Feedback
Welcome to the feedback section. Projects have been grouped per department for easy access. To give feedback, click on any project and give your feedback.
1. County Attorney
| # | Project Name | Status | Budget | Action |
|---|---|---|---|---|
| 1 | Kasikeu Ward Support to Land Succession | Ongoing | Ksh 1,000,000 | |
| 2 | Kathonzweni Ward Support to Land Succession | Ongoing | Ksh 1,000,000 | |
| 3 | Kitise/Kithuki Ward Support to Land Succession | Ongoing | Ksh 700,000 | |
| 4 | Tulimani Ward Support to Land Succession | Ongoing | Ksh 1,000,000 | |
| 5 | Wote/Nziu Ward Support to Land Succession | Ongoing | Ksh 1,000,000 | |
| 6 | Kithungo Kitundu ward support to land succession | Ongoing | Ksh 500,000 | |
| 7 | Land Governance(legal Clinics And Legal Aids For Land Ownership, Succession Support And Land Survey) | Ongoing | Ksh 1,000,000 | |
| 8 | Land Governance(legal Clinics And Legal Aids For Land Ownership, Succession Support And Land Survey) | Ongoing | Ksh 1,000,000 | |
| 9 | Land Governance(legal Clinics And Legal Aids For Land Ownership, Succession Support And Land Survey) | Ongoing | Ksh 1,000,000 | |
| 10 | Land Governance(legal Clinics And Legal Aids For Land Ownership, Succession Support And Land Survey) | Ongoing | Ksh 1,500,000 | |
| 11 | Land Governance(legal Clinics And Legal Aids For Land Ownership, Succession Support And Land Survey) | Ongoing | Ksh 1,000,000 | |
| 12 | Land Governance(legal Clinics And Legal Aids For Land Ownership, Succession Support And Land Survey) | Ongoing | Ksh 1,000,000 | |
| 13 | Land Governance(legal Clinics And Legal Aids For Land Ownership, Succession Support And Land Survey) | Ongoing | Ksh 500,000 | |
| 14 | Land Governance(legal Clinics And Legal Aids For Land Ownership, Succession Support And Land Survey) | Ongoing | Ksh 1,000,000 | |
| 15 | Land Governance(legal Clinics And Legal Aids For Land Ownership, Succession Support And Land Survey) | Ongoing | Ksh 1,000,000 | |
| 16 | Land Governance(legal Clinics And Legal Aids For Land Ownership, Succession Support And Land Survey) | Ongoing | Ksh 2,000,000 | |
| 17 | Land Governance(legal Clinics And Legal Aids For Land Ownership, Succession Support And Land Survey) | Ongoing | Ksh 1,000,000 | |
| 18 | Land Governance(legal Clinics And Legal Aids For Land Ownership, Succession Support And Land Survey) | Ongoing | Ksh 2,000,000 | |
| 19 | Land Governance(legal Clinics And Legal Aids For Land Ownership, Succession Support And Land Survey) | Ongoing | Ksh 1,500,000 | |
| 20 | Land Governance(legal Clinics And Legal Aids For Land Ownership, Succession Support And Land Survey) | Ongoing | Ksh 1,000,000 | |
| 21 | Land Governance(legal Clinics And Legal Aids For Land Ownership, Succession Support And Land Survey) | Ongoing | Ksh 3,000,000 | |
| 22 | Land Governance(legal Clinics And Legal Aids For Land Ownership, Succession Support And Land Survey) | Ongoing | Ksh 1,000,000 |
2. Department of Health Services
| # | Project Name | Status | Budget | Action |
|---|---|---|---|---|
| 1 | Infrastructure Improvement For Makueni Referral Hospital - Mortuary, Gate And Medical Equipment | Completed | Ksh 21,467,879 | |
| 2 | Matiliku Subcounty Hospital (dental Chair, Accessories And Other Smal Equipment) | Completed | Ksh 46,007 | |
| 3 | Surgical Implants And Medical Bills | Completed | Ksh 553,412 | |
| 4 | Fencing Of Facility (katulye Dispensary) | Completed | Ksh 1,970,000 | |
| 5 | Purchase Of Tanks | Completed | Ksh 451,760 | |
| 6 | Surgical Implants | Completed | Ksh 2,000,000 | |
| 7 | Matiliku Sub County Hospital Portable Xray | Completed | Ksh 8,000,000 | |
| 8 | Upgrading Of Mbitini Dispensary | Completed | Ksh 3,000,000 | |
| 9 | Fencing Of Mutyambua Health Center | Completed | Ksh 1,000,000 | |
| 10 | Mbenuu Health Centre | Completed | Ksh 4,000,000 | |
| 11 | Kikumini Model Health Center | Completed | Ksh 4,585,142 | |
| 12 | Kambi Mawe Dispensary | Completed | Ksh 979,389 | |
| 13 | Mumbuni Health Center | Completed | Ksh 70,021 | |
| 14 | Itumbule Dispensary – Fencing, Wiring, And Construction Of Soak Pit, Ash Pit And Incinerator At... | Completed | Ksh 1,274,000 | |
| 15 | Upgrading Kathonzweni Health Center. | Completed | Ksh 685,414 | |
| 16 | Construction Of Staff Quarters At Kiangini Dispensary | Completed | Ksh 2,960,000 | |
| 17 | Kathonzweni Health Centre -construction And Equipping Of Laboratory | Completed | Ksh 2,200,000 | |
| 18 | Upgrading Of Mbuvo Health Centre To Model Health Centreupgrading Of Mbuvo Health Centre To Model... | Completed | Ksh 2,000,000 | |
| 19 | Construction Of Septic Tank And Waste Pipe Installation From The Staff House And From The Maternity... | Completed | Ksh 500,000 | |
| 20 | Completion And Equipping Kathonzweni Health Center | Completed | Ksh 1,000,000 | |
| 21 | Completion And Equipping Mbuvo Health Centre | Completed | Ksh 1,000,000 | |
| 22 | Upgrading Of Mavindini Health Center | Completed | Ksh 4,312,000 | |
| 23 | Renovation Iani Dispensary | Completed | Ksh 4,000,000 | |
| 24 | Muusini Dispensary -construction Of An Outpatient Block | Completed | Ksh 4,000,000 | |
| 25 | Completion & Equipping Of Mbooni Isolation Ward | Completed | Ksh 474,000 | |
| 26 | Completion & Equipping Of Mbooni Isolation Ward | Completed | Ksh 30,000,000 | |
| 27 | Upgrading Ngai Health Center | Completed | Ksh 4,900,000 | |
| 28 | Utangwa Dispensary | Completed | Ksh 6,981,895 | |
| 29 | Ngai Health Centre -equipping Maternity Wing, Upgrading Septic Tank, Additional Staff, Electricity... | Completed | Ksh 4,000,000 | |
| 30 | Medical Bills And Surgical Implants | Completed | Ksh 172,464 | |
| 31 | Uvaani Dispensary | Completed | Ksh 1,404,736 | |
| 32 | Construction Of Staff House, Fencing And Upgrading Of Kivani Dispensary (lab) | Completed | Ksh 1,299,442 | |
| 33 | Katangini Dispensary -completion Of Maternity Block And Incinerator | Completed | Ksh 1,390,450 | |
| 34 | Kathulumbi Model Health Centre.(fencing And Gate) | Completed | Ksh 30,544 | |
| 35 | Mutembuku Heath Centre (renovations) | Completed | Ksh 2,500,000 | |
| 36 | Upgrading Of Kathulumbi Health Center. | Completed | Ksh 29,040 | |
| 37 | Equipping Of Kathulumbi Hospital Laboratory | Completed | Ksh 2,000,000 | |
| 38 | Renovation And Extension Of Waiting Bay And Furniture Mbavani Dispensary | Completed | Ksh 1,500,000 | |
| 39 | Fencing And Gate At Kathongo Dispensary | Completed | Ksh 2,000,000 | |
| 40 | Kalawa Subcounty Hospital Solarization | Completed | Ksh 4,000,000 | |
| 41 | Kalawa Subcounty Hospital Fence And Gate | Completed | Ksh 1,470,000 | |
| 42 | Ulu Dispensary (construction Of A L-shaped Dispensary) - Dispensary Infrastructural Requirements... | Completed | Ksh 340,040 | |
| 43 | Construction Of Marternity And Laboratory In Kavuko Dispensary | Completed | Ksh 2,936,945 | |
| 44 | Fencing, Filling Of Ditch, Incinerator,ashpit And Placenta Pit For Kalanzoni Dispensary | Completed | Ksh 500,000 | |
| 45 | Renovation Of Ngiini Dispensary | Completed | Ksh 1,500,000 | |
| 46 | Upgrading Of Enzai Dispensary | Completed | Ksh 2,940,000 | |
| 47 | Upgrading Of Kamuthini Dispensary(completion Of Injection Room And Equipping Of Maternity) | Completed | Ksh 29,542 | |
| 48 | Fencing And Gate Installation Of Mutiluni Dispensary | Completed | Ksh 1,260,900 | |
| 49 | Equipping And Operationalization Of General Ward At Uvete Health Centre | Completed | Ksh 26,042 | |
| 50 | Mbukuni Dispensary Renovation | Completed | Ksh 2,500,000 | |
| 51 | Construction of Patients' Toilet, Maternity Water Tower at Mutiluni Dispensary | Completed | Ksh 1,500,000 | |
| 52 | Renovation Of Maternity Wing And Upgrading Of Kasikeu Model Health Centre | Completed | Ksh 4,500,000 | |
| 53 | Completion Of Kiou Dispensary Block, Staff House And Water Tanks | Completed | Ksh 68,874 | |
| 54 | Completion Of Mbiini Dispensary | Completed | Ksh 2,450,000 | |
| 55 | Construction Of Kiou Top Dispensary | Completed | Ksh 11,508 | |
| 56 | Fencing Of Ngalana Dispensary | Completed | Ksh 498,890 | |
| 57 | Equipping Of Sultan Hamud Mortuary | Completed | Ksh 115,948 | |
| 58 | Kwale Dispensary -construction Of A Septic Tank, Provision Of Electricity Back Up, Construction Of... | Completed | Ksh 2,000,000 | |
| 59 | Muua Dispensary -equipping Of A Laboratory. | Completed | Ksh 1,000,000 | |
| 60 | Payings Of Medical Bills For Patients In The Ward | Completed | Ksh 1,000,000 | |
| 61 | Upgrading And Equipping Of Kiou Top Dispensary | Completed | Ksh 1,500,000 | |
| 62 | Upgrading Of Health Facilities In Kee Ward | Completed | Ksh 55,665 | |
| 63 | Upgrading Of Mang'ala Dispensary (facelift,incinerator And Equipping) | Completed | Ksh 367,398 | |
| 64 | Construction Of Kivani Staff Quarters | Completed | Ksh 3,222,450 | |
| 65 | Renovation Of Ngiluni Dispensary | Completed | Ksh 1,500,000 | |
| 66 | Renovations, Construction Of Incinerator At Kasunguni Dispensary | Ksh 1,500,000 | ||
| 67 | Kithembe Sub-ward Dispensaries: Fencing, Solar Energy At Nyaani Dispensary, Health Facilities... | Completed | Ksh 1,960,000 | |
| 68 | Kyanganda Dispensary – Fencing, Solarization And Water Connectivity | Completed | Ksh 1,884,003 | |
| 69 | Mutungu Health Centre - Medical Bills For The Needy Cases And Pwds | Completed | Ksh 500,000 | |
| 70 | Fencing and Levelling at Kilungu Sub County Hospital | Completed | Ksh 2,000,000 | |
| 71 | Fencing , Installation Of A Gate And Renovation Works At Kwa-mukuta Dispensary, | Completed | Ksh 1,000,000 | |
| 72 | Kyambeke Health Centre – Upgrading Of The Facility | Completed | Ksh 934,702 | |
| 73 | Musalala Dispensary – Upgrading | Completed | Ksh 943,085 | |
| 74 | Upgrading Of Kyang’a Dispensary – Construction Of Staff Quarters | Completed | Ksh 3,430,000 | |
| 75 | Upgrading Of Nzukini Health Centre (renovations) | Completed | Ksh 980,000 | |
| 76 | Upgrading Of Kavatanzou Dispensary | Completed | Ksh 1,466,506 | |
| 77 | Upgrading Of Kyambeke Dispensary-construction Of Two Wards -male And Female | Completed | Ksh 15,783 | |
| 78 | Mwaani Dispensary – Construction Of Galley | Completed | Ksh 1,000,000 | |
| 79 | Upgrading Of Musalala Dispensary | Completed | Ksh 2,500,000 | |
| 80 | Upgrading Of Nthangu Dispensary | Completed | Ksh 96,643 | |
| 81 | Kyuasini Health Centre | Completed | Ksh 400,113 | |
| 82 | Upgrading Of Kilala Dispensary; Staff House | Completed | Ksh 3,194,400 | |
| 83 | Nzouni Dispensary-construction Of Staff Quarters, Placenta Pit, Ash Pit, Electrification And Fencing | Completed | Ksh 4,500,000 | |
| 84 | Rehabilitation Of Iuani Health Centre | Completed | Ksh 3,000,000 | |
| 85 | Electrification And Fencing Of Kai Dispensary | Completed | Ksh 2,999,266 | |
| 86 | Installation Of Fence And Chain Link At Kiboko Dispensary. | Completed | Ksh 1,500,000 | |
| 87 | Hospital Bills And Implants | Completed | Ksh 2,000,000 | |
| 88 | Electrification Of Kai And Renovation Of Kavete Dispensaries | Completed | Ksh 2,000,000 | |
| 89 | Recruitment Of Casual Staff (4 Nurses) For Health Facilities Within The Ward-makindu | Completed | Ksh 3,000,000 | |
| 90 | Medical Bills And Surgical Implants | Completed | Ksh 42,610 | |
| 91 | Health Implants -kikumbulyu North | Completed | Ksh 1,335,460 | |
| 92 | Kikumbulyu North - Contracted Hospital Staff | Completed | Ksh 720,000 | |
| 93 | Purchase Of Bicycles For Chvs Kikumbulyu North | Completed | Ksh 1,000,000 | |
| 94 | Construction Of Pwd Empowered Structures At Kalulini Health Centre | Completed | Ksh 980,000 | |
| 95 | Surgical Implants And Medical Bills | Completed | Ksh 734,566 | |
| 96 | Construction Of Kyanginywa Dispensary- Equipping | Completed | Ksh 1,038,362 | |
| 97 | Kalungu Dispensary -construction Of Staff Quarters And Upgrading | Completed | Ksh 3,920,000 | |
| 98 | Lab And Matternity Equipping Of Mbuinzau Dispensary | Completed | Ksh 30,000 | |
| 99 | Renovation Of Kalulini Health Center | Completed | Ksh 1,271,703 | |
| 100 | Fence Kyanginywa And Electricity | Completed | Ksh 1,500,000 | |
| 101 | Upgrading Of Mikuyuni Dispensary – Wiring, Water Connection And Construction Of Waste Management... | Completed | Ksh 1,000,000 | |
| 102 | Implants And Hospital Bills | Completed | Ksh 1,297,800 | |
| 103 | Equipping Of Mbuinzau And Kalungu Dispensary Laboratories | Completed | Ksh 1,000,000 | |
| 104 | Issuance Of Bicycles To CHPs - Kikumbulyu South Ward | Completed | Ksh 1,000,000 | |
| 105 | Primary Health Care -kikumbulyu South | Completed | Ksh 720,000 | |
| 106 | Ndovoini Dispensary (fencing, Installation Of A Gate, Electrification(drop), Ceiling, And Supply Of... | Completed | Ksh 3,000,000 | |
| 107 | Hospitals Bills And Implants | Completed | Ksh 2,000,000 | |
| 108 | Renovation of Syumile Health Centre | Completed | Ksh 2,500,000 | |
| 109 | Renovation And Upgrading Kaunguni Health Center | Completed | Ksh 2,500,000 | |
| 110 | Electrical Works At Ndovoini Dispensary | Completed | Ksh 1,500,000 | |
| 111 | Fencing Of Kwa-kotoe Dispensary (katune Disp) | Completed | Ksh 980,000 | |
| 112 | Construction Of X-ray Block And Equipping At Emali Model Health Centre | Completed | Ksh 240,205 | |
| 113 | Fencing Of Tutini Dispensary | Completed | Ksh 500,000 | |
| 114 | Tutini Dispensary – Fencing | Completed | Ksh 500,000 | |
| 115 | Emali/mulala -medical Bills | Completed | Ksh 1,000,000 | |
| 116 | Mwanyani Health Centre | Completed | Ksh 3,000,000 | |
| 117 | Emali Mulala Primary Health Care | Completed | Ksh 1,000,000 | |
| 118 | Upgrading Kithyululu Model Health Centre | Completed | Ksh 1,775,636 | |
| 119 | Upgrading Ngwata Maternity Centre | Completed | Ksh 5,350,000 | |
| 120 | construction of maternity at masimbani health center | Completed | Ksh 4,800,000 | |
| 121 | Medical Bills | Completed | Ksh 500,000 | |
| 122 | Support for CHPs Mobility- Masongaleni | Completed | Ksh 500,000 | |
| 123 | Yikivuthi Dispensary -tiling And Fencing | Completed | Ksh 1,477,500 | |
| 124 | Construction & Equipping Of X-ray Block And Theatre At Kambu Sub County Hospital | Completed | Ksh 249,974 | |
| 125 | Medical Bills | Completed | Ksh 700,000 | |
| 126 | Fencing & Installation Of Electricity At Ivoleni Dispensary | Completed | Ksh 428,787 | |
| 127 | Medical Bills | Completed | Ksh 900,000 | |
| 128 | Construction Of Maternity Ward at Kyaani Health Center | Completed | Ksh 2,000,000 | |
| 129 | Electrification Of Muthungue Dispensary | Completed | Ksh 500,000 | |
| 130 | Support Mobility Of CHPs - Thange | Completed | Ksh 500,000 | |
| 131 | Construction & Equipping Of Ward And Mortuary At Nthongoni Dispensary | Completed | Ksh 781,200 | |
| 132 | Construction Of A New Hospital Block At Ivingoni Dispensary | Completed | Ksh 3,268,824 | |
| 133 | Fencing And Installation Of Gate at Mang'elete Dispensary | Completed | Ksh 1,000,000 | |
| 134 | Upgrading Of Kitende Dispensary(fencing And Gate) | Completed | Ksh 1,500,000 | |
| 135 | Upgrading Of Makasa Dispensary(fencing And Gate) | Completed | Ksh 1,470,000 | |
| 136 | Construction Of Kwa Ndava Dispensary | Completed | Ksh 18,885 | |
| 137 | Thithi Dispensary | Completed | Ksh 2,706,465 | |
| 138 | Masumba Dispensary -rehabilitation & Renovation Works | Completed | Ksh 2,000,000 | |
| 139 | Medical Bills | Completed | Ksh 800,000 | |
| 140 | Yikivumbu Dispensary | Completed | Ksh 1,500,000 | |
| 141 | Conditional Allocation For Leasing Of Medical Equipment | Completed | Ksh 124,723,404 | |
| 142 | Danida – Matching Grant For Level 2 And 3 Facilities | Completed | Ksh 10,530,000 | |
| 143 | Danida- Primary Healthcare In Devolved Context | Completed | Ksh 11,407,500 | |
| 144 | Facility Infrastructure Improvement Including Makueni Mortuary, Sultan Hospital, Theatre For... | Completed | Ksh 12,000,000 | |
| 145 | Nutrition International Donor Funding | Completed | Ksh 42,027,560 | |
| 146 | Nutrition Programme - Matching Grant | Completed | Ksh 5,386,965 | |
| 147 | Purchase Of Medical Equipment | Completed | Ksh 1,159,977 | |
| 148 | Universal Health Care Programme | Completed | Ksh 100,000,000 | |
| 149 | Transforming Health Systems For Universal Care Project (wb) | Completed | Ksh 261,683 | |
| 150 | Purchase Of Ambulances | Completed | Ksh 20,000,000 | |
| 151 | Universal Health Care Programme - Hospital | Completed | Ksh 70,000,000 | |
| 152 | Nutrition Programme - Matching Grant | Completed | Ksh 5,386,965 | |
| 153 | Danida – Matching Grant For Level 2 And 3 Facilities | Completed | Ksh 12,636,000 | |
| 154 | Danida- Primary Healthcare In Devolved Context | Completed | Ksh 11,407,500 | |
| 155 | Universal Healthcare Registration Fees | Completed | Ksh 7,350,000 | |
| 156 | Infrastructure Improvement For Health Facilities-aia | Completed | Ksh 14,905,700 | |
| 157 | Medical Health Services Fees - Facility Improvement Fee(cash Collection) - Hospitals | Completed | Ksh 176,430,000 | |
| 158 | Nhif And Linda Mama Reimbursement Edu Afya Fees | Completed | Ksh 367,570,000 | |
| 159 | Upgrading Of Six Model Health Facilities -(one Model Health Facility Per Sub County) | Completed | Ksh 9,000,000 | |
| 160 | Purchase Of Medical Equipment | Ksh 5,000,000 | ||
| 161 | Fencing Of Ndumoni Dispensary | Completed | Ksh 1,000,000 | |
| 162 | Renovation Of Ngiini Dispensary | Completed | Ksh 1,477,500 | |
| 163 | Construction Of Maternity Unit At Nziu Health Centre | Ongoing | Ksh 2,800,000 | |
| 164 | Power Backup For Nziu Health Centre Solar And Generator | Ongoing | Ksh 1,500,000 | |
| 165 | Surgical Implants And Employment Of A Nurse And A Nutritionist-Nzaui Kilili Kalamba | Ongoing | Ksh 1,920,000 | |
| 166 | Completion Of Modern Lab Block at Kathonzweni Health Centre | Ongoing | Ksh 2,000,000 | |
| 167 | Renovation Of Kanthuni Dispensary | Ongoing | Ksh 1,500,000 | |
| 168 | Medical Bills -kitise Kithuki | Ongoing | Ksh 650,000 | |
| 169 | Electrification Of Manza Dispensary | Ongoing | Ksh 1,000,000 | |
| 170 | Conditional Grant - For Covid 19 Emergency Response - | Ongoing | Ksh 27,257,613 | |
| 171 | Kako Health Center Construction Of Administration Block | Ongoing | Ksh 3,940,000 | |
| 172 | Kinyau Dispensary Renovation | Ongoing | Ksh 1,500,000 | |
| 173 | Construction Of Maternity Block at Itumbule Health Center | Ongoing | Ksh 3,000,000 | |
| 174 | Kwa Kaluli Dispensary-construction Of Septic Tank And Drainage | Ongoing | Ksh 400,000 | |
| 175 | Equipping Of Kamuthini Dispensary Laboratory | Ongoing | Ksh 1,000,000 | |
| 176 | Upgrading Of Masokani Dispensary | Ongoing | Ksh 1,500,000 | |
| 177 | Upgrading Of Kiou Top Dispensary-- Solar panels | Ongoing | Ksh 500,000 | |
| 178 | Upgrading Of Mutulani Dispensary- | Ongoing | Ksh 1,313,911 | |
| 179 | Upgrading Of Mutulani Dispensary With Ashpit, Incinerator,laboratory Eqquipping And Staff Quarters | Ongoing | Ksh 1,347,992 | |
| 180 | Relief Fund -Hospital Bill Waiver for the needy -Kilungu | Ongoing | Ksh 1,000,000 | |
| 181 | Mukuyuni Sub County Hospital -outpatient, Inpatient, Administration And X-ray Stoney Block | Ongoing | Ksh 2,000,000 | |
| 182 | Upgrading And Construction Of Ward At Mukuyuni Sub County Hospital | Ongoing | Ksh 10,000,000 | |
| 183 | Upgrading And Construction Of Ward At Mukuyuni Sub County Hospital | Ongoing | Ksh 3,246,818 | |
| 184 | Upgrading/construction Of Ward At Mukuyuni Sub County Hospital | Ongoing | Ksh 3,920,000 | |
| 185 | Construction Of Male Wards And Theatre At Mukuyuni Sub County Hospital | Ongoing | Ksh 3,880,000 | |
| 186 | Hospital Bills And Implants- Makindu | Ongoing | Ksh 3,000,000 | |
| 187 | Medical Bills -kikumbulyu North | Ongoing | Ksh 280,000 | |
| 188 | SHA /SHIF Registration Support -kikumbulyu South | Ongoing | Ksh 1,000,000 | |
| 189 | Electrification Of Kyanginywa Dispensary | Ongoing | Ksh 500,000 | |
| 190 | Construction Of Incinerators At Kasemeini & Kyanginywa Dispensaries | Ongoing | Ksh 500,000 | |
| 191 | Kyaani Dispensary - Construction Of Maternity Wing | Ongoing | Ksh 2,955,000 | |
| 192 | Renovation Of Nzeveni Health Centre Maternity | Ongoing | Ksh 1,500,000 | |
| 193 | Construction Of Outpatient Block And Latrine at Katulani Dispensary | Ongoing | Ksh 4,000,000 | |
| 194 | AIA Mutula Care | Ongoing | Ksh 90,000,000 | |
| 195 | DANIDA - Primary Healthcare In Devolved Context | Ongoing | Ksh 23,341,500 | |
| 196 | Medical Health Services Fees - Facility Improvement Fee(cash Collection) - Hospitals | Ongoing | Ksh 182,388,000 | |
| 197 | SHIF/SHA Reimbursements | Ongoing | Ksh 77,612,000 | |
| 198 | Essential Medicines And Medical Supplies-AIA | Ongoing | Ksh 250,000,000 | |
| 199 | Nutrition Programme - Matching Grant | Ongoing | Ksh 2,000,000 | |
| 200 | Purchase And Installation Of Mortuary Fridges | Not Started | Ksh 20,000,000 | |
| 201 | Renovation Of Kalima,kilili And Nzeeni Dispensaries | Under Procurement | Ksh 500,000 | |
| 202 | Kee Health Centre Solarization | Under Procurement | Ksh 400,000 | |
| 203 | Construction Of Incineter At Kasemeni And Kyanginywa Dispensary | Under Procurement | Ksh 500,000 | |
| 204 | Construction Of Kathyaka Maternity Block | Under Procurement | Ksh 2,000,000 | |
| 205 | Equipping And Operationalization of Mwasang'ombe Dispensary | Under Procurement | Ksh 1,000,000 | |
| 206 | Support For CHPs Mobility- Ivingoni Nzambani | Under Procurement | Ksh 2,900,000 | |
| 207 | Purchase Of Medical Equipment | Under Procurement | Ksh 8,000,000 | |
| 208 | Danida – Matching Grant For Level 2 And 3 Facilities | Under Procurement | Ksh 12,636,000 |
3. Department of Devolution, Public Service, Public Participation and Special Programs
