh 3,920,000 | |
229 | Maintenance Of Boreholes In Masongaleni Ward | Completed | Ksh 490,000 | |
230 | Ivuso Earth Dam | Completed | Ksh 873,780 | |
231 | Silimbi Kalata Water Project | Completed | Ksh 27,940 | |
232 | Ovo Earth Pan | Completed | Ksh 47,455 | |
233 | Extension Of Kyamulinzi Water Project From Kithyululu To Wa Ndei | Completed | Ksh 1,000,000 | |
234 | Muthenyenze Borehole | Completed | Ksh 1,160,000 | |
235 | Ndauni Pipeline | Completed | Ksh 4,500,000 | |
236 | Uyi Earth Dam-counter Funding With Ndma | Completed | Ksh 9,941,310 | |
237 | Rehabilitation Of Mitonguni Pipeline, Test Pumpin Of Mitooni Borehole | Completed | Ksh 275,047 | |
238 | Equipment Hire For Desilting Earth Dams(kwa Kitwa,kwa Manza, Kwa Kasau And Victoria Earth Dams) | Completed | Ksh 2,940,000 | |
239 | New Extension Of Ngai Ndethya River Sump Water To Nthungunu -- Construction Of A Tank, Installation... | Completed | Ksh 7,506,800 | |
240 | Kambu-kiteng'ei Water Project | Completed | Ksh 4,000,000 | |
241 | Construction Of Sand Dam At Kambu Sump Along Kambu River-distribution To Syethe, Ngomano, Kyunyu,... | Completed | Ksh 435,655 | |
242 | Kwa Diana New Phase- Solar Installation,submersible Pump Installation, Errection And Installation... | Completed | Ksh 247,971 | |
243 | Kwa Daina Mavindini Pipeline Improvement | Completed | Ksh 2,340,000 | |
244 | Kambu Kitengei Water Project | Completed | Ksh 7,500,000 | |
245 | Hydrological Survey, Drilling And Test Pumping At Mang'elete | Completed | Ksh 1,800,000 | |
246 | Ngai Ndethya Water Project | Completed | Ksh 7,417,400 | |
247 | Nzouni Borehole | Completed | Ksh 3,430,000 | |
248 | Ithayoni Bh | Completed | Ksh 27,962 | |
249 | Distribution Of Water From Machinery Town To Mbulutini Thange And A Water Tank Of 10,000 Litres -... | Completed | Ksh 33,490 | |
250 | Kikunduku Borehole | Completed | Ksh 3,430,000 | |
251 | Rehabilitation Of Nzouni Borehole | Completed | Ksh 3,500,000 | |
252 | Kambu Water Project By Kimawasco | Completed | Ksh 2,500,000 | |
253 | Drilling Of Talent Centre Borehole, Solarisation, Kiosk/distribution Within The Centre And Water... | Completed | Ksh 2,940,000 | |
254 | Kwa Kalekye Borehole | Completed | Ksh 2,940,000 | |
255 | Mang’elete Borehole (Changed to equip Kalekye borehole) | Completed | Ksh 2,940,000 | |
256 | Drilling Of Kwa Maundu | Completed | Ksh 2,036,680 | |
257 | Utu Borehole | Completed | Ksh 967,120 | |
258 | Kitenge Borehole | Completed | Ksh 18,970 | |
259 | Completion Of Manguluku Earth Dam - Fencing, Construction Of Cattle Traps, Construction Of Toilet | Completed | Ksh 17,152 | |
260 | Maia Atatu Earth Dam | Completed | Ksh 18,422 | |
261 | Water Development | Completed | Ksh 500,000 | |
262 | Katheka Kai Borehole | Completed | Ksh 4,000,000 | |
263 | Rehabilitation Of Kwa Kalekye Borehole | Completed | Ksh 4,000,000 | |
264 | Drilling Of Nzambani Boreholeborehole | Completed | Ksh 1,800,000 | |
265 | Kwa Kaluki Borehole | Completed | Ksh 105,414 | |
266 | Yumbuni Borehole | Completed | Ksh 442,460 | |
267 | Yikivumbu Water Sump | Completed | Ksh 1,193,000 | |
268 | Thithi Borehole | Completed | Ksh 80,000 | |
269 | Ndovoini Borehole- Installation Of A Casing, Pump, Motor And Solarization | Completed | Ksh 50,000 | |
270 | Distribution Of Kwa Mukonyo Borehole | Completed | Ksh 40,000 | |
271 | Yumbuni Borehole- Water Distribution. Extension Of The Pipeline | Completed | Ksh 94,000 | |
272 | Kwa Mukonyo Kwelela Borehole | Completed | Ksh 131,514 | |
273 | Construction Of Sump At Kimia Kateiko | Completed | Ksh 60,000 | |
274 | Kimia-kateiko Water Project-water Distribution. Extension Of The Pipeline For 4kms | Completed | Ksh 4,900,000 | |