| # | Project Name | Status | Budget | Action |
|---|---|---|---|---|
| 1 | Kilome Sub-county Administration Office | Completed | Ksh 9,000,000 | |
| 2 | Fire Fighting Equipment | Completed | Ksh 2,000,000 | |
| 3 | Wote Fire Station | Completed | Ksh 800,000 | |
| 4 | Kithuki Sub-ward Administrator's Office | Completed | Ksh 651,580 | |
| 5 | Makindu Fire Station | Completed | Ksh 300,000 | |
| 6 | Ivingoni/nzambani Ward Administrator's Office | Completed | Ksh 3,780,000 | |
| 7 | Mavindini Ward Administrator's Office | Completed | Ksh 6,258,066 | |
| 8 | Civic Education Programme | Completed | Ksh 500,000 | |
| 9 | Construction Of Ward Hod Offices (kilungu Ward Head Quarters Offices) -construction Of Ward... | Completed | Ksh 4,000,000 | |
| 10 | Civic Development Education -enhancement Of Civic Development Education Programs | Completed | Ksh 500,000 | |
| 11 | Budget For Civic Education -sensitization Forums For Public On Matters Development/issuance Of Ids | Completed | Ksh 500,000 | |
| 12 | Mavindini Ward Administrator's Office -furnishing Of Mavindini Ward Admin's Office And Kanthuni's... | Completed | Ksh 500,000 | |
| 13 | Fencing Of Makindu Fire Station | Completed | Ksh 900,000 | |
| 14 | Kdsp-ii Matching Grant | Completed | Ksh 10,000,000 | |
| 15 | Kdsp | Ongoing | Ksh 37,500,000 | |
| 16 | Ida(world Bank)-second Kenya Devolution Support Program-service Delivery And Investment... | Ongoing | Ksh 72,909,500 | |
| 17 | Ida(world Bank)-second Kenya Devolution Support Program-service Delivery And Investment... | Under Procurement | Ksh 352,500,000 |
4. Department of Agriculture, Livestock, Fisheries & Cooperative Development
| # | Project Name | Status | Budget | Action |
|---|---|---|---|---|
| 1 | Fruit Value Chain Development | Completed | Ksh 3,000,000 | |
| 2 | Establishment Of Low Pest Zones | Completed | Ksh 14,200,000 | |
| 3 | Provision Of Subsidized Certified Seeds | Completed | Ksh 3,000,000 | |
| 4 | Makueni Dairy Farmers Cooperative Society | Completed | Ksh 4,344,000 | |
| 5 | Fruit Value Chain Development (seedlings) Matching Grant | Completed | Ksh 2,000,000 | |
| 6 | Transportation Of Manure (fuel) | Completed | Ksh 1,000,000 | |
| 7 | Supply Of Manure And Seedlings | Completed | Ksh 1,500,000 | |
| 8 | Kavuthu Coldroom | Completed | Ksh 100,000 | |
| 9 | Grain And Pulse Value Chain Development | Completed | Ksh 2,000,000 | |
| 10 | Issuance Of Certified Maize Seeds | Completed | Ksh 4,000,000 | |
| 11 | Supply Of Certified Maize Seeds | Completed | Ksh 4,000,000 | |
| 12 | Support To Formation And Operationalization Of Ward Agricultural Sacco (navcd) | Completed | Ksh 1,000,000 | |
| 13 | Agricultural Training Institute - Kwa Kathoka | Completed | Ksh 6,898,299 | |
| 14 | Green Grams Value Chain Addition | Completed | Ksh 1,500,000 | |
| 15 | Rabies Vaccination | Completed | Ksh 500,000 | |
| 16 | Kathonzweni Dairy | Completed | Ksh 9,500,000 | |
| 17 | Training Of Young Agripreneurs | Completed | Ksh 500,000 | |
| 18 | Agricultural Development( Subsidized Ai Services) | Completed | Ksh 900,000 | |
| 19 | Agricultural Development( Supply Of Certified Pasture Seeds) | Completed | Ksh 1,000,000 | |
| 20 | Kathonzweni Dairy Farmers Cooperative Society | Completed | Ksh 7,272,345 | |
| 21 | Pasture Development | Completed | Ksh 1,000,000 | |
| 22 | Youth In Agriculture Project | Completed | Ksh 1,000,000 | |
| 23 | Fuel For Backhoe | Completed | Ksh 500,000 | |
| 24 | Kikome Irrigation Scheme Phase 11 | Completed | Ksh 7,000,000 | |
| 25 | Value Chain Mango Farming And Goat Rearing -funding Mavindini Farmer's Sacco So That Farmer's Can... | Completed | Ksh 1,000,000 | |
| 26 | Kikome Irrigation Scheme | Completed | Ksh 7,932,953 | |
| 27 | Training Of Young Agripreneurs | Completed | Ksh 500,000 | |
| 28 | Operationalization Of Kikima Dairy Processing Plant | Completed | Ksh 500,000 | |
| 29 | Dairy Farming And Livestock Keeping | Completed | Ksh 2,000,000 | |
| 30 | Grain And Pulse Value Chain Development | Completed | Ksh 2,000,000 | |
| 31 | Supply Of Certified Seeds | Completed | Ksh 1,000,000 | |
| 32 | Revitalize Kikima Dairy Cooperative And Provision Of Ai Services | Completed | Ksh 2,000,000 | |
| 33 | Dairy Development Programme -provision Of Subsidized Artificial Insemination Services | Completed | Ksh 1,000,000 | |
| 34 | Agriculture Development Programme -provision Of Certified Seeds (maize And Beans}, Supply Of... | Completed | Ksh 1,000,000 | |
| 35 | Mbooni Ward Kilimo Sacco -financial Support (seed Capital) To The Sacco | Completed | Ksh 1,000,000 | |
| 36 | Hay Stands | Completed | Ksh 490,408 | |
| 37 | Kathambalani Irrigation Project. | Completed | Ksh 8,000,000 | |
| 38 | Utangwa Coffee Factory,rehabilitation Of Infrastructure And Establishment Of Coffee Nursery | Completed | Ksh 3,000,000 | |
| 39 | Vegetable Value Chain Developement | Completed | Ksh 3,500,000 | |
| 40 | Procurement Of Fuel And Lubricant In The Department Of Agriculture | Completed | Ksh 909,000 | |
| 41 | Market Access Roads-culverts Along Kilyungi-woyani-ngaani Road. | Completed | Ksh 1,910,839 | |
| 42 | Rehabilitation Of Uvuu Coffee Factory | Completed | Ksh 3,000,000 | |
| 43 | Provision Of Mango And Avocado Seedlings | Completed | Ksh 2,500,000 | |
| 44 | Development Of Sustainable Value Chains | Completed | Ksh 1,000,000 | |
| 45 | Support Agricultural Saccos Distribution Of Certified Farm Inputs-seedlings, Fertilizer,... | Completed | Ksh 2,700,000 | |
| 46 | Mango Production And Storage Support And Poultry Farming. | Completed | Ksh 500,000 | |
| 47 | Kyang'ondu Stock Yard | Completed | Ksh 3,000,000 | |
| 48 | Grain And Pulse Value Chain Development | Completed | Ksh 1,000,000 | |
| 49 | Establish Satellite Fertiliser | Completed | Ksh 500,000 | |
| 50 | Provision Of Certified Seeds | Completed | Ksh 1,000,000 | |
| 51 | Pest And Disease Control For Mango Value Chain | Completed | Ksh 1,000,000 | |
| 52 | Establish Satellite Fertiliser Depot | Completed | Ksh 500,000 | |
| 53 | Seed Bulking | Completed | Ksh 1,000,000 | |
| 54 | Distribution Of Certified Seed | Completed | Ksh 1,000,000 | |
| 55 | Provision Of Certified Seeds (maize And Beans)adaptive To Mukaa Climate. | Completed | Ksh 3,000,000 | |
| 56 | Kasikeu Stock Yard And Toilet. | Completed | Ksh 478,184 | |
| 57 | Grain And Pulse Value Chain Development | Completed | Ksh 2,000,000 | |
| 58 | Agricultural Productivity Programme | Completed | Ksh 1,342,800 | |
| 59 | Kasikeu Grain Milling Facility | Completed | Ksh 19,950 | |
| 60 | Provision Of Certified Seeds | Completed | Ksh 1,500,000 | |
| 61 | Provision Of Certified Mango, Avocado Seedlings, Certified Seeds, Fertilizer And Other Farm Inputs | Completed | Ksh 4,000,000 | |
| 62 | Establish Satellite Fertilizer Depot At Kee | Completed | Ksh 500,000 | |
| 63 | Ward Based Sacco | Completed | Ksh 340,511 | |
| 64 | Provision Of Agricultural Inputs Of Certified Seeds | Completed | Ksh 2,500,000 | |
| 65 | Fruit Value Chain Development | Completed | Ksh 500,000 | |
| 66 | Avocado Value Chain Development | Completed | Ksh 2,000,000 | |
| 67 | Purchase Of Certified Maize Seeds | Completed | Ksh 5,000,000 | |
| 68 | Avocado Value Chain | Completed | Ksh 1,000,000 | |
| 69 | Avocado Value Chain Development | Completed | Ksh 1,500,000 | |
| 70 | Supply Of Certified Seeds | Completed | Ksh 1,500,000 | |
| 71 | Wautu Fertilizer Depot | Completed | Ksh 2,500,000 | |
| 72 | Avocado Value Chain -supply Of Locally Sourced Certified Seedling | Completed | Ksh 1,500,000 | |
| 73 | Development Of Farm Ponds- Fuel | Completed | Ksh 1,412,400 | |
| 74 | Centralized Small-scale Farming | Completed | Ksh 2,500,000 | |
| 75 | Development Of Makueni Ask Show | Completed | Ksh 4,663,000 | |
| 76 | Galla Goats For Pwds | Completed | Ksh 1,000,000 | |
| 77 | Goat Rearing Programme - Distribution Of Galla Goats | Completed | Ksh 172,150 | |
| 78 | Goat Value Chain Development | Completed | Ksh 2,000,000 | |
| 79 | Matching Grant To The Ward Agricultural Sacco | Completed | Ksh 500,000 | |
| 80 | Makueni Integrated Grain Value Addition Plant | Completed | Ksh 4,000,000 | |
| 81 | Support To Kikumbulyu Farmer's Sacco -navcdp | Completed | Ksh 1,000,000 | |
| 82 | Nguumo Poultry Aggregation Centre | Completed | Ksh 80,343 | |
| 83 | Subsidized Farm Pond Development | Completed | Ksh 600,000 | |
| 84 | Goat Value Chain Development- Pwds | Completed | Ksh 1,243,000 | |
| 85 | Green Grams Value Chain Development | Completed | Ksh 2,500,000 | |
| 86 | Agriculture Development Programme | Completed | Ksh 127,160 | |
| 87 | Agricultural And Livestock Productivity | Completed | Ksh 2,000,000 | |
| 88 | Support To Emali/mulala Farmers Sacco-funding The Sacco | Completed | Ksh 1,000,000 | |
| 89 | Poultry Chain Value Chain Development | Completed | Ksh 1,000,000 | |
| 90 | Masongaleni Kilimo Funds Sacco | Completed | Ksh 500,000 | |
| 91 | Green Grams Value Chain Development | Completed | Ksh 2,500,000 | |
| 92 | Provision Of Gala Goat | Completed | Ksh 1,000,000 | |
| 93 | Green Grams Value Chain Development | Completed | Ksh 1,000,000 | |
| 94 | Supplyof The Galla Goats | Completed | Ksh 1,000,000 | |
| 95 | Livestock Development | Completed | Ksh 1,000,000 | |
| 96 | Purchase Of Gala Goats And Distribution To Farmers | Completed | Ksh 1,000,000 | |
| 97 | Matching Grant To The Ward Agricultural Sacco | Completed | Ksh 150,000 | |
| 98 | Support Ward Sacco And Capacity Building On Value Chains& Market Development | Completed | Ksh 1,000,000 | |
| 99 | Purchase And Distribution Of Galla Goats | Completed | Ksh 2,000,000 | |
| 100 | Green Grams Value Chain Development | Completed | Ksh 1,500,000 | |
| 101 | Farmers Trainings And Timely Provision Of Certified Seeds | Completed | Ksh 1,000,000 | |
| 102 | Fisheries Development Programme | Completed | Ksh 1,500,000 | |
| 103 | Agriculture Extension Programme | Completed | Ksh 10,587,436 | |
| 104 | Agriculture Mechanzation Services(ams) | Completed | Ksh 1,000,000 | |
| 105 | Co-operative Development And Management | Completed | Ksh 4,583,930 | |
| 106 | Strengthening Of Nthonza Kilimo Sacco. | Completed | Ksh 2,000,000 | |
| 107 | Ready To Drink Juice(rtd) Production | Completed | Ksh 27,587,000 | |
| 108 | Purified Drinking Water Production | Completed | Ksh 1,513,505 | |
| 109 | Purchase Of Mangoes | Completed | Ksh 14,400,000 | |
| 110 | Kenya Devolution Support Programme | Completed | Ksh 8,525,054 | |
| 111 | National Agricultural And Rural Inclusive Growth Project (narigp) | Completed | Ksh 60,000,000 | |
| 112 | Ida(world Bank) Credit National Agricultural Value Chain Development Project(navcdp) | Completed | Ksh 200,000,000 | |
| 113 | Rabies Elimination Programme | Completed | Ksh 6,168,500 | |
| 114 | Livestock Disease Control | Completed | Ksh 5,308,526 | |
| 115 | Makueni Integrated Grain Value Chain Development Project | Completed | Ksh 4,000,000 | |
| 116 | Fruit Development Programme | Completed | Ksh 234,032 | |
| 117 | Extension Service Delivery | Completed | Ksh 244,714 | |
| 118 | Installation Of Pallets At Satellite Fertiliser Stores | Completed | Ksh 500,000 | |
| 119 | Sweden- Agricultural Sector Development Support Programme (asdsp) Ii | Completed | Ksh 1,101,751 | |
| 120 | Irrigation Development Programmes | Completed | Ksh 1,795,800 | |
| 121 | Food Security Initiatives | Completed | Ksh 296,001 | |
| 122 | Atc-kwa Kathoka | Completed | Ksh 375,550 | |
| 123 | Makueni Agricultural Extension Programme | Completed | Ksh 399,600 | |
| 124 | Livestock Disease Control | Completed | Ksh 5,308,526 | |
| 125 | Puree Production | Completed | Ksh 13,549,224 | |
| 126 | Ida (world Bank) Credit (national Agricultural And Rural Inclusive Growth Project (narigp) Pending... | Completed | Ksh 14,344,221 | |
| 127 | De-risking And Value Enhancement (drive) Project | Completed | Ksh 63,341,980 | |
| 128 | Conditional Grant For Provision Of Fertilizer Subsidy Programme | Completed | Ksh 162,562,856 | |
| 129 | National Agricultural Value Chain Development Project(navcdp) | Completed | Ksh 5,000,000 | |
| 130 | Mbavani Irrigation Scheme | Completed | Ksh 4,101,300 | |
| 131 | Artificial Insemination (ai) | Completed | Ksh 1,045,048 | |
| 132 | Rtd Line Arrears | Completed | Ksh 1,000,000 | |
| 133 | Agriculture Mechanzation Services(ams) | Completed | Ksh 1,000,000 | |
| 134 | Implement Animal Health And Breeding Program For All 30 Wards For Dairy And Beef Animals | Completed | Ksh 7,780,000 | |
| 135 | De-risking And Value Enhancement (drive) Project | Completed | Ksh 7,500,000 | |
| 136 | Purchase Of Mangoes | Completed | Ksh 13,400,000 | |
| 137 | Puree Production | Completed | Ksh 11,561,000 | |
| 138 | Ready To Drink Juice | Completed | Ksh 10,891,765 | |
| 139 | Purified Drinking Water | Completed | Ksh 10,269,682 | |
| 140 | Installation Of An Epoxy Floor Repair | Completed | Ksh 1,276,917 | |
| 141 | Quality Management Certifications | Completed | Ksh 2,950,000 | |
| 142 | Community Water Distribution | Completed | Ksh 550,000 | |
| 143 | Effluent Treatment Plant(etp) | Completed | Ksh 600,000 | |
| 144 | Feasibility Study And Designs For Kathonzweni Livestock Abattoir | Completed | Ksh 1,300,000 | |
| 145 | Ida(world Bank) Credit National Agricultural Value Chain Development Project(navcdp) | Completed | Ksh 151,515,152 | |
| 146 | Matching Grant-ida(world Bank) Credit National Agricultural Value Chain Development Project(navcdp) | Completed | Ksh 5,000,000 | |
| 147 | Maintance Of Low Pest Zones - Procurement Of Low Pest Management Technologies, And Training Farmers | Completed | Ksh 3,500,000 | |
| 148 | Industrial Crops Development (coffee, Macadamia) | Completed | Ksh 3,180,000 | |
| 149 | Establishment Of 10 Aggregation Centeres To Facilitate Market Linkages For Agricultural Produce And... | Completed | Ksh 2,500,000 | |
| 150 | Grains Development | Completed | Ksh 2,500,000 | |
| 151 | Feasibility Study And Designs For Kathonzweni Livestock Abattoir | Completed | Ksh 1,300,000 | |
| 152 | Rtd Line Repairs | Completed | Ksh 1,000,000 | |
| 153 | Purchase Of Mangoes For Puree Production | Completed | Ksh 13,920,000 | |
| 154 | Puree Production | Completed | Ksh 12,408,931 | |
| 155 | Policy & Legal Framework | Completed | Ksh 1,900,000 | |
| 156 | Technical Evaluation Of Flagship Projects | Completed | Ksh 1,500,000 | |
| 157 | Rtd Line Modification | Completed | Ksh 1,305,000 | |
| 158 | Agriculture Extension Programme | Completed | Ksh 1,200,000 | |
| 159 | Livestock Disease Control | Completed | Ksh 7,000,000 | |
| 160 | Matching Grant-ida(world Bank) Credit National Agricultural Value Chain Development Project(navcdp) | Completed | Ksh 5,000,000 | |
| 161 | Ulilinzi Mkt Livestock Yard | Completed | Ksh 2,000,000 | |
| 162 | Extension Service Delivery | Ongoing | Ksh 3,404,444 | |
| 163 | Avocado Development Programme | Ongoing | Ksh 241,408 | |
| 164 | Mukaa Ward Tree Nurseries | Ongoing | Ksh 702,585 | |
| 165 | Fuel For Excavation Of Farm Ponds | Ongoing | Ksh 750,000 | |
| 166 | Fruit Development- Avocado And Mango Value Chains | Ongoing | Ksh 2,500,000 | |
| 167 | Livestock Value Chain Support Project | Ongoing | Ksh 21,485,520 | |
| 168 | Erp System And Cctv Enhancement | Ongoing | Ksh 4,000,000 | |
| 169 | Quality Management Certifications | Ongoing | Ksh 3,442,000 | |
| 170 | Energy Audit | Ongoing | Ksh 435,000 | |
| 171 | Agriculture Mechanization Services(ams) | Ongoing | Ksh 3,000,000 | |
| 172 | Ida(world Bank) Credit National Agricultural Value Chain Development Project(NAVCDP) | Ongoing | Ksh 290,096,655 | |
| 173 | " A) Livestock Development-pasture Provision, Ai Services , Trainings And Value Addition B) ... | Under Procurement | Ksh 2,000,000 | |
| 174 | Agriculture Development Programme | Under Procurement | Ksh 1,510,000 | |
| 175 | Renovation And Fencing Of Tututha Cooperative House To Be A Fertilizer Depot | Under Procurement | Ksh 1,000,000 | |
| 176 | Mbumbuni Stockyard And Dumpsite | Under Procurement | Ksh 500,000 | |
| 177 | Support To Farmers - Supply Of Manure-fuel | Under Procurement | Ksh 800,000 | |
| 178 | Subsidized Farm Mechanization | Under Procurement | Ksh 2,000,000 | |
| 179 | Malili Town Stockyard | Under Procurement | Ksh 2,000,000 | |
| 180 | Completion Of Kasikeu Milling Plant | Under Procurement | Ksh 3,000,000 | |
| 181 | Dairy Value Chain -ai Services Inclunding Farmers' Capacity Building | Under Procurement | Ksh 1,000,000 | |
| 182 | Ai Development | Under Procurement | Ksh 329,685 | |
| 183 | Kenya Agricultural Business Development Project (kabdp) | Under Procurement | Ksh 10,918,919 | |
| 184 | Kenya Agricultural Business Development Project (kabdp) | Under Procurement | Ksh 10,918,919 | |
| 185 | Bottle Store Flooring | Under Procurement | Ksh 1,140,780 | |
| 186 | Rebranding | Under Procurement | Ksh 1,600,000 | |
| 187 | Tetra Pak Juice Machine | Under Procurement | Ksh 5,500,000 | |
| 188 | Blow Moulding Machine | Under Procurement | Ksh 8,398,511 |
5. Department of Finance, Planning, Budget and Revenue
| # | Project Name | Status | Budget | Action |
|---|---|---|---|---|
| 1 | Athi Tunguni Kilema Project | Completed | Ksh 1,253,896 | |
| 2 | Installation And Rehabilitation Of Integrated Solar Market Lights In Kilungu | Completed | Ksh 3,000,000 | |
| 3 | Installation Of Solar Power Streetlights From Deputy Governor's Residence Junction To Seku... | Completed | Ksh 4,471,298 | |
| 4 | Installation And Rehabilitation Of Streetlights In Makindu Ward | Completed | Ksh 2,000,000 | |
| 5 | MII ECDE | Completed | Ksh 4,088,980 | |
| 6 | Rehabilitation of Makueni Main Prison Borehole | Completed | Ksh 1,704,700 | |
| 7 | Drilling and development of Seku Borehole | Completed | Ksh 1,840,700 | |
| 8 | Rehabilitation Of Eni Borehole | Completed | Ksh 1,426,769 | |
| 9 | Rehabilitation Of Kyaluma Borehole | Completed | Ksh 598,682 | |
| 10 | Supply Of Foodstuffs(maize And Rice) For Whirlwind Disaster Victims In Makindu And Nzakika Wards | Completed | Ksh 390,400 | |
| 11 | Supply Of Foodstuffs(peas) For Whirlwind Disaster Victims In Makindu And Nzakika Wards | Completed | Ksh 208,000 | |
| 12 | Lung'u To Kavuvoni Pipeline Works And Supply Of Tanks & Pipes For Ua Borehole. | Completed | Ksh 1,999,996 | |
| 13 | Rehabilitation Of Kaseve Borehole | Completed | Ksh 527,936 | |
| 14 | Kdsp Level 1 | Completed | Ksh 4,956,232 | |
| 15 | Kdsp Level 2 Grant | Completed | Ksh 37,129,123 | |
| 16 | County Treasury Office Block | Completed | Ksh 4,074,246 | |
| 17 | Supplementary Projects | Completed | Ksh 6,127,951 | |
| 18 | County Treasury Office Block | Completed | Ksh 2,500,000 | |
| 19 | Proposed Drainage & Protection Works At Kalongo Packhouse | Completed | Ksh 4,732,104 | |
| 20 | Rehabilitation Of Kaiti 1 Filtration Unit & Pipeline | Completed | Ksh 3,135,568 | |
| 21 | Construction Of 3 Door Pit Latrine At Matiku Ecde Centre | Completed | Ksh 624,967 | |
| 22 | Hire Of Machines For Gravelling Of Utangwa - Kyambalasi Road | Completed | Ksh 5,331,000 | |
| 23 | Kwa Kakulu Earthdam | Ongoing | Ksh 1,834,400 | |
| 24 | Equipping Of Londokwe Borehole | Ongoing | Ksh 2,183,860 | |
| 25 | Kwa Kavisi Ecde | Ongoing | Ksh 4,082,230 | |
| 26 | Supplementary Projects | Under Procurement | Ksh 20,000,000 | |
| 27 | Skauti -kisyulya Road | Under Procurement | Ksh 3,904,677 |
6. Department of Gender, Children, Youth, Sports and Social Services
| # | Project Name | Status | Budget | Action |
|---|---|---|---|---|
| 1 | Kitikyumu Playground | Completed | Ksh 142,032 | |
| 2 | Sports Development Wote/nziu | Completed | Ksh 925,000 | |
| 3 | Nziu Playground | Completed | Ksh 1,500,000 | |
| 4 | Support To Organized Groups Including Pwds In Nziu Sub-ward | Completed | Ksh 5,096,000 | |
| 5 | Pwd Support-assistive Devices -support Pwds With Assorted Assistive Devices Wote/nziu | Completed | Ksh 500,000 | |
| 6 | Sports Development - Wote/nziu Ward | Completed | Ksh 300,000 | |
| 7 | Sports Development Programmes- Wote Nziu Ward | Completed | Ksh 350,000 | |
| 8 | Maintenance Of A Fitness Centre | Completed | Ksh 200,000 | |
| 9 | Social groups - Tents And Chairs Nzaui/kilili/kalamba | Completed | Ksh 5,635,000 | |
| 10 | Tents And Chairs To Five Groups-nzaui/kilili/kalamba | Completed | Ksh 1,250,000 | |
| 11 | Sports And Youth Development Programme -nzaui/kilili/kalamba | Completed | Ksh 405,000 | |
| 12 | Youth Ujuzi Teketeke-nzaui/kilili/kalamba | Completed | Ksh 850,000 | |
| 13 | Pwd Support-assistive Devices -support Pwds With Assorted Assistive Devices Nzaui/kilili/kalamba | Completed | Ksh 500,000 | |
| 14 | Support To Women Groups - Nzui/kilili/kalamba | Completed | Ksh 500,000 | |
| 15 | Issuance Of Birth Certificates | Completed | Ksh 200,000 | |
| 16 | Support To Groups-chairs And Tents (nzaui Region, Catholic Parish Matiliku, Ndumoni Welfare, Kikui... | Completed | Ksh 1,250,000 | |
| 17 | Manooni Play Ground | Completed | Ksh 3,688,468 | |
| 18 | Mbeletu Playground -levelling And Protection Works-mbitini Ward | Completed | Ksh 4,000,000 | |
| 19 | Purchase Of Chairs And Tents-mbitini Ward | Completed | Ksh 3,000,000 | |
| 20 | Sports And Youth Development Programme -mbitini | Completed | Ksh 450,000 | |
| 21 | Pwd Support-assistive Devices -support Pwds With Assorted Assistive Devices Mbitini | Completed | Ksh 500,000 | |
| 22 | Pa System- Mbitini Ward | Completed | Ksh 1,000,000 | |
| 23 | Pa System- Emali/mulala Ward | Completed | Ksh 1,000,000 | |
| 24 | Vulueni Play Ground | Completed | Ksh 2,000,000 | |
| 25 | Issuance Of Birth Certificates -mbitini | Completed | Ksh 200,000 | |
| 26 | Tents And Chairs- Mbitini | Completed | Ksh 1,000,000 | |
| 27 | Ligi Mashinani- Mbitini Ward | Completed | Ksh 1,000,000 | |
| 28 | Mbeletu Playground | Completed | Ksh 3,500,000 | |
| 29 | Facilitation For Issuance And Replacement Of Ids At Kwa Mutula,kithumani And Mbuthani- Mbtini Ward | Completed | Ksh 300,000 | |
| 30 | Sports And Youth Development Programme -kikumini/muvau | Completed | Ksh 300,000 | |
| 31 | Pwd Support-assistive Devices -support Pwds With Assorted Assistive Devices Kikumini/muvau | Completed | Ksh 500,000 | |
| 32 | Youth Sports Tournament Kathonzweni | Completed | Ksh 397,500 | |
| 33 | Wheelchairs And Assistive Devices To Pwd Kathonzweni | Completed | Ksh 500,000 | |
| 34 | Support To Special Groups With Tents And Chairs-kathonzweni Ward | Completed | Ksh 1,000,000 | |
| 35 | Sports And Youth Development Programme - Kathonzweni Ward | Completed | Ksh 300,000 | |
| 36 | Pwd Support-assistive Devices -support Pwds With Assorted Assistive Devices Kathonzweni | Completed | Ksh 500,000 | |
| 37 | Youth Economic Empowerment (ujuzi Teke Teke) Kathonzweni | Completed | Ksh 400,000 | |
| 38 | Ligi Mashinani- Kathonzweni Ward | Completed | Ksh 1,000,000 | |
| 39 | Sports Development Mavindini | Completed | Ksh 700,000 | |
| 40 | Mavindini Playground | Completed | Ksh 2,849,234 | |
| 41 | Completion Of Mavindini Play Ground- Drainage Structures And Sporting Infrastructure-mavindini Ward | Completed | Ksh 2,000,000 | |
| 42 | Sports And Youth Development Programme - Youth, Talent And Infrastructure Development For... | Completed | Ksh 450,000 | |
| 43 | Support To Organised Groups -tents And Chairs-mavindini Ward. | Completed | Ksh 1,500,000 | |
| 44 | Mavindini Playground -- | Completed | Ksh 1,500,000 | |
| 45 | Sports Development Kitise/kithuki | Completed | Ksh 340,000 | |
| 46 | Dias At Kisite Market | Completed | Ksh 1,000,000 | |
| 47 | Rehabilitation Of Kitise Market Public Dias-kitise/kithuki | Completed | Ksh 1,000,000 | |
| 48 | Sports And Youth Development Programme - Kitise/kithuki | Completed | Ksh 300,000 | |
| 49 | Pwd Support-assistive Devices -support Pwds With Assorted Assistive Devices Kitise/kithuki | Completed | Ksh 500,000 | |
| 50 | Youth Empowerment- Driving course training- Kitise/kithuki | Completed | Ksh 800,000 | |
| 51 | Ligi Mashinani - Kitise. Kithuki Ward | Completed | Ksh 1,000,000 | |
| 52 | Kyangoma Stadium | Completed | Ksh 1,025,000 | |
| 53 | Social Protection - Pwds Empowerment - Mbooni | Completed | Ksh 918,400 | |
| 54 | Youth Empowerment Programme Bodaboda Sacco Mbooni Ward | Completed | Ksh 800,000 | |
| 55 | Rehabilitation Of Kyangoma Playground Mbooni | Completed | Ksh 2,000,000 | |
| 56 | Sports-youth Development Programme,tulimani | Completed | Ksh 600,000 | |
| 57 | Support To Registered Groups( Tents And Chairs)-kithungo/kitundu | Completed | Ksh 1,500,000 | |
| 58 | Sports And Youth Development Programme -mbooni | Completed | Ksh 330,000 | |
| 59 | Support To Organized Groups-mbooni | Completed | Ksh 1,000,000 | |
| 60 | Pwd Spport-assistive Devices -support Pwds With Assorted Assistive Devices - Mbooni ward | Completed | Ksh 500,000 | |
| 61 | Sports Development Programme -mbooni | Completed | Ksh 1,000,000 | |
| 62 | Water tanks- Mbooni | Completed | Ksh 1,000,000 | |
| 63 | Pwd Empowerment Programme - Mbooni | Completed | Ksh 500,000 | |
| 64 | Kusyongali Playground | Completed | Ksh 4,000,000 | |
| 65 | Youth Empowerment Programme -kithungo/kitundu | Completed | Ksh 900,000 | |
| 66 | Sports And Youth Development Programme -kithungo/kitundu | Completed | Ksh 300,000 | |
| 67 | Pwd Support-assistive Devices -kithungo/kitundu | Completed | Ksh 500,000 | |
| 68 | Pwds Mapping- Kithungo Kitundu | Completed | Ksh 500,000 | |
| 69 | Tents And Chairs- Kithungo Kitundu | Completed | Ksh 1,500,000 | |
| 70 | Sport Development Programme- Tulimani ward | Completed | Ksh 150,000 | |
| 71 | Youth Empowerment Programme- Tulimani ward | Completed | Ksh 810,000 | |
| 72 | Social Groups Tents And Chairs Tulimani | Completed | Ksh 2,450,000 | |
| 73 | Youth Empowerment-licensing Tulimani | Completed | Ksh 1,000,000 | |
| 74 | Pwd Support-assistive Devices -support Pwds With Assorted Assistive Devices Tulimani | Completed | Ksh 500,000 | |
| 75 | Birth Certificates And Registration- Tulimani Ward | Completed | Ksh 267,983 | |
| 76 | Iviani, Kivani And Kiteta Playgrounds | Completed | Ksh 1,900,000 | |
| 77 | Support To Groups(tents And Chairs)- Kisau Kiteta ward | Completed | Ksh 3,000,000 | |
| 78 | Kiteta Playground Kisau/kiteta | Completed | Ksh 2,100,000 | |
| 79 | Sports And Youth Development Programme -kisau/kiteta | Completed | Ksh 300,000 | |
| 80 | Ligi Mashinani- Kisau Kiteta | Completed | Ksh 1,000,000 | |
| 81 | Boda Boda Shed - Kako/waia | Completed | Ksh 300,000 | |
| 82 | Ligi Mashinani Kako/waia | Completed | Ksh 1,000,000 | |
| 83 | Pwds Mapping Kako/waia | Completed | Ksh 500,000 | |
| 84 | Ligi Mashinani -waia Kako | Completed | Ksh 1,500,000 | |
| 85 | Wambiti Stadium/talent Centre | Completed | Ksh 1,000,000 | |
| 86 | Sports Development Kalawa | Completed | Ksh 200,000 | |
| 87 | Social Protection Kalawa | Completed | Ksh 887,500 | |
| 88 | Sports And Youth Development Programme - Kalawa | Completed | Ksh 300,000 | |
| 89 | Pwd Support-assistive Devices -kalawa | Completed | Ksh 500,000 | |
| 90 | Ligi Mashinani - Kalawa | Completed | Ksh 1,500,000 | |
| 91 | Pwd Sports- Kalawa | Completed | Ksh 500,000 | |
| 92 | Construction Of A Toilet At Kalawa Play Grounds | Completed | Ksh 500,000 | |
| 93 | Kiu Primary Play Ground And Toilet | Completed | Ksh 2,000,000 | |
| 94 | Sports And Youth Development Programme Kiimakiu/kalanzoni | Completed | Ksh 300,000 | |
| 95 | Pwd Assistive Devices - Kiima Kiu Kalanzoni Ward | Completed | Ksh 500,000 | |
| 96 | Tents And Chairs- Kiima Kiu Kalanzoni Ward | Completed | Ksh 1,500,000 | |
| 97 | Ligi Mashinani - Kiima Kiu Kalanzoni Ward | Completed | Ksh 1,000,000 | |
| 98 | Pwd Mapping -mapping And Registration- Kiima Kiu Kalanzoni Ward | Completed | Ksh 500,000 | |
| 99 | Sports Development Mukaa | Completed | Ksh 245,000 | |
| 100 | Uvete Playground | Completed | Ksh 2,000,000 | |
| 101 | Sports And Youth Development Programme Mukaa | Completed | Ksh 300,000 | |
| 102 | Pwd Support-assistive Devicesmukaa | Completed | Ksh 500,000 | |
| 103 | Purchase Of Tents And Chairs To 10 Groups Mukaa | Completed | Ksh 2,500,000 | |
| 104 | Sports And Youth Development Programme Kasikeu | Completed | Ksh 450,000 | |
| 105 | Pwd Support-assistive Devices Kasikeu | Completed | Ksh 500,000 | |
| 106 | Tents And Chairs- Kasikeu Ward | Completed | Ksh 2,000,000 | |
| 107 | Youth Empowerment Programme- Kee ward (Driving course training) | Completed | Ksh 378,000 | |
| 108 | Ujuzi Teke Teke Kee Ward | Completed | Ksh 198,630 | |
| 109 | Nguluni Bodaboda | Completed | Ksh 270,000 | |
| 110 | Sports And Youth Development Programme Kee | Completed | Ksh 300,000 | |
| 111 | Tents And Chairs- Kee ward | Completed | Ksh 1,600,000 | |
| 112 | Driving Course Training- Kee Ward | Completed | Ksh 500,000 | |
| 113 | Ligi Mashinani- Kee Ward | Completed | Ksh 1,000,000 | |
| 114 | Kyanduya Social Hall | Completed | Ksh 3,000,000 | |
| 115 | Sports Development Kilungu | Completed | Ksh 520,000 | |
| 116 | Social Groups - Tents And Chairs Kilungu | Completed | Ksh 3,000,000 | |
| 117 | Support To Groups – Kilungu | Completed | Ksh 3,000,000 | |
| 118 | Youth Empowerment-kilungu | Completed | Ksh 1,400,000 | |
| 119 | Ligi Mashinani- Kilungu | Completed | Ksh 2,000,000 | |
| 120 | Ilima Water Tanks For Elderly | Completed | Ksh 1,000,000 | |
| 121 | Gbv –ilima | Completed | Ksh 1,000,000 | |
| 122 | Purchase Of Tents And Chairs For Organized Groups-ilima | Completed | Ksh 1,500,000 | |
| 123 | Boda Boda Training And Licensing Ilima | Completed | Ksh 1,000,000 | |
| 124 | Sports Development – Ward Tournament Ilima | Completed | Ksh 300,000 | |
| 125 | Musalala/akatch Stadium | Completed | Ksh 984,850 | |
| 126 | Ligi Mashinani- Ilima Ward | Completed | Ksh 1,500,000 | |
| 127 | Tents And Chairs- Ilima | Completed | Ksh 1,500,000 | |
| 128 | Chairs - Ukia Ward | Completed | Ksh 266,900 | |
| 129 | Social Protection Ukia | Completed | Ksh 233,100 | |
| 130 | Kwa Kamoli (utaati) Talent Centre | Completed | Ksh 737,350 | |
| 131 | Kwa Kamoli Talent Center Ukia | Completed | Ksh 1,500,000 | |
| 132 | Sports And Youth Development Programme Ukia | Completed | Ksh 300,000 | |
| 133 | Pwd Support-assistive Devises Ukia | Completed | Ksh 500,000 | |
| 134 | Supply Of 500 Chairs To Organized Groups - Ukia ward | Completed | Ksh 500,000 | |
| 135 | Ligi Mashinani/paralympic -ukia | Completed | Ksh 1,000,000 | |
| 136 | Kwa Kamoli Talent Centre | Completed | Ksh 1,000,000 | |
| 137 | Youth Empowerment ; Ajira Kwa Vijana, Ujuzi Teketeke- Makindu | Completed | Ksh 500,000 | |
| 138 | Sports And Youth Development Program-youth, Talent And Infrastructure Development For Athletics,... | Completed | Ksh 100,000 | |
| 139 | Tents And Chairs- Kikumbulyu North | Completed | Ksh 2,000,000 | |
| 140 | Youth empowerment and Sports Development Kikumbulyu North | Completed | Ksh 450,000 | |
| 141 | Purchase Of Water Tanks For Women Groups - Kikumbulyu North | Completed | Ksh 500,000 | |
| 142 | Sports And Youth Development Programme -youth, Talent And Infrastructure Development For... | Completed | Ksh 300,000 | |
| 143 | Pwd Support-assistive Devices -support Pwds With Assorted Assistive Devices-kikumbulyu North | Completed | Ksh 500,000 | |
| 144 | Ujuzi Teketeke - Kikumbulyu North | Completed | Ksh 300,000 | |
| 145 | Social groups Tents And Chairs- Kikumbulyu South | Completed | Ksh 2,000,000 | |
| 146 | Youth empowerment programme Kikumbulyu South | Completed | Ksh 1,361,346 | |
| 147 | Sports And Youth Development Programme -youth, Talent And Infrastructure Development For... | Completed | Ksh 200,000 | |
| 148 | Support To Groups With Gas Cylinders -kikumbulyu South | Completed | Ksh 2,000,000 | |
| 149 | Plastic Chairs For Fbos-kikumbulyu South | Completed | Ksh 1,500,000 | |
| 150 | Support To Elderly- Kikumbulyu South | Completed | Ksh 500,000 | |
| 151 | Youth Empowerment- Kikumbulyu South Ward | Completed | Ksh 1,000,000 | |
| 152 | Support To The Elderly (blankets And Mattresses) - Kikkumbulyu South | Completed | Ksh 1,000,000 | |
| 153 | Tents And Chairs- Kikumbulyu South | Completed | Ksh 1,000,000 | |
| 154 | Food stuff and non-food stuff; Nguumo ward | Completed | Ksh 1,000,000 | |
| 155 | Sports And Youth Development Programme Youth, Talent And Infrastructure Development For Athletics,... | Completed | Ksh 300,000 | |
| 156 | Mulala Play Ground | Completed | Ksh 3,497,204 | |
| 157 | Makueni Child Protection Centre | Completed | Ksh 6,348,220 | |
| 158 | Kiuani Playground | Completed | Ksh 880,000 | |
| 159 | Support To Groups With Chairs And Tents-emali/mulala | Completed | Ksh 2,500,000 | |
| 160 | Sports Development- Emali/Mulala ward | Completed | Ksh 300,000 | |
| 161 | Boda-boda -emali/mulala | Completed | Ksh 500,000 | |
| 162 | Pwd Support – Support Pwds With Assorted Assistive Devices -emali/mulala | Completed | Ksh 500,000 | |
| 163 | Emali Mechanics Support Program | Completed | Ksh 500,000 | |
| 164 | Purchase Of Chairs And Tents- Emali/mulala | Completed | Ksh 1,000,000 | |
| 165 | Makueni Child Protection Centre | Completed | Ksh 3,786,979 | |
| 166 | Ujuzi Teke Teke - Masongaleni | Completed | Ksh 293,420 | |
| 167 | Support Groups - Masongaleni | Completed | Ksh 800,000 | |
| 168 | Social Groups Development -masongaleni | Completed | Ksh 1,500,000 | |
| 169 | Youth Empowerment And Sports - Masongaleni | Completed | Ksh 700,000 | |
| 170 | Purchase Of Tents-masongaleni Ward | Completed | Ksh 2,000,000 | |
| 171 | Sports And Youth Development Programme - masongaleni | Completed | Ksh 450,000 | |
| 172 | Ligi Mashinani -masongaleni | Completed | Ksh 1,000,000 | |
| 173 | Plastic Chairs For Churches- Masongaleni | Completed | Ksh 900,000 | |
| 174 | Sports Development Mtito Andei | Completed | Ksh 380,000 | |
| 175 | Social Groups Development Programme- Mtito Andei | Completed | Ksh 2,205,000 | |
| 176 | Support To Social Welfare Groups Tents And Chairs-mtito Andei Ward | Completed | Ksh 2,750,000 | |
| 177 | Sports development - Mtito Andei Ward | Completed | Ksh 300,000 | |
| 178 | Pwd Support-assistive Devices -support Pwds With Assorted Assistive Devices-mtito Andei | Completed | Ksh 500,000 | |
| 179 | Tents And Chairs - Mtito Andei | Completed | Ksh 2,500,000 | |
| 180 | Sports Development Thange | Completed | Ksh 679,000 | |
| 181 | Kyaani Bodaboda Shed | Completed | Ksh 200,000 | |
| 182 | Social Protection Tents And Chairs Thange | Completed | Ksh 1,409,210 | |
| 183 | Youth Empowerment Programme - Thange Ward (Driving course training and purchase of tools of trade) | Completed | Ksh 1,361,223 | |
| 184 | Purchase Of Tents And Chairs For Registered Groups-thange Ward. | Completed | Ksh 2,500,000 | |
| 185 | Sports And Youth Development Programme -thange | Completed | Ksh 450,000 | |
| 186 | Social Support-purchase Of Mattresses And Blankets-thange Ward | Completed | Ksh 1,000,000 | |
| 187 | Ujuzi Tekete-thange Ward | Completed | Ksh 800,000 | |
| 188 | Purchase Of Chairs For Churches- Thange | Completed | Ksh 1,213,700 | |
| 189 | Ligi Mashinani- Thange | Completed | Ksh 1,500,000 | |
| 190 | Sports Development Ivingoni/nzambani | Completed | Ksh 114,000 | |
| 191 | Sports And Youth Development Programme-ligi Mashinani/supa Cup-ivingoni/nzambani Ward | Completed | Ksh 450,000 | |
| 192 | Youth Empowerment Programme (ujuzi Teke Teke)-ivingoni Nzambani | Completed | Ksh 1,000,000 | |
| 193 | Pwd Support-assistive Devices -support Pwds With Assorted Assistive Devices-ivingoni/nzambani | Completed | Ksh 500,000 | |
| 194 | Youth Economic Training- Ivingoni -nzambani Ward | Completed | Ksh 1,000,000 | |
| 195 | Masumba Playground (fencing, Shade, Levelling And Construction Of A Toilet)-nguu/masumba | Completed | Ksh 3,000,000 | |
| 196 | Ujuzi teke teke- Nguu Masumba ward | Completed | Ksh 700,000 | |
| 197 | Pwd Support – Assistive Devices -nguu/masumba | Completed | Ksh 500,000 | |
| 198 | Sport Development- Nguu/masumba | Completed | Ksh 600,000 | |
| 199 | Vololo playground | Completed | Ksh 3,000,000 | |
| 200 | Sport Development HQ | Completed | Ksh 5,135,200 | |
| 201 | Kyisa Games | Completed | Ksh 3,716,048 | |
| 202 | Youth Empowerment Programme Hq | Completed | Ksh 3,787,205 | |
| 203 | Gender Based Violence Programmes Hq | Completed | Ksh 3,212,700 | |
| 204 | Kyisa Games-hq | Completed | Ksh 3,000,000 | |
| 205 | Makueni Child Protection Centre-hq | Completed | Ksh 3,000,000 | |
| 206 | Sports Development Programme | Completed | Ksh 10,615,000 | |
| 207 | Gbv Programmes | Completed | Ksh 925,000 | |
| 208 | Pwd Empowerment Support Programme | Completed | Ksh 989,500 | |
| 209 | Kyisa Games | Completed | Ksh 18,643,400 | |
| 210 | Youth Empowerment-boda Boda Support Programme Hq | Completed | Ksh 3,000,000 | |
| 211 | Supa Cup | Completed | Ksh 6,976,900 | |
| 212 | Sport Development Programme- Hq | Completed | Ksh 9,681,430 | |
| 213 | Huduma Mashinani | Completed | Ksh 6,499,080 | |
| 214 | Sports Development Programme(pool Table Competition),supa Cup, Special Olympics And Ndukuma... | Completed | Ksh 2,289,538 | |
| 215 | Pwd Support-assistive Devices Kee | Completed | Ksh 500,000 | |
| 216 | Support To Bodaboda (purchase Of Motorbikes For Bodaboda-)-kikumbulyu South | Completed | Ksh 2,500,000 | |
| 217 | Ajira Kwa Vijana - Wote Nziu | Ongoing | Ksh 2,000,000 | |
| 218 | Ligi Mashinani -wote Nziu | Ongoing | Ksh 2,000,000 | |
| 219 | Pwd Empowerment - Wote Nziu | Ongoing | Ksh 1,500,000 | |
| 220 | Tents And Chairs - Wote Nziu | Ongoing | Ksh 1,500,000 | |
| 221 | Youth And Women Empowerment -wote Nziu | Ongoing | Ksh 500,000 | |
| 222 | Tents And Chairs - Nzaui Kilili Kalamba | Ongoing | Ksh 2,530,000 | |
| 223 | Sports Development - Nzaui Kilili Kalamba | Ongoing | Ksh 1,000,000 | |
| 224 | PWD support - Start-up capital -nzaui Kilili Klamba | Ongoing | Ksh 500,000 | |
| 225 | PA system- Nzaui Kilili Kalamba | Ongoing | Ksh 500,000 | |
| 226 | Support To Women Groups - Nzaui/kilili/klamba | Ongoing | Ksh 500,000 | |
| 227 | Levelling Of Mutyambua Primary School Playground | Ongoing | Ksh 2,000,000 | |
| 228 | Mbeletu Playground-drainage Works | Ongoing | Ksh 800,000 | |
| 229 | Ligi Mashinani - Muvau/Kikumini | Ongoing | Ksh 1,000,000 | |
| 230 | Tents And Chairs- Kathonzweni Ward | Ongoing | Ksh 600,000 | |
| 231 | Upg Programme.(plwd Households)- Kathonzweni Ward | Ongoing | Ksh 350,000 | |
| 232 | Sport Development- Mavindini | Ongoing | Ksh 2,000,000 | |
| 233 | Pwd Support- Mavindini | Ongoing | Ksh 700,000 | |
| 234 | Pwd Mapping And Registration- Kitise Kithuki | Ongoing | Ksh 500,000 | |
| 235 | Kyangoma Playing Ground | Ongoing | Ksh 2,000,000 | |
| 236 | Ligi Mashinani - Kithungo Kitundu | Ongoing | Ksh 1,500,000 | |
| 237 | Ligi Mashinani - Tulimani | Ongoing | Ksh 2,000,000 | |
| 238 | Support To Youth Groups- Tulimani | Ongoing | Ksh 1,000,000 | |
| 239 | Tents And Chairs- Kako/waia Ward | Ongoing | Ksh 636,049 | |
| 240 | Levelling Of Kiima Kiu Play Ground | Ongoing | Ksh 1,000,000 | |
| 241 | Tents And Chairs- Kiima Kiu Kalanzoni Ward | Ongoing | Ksh 3,000,000 | |
| 242 | Ligi Mashinani- Mukaa | Ongoing | Ksh 1,000,000 | |
| 243 | Ligi Mashinani- Kasikeu Ward | Ongoing | Ksh 3,000,000 | |
| 244 | Youth Empowerment -driving Course- Kee Ward | Ongoing | Ksh 700,000 | |
| 245 | Pwd Support - Kilungu | Ongoing | Ksh 525,000 | |
| 246 | Tents With Chairs - Kilungu Ward | Ongoing | Ksh 3,500,000 | |
| 247 | Purchase Of 200 Pcs High Quality Plastic Chairs To Organised Groups- Ukia Ward | Ongoing | Ksh 238,504 | |
| 248 | Ligi Mashinani - Makindu Ward | Ongoing | Ksh 1,500,000 | |
| 249 | Ajira Kwa Vijana- Makindu | Ongoing | Ksh 2,000,000 | |
| 250 | Pwds Support - Makindu | Ongoing | Ksh 1,300,000 | |
| 251 | Makindu-youth Empowerment (group Registration, Tents And Pa System, Roadside Business And Setbook... | Ongoing | Ksh 2,000,000 | |
| 252 | Ajira Kwa Vijana -kikumbulyu North | Ongoing | Ksh 2,000,000 | |
| 253 | Ligi Mashinani -kikumbulyu North | Ongoing | Ksh 1,000,000 | |
| 254 | Tents And Chairs- Kikumbulyu North | Ongoing | Ksh 1,000,000 | |
| 255 | Facilitation To The Issuance Of Ids And Birth Certificates- Kikumbulyu South | Ongoing | Ksh 330,000 | |
| 256 | Ligi Mashinani- Kikumbulyu South | Ongoing | Ksh 3,000,000 | |
| 257 | Team Cash Support- Kikumbulyu South | Ongoing | Ksh 360,000 | |
| 258 | Sports Development -ligi Mashinani- Nguumo | Ongoing | Ksh 1,500,000 | |
| 259 | Ajira Kwa Vijana - Nguumo | Ongoing | Ksh 1,000,000 | |
| 260 | Ligi Mashinani- Emali/mulala | Ongoing | Ksh 2,000,000 | |
| 261 | Pwd Support - Emali/mulala | Ongoing | Ksh 500,000 | |
| 262 | Tractor Operators Training- Emali/mulala | Ongoing | Ksh 300,000 | |
| 263 | Tents And Chairs - Masongaleni | Ongoing | Ksh 1,000,000 | |
| 264 | Training And Issuance Of Driving Licences- Masongaleni | Ongoing | Ksh 1,000,000 | |
| 265 | Ligi Mashinani - Mtito Andei | Ongoing | Ksh 1,000,000 | |
| 266 | Youth Empeworment - Mtito Andei | Ongoing | Ksh 600,000 | |
| 267 | Pwds Support -thange | Ongoing | Ksh 1,500,000 | |
| 268 | Support To Groups ( Public Address Systems)- Thange Waard | Ongoing | Ksh 1,000,000 | |
| 269 | Ligi Mashinani- Ivingoni/nzambani | Ongoing | Ksh 1,500,000 | |
| 270 | Ligi Mashinani - Nguu Masumba | Ongoing | Ksh 1,700,000 | |
| 271 | Blankets for elderly- Nguu/Masumba | Ongoing | Ksh 300,000 | |
| 272 | Ajira Kwa Vijana - Nguu Masumba | Ongoing | Ksh 1,000,000 | |
| 273 | Ultra Poor Graduation Model | Ongoing | Ksh 1,953,500 | |
| 274 | Gender Based Violence Mitigation Programme | Ongoing | Ksh 2,000,000 | |
| 275 | Makueni County Empowerment Fund | Ongoing | Ksh 11,022,690 | |
| 276 | Sport Items- Mbitini | Under Procurement | Ksh 500,000 | |
| 277 | Group Training And Empowerment- Mbitini | Under Procurement | Ksh 200,000 | |
| 278 | Facilitation For Issuance And Replacement Of Ids At Kwa Mutula,kithumani And Mbuthani- Mbitini | Under Procurement | Ksh 300,000 | |
| 279 | Support To Organised Youth Group Programme - Kathonzweni | Under Procurement | Ksh 300,000 | |
| 280 | Sports Development -ward Tournament- Kitise Kithuki Ward | Under Procurement | Ksh 500,000 | |
| 281 | Support For The Pwds And Widower/window - Tulimani | Under Procurement | Ksh 300,000 | |
| 282 | First Edition Of Marathon - Kiima Kiu Kalanzoni Ward | Under Procurement | Ksh 500,000 | |
| 283 | Purchase Of Tent For Ngondini Village Shg | Under Procurement | Ksh 250,000 | |
| 284 | Purchase Of Tent For Manyaanzani Shg | Under Procurement | Ksh 250,000 | |
| 285 | Purchase Of Tent For Kyamuumba Village Shg | Under Procurement | Ksh 250,000 | |
| 286 | Purchase Of Pa System For Kwangumu Youth Group | Under Procurement | Ksh 250,000 | |
| 287 | Pwd Assistive Devices- Kasikeu Ward | Under Procurement | Ksh 500,000 | |
| 288 | Isovya Playground | Under Procurement | Ksh 500,000 | |
| 289 | Kalie/miangeni Pitch Purchase Completion And Bush Clearing | Under Procurement | Ksh 430,172 | |
| 290 | Pwd Assistive Device- Kikumbulyu South | Under Procurement | Ksh 500,000 | |
| 291 | Ujuzi Teketeke - Salon Kits: Kikumbulyu South | Under Procurement | Ksh 450,000 | |