275 | Katangini Water Project | Completed | Ksh 2,985,128 | |
276 | Ndimitava Kwa Mutoa And Desilting Of Ndiani Water Projec | Completed | Ksh 476,990 | |
277 | Water Development Programs | Completed | Ksh 2,303,000 | |
278 | Makueni Rural Water Board(maruwab) Operationalization | Completed | Ksh 4,373,617 | |
279 | Development Of Water Sources For Kibwezi East | Completed | Ksh 1,912,910 | |
280 | Water Tank Matching Programme | Completed | Ksh 42,410 | |
281 | Water Exploration Equipment | Completed | Ksh 705,420 | |
282 | DTF Construction | Completed | Ksh 2,700,000 | |
283 | Water Fund Establishment | Completed | Ksh 800,000 | |
284 | Ngua/syengoni Brehole- Supply And Delivery Of Drilling Materials | Completed | Ksh 3,000,000 | |
285 | Installation Of Submersible Pumps And Infiltration Galleries Kaiti 1 | Ongoing | Ksh 4,000,000 | |
286 | Kituasi Water Project | Ongoing | Ksh 10,000,000 | |
287 | Requisition For Kamunyolo Earth Dam Spillway Rehabilitation | Ongoing | Ksh 10,000,000 | |
288 | Mbiuni Borehole | Ongoing | Ksh 500,000 | |
289 | Distribution Of Ilengeni Water | Ongoing | Ksh 2,000,000 | |
290 | Rehabilitation And Extension Of Mbuthani Water Project And Kwo Thuku Works | Ongoing | Ksh 1,500,000 | |
291 | Mbuthani Water Sump | Ongoing | Ksh 3,796,770 | |
292 | Thwake Sand Dam | Ongoing | Ksh 9,212,000 | |
293 | Rehabilitation Of Kikumini Borehole | Ongoing | Ksh 5,500,000 | |
294 | Installation Of Pumping Unit,flashing Of Kwa Mwenga Borehole | Ongoing | Ksh 1,000,000 | |
295 | Distribution Of Water From Itaa Borehole To Kwa Kiviku | Ongoing | Ksh 1,000,000 | |
296 | Equiping And Distribution Of Kwa Mutemwa Borehole | Ongoing | Ksh 6,450,805 | |
297 | Thwake Sump and Distribution Line | Ongoing | Ksh 9,172,000 | |
298 | Kwa Kikuu Kavisi Water Project | Ongoing | Ksh 2,000,000 | |
299 | Yekanga Borehole | Ongoing | Ksh 1,960,000 | |
300 | Drilling And Equipping Of Yekanga Borehole | Ongoing | Ksh 5,000,000 | |
301 | Athi Mwania Water Project - Distribution Of Athi Mwania Water Project For Irrigation(feasibility... | Ongoing | Ksh 750,000 | |
302 | Athi Matheani Kithuki Water Project | Ongoing | Ksh 750,000 | |
303 | Mukameni Borehole-purchase And Installation Of Motor | Ongoing | Ksh 500,000 | |
304 | Mulima Earthdam Phase 2 | Ongoing | Ksh 40,000,000 | |
305 | Kya Mbui Water Project | Ongoing | Ksh 4,000,000 | |
306 | Kyambui Water Project-pumping System, Rising Main And Distribution To Kwa Erick Kiosk | Ongoing | Ksh 400,000 | |
307 | Desilting Of Ndiani Water Project | Ongoing | Ksh 3,787,578 | |
308 | Mitooni Water Project | Ongoing | Ksh 3,230,000 | |
309 | Rehabilitation Of Kitundu-kilyungi Pipeline And Extention Kiumi Water Project | Ongoing | Ksh 3,500,000 | |
310 | Kya Muata Water Project | Ongoing | Ksh 3,000,000 | |
311 | Supply And Delivery Of Pipes For Kithungo Kitundu Ward | Ongoing | Ksh 1,230,000 | |
312 | Kwa Mathenge Earth Dam | Ongoing | Ksh 4,000,000 | |
313 | Matenge Earth Dam Costruction- and distribution to Sofia Kithendu | Ongoing | Ksh 4,000,000 | |
314 | Miau Earthdam | Ongoing | Ksh 6,000,000 | |
315 | Waia Earth Dam | Ongoing | Ksh 4,000,000 | |
316 | Disilting Of Katukulu Earth Dam | Ongoing | Ksh 4,000,000 | |
317 | Katukulu Earth Dam | Ongoing | Ksh 1,500,000 | |
318 | Requisition and rehabilitation ofKasalama Borehole | Ongoing | Ksh 6,700,000 | |
319 | Repair And Distribution Of Nzaini Bh | Ongoing | Ksh 2,000,000 | |
320 | Kyanzisi Water Project Phase 1 | Ongoing | Ksh 7,000,000 | |
321 | Kaketa Water Project Phase 1 | Ongoing | Ksh 7,000,000 | |
322 | Water Improvement Programmesprogrammes | Ongoing | Ksh 2,300,000 | |
323 | Water Supply To Nunguni-phase 1 | Ongoing | Ksh 2,287,965 | |