| 292 | Ujuzi Teketeke - Cameras And Communication Gadgets: Kikumbulyu South | Under Procurement | Ksh 150,000 | |
| 293 | Support To Groups With 4 Tents: South | Under Procurement | Ksh 600,000 | |
| 294 | Safety Support To Boda Boda : Kikumbulyu South | Under Procurement | Ksh 1,500,000 | |
| 295 | Purchase Of Blankets-heavy Duty- Masongaleni | Under Procurement | Ksh 115,608 | |
| 296 | Tent- Masongaleni Ward | Under Procurement | Ksh 100,000 | |
| 297 | Social Support To Women- Thange | Under Procurement | Ksh 200,000 | |
| 298 | Youth Empowerment-makueni Youth Fair) | Under Procurement | Ksh 1,700,000 |
7. Department of ICT, Education and Internship
| # | Project Name | Status | Budget | Action |
|---|---|---|---|---|
| 1 | Nziu Ecde | Completed | Ksh 70,000 | |
| 2 | St. Johns Malivani Ecde | Completed | Ksh 231,339 | |
| 3 | Kavila Ecde | Completed | Ksh 226,219 | |
| 4 | Makueni Integrated Vocation Education Centre - Dormitory | Completed | Ksh 2,536,001 | |
| 5 | Wote/nziu Ward Bursary | Completed | Ksh 3,000,000 | |
| 6 | Construction Of Kitikyumu Ecde | Completed | Ksh 2,400,000 | |
| 7 | Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Wote/nziu Ward | Completed | Ksh 1,000,000 | |
| 8 | Nzeeni Ctti | Completed | Ksh 214,407 | |
| 9 | Nzaui/kilili/kalamba Ward Bursary | Completed | Ksh 7,000,000 | |
| 10 | Kwa Kalui Ecde | Completed | Ksh 2,400,000 | |
| 11 | Maatha Ecde | Completed | Ksh 2,400,000 | |
| 12 | Kalamba Ecde | Completed | Ksh 1,200,000 | |
| 13 | Kalamba Ecde | Completed | Ksh 1,568,000 | |
| 14 | Matiliku Ecde | Completed | Ksh 1,568,000 | |
| 15 | Kwa Kalui Ecde | Completed | Ksh 1,200,000 | |
| 16 | Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Nzaui Kilili Kalamba Ward | Completed | Ksh 1,000,000 | |
| 17 | Masokani Ctti & Kithumani Ctti - Water Tanks | Completed | Ksh 1,470,000 | |
| 18 | Kyumbuni Ecde | Completed | Ksh 3,430,000 | |
| 19 | Maumi Ecde | Completed | Ksh 2,400,000 | |
| 20 | Yiuma Ecde | Completed | Ksh 2,940,000 | |
| 21 | Muambwani ECDE | Completed | Ksh 3,500,000 | |
| 22 | Yuuni Ecde | Completed | Ksh 1,255,660 | |
| 23 | Kilili Ecde | Completed | Ksh 2,400,000 | |
| 24 | Ngoto Ecde | Completed | Ksh 3,600,000 | |
| 25 | Mbitini Ward Bursary | Completed | Ksh 4,000,000 | |
| 26 | Kavuthu Ecde | Completed | Ksh 3,600,000 | |
| 27 | Manooni Ecde | Completed | Ksh 3,600,000 | |
| 28 | Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Mbitini Ward | Completed | Ksh 1,000,000 | |
| 29 | Kyaka Ecde | Completed | Ksh 145,996 | |
| 30 | Ngosini Ecde | Completed | Ksh 10,000 | |
| 31 | Kikumini/muvau Bursary | Completed | Ksh 3,000,000 | |
| 32 | Kithoni Ecde Centre | Completed | Ksh 2,500,000 | |
| 33 | Mbuvuni Ecde | Completed | Ksh 3,600,000 | |
| 34 | Kithatha Ecde | Completed | Ksh 3,600,000 | |
| 35 | Kambi Mawe Ecde | Completed | Ksh 1,960,000 | |
| 36 | Kimuumo Ecde | Completed | Ksh 1,960,000 | |
| 37 | Itaa Vtc | Completed | Ksh 500,000 | |
| 38 | Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Muvau/kikumini | Completed | Ksh 1,000,000 | |
| 39 | Kiangi Youth Empowerment Centre | Completed | Ksh 4,910,388 | |
| 40 | Kathonzweni Ctti - Pit Latrine | Completed | Ksh 980,000 | |
| 41 | Kathonzweni Ward Bursary | Completed | Ksh 3,000,000 | |
| 42 | Ndukuma Ecde | Completed | Ksh 1,960,000 | |
| 43 | Ngomano Ecde | Completed | Ksh 3,430,000 | |
| 44 | Kiangini Ict Centre - Equipping | Completed | Ksh 1,500,000 | |
| 45 | Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Kathonzweni Ward | Completed | Ksh 1,000,000 | |
| 46 | Ivinga Nzia Ctti | Completed | Ksh 3,430,000 | |
| 47 | Mavindini Ctti Dormitory | Completed | Ksh 3,430,000 | |
| 48 | Kaiani Ecde | Completed | Ksh 3,500,000 | |
| 49 | Syethe Ecde | Completed | Ksh 2,500,000 | |
| 50 | Muusini Ecde | Completed | Ksh 70,000 | |
| 51 | Mavindini Bursary | Completed | Ksh 3,000,000 | |
| 52 | Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Mavindini Ward | Completed | Ksh 1,000,000 | |
| 53 | Yinthungu Ctti | Completed | Ksh 1,960,000 | |
| 54 | Athiani Ctti Renovation | Completed | Ksh 1,000,000 | |
| 55 | Kitise/kithuki Bursary | Completed | Ksh 4,000,000 | |
| 56 | Methovini Ecde | Completed | Ksh 4,300,000 | |
| 57 | Mikauni Ecde- | Completed | Ksh 2,500,000 | |
| 58 | Nzouni Ecde | Completed | Ksh 2,500,000 | |
| 59 | Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Kitise/kithuki Ward | Completed | Ksh 1,000,000 | |
| 60 | Mukaatini Ctti | Completed | Ksh 3,920,000 | |
| 61 | Ukala Ctti Equipping | Completed | Ksh 3,000 | |
| 62 | Mbooni Ward Bursary | Completed | Ksh 2,000,000 | |
| 63 | Ngunguuni Ecde | Completed | Ksh 3,920,000 | |
| 64 | Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Mbooni | Completed | Ksh 1,000,000 | |
| 65 | Kithungo/kitundu Ward Bursary | Completed | Ksh 3,000,000 | |
| 66 | Ngaani Ecde | Completed | Ksh 2,000,000 | |
| 67 | Nzueni Ecde | Completed | Ksh 3,920,000 | |
| 68 | Kyambwika Ecde | Completed | Ksh 500,000 | |
| 69 | Nthaani Ecde | Completed | Ksh 2,500,000 | |
| 70 | Syathani Ecde | Completed | Ksh 2,500,000 | |
| 71 | Muvuti Ecde | Completed | Ksh 2,500,000 | |
| 72 | Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Kithungo/ Kitundu | Completed | Ksh 1,000,000 | |
| 73 | Mulooni Ecde | Completed | Ksh 490,000 | |
| 74 | Kyamithengi Library | Completed | Ksh 1,000,000 | |
| 75 | Kango Ecde | Completed | Ksh 70,000 | |
| 76 | Kathokani Ecde | Completed | Ksh 943,210 | |
| 77 | Kiatineni Ecde | Completed | Ksh 660,540 | |
| 78 | Tulimani Ward Bursary | Completed | Ksh 5,000,000 | |
| 79 | Wambuli Ecde | Completed | Ksh 4,400,000 | |
| 80 | Tulimani Primary Ecde Class | Completed | Ksh 4,500,000 | |
| 81 | Musau Emale Ecde Class | Completed | Ksh 4,500,000 | |
| 82 | Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Tulimani Ward | Completed | Ksh 1,000,000 | |
| 83 | Kakuswi Ctti Dormitory | Completed | Ksh 6,860,000 | |
| 84 | Kalimani Ecde | Completed | Ksh 781,534 | |
| 85 | Kyooni Ecde | Completed | Ksh 3,200,000 | |
| 86 | Muluti Ecde | Completed | Ksh 3,200,000 | |
| 87 | Kisau/kiteta Ward Bursary | Completed | Ksh 3,950,000 | |
| 88 | Muutini Ecde | Completed | Ksh 3,000,000 | |
| 89 | Ngaa Ecde | Completed | Ksh 3,136,000 | |
| 90 | Itulu Ecde | Completed | Ksh 4,300,000 | |
| 91 | Kako/waia Bursary | Completed | Ksh 3,000,000 | |
| 92 | Kitandi Ctti Fencing | Completed | Ksh 356,302 | |
| 93 | Construction Of Nduluku Vtc Dinning Hall - | Completed | Ksh 5,000,000 | |
| 94 | Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Kako/waia | Completed | Ksh 1,000,000 | |
| 95 | Ndauni Ecde | Completed | Ksh 24,000 | |
| 96 | Songeni Ecde | Completed | Ksh 3,136,000 | |
| 97 | Mituvu Ecde | Completed | Ksh 4,250,000 | |
| 98 | Mililuni Ecde | Completed | Ksh 30,000 | |
| 99 | Mwaani Ecde | Completed | Ksh 79,074 | |
| 100 | Syokilati Ecde | Completed | Ksh 83,181 | |
| 101 | Ngungi Ecde | Completed | Ksh 1,500,000 | |
| 102 | Mweleli Ecde | Completed | Ksh 527,367 | |
| 103 | Ngamu Ecde | Completed | Ksh 110,497 | |
| 104 | Mulasya Ecde | Completed | Ksh 3,136,000 | |
| 105 | Kakuswi Ctti-construction Of Soak Pit And Installation Of Gutters | Completed | Ksh 1,000,000 | |
| 106 | Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Kisau/ Kiteta | Completed | Ksh 1,000,000 | |
| 107 | Kilungu Ecde | Completed | Ksh 125,424 | |
| 108 | Kyaume Ecde | Completed | Ksh 621,294 | |
| 109 | Kathulumbi Ctti Twin Workshop | Completed | Ksh 3,000,000 | |
| 110 | Kyaluma Ecde | Completed | Ksh 4,250,000 | |
| 111 | Syongungi Ecde | Completed | Ksh 2,940,000 | |
| 112 | Kasooni Ecde | Completed | Ksh 3,000,000 | |
| 113 | Mutanda Ctti Twin Workshop | Completed | Ksh 3,000,000 | |
| 114 | Kalawa Ward Bursary | Completed | Ksh 2,000,000 | |
| 115 | Youth Empowerment - 2jiajiri Programme (kcb Matching Grant) | Completed | Ksh 1,000,000 | |
| 116 | Tangu Primary School Ecde | Completed | Ksh 3,926 | |
| 117 | Kwa Kea Ecde | Completed | Ksh 3,430,000 | |
| 118 | Ulu Ecde | Completed | Ksh 782,690 | |
| 119 | Kilombo Ecde | Completed | Ksh 224,816 | |
| 120 | Kisse Ecde | Completed | Ksh 3,500,000 | |
| 121 | Kiuusini Ecde | Completed | Ksh 175,126 | |
| 122 | Kwa Ndeke Ecde | Completed | Ksh 3,600,000 | |
| 123 | Mwanyani Ecde | Completed | Ksh 3,600,000 | |
| 124 | Kiimakiu/kalanzoni Ward Bursary | Completed | Ksh 2,000,000 | |
| 125 | Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Kiima Kiu/kalanzoni | Completed | Ksh 1,000,000 | |
| 126 | Enzai Ctti Dormitory | Completed | Ksh 80,000 | |
| 127 | Kwa Kaseke Ecde | Completed | Ksh 235,359 | |
| 128 | Kyandue Ecde | Completed | Ksh 147,533 | |
| 129 | Kasalama Ecde | Completed | Ksh 3,700,000 | |
| 130 | Uvunye Ecde | Completed | Ksh 3,700,000 | |
| 131 | Kwa Muatha Ecde | Completed | Ksh 2,940,000 | |
| 132 | Kitaingo Ctti | Completed | Ksh 1,129,280 | |
| 133 | Mukaa Ward Bursary | Completed | Ksh 3,000,000 | |
| 134 | Uthini Ecde | Completed | Ksh 2,500,000 | |
| 135 | Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Mukaa Ward | Completed | Ksh 1,000,000 | |
| 136 | Kitumbini Ctti Fencing | Completed | Ksh 1,470,000 | |
| 137 | Wathini Ecde | Completed | Ksh 70,000 | |
| 138 | Ndivu Ecde | Completed | Ksh 3,920,000 | |
| 139 | Kwa Mbumbu Ecde | Completed | Ksh 533,472 | |
| 140 | Katuliani Ecde | Completed | Ksh 73,539 | |
| 141 | Kathikwani Ecde | Completed | Ksh 911,453 | |
| 142 | Kasikeu Ward Bursary | Completed | Ksh 3,000,000 | |
| 143 | Ngiluni Ecde | Completed | Ksh 4,300,000 | |
| 144 | Kwa Kalelo Ecde | Completed | Ksh 4,300,000 | |
| 145 | Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)-kasikeu Ward | Completed | Ksh 1,000,000 | |
| 146 | Nguluni Ecde | Completed | Ksh 3,430,000 | |
| 147 | Kee Ctti | Completed | Ksh 2,000,000 | |
| 148 | Mutulani Ecde | Completed | Ksh 171,584 | |
| 149 | Kivaku Ecde | Completed | Ksh 211,938 | |
| 150 | Kyandumbi Ecde | Completed | Ksh 3,700,000 | |
| 151 | Kasunguni Ecde | Completed | Ksh 4,300,000 | |
| 152 | Kee Ward Bursary | Completed | Ksh 3,500,000 | |
| 153 | Kivai Ecde | Completed | Ksh 2,300,000 | |
| 154 | Kyanduya Ctti-fencing | Completed | Ksh 1,500,000 | |
| 155 | Kivaku Ecde Toilet And Water Installation | Completed | Ksh 800,000 | |
| 156 | Kyamwalye Ecde | Completed | Ksh 2,500,000 | |
| 157 | Kitandi Ecde | Completed | Ksh 2,500,000 | |
| 158 | Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Kee Ward | Completed | Ksh 1,000,000 | |
| 159 | Kauti Ctti Equipping | Completed | Ksh 1,470,000 | |
| 160 | Kyakathungu Ecde | Completed | Ksh 70,000 | |
| 161 | Kiseeni Ctti Access Road | Completed | Ksh 144,308 | |
| 162 | Mutongu Ecde | Completed | Ksh 2,940,000 | |
| 163 | Mutungu Ecde | Completed | Ksh 2,940,000 | |
| 164 | Kyakituku Ecde | Completed | Ksh 372,506 | |
| 165 | Mutanda Ecde | Completed | Ksh 2,950,000 | |
| 166 | Kauti Ctti Renovation | Completed | Ksh 166,060 | |
| 167 | Kilungu Ward Bursary | Completed | Ksh 5,000,000 | |
| 168 | Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Kilungu Ward | Completed | Ksh 500,000 | |
| 169 | Isovya Ctti | Completed | Ksh 4,900,000 | |
| 170 | Kyang'a Ecde | Completed | Ksh 30,879 | |
| 171 | Ilima Ward Bursary | Completed | Ksh 5,000,000 | |
| 172 | Mwaani Ecde | Completed | Ksh 3,500,000 | |
| 173 | Inyokoni Ecde | Completed | Ksh 3,500,000 | |
| 174 | Kiluluini Ecde | Completed | Ksh 3,500,000 | |
| 175 | Kathangathini Ecde | Completed | Ksh 2,500,000 | |
| 176 | Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Ilima Ward | Completed | Ksh 1,000,000 | |
| 177 | Ukaatuni Ctti | Completed | Ksh 1,751,882 | |
| 178 | Ukia Ward Bursary | Completed | Ksh 4,000,000 | |
| 179 | Kisyungii Ecde | Completed | Ksh 3,300,000 | |
| 180 | Isovya Ecde | Completed | Ksh 3,500,000 | |
| 181 | Mumbuni Ecde | Completed | Ksh 1,470,000 | |
| 182 | Kavani Ecde | Completed | Ksh 2,000,000 | |
| 183 | Iiuni Ecde | Completed | Ksh 2,000,000 | |
| 184 | Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Ukia Ward | Completed | Ksh 1,000,000 | |
| 185 | Makindu A Ecde | Completed | Ksh 305,133 | |
| 186 | Makindu Ward Bursary | Completed | Ksh 7,000,000 | |
| 187 | Kisingo Ctti Scholarship | Ksh 595,740 | ||
| 188 | Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Makindu | Completed | Ksh 1,000,000 | |
| 189 | Kisingo Ctti Workshop | Completed | Ksh 2,000,000 | |
| 190 | Kyaani Ecde | Completed | Ksh 3,430,000 | |
| 191 | Katilamuni Ecde | Completed | Ksh 3,430,000 | |
| 192 | Kiaoni Ecde | Completed | Ksh 1,500,000 | |
| 193 | Kikumbulyu North Ward Bursary | Completed | Ksh 5,000,000 | |
| 194 | Kikumbulyu North Ecde Toilet | Completed | Ksh 900,000 | |
| 195 | Mukononi Ecde | Completed | Ksh 3,430,000 | |
| 196 | Ithumula Ecde | Completed | Ksh 4,300,000 | |
| 197 | Ecde Makaani | Completed | Ksh 3,500,000 | |
| 198 | Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Kikumbulyu North | Completed | Ksh 1,000,000 | |
| 199 | Kalulini Ecde | Completed | Ksh 10,000 | |
| 200 | Kibwezi Township Ecde Toilet | Completed | Ksh 124,350 | |
| 201 | Kanundu Ctti Electrification | Completed | Ksh 138,529 | |
| 202 | Kikumbulyu South Bursary | Completed | Ksh 4,950,000 | |
| 203 | Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Kikumbulyu South | Completed | Ksh 1,000,000 | |
| 204 | Kwa Kyai Ecde | Completed | Ksh 3,430,000 | |
| 205 | Makusu Ecde | Completed | Ksh 1,420,000 | |
| 206 | Uvileni Ctti- Toilet | Completed | Ksh 686,000 | |
| 207 | Kilongoni Ecde | Completed | Ksh 10,000 | |
| 208 | Nguumo Bursary | Completed | Ksh 4,000,000 | |
| 209 | Wayona Ecde- | Completed | Ksh 2,500,000 | |
| 210 | Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Nguumo Ward | Completed | Ksh 1,000,000 | |
| 211 | Ng'etha Ctti | Completed | Ksh 6,860,000 | |
| 212 | Mwasa Ng'ombe Ecde | Completed | Ksh 3,430,000 | |
| 213 | Spring Hill Kwa Kakulu Ctti Workshop | Completed | Ksh 3,073,613 | |
| 214 | Ngomongo Ecde | Completed | Ksh 10,000 | |
| 215 | Emali/mulala Ward Bursary | Completed | Ksh 4,500,000 | |
| 216 | Ulilinzi Ecde | Completed | Ksh 1,470,000 | |
| 217 | Emali Township Ecde | Completed | Ksh 3,430,000 | |
| 218 | Ngelenge Ecde | Completed | Ksh 3,500,000 | |
| 219 | Yikitaa ECDE | Completed | Ksh 1,470,000 | |
| 220 | Kithito Ecde | Completed | Ksh 88,807 | |
| 221 | Kiange Ecde | Completed | Ksh 85,180 | |
| 222 | Utini Ctti Equipping | Completed | Ksh 31,400 | |
| 223 | Kalima Koi Ecde | Completed | Ksh 80,829 | |
| 224 | Masongaleni Bursary | Completed | Ksh 3,000,000 | |
| 225 | Ndauni Ecde | Completed | Ksh 2,400,000 | |
| 226 | Utini Ecde | Completed | Ksh 2,400,000 | |
| 227 | Nguuni Ecde | Completed | Ksh 2,400,000 | |
| 228 | Iongoni Ecde | Completed | Ksh 2,400,000 | |
| 229 | Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Masongaleni | Completed | Ksh 1,000,000 | |
| 230 | Mitooni Ecde | Completed | Ksh 4,000 | |
| 231 | Mtito Andei Resource Centre- Equipping | Completed | Ksh 649,000 | |
| 232 | Kikwasuni Ecde | Completed | Ksh 135,809 | |
| 233 | Kathekani Ecde | Completed | Ksh 244,054 | |
| 234 | Nzoila Ecde | Completed | Ksh 222,581 | |
| 235 | Mavindini Ecde | Completed | Ksh 1,960,000 | |
| 236 | Yindundu Ecde | Completed | Ksh 2,500,000 | |
| 237 | Mtito Andei Ward Bursary | Completed | Ksh 3,000,000 | |
| 238 | Miangeni Ecde | Completed | Ksh 382,478 | |
| 239 | Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)-mtito Andei | Completed | Ksh 1,000,000 | |
| 240 | Kiumoni Ctti Equipping | Completed | Ksh 980,000 | |
| 241 | Kikunduku Ecde | Completed | Ksh 40,000 | |
| 242 | Kavungwa ECDE | Completed | Ksh 1,960,000 | |
| 243 | Mwaani Ecde | Completed | Ksh 2,500,000 | |
| 244 | Kinyambu Ecde | Completed | Ksh 2,668 | |
| 245 | Thange Ward Bursary | Completed | Ksh 3,000,000 | |
| 246 | Yikitaa Ecde | Completed | Ksh 1,500,000 | |
| 247 | Purchase Of Matresses For Ecde Kids | Completed | Ksh 500,000 | |
| 248 | Ecde Classes At Thange | Completed | Ksh 1,500,000 | |
| 249 | Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Thange Ward | Completed | Ksh 1,000,000 | |
| 250 | Silanga Ecde Class | Completed | Ksh 2,500,000 | |
| 251 | Miamba Ecde | Completed | Ksh 2,500,000 | |
| 252 | Mbwetwani Ecde | Completed | Ksh 3,500,000 | |
| 253 | Kamulalani Ecde | Completed | Ksh 2,500,000 | |
| 254 | Kambili Ecde | Completed | Ksh 2,500,000 | |
| 255 | California Ecde | Completed | Ksh 74,000 | |
| 256 | Kativani Ctti | Completed | Ksh 40,000 | |
| 257 | Mukanda Ctti | Completed | Ksh 216,855 | |
| 258 | Ndivuni Ecde | Completed | Ksh 225,059 | |
| 259 | Ngokolani Ecde | Completed | Ksh 1,960,000 | |
| 260 | Thange Ecde | Completed | Ksh 2,100,000 | |
| 261 | Kithasyu Ecde | Completed | Ksh 2,100,000 | |
| 262 | Syandani Ecde | Completed | Ksh 269,162 | |
| 263 | Ivingoni/nzambani Ward Bursary | Completed | Ksh 3,000,000 | |
| 264 | Kativani Ctti | Completed | Ksh 2,000,000 | |
| 265 | Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)- Ivingoni/nzambani Ward | Completed | Ksh 1,000,000 | |
| 266 | Nzouni Ecde | Completed | Ksh 1,960,000 | |
| 267 | Ecde Classes At Ivoleni | Completed | Ksh 2,500,000 | |
| 268 | Kwa Matungu Ctti | Completed | Ksh 110,213 | |
| 269 | Thithi Ecde | Completed | Ksh 780,000 | |
| 270 | Muangeni Ecde | Completed | Ksh 3,500,000 | |
| 271 | Uutini Ecde | Completed | Ksh 223,202 | |
| 272 | Kikwasuni Ecde | Completed | Ksh 2,450,000 | |
| 273 | Matulani Ecde | Completed | Ksh 3,600,000 | |
| 274 | Kwa Matungu Ctti - Equipping | Completed | Ksh 300,000 | |
| 275 | Ndunguni Ecde | Completed | Ksh 10,000 | |
| 276 | Nguu Masumba Bursary | Completed | Ksh 6,000,000 | |
| 277 | Masumba Ctti | Completed | Ksh 2,000,000 | |
| 278 | Youth Empowerment - 2jiajiri Programme (kcb Matching Grant)-nguu/masumba | Completed | Ksh 1,000,000 | |
| 279 | Iiani Ecde | Completed | Ksh 3,600,000 | |
| 280 | Kiunduani Ecde | Completed | Ksh 3,300,000 | |
| 281 | Kiambani Ecde | Completed | Ksh 3,300,000 | |
| 282 | Ngongweni Ecde | Completed | Ksh 3,430,000 | |
| 283 | Kwa-mukonyo Ecde | Completed | Ksh 3,600,000 | |
| 284 | Ctti Capitation | Completed | Ksh 20,553,968 | |
| 285 | Government Automation- Cihmis | Completed | Ksh 28,420,000 | |
| 286 | Ict Development Programmes | Completed | Ksh 470,408 | |
| 287 | Ict Connectivity | Completed | Ksh 1,431,621 | |
| 288 | Matutu Ecde | Completed | Ksh 3,600,000 | |
| 289 | Mbukani Ecde | Completed | Ksh 3,250,000 | |
| 290 | Kikumini Ecde | Completed | Ksh 3,250,000 | |
| 291 | Ecde Capitation | Completed | Ksh 310,400 | |
| 292 | Internship, Mentoring & Volunteer Programme | Completed | Ksh 2,904,785 | |
| 293 | Ctti Capitation | Completed | Ksh 15,020,000 | |
| 294 | Budget Automation And Education System | Completed | Ksh 3,000,000 | |
| 295 | Government Automation - Other Ict Programmes | Completed | Ksh 3,576,875 | |
| 296 | Ctti Development And Capitation | Completed | Ksh 9,500,000 | |
| 297 | Ngwata Ctti Workshop | Completed | Ksh 1,529,485 | |
| 298 | Darajani Cic Centre | Completed | Ksh 2,504,053 | |
| 299 | Government Automation - Cihmis Phase Two | Completed | Ksh 14,135,445 | |
| 300 | Kikima Town Ecde Center | Completed | Ksh 4,500,000 | |
| 301 | Nziu Ctti -construction Of Dormitory | Ongoing | Ksh 4,000,000 | |
| 302 | Equipping Of Mivec Dormitory | Ongoing | Ksh 1,500,000 | |
| 303 | Kitonyoni Ecde | Ongoing | Ksh 2,000,000 | |
| 304 | Kyamusoi Ecde | Ongoing | Ksh 2,000,000 | |
| 305 | Senda Ecde | Ongoing | Ksh 2,000,000 | |
| 306 | Makueni Ctti Dormitory | Ongoing | Ksh 2,500,000 | |
| 307 | Makueni Vtc Dormitory- Additional Funds | Ongoing | Ksh 1,500,000 | |
| 308 | Mutini Ecde | Ongoing | Ksh 2,500,000 | |
| 309 | Kavumbu Ecde | Ongoing | Ksh 2,500,000 | |
| 310 | Kitumbai Ecde | Ongoing | Ksh 3,600,000 | |
| 311 | Uma Primary School Ecde | Ongoing | Ksh 4,500,000 | |
| 312 | Mukaatini Ctti Dormitory- Phase 2 | Ongoing | Ksh 1,000,000 | |
| 313 | Yatwa Ecde | Ongoing | Ksh 4,400,000 | |
| 314 | Iviani Ecde | Ongoing | Ksh 3,000,000 | |
| 315 | Malelu Ecde | Ongoing | Ksh 4,000,000 | |
| 316 | Mwea Vtc Dormitory | Ongoing | Ksh 3,000,000 | |
| 317 | School Feeding Programme -school Feeding For Ecde Children- Kee Ward | Ongoing | Ksh 1,500,000 | |
| 318 | Muthethe Ecde | Ongoing | Ksh 3,500,000 | |
| 319 | Kisekini Ecde | Ongoing | Ksh 3,000,000 | |
| 320 | Kikongooni Ecde | Ongoing | Ksh 2,000,000 | |
| 321 | Matindini Ctti | Ongoing | Ksh 1,500,000 | |
| 322 | Kai Ecde | Ongoing | Ksh 2,400,000 | |
| 323 | Mutokwe Ecde Toilet | Ongoing | Ksh 700,000 | |
| 324 | Makelenzuni Ecde | Ongoing | Ksh 2,500,000 | |
| 325 | Ndeini Ctti Electricity | Ongoing | Ksh 490,000 | |
| 326 | Katangini Ecde | Ongoing | Ksh 2,470,000 | |
| 327 | Kawelu Ecde- | Ongoing | Ksh 2,500,000 | |
| 328 | Kwa Matungu Ctti | Ongoing | Ksh 712,400 | |
| 329 | Kasikeu Ict Hub | Not Started | Ksh 3,000,000 | |
| 330 | Kyakatoni Ecde | Not Started | Ksh 3,500,000 |
8. Department of Infrastructure, Transport, Public Works, Housing and Energy
| # | Project Name | Status | Budget | Action |
|---|---|---|---|---|
| 1 | Construction Of Muaani Drift And Murraming Of Jones To Muaani Girls Road | Completed | Ksh 4,900,000 | |
| 2 | Kwa Kitingi -kwa Joel -kwa Mwaniki Road Opening And Grading | Completed | Ksh 3,430,000 | |
| 3 | Road Opening (ndivuni- Kisemeini- Kwamukosi- Nziu Market) Road Opening And Grading | Completed | Ksh 2,940,000 | |
| 4 | Unoa Grounds Floodlights | Completed | Ksh 2,300,000 | |
| 5 | Road Improvement Programme | Completed | Ksh 300,000 | |