324 | Ndiani Water Project | Ongoing | Ksh 2,000,000 | |
325 | Extension Of Kwa Mwilu Sand Dam Water Project- 3km Return Lines , 2 No . 1.5km Katikomu Village... | Ongoing | Ksh 5,730,820 | |
326 | Excavation Of Syengoni Earth Damdam | Ongoing | Ksh 3,000,000 | |
327 | Athi Tunguni Water Project | Ongoing | Ksh 37,500,000 | |
328 | Kwa Mbuli Borehole | Ongoing | Ksh 500,000 | |
329 | Silanga Borehole | Ongoing | Ksh 2,000,000 | |
330 | Extension Of Kimawasco From Gff To Miamba | Ongoing | Ksh 2,500,000 | |
331 | Ilingoni Pipeline Extension By Kibmawasco | Ongoing | Ksh 433,965 | |
332 | Mukameni Borehole Water Project | Ongoing | Ksh 6,000,000 | |
333 | Construction Of Water Stand At Kwangala Borehole | Ongoing | Ksh 500,000 | |
334 | Mulala Primary Borehole | Ongoing | Ksh 6,000,000 | |
335 | Piping Of Matiku Borehole | Ongoing | Ksh 500,000 | |
336 | Kwa Maima Earth Dam | Ongoing | Ksh 4,000,000 | |
337 | Kwa Maima Earth Dam | Ongoing | Ksh 2,920,000 | |
338 | Kiambani Borehole | Ongoing | Ksh 5,000,000 | |
339 | Supply And Delivery Of One Motorbike For Thange Ward | Ongoing | Ksh 200,000 | |
340 | Kakili Borehole Markets | Ongoing | Ksh 3,000,000 | |
341 | Dam Construction by (dcu) | Ongoing | Ksh 9,000,000 | |
342 | Drilling And Test Pumping Unit (dtu) Rig | Ongoing | Ksh 5,000,000 | |
343 | Project Feasibility Studies | Ongoing | Ksh 4,000,000 | |
344 | Water Development Programme | Ongoing | Ksh 3,787,578 | |
345 | Kalii Earthdam Rehabilitation | Not Started | Ksh 2,848,840 | |
346 | Distribution Of Kwa Ng'ondu Borehole | Stalled | Ksh 2,000,000 | |
347 | Kauani Earth Dam | Under Procurement | Ksh 1,000,000 | |
348 | Construction Of Wote Bridge Sand Dam | Under Procurement | Ksh 15,000,000 | |
349 | Desilting Of Kwa Muia Earth Dam | Under Procurement | Ksh 3,000,000 | |
350 | Mantainance And Fuelling Ofward Backhoe And Desilting Small Communal Dams Using The Same Machine | Under Procurement | Ksh 3,138,700 | |
351 | Mwania Borehole - Purchase And Installation Of Motor | Under Procurement | Ksh 500,000 | |
352 | Kitise Water Project - Electrification Through Rerec | Under Procurement | Ksh 3,000,000 | |
353 | Kamwinzi Earth Dam - Machinery Desilting | Under Procurement | Ksh 458,000 | |
354 | Syumbe Borehole | Under Procurement | Ksh 2,500,000 | |
355 | Requisition For Water Improvement Program-kiamani And Kyome Markets | Under Procurement | Ksh 807,629 | |
356 | Drilling And Capping Of Kathamba Borehole | Under Procurement | Ksh 1,802,294 | |
357 | Kaangi Water Project | Under Procurement | Ksh 3,500,000 | |
358 | Requisition For Testpumping Andwater Analysis | Under Procurement | Ksh 3,500,000 | |
359 | Requisition For Maiani Borehole Equipping In Mukaa Ward | Under Procurement | Ksh 3,295,200 | |
360 | Kilombo Earth Dam | Under Procurement | Ksh 5,000,000 | |
361 | Purchase Of Institutional | Under Procurement | Ksh 2,000,000 | |
362 | Requisition For Kwa Mwilu Water Project- Solar Power System Rehabilitation | Under Procurement | Ksh 414,979 | |
363 | Kanaani Water Project | Under Procurement | Ksh 2,000,000 | |
364 | Kwa Mbuli Borehole Water Project | Under Procurement | Ksh 500,000 | |
365 | Requisition For Test Pumping Mukameni Borehole Water Project | Under Procurement | Ksh 6,000,000 | |
366 | Emali Chiefs Borehole | Under Procurement | Ksh 406,439 | |
367 | Requisition For Uyi Earthdam Water Project- Yikivuthi Earthdam Water Connection | Under Procurement | Ksh 9,941,310 | |
368 | Drilling And Equipping Muthungue Boreholeborehole | Under Procurement | Ksh 3,500,000 | |
369 | Kenya Water And Sanitation And Hygiene K-wash | Under Procurement | Ksh 5,000,000 |
12. The Office of the Governor