| 6 | Roads Improvement | Completed | Ksh 1,940,000 | |
| 7 | Road Improvement | Completed | Ksh 1,960,000 | |
| 8 | Grading along Makolongo-kwa Juda- Kaiti Road | Completed | Ksh 5,000,000 | |
| 9 | Opening And Grading Of Mutinda- Mbalu-kitheini Pri-makuli-nichodemus-kwa Matheka Road | Completed | Ksh 4,000,000 | |
| 10 | Maintenance of Kivandini- Yathonza road, mikwani -Kombai road &Febi-Makuli road | Completed | Ksh 4,000,000 | |
| 11 | Routine Maintenance Of Wote Ward Access Road | Completed | Ksh 3,000,000 | |
| 12 | Road Improvement Programme Along Shimo-kwa Maluna-kwa Ngulue-kamunyolo Dam | Completed | Ksh 1,000,000 | |
| 13 | Construction Of Kyambui Drift | Completed | Ksh 5,000,000 | |
| 14 | Roads Improvement Across The Ward | Completed | Ksh 4,900,000 | |
| 15 | Road Improvement Programme Through Road Opening And Grading Of Roads | Completed | Ksh 4,706,086 | |
| 16 | Hire Of Shovel And Grader For Road Maintenance -Nzakika | Completed | Ksh 4,000,000 | |
| 17 | Rehabilitation Of Market Lighting (mulika Mwizi) And Street Lightings | Completed | Ksh 200,000 | |
| 18 | Market Lighting -installation Of Lighting At Jasho, Kalima, Wee, Mathanguni, Kwa Mutavi And Kwa... | Completed | Ksh 1,665,000 | |
| 19 | Mechanical Road Opening And Widening | Completed | Ksh 2,970,000 | |
| 20 | Kithumani- Mbalani-Katundu Drift | Completed | Ksh 3,920,000 | |
| 21 | Kwa Kitei Drift | Completed | Ksh 3,430,000 | |
| 22 | Road Improvement (fuel) | Completed | Ksh 50,000 | |
| 23 | Gravelling Works; Mutiambua-kavuthu-muswii Rd | Completed | Ksh 16,000 | |
| 24 | Installation Of Highmast Floodlight At Mutyambua Market | Completed | Ksh 2,000,000 | |
| 25 | Road Improvement Programme In Mbitini Ward | Completed | Ksh 1,000,000 | |
| 26 | Road Maintenance in Mbitini ward– (fuel) | Completed | Ksh 986,944 | |
| 27 | Opening Of Roads Kithumani – Muamani Road | Completed | Ksh 2,000,000 | |
| 28 | Road Improvement - in Mbitini ward through NYS | Completed | Ksh 1,446,336 | |
| 29 | Mbulutini Drift- Construction Of A Drift | Completed | Ksh 12,500,000 | |
| 30 | Road Improvements | Completed | Ksh 4,900,000 | |
| 31 | Kwa Kateli Drift | Completed | Ksh 2,940,000 | |
| 32 | Kwa Kisoi Gulley | Completed | Ksh 1,470,000 | |
| 33 | Kwa Mulinge Drift | Completed | Ksh 1,470,000 | |
| 34 | Kwa Mwenga Culverts | Completed | Ksh 1,470,000 | |
| 35 | Opening Of Ward Roads In Muvau Kikumini Ward | Completed | Ksh 155,000 | |
| 36 | Road Improvement Programme | Completed | Ksh 100,000 | |
| 37 | Road Improvement | Completed | Ksh 1,000,000 | |
| 38 | Routine Maintenance Of Muvau/kikumini Ward Access Roads | Completed | Ksh 5,500,000 | |
| 39 | Grading Of Kilisa – Mandoi – Neema – Muambani – Kivani – Kangutheni – Corner Baridi –... | Completed | Ksh 10,215 | |
| 40 | Road Improvement Programme - Kikumini/muvau Ward | Completed | Ksh 3,500,000 | |
| 41 | Installation Of Road Structures in Muvau/ Kikumini ward | Completed | Ksh 4,000,000 | |
| 42 | Construction Of A Keywall Along Ngomeni Road | Completed | Ksh 500,000 | |
| 43 | "opening And Grading Of Roads -heavy Grading Of Kiambani - Kaseve - Kwa Mbeleti - Makutano. ... | Completed | Ksh 3,000,000 | |
| 44 | Machine Hire For Opening Of Feeder Roads | Completed | Ksh 1,960,000 | |
| 45 | Fuel For Grading Using County Machinery | Completed | Ksh 1,470,000 | |
| 46 | Six (6) Market Lights At Mutini, Kiangini, Kyunyu, Ngomano, Thavu, And Ikaasu Markets. | Completed | Ksh 1,470,000 | |
| 47 | Opening And Grading Of Nyunzu,matithini,aic Iani,nzaai,kalaani,nguumo,kaseve Market Road(mtf) | Completed | Ksh 1,201,928 | |
| 48 | Opening,grading And Road Structures OfLondokwe- Mbuvo Nzau- Munathi- Syethe- Kwa Mbalya Road | Completed | Ksh 3,000,000 | |
| 49 | Gravelling, Installation Of Culverts, Gabions And Drifts Along Kathamboni Spill Way | Completed | Ksh 3,000,000 | |
| 50 | Installation And Rehabilitation Of Market Lights At Kiteei, Mbuvo Nzau,kavumbu And Kiluluini Markets | Completed | Ksh 1,100,000 | |
| 51 | Routine Maintenance Of Kathozweni Ward Access Roads | Completed | Ksh 500,000 | |
| 52 | Machine Hire For Opening Of Roads Across Kathonzweni Ward | Completed | Ksh 2,300,000 | |
| 53 | Installation Of Security Lights At Ikaasu Market | Completed | Ksh 450,000 | |
| 54 | High Mast Street Lighting At Iiani Market | Completed | Ksh 1,960,000 | |
| 55 | Road Structures And Protection Works | Completed | Ksh 2,940,000 | |
| 56 | Road Improvements | Completed | Ksh 1,300,000 | |
| 57 | Upgrading Yeemulwa- Ivinganzia- Kavilila Road | Completed | Ksh 10,000 | |
| 58 | Methovini-kyangwasi- Kwakivandi-kasayani Rd, Mathemba-musuuni-st. Jude Rd And Kithathaini-katungu... | Completed | Ksh 1,884,799 | |
| 59 | Routine Maintenance Of Mavindini Ward Access Roads Opening Of Feeder Roads | Completed | Ksh 3,900,000 | |
| 60 | Mantainance And Installation Of Drainage Structres Of Nzeveni-kwa Ndungulu-kwa Joelkwa... | Completed | Ksh 3,000,000 | |
| 61 | Opening And Grading Of Wito Farm-mbavini- Kaiani-sinai-ctti-nguthunu-nditiku-kwa Kaunda Road | Completed | Ksh 3,000,000 | |
| 62 | Road Works On Kavingoni-nduu Ndune - Syandoo - Ngosini Road | Completed | Ksh 2,500,000 | |
| 63 | Fuel For Grading Of Roads Using County Machinery in Mavindini ward | Completed | Ksh 800,000 | |
| 64 | Road Mantainance Across Mavindini Ward | Completed | Ksh 3,300,000 | |
| 65 | Road Structures At Wito Farm-mbavani-kaiani- Sinai Road | Completed | Ksh 1,700,000 | |
| 66 | Opening Of Matheani Kwa Nyaa Road | Completed | Ksh 2,500,000 | |
| 67 | Opening And Grading Of Kalembu- Mulango Road Through Kwa Kavilu | Completed | Ksh 2,000,000 | |
| 68 | Construction Of Road Structures (culverts And Drifts) | Completed | Ksh 1,960,000 | |
| 69 | Road Improvement Program – Fuel For Inhouse Works | Completed | Ksh 900,000 | |
| 70 | Rerec Matching Grant (for Kitise And Kithuki Subwards) | Completed | Ksh 2,000,000 | |
| 71 | Installation Of Floodlights | Completed | Ksh 1,960,000 | |
| 72 | Installation Of Flood Lights At Matheani Market | Completed | Ksh 500,000 | |
| 73 | Roads Improvement (fuel) | Completed | Ksh 344,689 | |
| 74 | In-house Road Improvement Works | Completed | Ksh 144,000 | |
| 75 | Construction Of Kwa Kalelo - Winzeni Drift | Completed | Ksh 4,000,000 | |
| 76 | Installation Of Road Structures And Culverts - Mbata - Mayuu - Manza - Ngunguuni - Athiani Road | Completed | Ksh 4,000,000 | |
| 77 | Road Improvement Program | Completed | Ksh 3,430,000 | |
| 78 | Light Grading & Drainage Works Of Kiambani-kiuuku-kithuki-matheani-kitise Road | Completed | Ksh 3,500,000 | |
| 79 | Installation Of Floodlights in Kitise Kithuke markets | Completed | Ksh 3,000,000 | |
| 80 | Opening & Grading Of Athiani-kithaayoni-mwania-kwa Nzula-kwa Kimasyu-kikome- Kwa Nyaa Road | Completed | Ksh 3,500,000 | |
| 81 | Construction Of Key Wall At Londokwe Along Nzouni- Manza Road | Completed | Ksh 2,000,000 | |
| 82 | Construction Of Key Wall At Londokwe Along Matheani -kwa Nyaa Road | Completed | Ksh 2,000,000 | |
| 83 | Installation of High Mast Floodlight At Yinthungu Market | Completed | Ksh 2,000,000 | |
| 84 | Rehabilitation Of 4 Solar Floodlights in Kitise/Kithuki | Completed | Ksh 1,000,000 | |
| 85 | Installation Of Floodlights In Markets (mayuu, Kwa Nyaa, Kithayoni, Katangini, Mwakini ,nzouni,... | Completed | Ksh 3,000,000 | |
| 86 | Foodlight At Kasayani Market | Completed | Ksh 1,000,000 | |
| 87 | Fuel For Routine Maintenance Of Kitise Ward Access Roads | Completed | Ksh 1,000,000 | |
| 88 | Construction of Londokwe Drift | Completed | Ksh 7,500,000 | |
| 89 | Road Opening - Kyuasi - Londokwe And From Muti Kati - Kikwasu - Winzeni Road | Completed | Ksh 2,000,000 | |
| 90 | Flood Light At Muangeni Market | Completed | Ksh 350,000 | |
| 91 | Upgrading Of Kalamani- Nzaini Road | Completed | Ksh 2,940,000 | |
| 92 | Road Improvement | Completed | Ksh 7,000,000 | |
| 93 | Kikima Market Improvement Programme | Completed | Ksh 9,410,000 | |
| 94 | Kikima Market Development | Completed | Ksh 980,000 | |
| 95 | Roads Improvement/maintenance | Completed | Ksh 36,000 | |
| 96 | Muisyo-ngomeni River Drift | Completed | Ksh 9,815,000 | |
| 97 | Kitituni-nthaene Kwa Ngoa | Completed | Ksh 2,500,000 | |
| 98 | Rehabilitation Of Kalamani- Nzaini Road | Completed | Ksh 980,000 | |
| 99 | Installation Of Street Lights Phase 2 Around Kikima Market | Completed | Ksh 12,000,000 | |
| 100 | Road improvement programme through road opening in Mbooni ward | Completed | Ksh 2,000,000 | |
| 101 | Kikima Market Improvement Programme | Completed | Ksh 4,000,000 | |
| 102 | Kikima Town/markets Development Program -phased Programme.- Cabro Paving Kikima Victoria Hotel-... | Completed | Ksh 10,000,000 | |
| 103 | Roads Maintenance/grading/murraming Programme -routine Road Maintenance, Construction Of Road... | Completed | Ksh 4,000,000 | |
| 104 | Kikima Town And Markets Improvement Programme 2 | Completed | Ksh 4,000,000 | |
| 105 | Nzueni, Muvaa, Kusyokithoiand Ndandini Road Improvement | Completed | Ksh 4,900,000 | |
| 106 | Isuuni Drift | Completed | Ksh 11,000,000 | |
| 107 | Road Improvement Kithungo Kitundu | Completed | Ksh 3,300,000 | |
| 108 | Kilyungi Hybrid High Mast Floodlight | Completed | Ksh 2,940,000 | |
| 109 | Isuuni – Kyamwata – Kwa Kimae Rd, grading And Gravelling @ Kshs. 2,500,000.00, community... | Completed | Ksh 3,000,000 | |
| 110 | Drainage Works Along Mwanyani-kwa Kyole Road | Completed | Ksh 1,380,040 | |
| 111 | Survey, Road Opening And Widening And Murraming Of Kwa Titus-aic Mbiuni-kwa Iwaikanga Road | Completed | Ksh 4,000,000 | |
| 112 | Kitundu-mwea-kalala-ititu-ngai Health Centre Road | Completed | Ksh 4,000,000 | |
| 113 | Installation Of Floodlights At Kyanzuki, Katumani, Munyeetani And Muumani Markets | Completed | Ksh 3,000,000 | |
| 114 | Road Grading And Culvert Installation Along Kwa Nzelu-ndandini-kyevutula-munyeetani | Completed | Ksh 2,000,000 | |
| 115 | Mwanyani- Katunyoni-utwiini-mumani Road- Widening, Grading And Drainage Structures | Completed | Ksh 4,000,000 | |
| 116 | Hire Of Grader For Routine Maintenance Of Kithungo/kitundu | Completed | Ksh 2,000,000 | |
| 117 | Roads Improvement Programme Kithungo Kitundu | Completed | Ksh 2,500,000 | |
| 118 | Instalation Of Flood Lights At Nthengo Syathani And Kalambya Markets | Completed | Ksh 2,100,000 | |
| 119 | Road Improvement In The Ward | Completed | Ksh 10,000,000 | |
| 120 | Heavy Grading, Construction Protection Works And Installation Of Culverts At Kwa Ikavi-musoa... | Completed | Ksh 6,861,200 | |
| 121 | Installation Of Flood Lights At Kalawani | Completed | Ksh 1,000,000 | |
| 122 | Routine Maintenance Works; Ngetha – Vyaa - Utumoni Rd | Completed | Ksh 4,696,661 | |
| 123 | Rehabilitation Of Vengea-kakima-kwa Boss-abc Thwake Road | Completed | Ksh 5,400,000 | |
| 124 | Installation of floodlights At Iiani Market,itetani Market,wanzauni Market And Mavindu Market | Completed | Ksh 4,000,000 | |
| 125 | Ndiangu-malaa- Kanoto Ndoo,kyanguma-ithemboni-mukangu- Mavindu Road | Completed | Ksh 4,000,000 | |
| 126 | Kwa Ithitu – Itetani – Kikumbo Road | Completed | Ksh 3,100,000 | |
| 127 | Routine Maintenance Of Tulimani Ward Access Roads | Completed | Ksh 1,000,000 | |
| 128 | Roads Improvement Programme | Completed | Ksh 801,540 | |
| 129 | Road Improvement Program (fuel For Road Maintanance) | Completed | Ksh 1,000,000 | |
| 130 | Construction Of Ngwani River Drift | Completed | Ksh 8,106,722 | |
| 131 | In-house Road Improvement Works | Completed | Ksh 50,000 | |
| 132 | Road Improvement Program | Completed | Ksh 4,410,000 | |
| 133 | Routine maintenance of Kisau/Kiteta ward access roads | Completed | Ksh 5,000,000 | |
| 134 | Opening Kwa Kisingu - Kyome -Kwa Makenzi Kithetheni kwa Ndisya road | Completed | Ksh 5,000,000 | |
| 135 | Installation Of Floodlights At Mbiiani ,nthungoni,katungoli, Kwa Kulomba And Kavutini Markets | Completed | Ksh 3,000,000 | |
| 136 | Kwa Kisingu- Kwa Ndisya Road Structures- Road Strucures | Completed | Ksh 1,500,000 | |
| 137 | Construction Of Kako - Kandulyu (savani) Drift | Completed | Ksh 4,210,612 | |
| 138 | Road Improvement Programme | Completed | Ksh 473,931 | |
| 139 | Road Improvement Programme | Completed | Ksh 7,180,720 | |
| 140 | Rehabilitation of Ikundu- Kwa Mali -Kwa Maingi - Kwa Ndungu Road | Completed | Ksh 4,000,000 | |
| 141 | Road Improvement Programme - Mwani mkt - kwa chief Ndiku road | Completed | Ksh 4,000,000 | |
| 142 | Road Improvement Programme In Kako/waia Ward -mtf | Completed | Ksh 3,200,000 | |
| 143 | Installation Of Floodlights In Kitongu Market | Completed | Ksh 2,000,000 | |
| 144 | Rehabilitation Of Kwa Mwanzau And Muia Drifts | Completed | Ksh 1,000,000 | |
| 145 | Roads Improvement Programme-opening Of Kwa Kiuani-kitongu-mukio-kwa Ndung | Completed | Ksh 3,000,000 | |
| 146 | Road Improvement Kako/Waia | Completed | Ksh 1,000,000 | |
| 147 | Road Improvent Programme | Completed | Ksh 9,750,000 | |
| 148 | Rehabilitation of Malamuni-Miangeni-Mwenethe-Kinze-Mbavani- Ngaanwa-Mutembuko -Syongungi-Kwa Maseka... | Completed | Ksh 3,509,550 | |
| 149 | Hire Of Machines For Roadworks; Katangini – Ngunini Rd, Murramuni... | Completed | Ksh 3,000,000 | |
| 150 | Road Improvement Programme Through Machine Hire In Kalawa Ward | Completed | Ksh 3,000,000 | |
| 151 | Road Improvement Programme In Kalawa Ward | Completed | Ksh 1,900,000 | |
| 152 | Grading And Murraming From Malamuni - Miangeni -kinze- Mbavani- Mutembuku- Syongungi To Kwa Maseka... | Completed | Ksh 3,509,550 | |
| 153 | Mutembuku Floodlight | Completed | Ksh 500,000 | |
| 154 | Grading And Installation Of Drainage Structures Along Ngaamba-marwa Road | Completed | Ksh 3,920,000 | |
| 155 | Rehabilitation of Kwa Tuva - Ngiini- Kalanzoni - Yaitha Road | Completed | Ksh 9,860,000 | |
| 156 | In-house Road Improvement Works | Completed | Ksh 19,521 | |
| 157 | Inhouse Works - Bush Clearing And Spot Murraming | Completed | Ksh 400,890 | |
| 158 | Installation Of 8.5m Double Arm Integrated Solar Lights System Mavivye Market | Completed | Ksh 245,000 | |
| 159 | Machines For Hire -road Improvement | Completed | Ksh 3,995,000 | |
| 160 | Rehabilitation Tuvilani-kiongwani Girls-kavuko-kwawala-rubis Petrol Station Road | Completed | Ksh 3,100,000 | |
| 161 | Routine Maintenance In Kiima Kiu/kalanzoni | Completed | Ksh 3,782,995 | |
| 162 | Ngiini-kwa Mohamed-uiini Primary-kwa Kala-lake Oil- Kalanzoni Road-kwa Muthusi-kwa Atumia-mbondoni... | Completed | Ksh 1,500,000 | |
| 163 | Grading Of Ngiini-malili Sec- Eka Ili- Kwa Mohammed-uiini Primary-junction Lake Oil- Kwa... | Completed | Ksh 2,100,000 | |
| 164 | Road Improvement Programme | Completed | Ksh 2,965,200 | |
| 165 | Mukaa-uvete Road | Completed | Ksh 5,385,000 | |
| 166 | Mukaa Road Improvement | Completed | Ksh 1,500,000 | |
| 167 | Hire Of Machinery | Completed | Ksh 1,176,000 | |
| 168 | Installation Of Integrated Solar Light System ( Kamuthini, Kiongwani,kyandue, Kyangala, Mutiluni... | Completed | Ksh 1,470,000 | |
| 169 | Kiongwani- Mwaani- Kitonguni- Uvete Road | Completed | Ksh 4,500,000 | |
| 170 | Kanini Kaseo- Kwa Ngumu- Mt. Carmel- Kwa Wakata Road | Completed | Ksh 4,000,000 | |
| 171 | Hire Of Machinery For Mukaa Ward Access Roads | Completed | Ksh 2,700,000 | |
| 172 | Rehabilitation Of Kasikeu – Mutweamboo – Kwa Ndiki – Ndumbini – Mombasa Road | Completed | Ksh 10,843,838 | |
| 173 | Road Improvement Programme | Completed | Ksh 2,940,000 | |
| 174 | Kwa Kavenzi-mitamboni-mwangini Road | Completed | Ksh 965,000 | |
| 175 | Road Improvement Programme | Completed | Ksh 330,000 | |
| 176 | Routine Maintenance Of Roads | Completed | Ksh 163,776 | |
| 177 | Kwa Katwae-kwa Nzae-mwenye Ivaa Road | Completed | Ksh 50,216 | |
| 178 | Road Improvement And Maintenance | Completed | Ksh 4,400,000 | |
| 179 | Heavy Grading And Murraming Of Kilome- Uvete- Kayata- Kasikeu- Mutweamboo- Lumu- Kiou Top- Kwa... | Completed | Ksh 9,310,000 | |
| 180 | Construction Of Kating'ila Drift | Completed | Ksh 4,500,000 | |
| 181 | Repair And Maintenance Of Floodlights in Kasikeu | Completed | Ksh 400,000 | |
| 182 | Drainage Works Kwa Malenge | Completed | Ksh 4,000,000 | |
| 183 | Road Improvement Programme | Completed | Ksh 7,700,000 | |
| 184 | Road Improvement Programme - Kasikeu | Completed | Ksh 7,000,000 | |
| 185 | Miradi Kwa Jamii(mkj) Sand Dams/ Drift Labour At Muusini And Kya Kaleli | Completed | Ksh 490,000 | |
| 186 | Miradi Kwa Jamii(mkj) At Matangi And Kivani | Completed | Ksh 490,000 | |
| 187 | Installation Of Street Lights In Markets | Completed | Ksh 1,960,000 | |
| 188 | Drainage Works View Point -ngiluni- Mavia Meu Road | Completed | Ksh 1,496,583 | |
| 189 | Installation Of 7No. Intergrated solar market and Rehabiliation of 1 No. Solar market lights | Completed | Ksh 2,100,000 | |
| 190 | Rehabilitation of Kyambalasi - Mwea Pri - mavia meu rd | Completed | Ksh 2,000,000 | |
| 191 | Construction Of Drainage Structures At Kitandi-muusini-kakisya-munyuni-nguluni Road | Completed | Ksh 1,000,000 | |
| 192 | Machine Hire (wet Rate)-grader Mtf, Grading Of Roads | Completed | Ksh 1,000,000 | |
| 193 | Road Improvement Programme-fuel Kee ward | Completed | Ksh 850,000 | |
| 194 | Solarisation Of Kee Model Health Centre | Completed | Ksh 1,000,000 | |
| 195 | Machine Hire (wet Rate)-shovel Mtf, Opening Of Roads | Completed | Ksh 1,500,000 | |
| 196 | Kituiuni Junction – Mutanda Primary | Completed | Ksh 2,940,000 | |
| 197 | Itambani – Kyanganda Road | Completed | Ksh 3,920,000 | |
| 198 | Kituaimwe – Kyakathungu And Itambani - Kilisa Roads | Completed | Ksh 1,960,000 | |
| 199 | Kyaka Drift Construction | Completed | Ksh 1,000,000 | |
| 200 | Road Improvement | Completed | Ksh 15,511 | |
| 201 | Road Improvement along Kithangathini – Kisyani – nduu Sunday school road | Completed | Ksh 4,000,000 | |
| 202 | Grading Of Roads (hire Of Machines); Upete/kilome – Kivuuni Borehole – Kithangathini Primary... | Completed | Ksh 3,789,075 | |
| 203 | Road Improvement Programme in Kilungu Ward | Completed | Ksh 4,600,000 | |
| 204 | Rehabilitation of Muthethe road - ABC church Kalongo -Kyakathungu Primary road | Completed | Ksh 3,900,000 | |
| 205 | Road Improvement Programme along Kitituni -Nyaani road | Completed | Ksh 1,500,000 | |
| 206 | Road Improvement Programme Along Kilungu – Kimandeni Road | Completed | Ksh 1,500,000 | |
| 207 | Rehabilitation Of Kwa Sikauti- Kisyulya Road In Kilungu Ward | Completed | Ksh 3,904,677 | |
| 208 | Routine Maintenance Of Roads in Kilungu ward -Fuel | Completed | Ksh 327,229 | |
| 209 | Construction of Kithioni drift | Completed | Ksh 15,000,000 | |
| 210 | Road Improvement Programme | Completed | Ksh 3,430,000 | |
| 211 | Grading, Murraming And Installation Of Structures Along Mbaloni – Kyenzenzeni Road | Completed | Ksh 5,880,000 | |
| 212 | Market lighting at Mutini, Musalala and Kwa Mwove markets | Completed | Ksh 1,500,000 | |
| 213 | Machine Hire For The Following Roads; Abc Kavatanzou – Mutambukoni- Kamunandani – Kwa Ndile... | Completed | Ksh 4,500,000 | |
| 214 | Kaumoni - Nthangathi - Kitutu Road | Completed | Ksh 2,940,000 | |
| 215 | Kisimbi-mutanga/ Nthangathi- Muiu Road | Completed | Ksh 2,940,000 | |
| 216 | Road Improvement | Completed | Ksh 1,960,000 | |
| 217 | Road Improvement | Completed | Ksh 1,960,000 | |
| 218 | Nzouni - Mutambuukoni - Kavani Road | Completed | Ksh 1,960,000 | |
| 219 | Construction Of Concrete Slab 40m Long Along Makuli Forest Road At Kwa Mbunga | Completed | Ksh 1,800,000 | |
| 220 | Construction of road structures across Ukia sub ward | Completed | Ksh 1,500,000 | |
| 221 | Road Improvement Programme Through Installation Of Road Structures Across Kilala/iuani | Completed | Ksh 1,500,000 | |
| 222 | Construction Of Concrete Slab 30m Long Along Kavani Kituluku Dispensary Road | Completed | Ksh 1,500,000 | |
| 223 | Installation Of 2-15 M Concrete Pole Market Lights At Ikalyoni Market And Kyau Market | Completed | Ksh 1,400,000 | |
| 224 | Grading And Murraming Of Road Across Kilala/iuani - Fuel | Completed | Ksh 1,500,000 | |
| 225 | Grading And Spot Murraming Of Road Across Ukia Sub Ward | Completed | Ksh 1,500,000 | |
| 226 | 3-solar Flood Lights (mumbuni , Matindini And Ivumbuni Markets | Completed | Ksh 1,000,000 | |
| 227 | Machine Hire-grading Of Kwa Kasoli-kwa Nthoka Wote Road,kandengya-ndalani-junction (kisingo-ngomano... | Completed | Ksh 4,900,000 | |
| 228 | Roads Improvement Programme | Completed | Ksh 490,000 | |
| 229 | Streetlighting Kiambani Primary,secondary Schools And Makindu Town | Completed | Ksh 3,430,000 | |
| 230 | Installation Of Flood Light Masts At Makindu Upper Market | Completed | Ksh 2,940,000 | |
| 231 | Roads Improvement Programme(fuel) Makindu ward | Completed | Ksh 500,000 | |
| 232 | Potholes Repairs And Murraming Of Streets Behind Makindu - Nairobi/mombasa Matatu Stages To... | Completed | Ksh 1,000,000 | |
| 233 | Rehabilitation Of Kiboko Underpass-mbiuni-muuni River-ngakaa-kyanda-kawala Market Kalii Pri... | Completed | Ksh 9,800,000 | |
| 234 | Routine maintenance of MAkindu ward access roads | Completed | Ksh 3,500,000 | |
| 235 | Kisayani-kathyaka-mukononi-ngaikini Road | Completed | Ksh 4,410,000 | |
| 236 | Road Improvement Programme | Completed | Ksh 2,450,000 | |
| 237 | Road Improvement Programme | Completed | Ksh 147,032 | |
| 238 | Installation Of Kisayani Flood Light/ Mast | Completed | Ksh 2,058,000 | |
| 239 | Street Lighting For Main Stage To Kisayani Health Centre | Completed | Ksh 980,000 | |
| 240 | Road Mantainance Across Makindu Ward | Completed | Ksh 4,890,000 | |
| 241 | Construction Of Muangeni Drift | Completed | Ksh 2,000,000 | |
| 242 | Road Improvement Programme in Kikumbulyu North | Completed | Ksh 7,000,000 | |
| 243 | Construction Of Muangeni Drift | Completed | Ksh 5,000,000 | |
| 244 | "road Maintenace - Opening, Grading And Spot Murraming - Of The Proposed Roads Below. ... | Completed | Ksh 4,700,000 | |
| 245 | Road Improvement Programme | Completed | Ksh 1,493,400 | |
| 246 | Kiaoni Floodlights | Completed | Ksh 2,000,000 | |
| 247 | Kisayani Street Light | Completed | Ksh 2,000,000 | |
| 248 | Kathyaka Floodlights | Completed | Ksh 2,000,000 | |
| 249 | Installation Of Culverts In Various Roads Within Kikumbulyo North | Completed | Ksh 4,600,000 | |
| 250 | Opening Of And Ugrading Of Kwa Power, Kwa Solomon, Kasarani, Mikuyuni Secondary, Kyanzili Kavete... | Completed | Ksh 5,900,000 | |
| 251 | Kibwezi Town Roads Improvement | Completed | Ksh 4,410,000 | |
| 252 | Fuel For County Machinery | Completed | Ksh 1,414,720 | |
| 253 | Miradi Kwa Jamii(mkj) | Completed | Ksh 500,000 | |
| 254 | Fueling Of Machines For Grading Of Roads | Completed | Ksh 35,000 | |
| 255 | Kibwezi Town Lighting Programme ( Matundani Floodlight, Kibwezi Streetlighting) | Completed | Ksh 3,822,000 | |
| 256 | Market Solar Light Rehabilitation Programme( Siembeni, Mbui Nzau, Kyanginywa, Mikuyuni) | Completed | Ksh 588,000 | |
| 257 | Kangesu -– Ithambaume – Kwa Nzinga – Gff – Mutokwe Ecde Road | Completed | Ksh 5,000,000 | |
| 258 | Routine Maintenance Of Kikumbulyu South Ward Access Roads | Completed | Ksh 3,000,000 | |
| 259 | Installation Of Road Structures Along Kwakitavu Road | Completed | Ksh 1,000,000 | |
| 260 | Kibwezi-bpp Streetlights | Completed | Ksh 1,000,000 | |
| 261 | Fuel/machine Hire For Grading Of Sekeleni-ilatu-kalembe Raha Road | Completed | Ksh 1,960,000 | |
| 262 | Road Improvement Programme | Completed | Ksh 4,943,800 | |
| 263 | Ngambi Ya Munzyu- Tuanga Road | Completed | Ksh 4,410,000 | |
| 264 | Fuel/machine Hire For Grading And Murraming Of Mbui Nzau-yala-kalyakalya-kwa Kanyingi-kwa... | Completed | Ksh 3,963,520 | |
| 265 | Kilema-muundani-kwa Kanyasya-muuani Soko Muyo-mutantheeu Road | Completed | Ksh 4,500,000 | |
| 266 | Kwa Kivou Tala-kwa Kinyingi-kaunguni-tindima Road | Completed | Ksh 4,000,000 | |
| 267 | Kiunduani Market | Completed | Ksh 3,000,000 | |
| 268 | Kibarani-wivia-kiuani Road | Completed | Ksh 2,500,000 | |
| 269 | Murraming Of Jcc Kaunguni-kwa Muoka To Kwa Kivivye -3km Road. | Completed | Ksh 1,500,000 | |
| 270 | KALEMBE RAHA KIAMBANI ROAD | Completed | Ksh 1,000,000 | |
| 271 | Fuel For Road Opening in Nguumo ward Using County Machinery | Completed | Ksh 1,000,000 | |
| 272 | Road Improvement Programme | Completed | Ksh 4,500,000 | |
| 273 | In-house Road Improvement Works | Completed | Ksh 25,000 | |
| 274 | Kwa Kausha-kimbingo-mulala-makutano-kwa Kinuka-mwasang'ombe-ngomongo-thea-kwa Masauti-muselele-kwa... | Completed | Ksh 344,466 | |
| 275 | Masauti -muselele -mumbuni -mungetheele Road | Completed | Ksh 4,500,000 | |
| 276 | Routine Maintenance Of Emali/mulala Ward Access Roads | Completed | Ksh 4,000,000 | |
| 277 | Emali Street Lights Rehabilitation | Completed | Ksh 500,000 | |
| 278 | Installation Of Drift At Tutini-kwa Maima Road | Completed | Ksh 5,500,000 | |
| 279 | Road Improvement Along Kwa Masauti - Mung'ethele Road | Completed | Ksh 4,000,000 | |
| 280 | Installation Of Road Structures Along Kwa Kausha Mulala Road | Completed | Ksh 1,000,000 | |
| 281 | Road Improvement Programme | Completed | Ksh 490,000 | |
| 282 | Rehabilitation Of Isunguluni-cutline-kyanguli-masaku Ndogo Road | Completed | Ksh 7,400,000 | |
| 283 | Road Improvement Programme | Completed | Ksh 1,988,800 | |
| 284 | Kambaland Road, Ngomano – Nzembete Rd, Salama – Kwa Makete Rd, Mwaani – Wandei Rd,... | Completed | Ksh 1,217,954 | |
| 285 | Solar Market Floodlights - 1m Kativani, Kavatini, Makutano, Ndauni Markets | Completed | Ksh 980,000 | |
| 286 | Rehabilitation As Integrated Lights At Yikitaa And Ulilinzi Markets And Installation Of A New... | Completed | Ksh 779,708 | |
| 287 | Miradi Kwa Jamii Programme | Completed | Ksh 490,000 | |
| 288 | Hire Of Machines For Opening And Grading; Lukenya – Utini Rd, Utini Junction - Yikivuthi Rd,... | Completed | Ksh 34,652 | |
| 289 | Road Improvement Programme In Masongaleni Ward | Completed | Ksh 7,000,000 | |
| 290 | Installation Of Solar Market Lights At Munyenze, Kithiiani, Kithyululu And Kyanguli Markets | Completed | Ksh 1,400,000 | |
| 291 | Repair Of Solar Market Lights (intregrated Model) At Katulye, Masaku Ndogo And Kyumani Markets | Completed | Ksh 650,000 | |
| 292 | Construction Of Culverts In Masongaleni Ward | Completed | Ksh 1,000,000 | |
| 293 | Road Improvement Programme (NYS) | Completed | Ksh 490,000 | |
| 294 | Road Improvement | Completed | Ksh 10,617,604 | |
| 295 | Solar Market Flood Lights At Kyusyani, Mbeetwani,songea, Kalimani, Mavindini, Makutano, Misuuni And... | Completed | Ksh 1,960,000 | |
| 296 | Hire Of Road Maintainance Equipment | Completed | Ksh 3,185,000 | |
| 297 | Kalimani – Kitengei – Kilumilo road | Completed | Ksh 4,000,000 | |
| 298 | Installation Of Street Lighting In Subati, Kilumilo And Kwa Kinyuti, Nzoila, Ngiluni, Iviani And... | Completed | Ksh 3,000,000 | |
| 299 | Rehabilitation Of Market Solar Lights-nthunguni, Kathekani, Darajani, Kiteng'ei And Mwakila Markets | Completed | Ksh 1,065,000 | |
| 300 | Hire Of Road Mantainance Equipment - Mtito Andei | Completed | Ksh 1,917,764 | |
| 301 | Roads Improvement Programme-hire Of Equipment in Mtito Andei | Completed | Ksh 2,500,000 | |
| 302 | Road Opening - Hire Of Equipment Mtito Andei | Completed | Ksh 2,500,000 | |
| 303 | Hire Of National Youth Service (nys) Machines- Mtito Andei | Completed | Ksh 2,450,000 | |
| 304 | Maintenance Of Tsavo Electric Fence | Completed | Ksh 6,000,000 | |
| 305 | Nzavoni Drift | Completed | Ksh 2,940,000 | |
| 306 | Kwa Kavuu- Kwa Kyulu- Ithaayoni- Kasasule- Kwa Kolovoi Road | Completed | Ksh 2,500,000 | |
| 307 | Road Improvement Programme | Completed | Ksh 3,000,000 | |
| 308 | Heavy Grading And Gravelling Of Machinery- Baptist – Makongenii – Nzavoni- Ndivuni –... | Completed | Ksh 1,960,000 | |
| 309 | Road Improvement | Completed | Ksh 2,962,200 | |
| 310 | Culverts Across The Ward | Completed | Ksh 1,960,000 | |
| 311 | In-house Road Improvement Works | Completed | Ksh 210,000 | |
| 312 | Installation Of Flood Lights At All Markets | Completed | Ksh 2,940,000 | |
| 313 | Electrification Of Usalama Market(matching Grant) | Completed | Ksh 1,500,000 | |
| 314 | Grading And Marraming Kwa Jc – Muthungue Primary - Ituumo | Completed | Ksh 980,000 | |
| 315 | Grading Marraming Of Utithi- Kyumbi – Silanga – Kwa Mailu | Completed | Ksh 980,000 | |
| 316 | Kwa Agnes-St.Peter-Aic-St.Marys-Veneti Road | Completed | Ksh 3,000,000 | |
| 317 | Kikingini-usalama- Muusini-maikuu-kwa Malyungi-kwa Mwololo-kwa Nyaanya- Ituumo-utithi-kalulu-kwa... | Completed | Ksh 3,000,000 | |
| 318 | Hire Of Dozer For Opening Of New Roads | Completed | Ksh 2,500,000 | |
| 319 | Maintenance Of Thange Ward Access Roads | Completed | Ksh 1,000,000 | |
| 320 | Murramming, Grading Of Kwa Agnes-st.peter-aic-st.marys-veneti-own Machinery And Installation Of... | Completed | Ksh 1,000,000 | |
| 321 | Construction Of Culverts At Kikingini-usalama- Muusini-maikuu-kwa Malyungi-kwa Mwololo-kwa Nyaanya-... | Completed | Ksh 1,000,000 | |
| 322 | Installation Of Floodlight At Matulani And Rehabilitation Of Unworking Floodlights At Masonga... | Completed | Ksh 3,000,000 | |
| 323 | Installation Of Floodlight At Utithi And Yumbuni | Completed | Ksh 600,000 | |
| 324 | Rehabilitation And Installation Of Road Structures From Kwa Agnes - Aic... | Completed | Ksh 3,000,000 | |
| 325 | Road Improvement in Thange Ward | Completed | Ksh 1,000,000 | |
| 326 | Grading Of Kalulu Road | Completed | Ksh 1,000,000 | |
| 327 | Marraming Of Kwa Kimasyu – Misuuni Road | Completed | Ksh 2,450,000 | |
| 328 | Marraming Of Kativani - Pastor Komu – Utu Roads | Completed | Ksh 1,960,000 | |
| 329 | Matingini – Kwa Kata – Kwa Muli – Kwa Mutuku – Sila Mulu | Completed | Ksh 1,960,000 | |
| 330 | Opening Of Kalikoni Borehole-kilokwe-mulu Ngomeli-kilongosi-wandia-mboyanganda-kwa Nduku-kwa... | Completed | Ksh 980,000 | |
| 331 | Opening Of Kwa Mbwika-ivingoni School-kwa Kimilu Road | Completed | Ksh 980,000 | |
| 332 | Opening Of Kyuasini- Kwa Nzekele Road | Completed | Ksh 980,000 | |
| 333 | Upgrading of road from Mang’elete- yumbuni- kitheini- katheka kai- kwa muma- mbotela- manyata-... | Completed | Ksh 4,900,000 | |
| 334 | Road Improvement | Completed | Ksh 1,470,000 | |
| 335 | Road Improvement( Matulani Roads) | Completed | Ksh 1,470,000 | |
| 336 | Migingo Parking | Completed | Ksh 980,000 | |
| 337 | Installation Of Street Lights Within The Makutano Talent Centre | Completed | Ksh 1,960,000 | |
| 338 | Kwa Skizana-kwa Kimangu-pondeni-kwa Jane To Katheini Road | Completed | Ksh 2,000,000 | |
| 339 | Routine Maintenance Of Ivingoni /nzambani Ward Access Roads | Completed | Ksh 2,000,000 | |
| 340 | Kwa Mwambu-mbukoni-manyata-mbotela Market | Completed | Ksh 2,000,000 | |
| 341 | Muthingiini-Nzambani Roads | Completed | Ksh 2,000,000 | |
| 342 | Yimbuvu-kwa Muma-mbotela Market | Completed | Ksh 1,000,000 | |
| 343 | Kiuukuni-kwa Malonza-yumbuni-rose Dominic-nzeveni-ndithini | Completed | Ksh 1,000,000 | |
| 344 | Kwa Ngolo-kwa Mbithi-kwa Kitosya-kwa Muthusi-kitheini | Completed | Ksh 1,000,000 | |
| 345 | Kwa Masaa Road | Completed | Ksh 1,000,000 | |
| 346 | Installation Of Culverts At Chief Ngutu Road | Completed | Ksh 400,000 | |
| 347 | Murramig Of Nzeveni-selewa-kwa Matundu-kwa Willy Road | Completed | Ksh 1,250,000 | |
| 348 | Graveling And Grading Along Ndivuni Ecde - Lutheran - Subcounty County Offices - Kwa Nthuku-... | Completed | Ksh 3,000,000 | |
| 349 | Makasa primary - Thuti -Utini road | Completed | Ksh 4,900,000 | |
| 350 | Road Opening | Completed | Ksh 4,185,128 | |
| 351 | Vololo -Kemalili road | Completed | Ksh 2,940,000 | |
| 352 | Drift Construction; Kwa Matungu – Kanyenyoni – Kwa Carlos – Masumba Road And Grading And... | Completed | Ksh 2,252,302 | |
| 353 | Road Improvement | Completed | Ksh 1,550,000 | |
| 354 | Road Improvement Programme In Nguu/masumba Through Opening Across The Ward | Completed | Ksh 3,000,000 | |
| 355 | Makutano-Kyaani -Kiuani - Vololo road | Completed | Ksh 3,000,000 | |
| 356 | Rehabilitation Of Kwa Kiamba -makasa Aic -kwa Tumbo- Ngulai Road | Completed | Ksh 6,806,810 | |
| 357 | Construction Of A Culvert At Matongoleni | Completed | Ksh 2,000,000 | |
| 358 | Road Improvement, Light Grading in Nguu Masumba | Completed | Ksh 2,000,000 | |
| 359 | Kanyiliilya - Ilivini Road- Installation Of Culverts | Completed | Ksh 1,004,213 | |
| 360 | Road Maintenance Programme in Nguu Masumba | Completed | Ksh 2,000,000 | |
| 361 | Opening Grading Murraming And Drainage Works Of Makutano, Kyaani Kiuani Vololo Rd | Completed | Ksh 3,000,000 | |
| 362 | Green Energy Promotion | Completed | Ksh 28,420,000 | |
| 363 | Rural Electrification Programme - Rerec Matching Grant | Completed | Ksh 30,000,000 | |
| 364 | Maintenance Of Street/flood Lights | Completed | Ksh 7,900,000 | |
| 365 | Road Maintenance | Completed | Ksh 13,014,219 | |
| 366 | Road Improvement In Hilly Terrain Wards | Completed | Ksh 2,030,712 | |
| 367 | Roads Improvement Programme | Completed | Ksh 12,007,102 | |
| 368 | Road Improvement All Wards | Completed | Ksh 2,288,943 | |
| 369 | Maintenance Of Street/flood Lights- Climate Action | Completed | Ksh 8,386,455 | |
| 370 | Enhancement Of Infrastructure Projects(to Facilitate Payment Of Project Components Removed During... | Completed | Ksh 8,386,455 | |
| 371 | Installation Of A Flood Light At Kiunduani Market | Completed | Ksh 3,000,000 | |
| 372 | Roads Maintenance Programme Wote/ Nziu Ward | Ongoing | Ksh 2,000,000 | |
| 373 | Cosntruction Of Road Structures For Makolongo- Kwa Juda- Lili-kavingo Road And Opening Of... | Ongoing | Ksh 3,000,000 | |
| 374 | Opening And Grading Of Roads -opening And Heavy Grading Of The Road From Ngutwa Market - Redeemed... | Ongoing | Ksh 3,000,000 | |
| 375 | Road Maintenance/spot Murrumimg/sand To Public Institutions | Ongoing | Ksh 1,000,000 | |
| 376 | Kwa Ndungulu-kwa Joel Kwa Ndeme -nzeveni Catholic- Kwa Letu- Kwa Muthoka - Ngei Road -installation... | Ongoing | Ksh 1,500,000 | |
| 377 | Grading And Murraming, Mutyambua Market And Kwa Komu-iani Road | Ongoing | Ksh 747,620 | |
| 378 | Grading, Murraming And Construction Of Road Structures For Manooni - T Room - Barazani - Mutyambua... | Ongoing | Ksh 4,500,000 | |
| 379 | "opening Of Roads - Nys 1. Kithumani-katundu Road 2. Barazani- Kwa Ndolo-kwa Mboya Road 3. ... | Ongoing | Ksh 1,500,000 | |
| 380 | Roads Maintanance Muvau/ Kilumini - MTF | Ongoing | Ksh 5,500,000 | |
| 381 | Installation Of Culverts And Gabbions Along; (a)mathemba-kwa Kinzi-yemulwa; (b)kasambani- Kwa... | Ongoing | Ksh 3,000,000 | |
| 382 | Road Maintenance Through Grading And Spot Murraming Across Kathonzweni Ward | Ongoing | Ksh 2,000,000 | |
| 383 | Kwa Muthuka- Yembondo Road Through Kwa Mwania And Kwa Wewa- Installation Of Road Structures ,... | Ongoing | Ksh 1,500,000 | |
| 384 | Roads Mantainance (fuel) | Ongoing | Ksh 500,000 | |
| 385 | Road Improvement in Kitise Kithuki - NYS | Ongoing | Ksh 2,500,000 | |
| 386 | Rehabilitation of Matheani- Kwa Nyaa road | Ongoing | Ksh 7,500,000 | |
| 387 | Roads Improvement Programme- Nzeveni Kwa Ingeeti Kwa Ndeti Kwa Mwevyo Road Opening | Ongoing | Ksh 2,500,000 | |
| 388 | Hire Of Machines Across Mbooni Ward | Ongoing | Ksh 2,000,000 | |
| 389 | Hire Of Machines - Opening Of Roads Kyaavua-kyanguliviti - Kamunani - Milimani- Kwa Kasina - Kwa... | Ongoing | Ksh 1,500,000 | |
| 390 | Construction Of A Drift At Kyevutula | Ongoing | Ksh 4,000,000 | |
| 391 | Routine Mantainance Across The Ward Roads in Kisau Kiteta | Ongoing | Ksh 4,000,000 | |
| 392 | Construction Of Boda Boda Shed Atkwa Ndunda And Ngoni Market | Ongoing | Ksh 1,000,000 | |
| 393 | Road Opening, Grading, Murraming And Installation Of Structures - Kwaminzyoka - Kwa Muthai - Kwa... | Ongoing | Ksh 4,000,000 | |
| 394 | Road Improvement-hire Of Motor Grader And Shovel | Ongoing | Ksh 2,500,000 | |
| 395 | Opening Of Mithumo- Kaseveni Road -road Opening | Ongoing | Ksh 2,000,000 | |
| 396 | Kaiti-uviluni-mbimbini-kyaume Road Opening -light Grading And Road-runoff Harvesting | Ongoing | Ksh 2,000,000 | |
| 397 | Rerec Matching Grant At Kalawa | Ongoing | Ksh 1,000,000 | |
| 398 | Road Improvement Works Through Grading On Selected Roads Across Kalawa Ward | Ongoing | Ksh 3,000,000 | |
| 399 | Opening,grading & Critical Spot Murraming Of Ngunini-ngamu Road,unyeeo-syotuvali... | Ongoing | Ksh 3,000,000 | |
| 400 | Installation Of Culverts Along Rubis Kwa Dky Mutio Kililuni Road | Ongoing | Ksh 1,280,346 | |
| 401 | Road Improvement Programme in Mukaa ward | Ongoing | Ksh 3,000,000 | |
| 402 | Road Maintenance Across Mukaa Ward | Ongoing | Ksh 3,000,000 | |
| 403 | Hire Of County Machinery in Mukaa Ward | Ongoing | Ksh 1,000,000 | |
| 404 | Road Improvement In Kasikeu Through County Machinery | Ongoing | Ksh 3,000,000 | |
| 405 | Roads Improvement Programme In Kee Ward | Ongoing | Ksh 3,000,000 | |
| 406 | Road Improvement Programme-cdd | Ongoing | Ksh 600,000 | |
| 407 | Road Improvement Kilungu through nys/mtf | Ongoing | Ksh 1,000,000 | |
| 408 | Domino-kithangathini-mbuini-kisyani Road Constructionof A Drift At Kithangathini River , Diggingof... | Ongoing | Ksh 3,000,000 | |
| 409 | Murraming, Grading, Installation Of Culvert And Drainage Works Along Mwaani Matwiku Kyakatoni... | Ongoing | Ksh 3,000,000 | |
| 410 | Construction Of Kiuswi Drift At Munyolis Corner | Ongoing | Ksh 2,000,000 | |
| 411 | Rerec Matching Grant (for Ukia -10 Villages In Upper Iuani Cluster) | Ongoing | Ksh 3,000,000 | |
| 412 | Road Structures (tengéa, Kwa Mwanthi, Kwa Musau, Kwa Muumbi, Ukia Ndivuni.) | Ongoing | Ksh 700,000 | |
| 413 | Kisimbi-mutanga Road-kitutu Kitile, Kwa Muloka-nthangu Ndio, Iiuni,kyuki,kitile, Nthangathi Roads ... | Ongoing | Ksh 5,000,000 | |
| 414 | Cdd (kavukuni Road, Kikongooni Primary - Mutambuukoni And Kyamukumu - Nthongoni @100k | Ongoing | Ksh 300,000 | |
| 415 | Opening Of Kyau - Muvani Road Section | Ongoing | Ksh 1,500,000 | |
| 416 | Road Grading Across Ukia - Nys | Ongoing | Ksh 1,250,000 | |
| 417 | Purchase Of A 3phase Transformer And Connection To 120 Homes | Ongoing | Ksh 2,500,000 | |
| 418 | Rerec Matching Grant In Makindu Ward | Ongoing | Ksh 3,000,000 | |
| 419 | Lorry Park Behind Nairobi Stage, From Kiambani Primary School Junction - Mumbe Hardware - Kwa Tom... | Ongoing | Ksh 500,000 | |
| 420 | Gravelling And Spot Murraming Of At Least 6 Spots Of Roads, Trenches And Areas Affected By Rains... | Ongoing | Ksh 1,000,000 | |
| 421 | Machine Hire Kikumbulyo North | Ongoing | Ksh 3,500,000 | |
| 422 | Road Opening (hire Of Shovel) Across Kikumbulyo North | Ongoing | Ksh 1,100,000 | |
| 423 | Rerec Matching Grant Kikumbulyu South | Ongoing | Ksh 2,000,000 | |
| 424 | Kikumbulyu South Rerec Grant-electrification Of Households In Upper Kalungu And Kasemeini Clusters | Ongoing | Ksh 2,000,000 | |
| 425 | Kibwezi Roads Improvement Programme -spot Murraming Of Kibwezi- London Road And Other Feeder Roads... | Ongoing | Ksh 1,500,000 | |
| 426 | Muundani- Kilema- Wayona- Kituamba-mutantheeu- Kwa Mwangu- Tuanga Rd (19km). | Ongoing | Ksh 3,500,000 | |
| 427 | Road Maintenance Of Ward Access Roads(nys) In Emali Mulala Ward | Ongoing | Ksh 2,850,000 | |
| 428 | Rerec Matching Grant- Masongaleni ward | Ongoing | Ksh 4,000,000 | |
| 429 | Installation Of Culverts In Various Roads Within The Ward | Ongoing | Ksh 700,000 | |
| 430 | Construction Of Kalimani - Kwa Sammy Culvert. - Cost Shared With Masongaleni Ward. | Ongoing | Ksh 600,000 | |
| 431 | Installation Of Streetlight At Machinery Town And At Kinyambu Market | Ongoing | Ksh 500,000 | |
| 432 | Road Improvement Programme in Nguu Masumba through -nys/mtf | Ongoing | Ksh 2,000,000 | |
| 433 | Construction of Kitende Drift | Ongoing | Ksh 14,000,000 | |
| 434 | Rural Electrification Programme - Rerec Matching Grant | Ongoing | Ksh 30,000,000 | |
| 435 | Green Energy Promotion | Ongoing | Ksh 3,500,000 | |
| 436 | Roads Maintenance Fuel Levy | Ongoing | Ksh 146,891,738 | |
| 437 | Maintenance Of Street/flood Lights Across The Wards | Ongoing | Ksh 10,000,000 | |
| 438 | Rural Electrification Programme - Rerec Matching Grant | Ongoing | Ksh 30,000,000 | |
| 439 | Housing Programme | Ongoing | Ksh 1,000,000 | |
| 440 | Roads Improvement Programme - All Wards | Ongoing | Ksh 7,000,000 | |
| 441 | Roads Infrastructure | Ongoing | Ksh 1,000,000 | |
| 442 | Clean Cooking (gas Cylinders) in Nzakika | Under Procurement | Ksh 1,000,000 | |
| 443 | Construction Of Keywalls At Athiani-kikome Road | Under Procurement | Ksh 161,600 | |
| 444 | Installation Of Road Structures - Kyaavua - Kyanguliviti - Kamunani - Milimani - Kwa Kasina - Kwa... | Under Procurement | Ksh 500,000 | |
| 445 | Kwa Loa And Kwa Mamuu Culvert | Under Procurement | Ksh 394,232 | |
| 446 | Opening Of Itambani-kilisa Road | Under Procurement | Ksh 500,000 | |
| 447 | Clean Coocking(gas Cylinders ) in Kikumbulyu South | Under Procurement | Ksh 1,000,000 | |
| 448 | Housing Levy Fund | Under Procurement | Ksh 1,987,622 |
9. Department of Lands, Urban Planning and Development, Environment and Climate Change
| # | Project Name | Status | Budget | Action |
|---|---|---|---|---|
| 1 | Ida (world Bank) Credit: Kenya Urban Support Project (kusp)- Urban Institutional Grants (uig) | Completed | Ksh 203,215 | |
| 2 | Ida (world Bank) Credit: Kenya Urban Support Project(kusp) - Urban Development Grant (udg) | Completed | Ksh 6,669,716 | |
| 3 | Cabro Paving Of Wote Township Parking Zones | Completed | Ksh 3,000,000 | |
| 4 | Opening And Unclogging Of Drainage Systems | Completed | Ksh 1,196,192 | |
| 5 | Construction Of Upendo Toilet Nziu | Completed | Ksh 786,052 | |
| 6 | Construction Of Toilet Kuku Market Acacia | Completed | Ksh 650,000 | |
| 7 | Repair Of Green Park Borehole | Completed | Ksh 1,000,000 | |
| 8 | Construction Of Modern Boda Boda Sheds In Wote Town | Completed | Ksh 1,000,000 | |
| 9 | Kaiti 2 Water Project | Completed | Ksh 15,000,000 | |
| 10 | Forest conservation and awareness (tree planting/water weirs/sand dams) | Completed | Ksh 2,085,000 | |
| 11 | Planting Of Trees -climate Change Fund | Completed | Ksh 700,000 | |
| 12 | Tree Planting | Completed | Ksh 1,000,000 | |
| 13 | Rehabilitation Of Kwa Ngwili/ndilo Gulley | Completed | Ksh 3,642,828 | |
| 14 | Kwa Kathoka Town Planning | Completed | Ksh 1,000,000 | |
| 15 | Demarcation Of Riparian Land Within Ndukuma | Completed | Ksh 730,113 | |
| 16 | Climate Change Intiative | Completed | Ksh 1,000,000 | |
| 17 | Market Survey, Preparation of Deed Plan and issuance of Leasehold Title Deeds, Lims and opening of... | Completed | Ksh 7,700,000 | |
| 18 | Fuel For Desilting Of Londokwe Dam Using County Machinery | Completed | Ksh 1,500,000 | |
| 19 | Construction Of Modern Toilets In Kathonzweni Town | Completed | Ksh 1,980,546 | |
| 20 | Land Compensation - Kwa Mbila Earth Dam | Completed | Ksh 1,800,000 | |
| 21 | Kikuu/kiangini Water Project | Completed | Ksh 10,000,000 | |
| 22 | Desilting Of Londokwe Earth Dam | Completed | Ksh 3,399,000 | |
| 23 | Construction Of 2 Sand Dams At Kwa Maundu,musau Ndati To Londokwe River | Completed | Ksh 2,000,000 | |
| 24 | Construction Of Tuvilani Toilet | Completed | Ksh 59,000 | |
| 25 | Construction Of Toilet Kikima Market | Completed | Ksh 25,000 | |
| 26 | Conservation Of Kwa Kithue Wetland | Completed | Ksh 1,500,000 | |
| 27 | Kyaavua Village Land Clinic,mapping And Titling | Completed | Ksh 1,000,000 | |
| 28 | Isuuni – Kwa Kisela Pumping And Water Distribution Project | Completed | Ksh 13,000,000 | |
| 29 | Feasibility Study On Mining | Completed | Ksh 2,500,000 | |
| 30 | Planning and survey of Kathulumbi market | Completed | Ksh 1,000,000 | |
| 31 | Water And Sanitation -desilting Of Kyambulu Earth Dam | Completed | Ksh 498,680 | |
| 32 | Rehabilitation And Catchment Conservation Of Ikaasu Earthdam | Completed | Ksh 5,000,000 | |
| 33 | Conservation Programme | Completed | Ksh 1,000,000 | |
| 34 | Kwa Kakui Earth Dam | Completed | Ksh 16,000,000 | |
| 35 | Planning of Kayata Market | Completed | Ksh 1,622,600 | |
| 36 | Kinze Earthdam Enhancement | Completed | Ksh 11,000,000 | |
| 37 | Planning and survey of Kalawa market | Completed | Ksh 1,000,000 | |
| 38 | Control Of Gulleys At Kwe Kuyu Kalembwani | Completed | Ksh 1,000,000 | |
| 39 | Rehabilitation of gulleys and road bush clearing and drainage | Completed | Ksh 500,000 | |
| 40 | Operationalization Of Kee-mbooni Municipality | Completed | Ksh 2,000,000 | |
| 41 | Kyanduu Water Distribution For Domestic And Agriculture Project | Completed | Ksh 150,000,000 | |
| 42 | Plot Validation And Market Survey Of Nunguni Town: Plot Validation, Market Survey, Preparation Of... | Completed | Ksh 407,500 | |
| 43 | Rehabilitation Of Nthunguni Gulley And Tree Compensation During Road Reopening | Completed | Ksh 400,000 | |
| 44 | Ilovoto Water Project | Completed | Ksh 13,000,000 | |
| 45 | Construction Of Wautu Toilet | Completed | Ksh 80,000 | |
| 46 | Purchase Of Land For Mwaani Dispensary | Completed | Ksh 1,000,000 | |
| 47 | Development and enforcement of Municipal Plans and development control | Completed | Ksh 500,000 | |
| 48 | Riverine conservation and restoration | Completed | Ksh 99,720 | |
| 49 | Kyamuthei Toilet-construction Of 3 3-door Toilet With Urinal | Completed | Ksh 750,000 | |
| 50 | Kiboko Town Planning | Completed | Ksh 3,320,000 | |
| 51 | Wautu Kyangaati Sand Dam And Water Project | Completed | Ksh 15,499,911 | |
| 52 | Kaiti-Miting'ani water project | Completed | Ksh 11,000,000 | |
| 53 | Town Planning of Thithi/simba Market | Completed | Ksh 1,000,000 | |
| 54 | Urban Infrastructure Development | Completed | Ksh 1,985,493 | |
| 55 | Preparation Of Kisip Designs For County Informal Settlement Improved Plan | Completed | Ksh 420,000 | |
| 56 | Construction Of Gabions Along Mbeetwani Road | Completed | Ksh 1,000,000 | |
| 57 | Draining System Along Kibwezi Town | Completed | Ksh 221,760 | |
| 58 | Survey And Planning Koya/maanda Market | Completed | Ksh 500,000 | |
| 59 | Ict Inftrastructure - Lan | Completed | Ksh 2,000,000 | |
| 60 | Development of Municipal Integrated Development Plan (IDEP) and Municipal Spatial Plan | Completed | Ksh 10,000,000 | |
| 61 | Opening And Unclogging Of Drainage Systems | Completed | Ksh 2,000,000 | |
| 62 | Opening And Sport Murraming Of Roads At Emali And Sultan Towns | Completed | Ksh 5,546,800 | |
| 63 | Partitioning And Equiping Of Emali-sultan Municipality Office | Completed | Ksh 3,000,000 | |
| 64 | Equiping Of Emali-sultan Municipality Office | Completed | Ksh 3,000,000 | |
| 65 | Emali Town Plots Verification And Validation | Completed | Ksh 399,826 | |
| 66 | Survey Of Ward Road Network And Ward Public Utilities | Completed | Ksh 500,000 | |
| 67 | Purchase of ERP system | Completed | Ksh 5,000,000 | |
| 68 | Opening And Unclogging Of Drainage Systems | Completed | Ksh 561,798 | |
| 69 | Purchase Of Market Cleaning Equipment And Protective Gear | Completed | Ksh 1,000,000 | |
| 70 | Purchase Of Cleaning Machinery | Completed | Ksh 6,000,000 | |
| 71 | Youth Empowerment - Sports And Talent Development | Completed | Ksh 1,000,000 | |
| 72 | Market survey of Mtito Andei market: Market survey, Preparation of perimeter and picking... | Completed | Ksh 4,900,000 | |
| 73 | EIA and Exision of Ngai Ndethya settlement scheme | Completed | Ksh 2,370,600 | |
| 74 | Cleaning Of The Town And Trenching Of Storm Water Management System. | Completed | Ksh 264,320 | |
| 75 | Yandia Water Project | Completed | Ksh 13,000,000 | |
| 76 | Land Succession Program, Survey And Titling | Completed | Ksh 1,500,000 | |
| 77 | Wildlife conservation and management | Completed | Ksh 454,380 | |
| 78 | Muliluni-kiambani Water Project | Completed | Ksh 10,000,000 | |
| 79 | Thange Water And Livelihood Restoration Project | Completed | Ksh 13,000,000 | |
| 80 | Construction Of Eco Toilet At Nthongoni Market | Completed | Ksh 15,000 | |
| 81 | Kwa Nzoongo Earth Dam | Completed | Ksh 11,746,435 | |
| 82 | Yikivumbu Survey And Titling | Completed | Ksh 2,000,000 | |
| 83 | Sand Value Addition And Construction Of Sand Dams | Completed | Ksh 4,000,000 | |
| 84 | Sand Conservation Programmes | Completed | Ksh 6,228,589 | |
| 85 | Plot Registration - Data Collection For Registering Plots To Lims Countywide | Completed | Ksh 2,000,000 | |
| 86 | Enhancement Of Lims System And Data Clerks | Completed | Ksh 2,000,000 | |
| 87 | Urban Development -resoulution Of Boundary And Land Ownership Disputes | Completed | Ksh 3,711,550 | |
| 88 | Climate Change Fund Board | Completed | Ksh 10,906,480 | |
| 89 | Flloca Funding | Completed | Ksh 3,387,873 | |
| 90 | Climate Change Fund Board | Completed | Ksh 6,000,000 | |
| 91 | Resolution Of Boundary And Land Ownership Disputes And Issuance Of Public Utilities' Title | Completed | Ksh 8,850,000 | |
| 92 | Financing locally-led climate actions(FLLoCA) program County Climate Risk Assessment (CCIS) Grant | Completed | Ksh 21,000,000 | |
| 93 | Urban Planning- Preparation And Implementation Of Urban Land Use Plan For Tawa Market | Completed | Ksh 3,500,000 | |
| 94 | Operationalization Of Kee-mbooni Municipality | Completed | Ksh 4,422,400 | |
| 95 | Ccis(county Climate Instistutional Institutional Support) Flloca Matching Grant | Completed | Ksh 22,000,000 | |
| 96 | Development And Enforcement Of Municipal Plans And Development Control - Kilala And Kalamba Markets | Completed | Ksh 3,000,000 | |
| 97 | Road Upgrading - Cabro Paving Access Roads In Wote Township -a Thousand Palms - Kwa Nguku - Equity... | Completed | Ksh 10,000,000 | |
| 98 | Purchase Of Erp System | Completed | Ksh 3,000,000 | |
| 99 | Erection Of Integrated Solar Flood Light High Mast 20 Metre (bangladesh- Wote Town) -20 Metre High... | Completed | Ksh 3,000,000 | |
| 100 | Construction Of Modern Toilet At Kalamba - Construction Of 5 Door Wc With Urinal, Septic, Water... | Completed | Ksh 2,300,000 | |
| 101 | Construction Of Exhaistible Pit Latrine At Mituvu Market And Ikalyoni Market | Completed | Ksh 2,000,000 | |
| 102 | Climate Change Adaptation Initiative - Municipality Greening Programme | Completed | Ksh 1,500,000 | |
| 103 | Old Mukuyuni Marikiti Market | Completed | Ksh 1,000,000 | |
| 104 | Drainage improvement and Murrumingof Old slaughter to Kwa Kitindo Road -Construction of Culverts,... | Completed | Ksh 4,000,000 | |
| 105 | Ida (world Bank) Credit Financing Locally-led Climate Action (flloca) Program, County Climate... | Completed | Ksh 14,792,940 | |
| 106 | Ccis(county Climate Instistutional Institutional Support) Flloca Matching Grant | Completed | Ksh 11,000,000 | |
| 107 | 20km Community Based Tree Growing Program Along Isuuni, Kaiti, Muooni, Tawa ( Self Help Group) | Completed | Ksh 1,000,000 | |
| 108 | Sand Management Committee Meetings In The 6 Sub Counties/meeting Held Quarterly | Completed | Ksh 2,000,000 | |
| 109 | Supply Of Skip Bins | Completed | Ksh 3,200,000 | |
| 110 | Construction Of Canopy For Mukuyuni Market Shed | Completed | Ksh 1,000,000 | |
| 111 | Construction Of Exhaustible Pit Latrine At muusini | Completed | Ksh 1,000,000 | |
| 112 | Roads Improvement Program Across The Municipality | Completed | Ksh 5,000,000 | |
| 113 | Installation Of 15m Market Lights On A Concrete Pole At Mumbuni, Kyamuthei, Kyuasini, Yemulwa,... | Completed | Ksh 6,300,000 | |
| 114 | 570-grid Powered Streetlights And Floodlights | Completed | Ksh 9,000,000 | |
| 115 | Mbooni – Kee Municipality | Completed | Ksh 4,000,000 | |
| 116 | Opening And Unclogging Of Drainage Systems | Ongoing | Ksh 500,000 | |
| 117 | Ndumoni Dispensary (purchase Of Land) | Ongoing | Ksh 200,000 | |
| 118 | Mulata Dispensary (purchase Of Land) | Ongoing | Ksh 75,000 | |
| 119 | Kikuu -kawala Intergrated Water And Livelihood Restoration Project | Ongoing | Ksh 16,000,000 | |
| 120 | Athi Mavindini Water Project | Ongoing | Ksh 13,000,000 | |
| 121 | Construction Of Londokwe - Kitise Earthpan Restoration Project | Ongoing | Ksh 15,000,000 | |
| 122 | Desilting of kwa Nditu | Ongoing | Ksh 5,000,000 | |
| 123 | Construction of kwa Malong'a Sand Dam | Ongoing | Ksh 3,000,000 | |
| 124 | Makindu - Beaconing And Issuance Of Title Deeds. | Ongoing | Ksh 4,000,000 | |
| 125 | Survey of Muuni Subward | Ongoing | Ksh 304,620 | |
| 126 | Sekeleni Integrated Water Project | Ongoing | Ksh 10,000,000 | |
| 127 | Rehabilitation Of Sultan Hamud Decentralized Treatment Facility(dtf) | Ongoing | Ksh 3,000,000 | |
| 128 | Construction Of Sultan Hamud Open Air Market - Phase 1 | Ongoing | Ksh 2,000,000 | |
| 129 | Sultan Hamud Floodlight | Ongoing | Ksh 3,000,000 | |
| 130 | Fencing And Roofing Of Water Tanks In Emali Business Center | Ongoing | Ksh 2,000,000 | |
| 131 | Rehabilitation Of Emali Recreation Park And Ict Resource Centre | Ongoing | Ksh 2,500,000 | |
| 132 | Construction Of 3 Bodaboda Sheds At Emali, Sultan Hamud And Vulueni Markets | Ongoing | Ksh 2,000,000 | |
| 133 | Installation Of Streetlights Kwa Mutula Market In Mbitini Ward And Emali Town | Ongoing | Ksh 6,000,000 | |
| 134 | Security Of Land Tenure - Provision Of Title Deeds For Ngai Ndethya Settlement Scheme. | Ongoing | Ksh 574,480 | |
| 135 | Surveying of Machinery and Kinyambu Markets | Ongoing | Ksh 1,661,620 | |
| 136 | Muthyamwii Intergated Water And Livelihood Restoration Project | Ongoing | Ksh 13,000,000 | |
| 137 | Ida (world Bank) Credit Financing Locally-led Climate Action (flloca) Program, County Climate... | Ongoing | Ksh 181,246,435 | |
| 138 | Mapping, Surveying And Beaconing Of County Forests At Nzueni, Kitundu A&b, Mutungu And Kathekani | Ongoing | Ksh 577,600 | |
| 139 | Ida (world Bank) Credit Financing Locally-led Climate Action (flloca) Program, County Climate... | Ongoing | Ksh 285,492,870 | |
| 140 | Ida (world Bank Credit Financing Locally- Led Climate Action (FLLoCA) Program, (CCRI) Matching grant | Ongoing | Ksh 86,823,400 | |
| 141 | Ida (world Bank)credit: Kenya Urban Support Project(kusp)-urban Institutional Grant(uig) | Ongoing | Ksh 35,000,000 | |
| 142 | Renovation Of Kako Market Shed | Ongoing | Ksh 1,000,000 | |
| 143 | Preparation Of Municipal Spatial Plan | Ongoing | Ksh 9,800,000 | |
| 144 | Ida (world Bank) Credit: Kenya Urban Support Project(kusp) - Urban Development Grant (udg) | Under Procurement | Ksh 20,083,771 | |
| 145 | Survey For Titling Of Wote and Kibwezi town | Under Procurement | Ksh 3,000,000 | |
| 146 | Survey For Titling Of Wote Public Utilities And Matiliku Townships | Under Procurement | Ksh 3,000,000 | |
| 147 | Survey For Public Utilities And Roads | Under Procurement | Ksh 200,000 | |
| 148 | Muuoni- Mbitini Water Distribution For Agriculture And Livelihood Restoration Project | Under Procurement | Ksh 13,000,000 | |
| 149 | Erection Of A Perimeter Wall At Kingutheni | Under Procurement | Ksh 1,541,500 | |
| 150 | Thwake Water Distribution And Livelihood Restoration Project | Under Procurement | Ksh 13,000,000 | |
| 151 | Abattoir -buy Land To Construct An Abattoir | Under Procurement | Ksh 1,000,000 | |
| 152 | Opening Up Of Kikima Town Roads | Under Procurement | Ksh 1,100,000 | |
| 153 | Survey Of Tawa Township | Under Procurement | Ksh 4,000,000 | |
| 154 | Mulima Water Livelihood And Restoration Project | Under Procurement | Ksh 10,000,000 | |
| 155 | Ngoano Sanddam Construction And Livelihood Restoration Project | Under Procurement | Ksh 10,000,000 | |
| 156 | Operationalization Of Mbooni - Kee Municipality | Under Procurement | Ksh 7,051,065 | |
| 157 | Makaia Borehole Water Distribution Livelihood And Restoration Project | Under Procurement | Ksh 13,000,000 | |
| 158 | Silanga Mbuu Water Distribution Land And Livelihood Restoration Project | Under Procurement | Ksh 13,000,000 | |
| 159 | Construction Of Sand Dam At Munakye River | Under Procurement | Ksh 845,560 | |
| 160 | Ak-wash Water Distribution And Livelihood Restoration Project | Under Procurement | Ksh 13,000,000 | |
| 161 | Survey And Planning Of Sultan Hamud Town -completion Of Cadastral Survey And Planning Of Sultan... | Under Procurement | Ksh 2,000,000 | |
| 162 | Kyakivadi Intergrated Water And Livelihood Restoration Project | Under Procurement | Ksh 13,000,000 | |
| 163 | Kiboko Twaandu Livelihood Restoration And Water Project | Under Procurement | Ksh 10,000,000 | |
| 164 | Kilisa & Athitunguni Distribution And Livelihood Project | Under Procurement | Ksh 10,000,000 | |
| 165 | Ngandani Water Distribution And Livelihood Project | Under Procurement | Ksh 10,000,000 | |
| 166 | Town Planning Of Kiunduani Town | Under Procurement | Ksh 3,000,000 | |
| 167 | Purchase Of Land For Kiunduani Livestock Yard. | Under Procurement | Ksh 2,000,000 | |
| 168 | Construction Of Sultan Hamud Open Air Market - Phase 1 | Under Procurement | Ksh 2,000,000 | |
| 169 | Rehabilitation Of Emali Recreation Park | Under Procurement | Ksh 500,000 | |
| 170 | Ida (world Bank Credit: Kenya Urban Support Project(kusp)- Urban Development Grant (udg) | Under Procurement | Ksh 37,167,542 | |
| 171 | Opening And Unclogging Of Drainage Systems At Emali And Sultan Hamud Towns | Under Procurement | Ksh 950,000 | |
| 172 | Surveying, Beaconing, And Allocation Of Public Lands(ngomano And Miumoni) | Under Procurement | Ksh 500,000 | |
| 173 | Marking, Issuance Of Enforcement Notices In Mtito Andei And Kambu Markets, And Hire Of Machines | Under Procurement | Ksh 2,000,000 | |
| 174 | Survey And Tilting | Under Procurement | Ksh 2,000,000 | |
| 175 | Construction Of 3 No. 2-door Public Toilets Matiliku Stockyard, Kasikeu Stockyard And Kikumini... | Under Procurement | Ksh 3,000,000 | |
| 176 | Purchase Of Wote Bus Park Land | Under Procurement | Ksh 40,000,000 |
10. Department of Trade, Marketing, Industry, Culture and Tourism.
| # | Project Name | Status | Budget | Action |
|---|---|---|---|---|
| 1 | Construction Of A Public Toilet At Ikaasu Market | Completed | Ksh 500,000 | |
| 2 | Construction Of A Public Toilet At Kavumbu Market(kathonzweni) | Completed | Ksh 500,000 | |
| 3 | Construction Of Kathwonzeni Market Toilet | Completed | Ksh 1,000,000 | |
| 4 | Construction of Yemulwa Market Public Block | Completed | Ksh 700,000 | |
| 5 | Construction of A 4- Door Pit Latrine and Urinal At Kitundu Market And Kilyungi Market | Completed | Ksh 2,000,000 | |
| 6 | Cottage Industry Support For Kingongi-mivuko Women Group | Completed | Ksh 700,000 | |
| 7 | Kavumbu Public Toilet (kalawa) | Completed | Ksh 500,000 | |
| 8 | Syokilati Market Toilet | Completed | Ksh 500,000 | |
| 9 | Syotuvali Market Toilet | Completed | Ksh 500,000 | |
| 10 | Construction Of Kinze Market Latrine- 2 Door Pit Latrine And Urinal | Completed | Ksh 500,000 | |
| 11 | Construction Of A Public Toilet At Marwa Market | Completed | Ksh 1,000,000 | |
| 12 | Construction Of Public Toilet At Ngiini Playground | Completed | Ksh 1,000,000 | |
| 13 | Construction Of Pit latrine Block at Ulu Market | Completed | Ksh 1,000,000 | |
| 14 | Construction Of Pit Latrine Block At Kwa Dc Market | Completed | Ksh 1,000,000 | |
| 15 | Construction Of Pit latrine Block at Mavivye Market | Completed | Ksh 1,000,000 | |
| 16 | Construction Of Kiu Market Public Toilet | Completed | Ksh 1,000,000 | |
| 17 | Kima Public Toilet -construction Of Kima Market Public Toilet | Completed | Ksh 750,000 | |
| 18 | Uvete Market Shed (construction Of Worktops, Compartments) | Completed | Ksh 2,000,000 | |
| 19 | Construction Of Sanitation Block At Kilome Market | Completed | Ksh 1,000,000 | |
| 20 | Construction Of Maiani Market Shade | Completed | Ksh 3,500,000 | |
| 21 | Maintainence Of Other Assets - Markets, Tourism Centres. | Completed | Ksh 263,097 | |
| 22 | Construction Of Kola Sanitation Block (shelved) And Water Storage | Completed | Ksh 1,600,000 | |
| 23 | Nunguni Business Centre And Town Infrastructure Upgrade | Completed | Ksh 5,000,000 | |
| 24 | Uvileni Market Toilet | Completed | Ksh 1,000,000 | |
| 25 | Emali Wholesale Market( Kdsp Project) | Completed | Ksh 3,375,725 | |
| 26 | Kenya Music And Cultural Festivals | Completed | Ksh 1,000,000 | |
| 27 | Construction Of A Three Door Latrine At Utini Market | Completed | Ksh 650,000 | |
| 28 | Kyaani and Ngokolani toilets | Completed | Ksh 1,300,000 | |
| 29 | Construction Of Public Toilet At Utithi Market | Completed | Ksh 500,000 | |
| 30 | Exhibitions And Trade Fairs | Completed | Ksh 311,600 | |
| 31 | Msmes Development Programme | Completed | Ksh 488,100 | |
| 32 | Consumer Protection Programme | Completed | Ksh 216,300 | |
| 33 | Trade And Marketing Development Programmes | Completed | Ksh 678,200 | |
| 34 | Small Business Development Centres Usaid Matching Grant | Completed | Ksh 2,420,100 | |
| 35 | Tourism Sector Development and Promotion | Completed | Ksh 940,600 | |
| 36 | Supply and Delivery 4 No of Skip bins | Completed | Ksh 2,000,000 | |
| 37 | Market Infrastructure Improvement | Completed | Ksh 8,000,000 | |
| 38 | Special Economic Zone(prefeasibility Study-eia,master Plan ) At Kwa Kathoka | Completed | Ksh 2,000,000 | |
| 39 | Esp Markets | Completed | Ksh 1,000,000 | |
| 40 | Tourism Infrastructure Improvement | Completed | Ksh 1,500,000 | |
| 41 | Supply of 4 No.Skip Bins | Completed | Ksh 2,000,000 | |
| 42 | Cultural Sites And Infrastructure Improvement- Mangelete sacret site and cultural center - fencing | Completed | Ksh 1,000,000 | |
| 43 | Msmes Development Programme (parasol, Apron/dustcoats, Tables) | Completed | Ksh 800,000 | |
| 44 | Construction Of Yakanga Pit Latrine | Ongoing | Ksh 1,000,000 | |
| 45 | Kasikeu Stockyard Public Toilet -construction Of Kasikeu Stock Yard Public Toilet | Ongoing | Ksh 750,000 | |
| 46 | Construction Of Nunguni Modern Market - Kilungu Ward | Ongoing | Ksh 74,650,000 | |
| 47 | Construction Of 5-door Public Toilet At Emali Jua Kali Ground -construction Of 5-door Public Toilet | Ongoing | Ksh 2,000,000 | |
| 48 | Market Infrastructure Improvement | Ongoing | Ksh 4,732,487 | |
| 49 | Special Economic Zone(prefeasibility Study-eia,master Plan ) At Kwa Kathoka | Ongoing | Ksh 1,585,300 | |
| 50 | Cottage Industry Development(product Development,certifications And Intellectual Property... | Ongoing | Ksh 700,000 |
11. Department of Water and Sanitation
| # | Project Name | Status | Budget | Action |
|---|---|---|---|---|
| 1 | Makueni Girls Borehole | Completed | Ksh 2,940,000 | |
| 2 | Kamunyolo Earthdam | Completed | Ksh 605,680 | |
| 3 | Kaiti/kamunyii Water Project | Completed | Ksh 921,928 | |
| 4 | Katoloni Pipeline Extension | Completed | Ksh 980,000 | |
| 5 | Kwa Musila Earth Dam | Completed | Ksh 1,470,000 | |
| 6 | Kamunyolo Earth Dam | Completed | Ksh 2,500,000 | |
| 7 | Kituasi Water Project | Completed | Ksh 3,430,000 | |
| 8 | Kwa Kamende Borehole | Completed | Ksh 3,920,000 | |
| 9 | Kathuma Borehole | Completed | Ksh 4,900,000 | |
| 10 | Kaiti-kamunyii Water Project | Completed | Ksh 5,000,000 | |
| 11 | Mwaani Water Project | Completed | Ksh 9,917,000 | |
| 12 | Kituasi Water Project | Completed | Ksh 10,000,000 | |
| 13 | Requisition For Kamunyolo Earth Dam Spillway Rehabilitation | Completed | Ksh 10,000,000 | |
| 14 | Wote Town Improvement Project - Distribution Of Kwa Kitungu Water Project | Completed | Ksh 10,000,000 | |
| 15 | Completion Of Kamunyolo Sump And Relocation Of The Pipes | Completed | Ksh 3,500,000 | |
| 16 | Desilting And Repair Of Kauani Earth Dam | Completed | Ksh 1,000,000 | |
| 17 | Electicity Back-up And Distribution Of Kituasi Water Project To Six Designated Water Points | Completed | Ksh 6,000,000 | |
| 18 | Kaiti 1 sump - Installation Of Submersible Pumps And Infiltration Galleries | Completed | Ksh 4,000,000 | |
| 19 | Construction Of Kamunyolo Earth Dam | Completed | Ksh 605,680 | |
| 20 | Wote Water Supply- Wowasco | Completed | Ksh 2,500,000 | |
| 21 | Installation Of Solar At Mwaani Booster | Completed | Ksh 10,000,000 | |
| 22 | Kwa Muthama Borehole | Completed | Ksh 343,000 | |
| 23 | Yandia Kalatu To Kakuswi- Pipeline Extension | Completed | Ksh 980,000 | |
| 24 | Mbiuni Borehole | Completed | Ksh 1,000,000 | |
| 25 | Water Tanks | Completed | Ksh 1,201,499 | |
| 26 | Kwa Moto Water Sump | Completed | Ksh 1,470,000 | |
| 27 | Kanzili Borehole | Completed | Ksh 1,500,000 | |
| 28 | Ngaa Borehole | Completed | Ksh 1,500,000 | |
| 29 | Kikuu Kalima Water Project | Completed | Ksh 2,400,000 | |
| 30 | Njau Earth Dam | Completed | Ksh 3,000,000 | |
| 31 | Isololo Kwakoki Bh Pipeline Extention | Completed | Ksh 5,390,000 | |
| 32 | Supply Of Water Tanks And Piping | Completed | Ksh 4,000,000 | |
| 33 | Supply Of Water Tanks And Distribution Pipes For Mandela, Kweleli, Syaolwe, Kwa Moto And Isololo... | Completed | Ksh 4,000,000 | |
| 34 | Rehabilitation Of Mandela Sump And Muthini Borehole | Completed | Ksh 609,736 | |
| 35 | Kwa Moto Electrical And Rehabilitation Works | Completed | Ksh 3,787,578 | |
| 36 | Rehabilitation Of Kalima Sump | Completed | Ksh 609,737 | |
| 37 | Distribution Of Ithetheni Water Project To Maviaume,kwa Kitengi And Nthiiani | Completed | Ksh 900,000 | |
| 38 | Kwa Koki,isololo Water Project | Completed | Ksh 500,000 | |
| 39 | Rehabilitation of mbulutini and connection to Njau Water pipeline | Completed | Ksh 500,000 | |
| 40 | Kikwasuni Borehole Repair | Completed | Ksh 250,000 | |
| 41 | Mbiuni Borehole | Completed | Ksh 200,000 | |
| 42 | Ward Motorcycle | Completed | Ksh 276,600 | |
| 43 | Mbitini Borehole | Completed | Ksh 1,360,000 | |
| 44 | Ilengeni Water Project | Completed | Ksh 6,870,000 | |
| 45 | Distribution Of Ilengeni Water | Completed | Ksh 2,000,000 | |
| 46 | Rehabilitation And Extension Of Mbuthani Water Project And Kwo Thuku Works | Completed | Ksh 1,500,000 | |
| 47 | Mbuthani Water Sump | Completed | Ksh 3,796,770 | |
| 48 | Kwa Kathoka Community Borehole | Completed | Ksh 90,000 | |
| 49 | Kwa Mutemwa Borehole | Completed | Ksh 3,920,000 | |
| 50 | Kwa Malombe Earth Dam | Completed | Ksh 1,982,000 | |
| 51 | Rehabilitation Of Kikumini Borehole | Completed | Ksh 5,500,000 | |
| 52 | Desilting Of Kwa Muia Earth Dam | Completed | Ksh 3,000,000 | |
| 53 | Feasibility Study For Distribution Of Ndukuma Earthdam | Completed | Ksh 15,000,000 | |
| 54 | Installation Of Pumping Unit,flashing Of Kwa Mwenga Borehole | Completed | Ksh 1,000,000 | |
| 55 | Distribution Of Water From Itaa Borehole To Kwa Kiviku | Completed | Ksh 1,000,000 | |
| 56 | Equiping And Distribution Of Kwa Mutemwa Borehole | Completed | Ksh 6,450,805 | |
| 57 | Thwake Sump and Distribution Line | Completed | Ksh 9,172,000 | |
| 58 | "drilling, Distribution Of Nzueni Borehole -drilling, Solarization And Pumping Unit, Fencing Of... | Completed | Ksh 4,000,000 | |
| 59 | Itaa Water Project | Completed | Ksh 500,000 | |
| 60 | Desilting, Expansion, Construction Of Treatment Works Of Ndukuma Earth Dam And Extension To Wote... | Completed | Ksh 45,509,592 | |
| 61 | Purchase Of A Backhoe | Completed | Ksh 14,960,000 | |
| 62 | Kwa Mbila Water Project | Completed | Ksh 1,960,000 | |
| 63 | Itumbule Bh | Completed | Ksh 2,450,000 | |
| 64 | Kaiani Borehole | Completed | Ksh 175,448 | |
| 65 | Kwa Kioko Kiluluini Village Kavingoni Borehole | Completed | Ksh 39,825 | |
| 66 | Kwa Mbila Earth Dam | Completed | Ksh 271,116 | |
| 67 | Yemulwa/kitutu Borehole | Completed | Ksh 100,380 | |
| 68 | Kikuu-kiangini Water Project | Completed | Ksh 202,500 | |
| 69 | Desilting Of Matinga 2 And Kyambusya Earth Dams | Completed | Ksh 3,857,180 | |
| 70 | Water Improvement And Borehole Maintenance | Completed | Ksh 524,207 | |
| 71 | Kwa Mbila Water Project | Completed | Ksh 1,960,000 | |
| 72 | Drilling And Develovement Of Kiteei Mutini Bh | Completed | Ksh 2,837,000 | |
| 73 | Desilting Of Mitooni Earthdam In Kitise Kithuki Ward | Completed | Ksh 1,491,000 | |
| 74 | Rehabilitation Of Kaiani Borehole | Completed | Ksh 931,750 | |
| 75 | Makutano Water Project | Completed | Ksh 1,500,000 | |
| 76 | Kwa Mbila Water Project | Completed | Ksh 4,000,000 | |
| 77 | Requisition For Equipping Of Kiteei Mutini Borehole | Completed | Ksh 3,138,700 | |
| 78 | Mantainance And Fuelling Ofward Backhoe And Desilting Small Communal Dams Using The Same Machine | Completed | Ksh 3,138,700 | |
| 79 | Solarization And Equipping Of Makutano Borehole And Distribution Of Water | Completed | Ksh 5,000,000 | |
| 80 | Rehabilitation Of Kikuu- Kwa Kavisi Water Project Raising Main. | Completed | Ksh 2,000,000 | |
| 81 | Kiku Kikuu-kiangini Water Project( Katangini) | Completed | Ksh 3,700,000 | |
| 82 | Athi-mavindini Water Project | Completed | Ksh 7,668,213 | |
| 83 | Water Improvement Programme | Completed | Ksh 2,184,800 | |
| 84 | Katuluni / Nzeveni Water Pipeline | Completed | Ksh 2,940,000 | |
| 85 | Yekanga Borehole | Completed | Ksh 1,960,000 | |
| 86 | Kwa Mbila Dam -distribute Water To Kyunyu Market,ikaasu,katangi, Kwa Kisumo And Mbuvo Health Centre | Completed | Ksh 3,000,000 | |
| 87 | Matinga 1 Dam -additional Solar, Plastic Elevated Tank-24m3, Rehabiliation Of The Rising Main And... | Completed | Ksh 3,000,000 | |
| 88 | Kamuithi -ungatani Water Project | Completed | Ksh 2,450,000 | |
| 89 | Kiimani Borehole | Completed | Ksh 5,380,000 | |
| 90 | Athi Mavindini Water Project | Completed | Ksh 5,880,000 | |
| 91 | Muusini Borehole | Completed | Ksh 6,380,000 | |
| 92 | Drilling And Equipping Of Kwa Ngoka Borehole | Completed | Ksh 6,000,000 | |
| 93 | Drilling And Equipping Of Yekanga Borehole | Completed | Ksh 5,000,000 | |
| 94 | Drilling Of Kitumbai Borehole | Completed | Ksh 2,000,000 | |
| 95 | Soko Muyo/msambweni Borehole -drilling, Distribution And Solarization Of Soko Muyo Borehole | Completed | Ksh 5,000,000 | |
| 96 | Athi Mavindini Water Project | Completed | Ksh 7,668,212 | |
| 97 | Kwa Ngoka Borehole - Drilling, Equipping And Distribution Of Kwa Ngoka Borehole, Construction Of A... | Completed | Ksh 3,182,060 | |
| 98 | Distribution And Piping Of Athi-mavindini Water Project | Completed | Ksh 481,360 | |
| 99 | Water Improvement Program- Mavindini | Completed | Ksh 800,000 | |
| 100 | Nthunguni Borehole | Completed | Ksh 4,000,000 | |
| 101 | Kimundi Sump | Completed | Ksh 2,500,000 | |
| 102 | Kwa-kamaso Sand Dam And Sump | Completed | Ksh 196,480 | |
| 103 | Kwetui Water Dam | Completed | Ksh 1,477,000 | |
| 104 | Kwanyaa Borehole | Completed | Ksh 24,000 | |
| 105 | Mbata Borehole | Completed | Ksh 150,000 | |
| 106 | Kwa Kaivu Borehole | Completed | Ksh 150,000 | |
| 107 | Kitise Water Project | Completed | Ksh 600,000 | |
| 108 | Mukameni B Borehole - Purchase And Installation Of Motor | Completed | Ksh 500,000 | |
| 109 | Kwanyaa Borehole - Purchase And Installation Of Motor | Completed | Ksh 500,000 | |
| 110 | Athi Mwania Water Project - Distribution Of Athi Mwania Water Project For Irrigation(feasibility... | Completed | Ksh 750,000 | |
| 111 | Athi Matheani Kithuki Water Project | Completed | Ksh 750,000 | |
| 112 | Kitise Water Project | Completed | Ksh 1,000,000 | |
| 113 | Kimundi Water Project | Completed | Ksh 1,500,000 | |
| 114 | Kwa Mbila Earthdam | Completed | Ksh 1,500,000 | |
| 115 | Mukameni Borehole-purchase And Installation Of Motor | Completed | Ksh 500,000 | |
| 116 | Rehabilitation Of Kitise Water Project | Completed | Ksh 8,000,000 | |
| 117 | Kitise Water Project - Upgrading Of 3 | Completed | Ksh 3,000,000 | |
| 118 | Solarization And Installation Of Water Pump At Kwambila Earth Dam And Extension Of The Same Project... | Completed | Ksh 4,200,000 | |
| 119 | Yekanga Borehole - Drilling,equipping And Distribution Of Yekanga Borehole, Construction Of A Water... | Completed | Ksh 3,123,760 | |
| 120 | Kyambui Water Project | Completed | Ksh 3,920,000 | |
| 121 | Rehabilitation Of Water Tank And Pipeline Rehabilitation To Yatwa-itaani Village( Uviuni) | Completed | Ksh 1,960,000 | |
| 122 | Ndueni-mulima Water Project | Completed | Ksh 4,900,000 | |
| 123 | Kitise water project | Completed | Ksh 2,300,000 | |
| 124 | Mulima Water Project | Completed | Ksh 10,176,660 | |
| 125 | Mulima Phase 1 | Completed | Ksh 1,905,334 | |
| 126 | Kya Mbui Water Project | Completed | Ksh 4,000,000 | |
| 127 | Kyambui Water Project-pumping System, Rising Main And Distribution To Kwa Erick Kiosk | Completed | Ksh 4,000,000 | |
| 128 | Desilting Of Ndiani Water Project | Completed | Ksh 3,787,578 | |
| 129 | Kyambui Water Project -construction Of Masonry Tank At Misakwani And Water Distribution To Mutwii-... | Completed | Ksh 3,000,000 | |
| 130 | Mulima Water Project | Completed | Ksh 15,000,000 | |
| 131 | Kiumi Water Project | Completed | Ksh 94,129 | |
| 132 | Ngunini Water Project | Completed | Ksh 59,494 | |
| 133 | Kiumi Water Project | Completed | Ksh 3,920,000 | |
| 134 | Kinyongo Water Project | Completed | Ksh 3,920,000 | |
| 135 | Drilling Of Mutooni Borehole | Completed | Ksh 1,660,000 | |
| 136 | Water Improvement Programme | Completed | Ksh 57,556 | |
| 137 | Kiumi Water Project | Completed | Ksh 64,250 | |
| 138 | Mitooni Water Project | Completed | Ksh 1,230,000 | |
| 139 | Rehabilitation Of Kitundu-kilyungi Pipeline And Extention Kiumi Water Project | Completed | Ksh 3,500,000 | |
| 140 | Kya Muata Water Project | Completed | Ksh 3,000,000 | |
| 141 | Supply And Delivery Of Pipes For Kithungo Kitundu Ward | Completed | Ksh 1,230,000 | |
| 142 | Kooi Earth Dam | Completed | Ksh 4,900,000 | |
| 143 | Lower Ngwani Water Project | Completed | Ksh 980,000 | |
| 144 | Rehabilitation Of Wanzauni Kikima Pipeline | Completed | Ksh 686,000 | |
| 145 | Upper Ngwani Water Project | Completed | Ksh 2,509,811 | |
| 146 | Mutooni Borehole Water Project-equipping And Distribution Of Water To Kithungo Primary,secondary... | Completed | Ksh 4,000,000 | |
| 147 | Masyonyeki Earth Dam | Completed | Ksh 4,900,000 | |
| 148 | Extension Of Upper Ngwani Water Project | Completed | Ksh 4,000,000 | |
| 149 | Ikokani Water Project | Completed | Ksh 7,000,000 | |
| 150 | Kyamuata Water Project-distribution Tokyambwika Ecde And Kyamuata Market | Completed | Ksh 3,000,000 | |
| 151 | Lungu Borehole | Completed | Ksh 2,374,220 | |
| 152 | Kithongo Borehole | Completed | Ksh 2,374,221 | |
| 153 | Kimandi Borehole | Completed | Ksh 3,710,279 | |
| 154 | Songeni Water Project | Completed | Ksh 4,900,000 | |
| 155 | Kango Borehole Distribution - Pipeline Extension From Kango Borehole To Kwa Mutisya Market... | Completed | Ksh 1,500,000 | |
| 156 | Kwa Matinga Water Project | Completed | Ksh 4,794,228 | |
| 157 | Ndumanu Earth Dam | Completed | Ksh 3,000,000 | |
| 158 | Kithongo Borehole | Completed | Ksh 2,500,000 | |
| 159 | Lungu Borehole | Completed | Ksh 1,500,000 | |
| 160 | Syumbe Borehole | Completed | Ksh 2,500,000 | |
| 161 | Requisition For Water Improvement Program-kiamani And Kyome Markets | Completed | Ksh 807,629 | |
| 162 | Distribution Of Kinze Water Project/mbumbuni Scheme | Completed | Ksh 5,770,750 | |
| 163 | Kinze Water Project-distribution | Completed | Ksh 7,000,000 | |
| 164 | Kamen Self Help Group- Water Improvement Fund | Completed | Ksh 409,374 | |
| 165 | Nyaanyaa A Earthdam | Completed | Ksh 159,900 | |
| 166 | Kaiti -kwakitila Water Project | Completed | Ksh 159,448 | |
| 167 | Miau Earth Dam | Completed | Ksh 495,900 | |
| 168 | Waia Earth Dam | Completed | Ksh 5,880,000 | |
| 169 | Kwa Mutombi Water Project | Completed | Ksh 1,960,000 | |
| 170 | Nyaanyaa Earthdam Phase 2 | Completed | Ksh 1,568,000 | |
| 171 | Kyaluma Bore Hole Water Project | Completed | Ksh 4,900,000 | |
| 172 | Solarization And Distribution Of Makaia Borehole | Completed | Ksh 6,860,000 | |
| 173 | Kavingiliti Earthdam ( Miau earthdam) | Completed | Ksh 2,940,000 | |
| 174 | Construction Of Kwa Malai Earthdam,enlargement Spillway Checkdam,drawal System | Completed | Ksh 284,274 | |
| 175 | Miau Earthdam | Completed | Ksh 6,000,000 | |
| 176 | Drilling And Capping Of Kathamba Borehole | Completed | Ksh 1,802,294 | |
| 177 | Construction Of Kwa Malai Earthdam,enlargement Spillway Checkdam,drawal System | Completed | Ksh 284,274 | |
| 178 | Athi Kalawa Wash Programme | Completed | Ksh 2,430,000 | |
| 179 | Muambe Earth Dam | Completed | Ksh 2,500,000 | |
| 180 | Waia Earth Dam | Completed | Ksh 4,000,000 | |
| 181 | Distribution Of Miau Earthdam Water Project, Distribution To Kwa Katheo,construction Of Masonry... | Completed | Ksh 4,000,000 | |
| 182 | Athi-miangeni- Kalawa Water Project. | Completed | Ksh 1,000,000 | |
| 183 | Kyamakuthi Earth Dam | Completed | Ksh 14,910,012 | |
| 184 | Akwash Water Project | Completed | Ksh 1,312,182 | |
| 185 | Kwa Muthama Earthdam | Completed | Ksh 2,450,000 | |
| 186 | Kwa Ivali Earthdam | Completed | Ksh 4,900,000 | |
| 187 | Drilling And Equipping Of 5 No. Boreholes In The Ward Using Own Machines | Completed | Ksh 7,000,000 | |
| 188 | Disilting Of Katukulu Earth Dam | Completed | Ksh 4,000,000 | |
| 189 | Katukulu Earth Dam | Completed | Ksh 1,500,000 | |
| 190 | Katatu Dam | Completed | Ksh 3,920,000 | |
| 191 | Akwash Project – (a. Extension Line From Katoloka To Kathongo (1 Kiosk At Kathongo); B. Extension... | Completed | Ksh 4,000,000 | |
| 192 | Kwa Makaa Earthdam | Completed | Ksh 2,940,000 | |
| 193 | Kaangi Borehole | Completed | Ksh 91,823 | |
| 194 | Kwa Malului Borehole | Completed | Ksh 114,842 | |
| 195 | Kyunguni Earth Dam | Completed | Ksh 2,189,243 | |
| 196 | Requisition and rehabilitation ofKasalama Borehole | Completed | Ksh 6,700,000 | |
| 197 | Desilting Of Kwa Loa Earthdam | Completed | Ksh 3,500,000 | |
| 198 | Kaangi Water Project | Completed | Ksh 3,500,000 | |
| 199 | Kavesa Shallow Well Test Pumping | Completed | Ksh 3,787,578 | |
| 200 | Kyamuumba Earth Dam - Rehabilitation | Completed | Ksh 400,000 | |
| 201 | Requisition For Testpumping And Water Analysis For Kwa Wala Borehole | Completed | Ksh 3,500,000 | |
| 202 | Water Treatment & Distribution Of Katilini Earth Dam Water Project | Completed | Ksh 24,230,000 | |
| 203 | Distribution Of Kwa Wala Borehole -rising Main To Ndatai Hill, Construction Of 100m3 Masonry Tank,... | Completed | Ksh 6,374,144 | |
| 204 | Distribution Of Katilini Water Project-rising Main To Kiima Kiu Hill, Distribution Network,... | Completed | Ksh 6,000,000 | |
| 205 | Rehabilitation Of Mbondoni Borehole-purchase And Installation Of Solar Panels And Rewiring | Completed | Ksh 500,000 | |
| 206 | Ngomeni Earth Dam | Completed | Ksh 484,492 | |
| 207 | Kwa Kakui Earth Dam | Completed | Ksh 6,000 | |
| 208 | Kwa Muulu Weir | Completed | Ksh 3,975,700 | |
| 209 | Kwa Ng’oku Earth Dam | Completed | Ksh 3,724,000 | |
| 210 | Mutiluni Borehole | Completed | Ksh 4,900,000 | |
| 211 | Maiani Borehole | Completed | Ksh 4,900,000 | |
| 212 | Kamuthini Borehole | Completed | Ksh 3,920,000 | |
| 213 | Repair And Distribution Of Nzaini Bh | Completed | Ksh 2,000,000 | |
| 214 | Drilling And Equipping Borehole In Mukaa Boys | Completed | Ksh 5,000,000 | |
| 215 | Kyanzisi Water Project Phase 1 | Completed | Ksh 7,000,000 | |
| 216 | Kaketa Water Project Phase 1 | Completed | Ksh 7,000,000 | |
| 217 | Requisition For Maiani Borehole Equipping In Mukaa Ward | Completed | Ksh 3,295,200 | |
| 218 | Rehabilitation Of Kwa Kulundu Water Project | Completed | Ksh 792,471 | |
| 219 | Rehabilitation Of Kwa Kulundu Borehole | Completed | Ksh 250,000 | |
| 220 | Mbiini - Isika Pipeline | Completed | Ksh 98,000 | |
| 221 | Kayata Borehole | Completed | Ksh 161,882 | |
| 222 | Kisaulu Community Borehole | Completed | Ksh 162,640 | |
| 223 | Kisaulu Borehole | Completed | Ksh 29,800 | |
| 224 | Muatinini Borehole | Completed | Ksh 1,504,600 | |
| 225 | Mikuyu II Water Project | Completed | Ksh 1,470,000 | |
| 226 | Muatineni Borehole | Completed | Ksh 3,920,000 | |
| 227 | Masokani Borehole | Completed | Ksh 4,900,000 | |
| 228 | Mikuyu 2 Water Project | Completed | Ksh 3,172,700 | |
| 229 | Kithuni Borehole | Completed | Ksh 1,500,000 | |
| 230 | Machine Hire For Desilting Of Kya Nduu Earth Dam | Completed | Ksh 2,700,000 | |
| 231 | Thoma Borehole-drilling And Distribution | Completed | Ksh 176,314 | |
| 232 | Kilia Borehole | Completed | Ksh 70,547 | |
| 233 | Mwitiko Sand Dam | Completed | Ksh 139,023 | |
| 234 | Flashing And Solarisation Of Kyandumbi Borehole | Completed | Ksh 141,407 | |
| 235 | Drilling And Extension Of Kyambalasi | Completed | Ksh 137,299 | |
| 236 | Rehabilitation Of Nzalani Earth Dam- Scooping Of The Dam Construction Of Embankment Wall | Completed | Ksh 3,500,000 | |
| 237 | Water Improvement Programme | Completed | Ksh 700,000 | |
| 238 | Rehabilitation Of Dams( Kivaku, And Kikonde Earth Dams) | Completed | Ksh 5,388,459 | |
| 239 | Distribution Of Kyandumbi Water | Completed | Ksh 3,500,000 | |
| 240 | Miradi Kwa Jamii (sand Dam/drift At Kileani Iiani) | Completed | Ksh 500,000 | |
| 241 | Ngiitini Borehole Solarization And Distribution | Completed | Ksh 4,000,000 | |
| 242 | Equipping And Distribution Kithuni Borehole | Completed | Ksh 1,500,000 | |
| 243 | Kwa Kikungu Earth Dam Desilting And Kikonde Earthdam Spillway | Completed | Ksh 3,429,848 | |
| 244 | Kyamyatu Earth Dam | Completed | Ksh 2,954,636 | |
| 245 | Water Improvement Programme( Reallocated To Kyamyatu) | Completed | Ksh 1,500,000 | |
| 246 | Water Improvement Program -kee | Completed | Ksh 1,932,958 | |
| 247 | Distribution Of Usi Wasa Project(kyanganda And Kyathani) | Completed | Ksh 89,691 | |
| 248 | Piping Of Ilovoto-kisekini Water( Ilovoto Water Project) | Completed | Ksh 116,171 | |
| 249 | Rehabilitation Of Nduu Water Project | Completed | Ksh 1,960,000 | |
| 250 | Ndiani Water Project – Solarization, 2km Distribution Line With Water Kiosks | Completed | Ksh 5,880,000 | |
| 251 | Ndiani Water Project | Completed | Ksh 2,000,000 | |
| 252 | Design And Construction Of Water Supply To Nunguni Market - Phase 1 | Completed | Ksh 10,000,000 | |
| 253 | Muthunzuuni Water Project | Completed | Ksh 2,000,000 | |
| 254 | Kwa Mwilu Sand Dam | Completed | Ksh 553,860 | |
| 255 | Nduu water project | Completed | Ksh 2,000,000 | |
| 256 | Ikaasu Kyamandi Water Project- | Completed | Ksh 54,231 | |
| 257 | Construction Of Sand Dam And Sump Tank At Mukilitwa River | Completed | Ksh 92,734 | |
| 258 | Kyakithuku Borehole | Completed | Ksh 184,510 | |
| 259 | Kwa Matolo Earth Dam | Completed | Ksh 5,482,000 | |
| 260 | Kiusyi Water Project | Completed | Ksh 5,000,000 | |
| 261 | Kiusyi Wear Rehabilitation | Completed | Ksh 1,475,624 | |
| 262 | Requisition For Kwa Mwilu Water Project- Solar Power System Rehabilitation | Completed | Ksh 414,979 | |
| 263 | Purchase Of Institutional | Completed | Ksh 2,000,000 | |
| 264 | Purchase Of Institutional E.g Churches And Schools Water Tanks | Completed | Ksh 2,000,000 | |
| 265 | Ithanzeni Borehole- Extension And Water Distribution | Completed | Ksh 3,920,000 | |
| 266 | Water Extension Line From Kyau Kwa Munanga To Kwa Kitili | Completed | Ksh 102,052 | |
| 267 | Construction Of Sump Tank And Piping Of Mbaani Water Project | Completed | Ksh 305,355 | |
| 268 | Kaumoni Earth Dam- Expansion Of Shallow Well And Water Treatmen | Completed | Ksh 602,200 | |
| 269 | Itenge Water Project- Water Distribution | Completed | Ksh 1,960,000 | |
| 270 | Kyeng'eethe Water Project- Extension And Distribution And Solar Installation | Completed | Ksh 114,371 | |
| 271 | Water Boreholes Maintenance | Completed | Ksh 980,000 | |
| 272 | Ithanzeni Bore Hole: Upgrading Of Solar Pump System | Completed | Ksh 1,960,000 | |
| 273 | Kilala Bh Water Project | Completed | Ksh 1,470,000 | |
| 274 | Kaiti Miting'ani Sand Dam : Construction Of Sump, Increase Sand Dam Height By 1.5m And Construction... | Completed | Ksh 7,840,000 | |
| 275 | Drilling And Equipping Borehole In Ukia Girls Secondary School | Completed | Ksh 5,000,000 | |
| 276 | Itenge Water Project | Completed | Ksh 5,000,000 | |
| 277 | Ithanze Water Project | Completed | Ksh 3,000,000 | |
| 278 | Drilling Of Mukuyuni Sub County Hospital Borehole | Completed | Ksh 2,000,000 | |
| 279 | Rehabilitation Of Kwa Kisela Water Project -rehabilitation, Extension To Mukuyuni Hospital And... | Completed | Ksh 2,500,000 | |
| 280 | Kithamba Borehole -solarization And Extension Of Pipeline To Kinyuani Areas | Completed | Ksh 2,000,000 | |
| 281 | Supply Of Pipes And Fittings For Kilala Health Centre And Kyambiwa Water Project | Completed | Ksh 80,000 | |
| 282 | Makindu Town Water Project – Grant To Kimawasco To Boost Water Supply In Makindu (a Borehole) | Completed | Ksh 142,000 | |
| 283 | Makindu-kiu Catchment Borehole | Completed | Ksh 1,500,000 | |
| 284 | Mulilii Earth Dam | Completed | Ksh 2,940,000 | |
| 285 | Excavation Of Syengoni Earth Damdam | Completed | Ksh 3,000,000 | |
| 286 | Kanaani Water Project | Completed | Ksh 2,000,000 | |
| 287 | Syengoni Borehole- Testpumbing | Completed | Ksh 3,000,000 | |
| 288 | Kwa Mbuli Borehole Water Project | Completed | Ksh 500,000 | |
| 289 | Syengoni Borehole-equipping | Completed | Ksh 2,700,000 | |
| 290 | Excavation Of Syengoni Earthdam | Completed | Ksh 1,309,020 | |
| 291 | Pipeline Extension To Kiaoni Market (kibmawasco) | Completed | Ksh 1,000,000 | |
| 292 | Service Line Rehabilitation Milu-kimawasco | Completed | Ksh 355,100 | |
| 293 | Construction Of Kathyaka Masonry Tank/ Under Kibmawasco | Completed | Ksh 4,410,000 | |
| 294 | Construction Of Sump Tank Reservoir, Water Treatment And Distribution To 10 Clusters From Athi... | Completed | Ksh 1,410,250 | |
| 295 | Silanga Borehole | Completed | Ksh 2,000,000 | |
| 296 | Kilisa Water Tank Reseivoir.reseivoir. | Completed | Ksh 2,000,000 | |
| 297 | Improvement Of Water In Kikumbulyu North Ward By Kibmawasco-kasayani Market To Cutline, Kwa Kakumi... | Completed | Ksh 4,300,000 | |
| 298 | Water Connection From Kibmawasco Line To Kisayani, Kathyaka And Kiaoni Dispensaries -water... | Completed | Ksh 300,000 | |
| 299 | Construction Of Sump Tank Reservoiur,water Treatment And Distribution To 10 Clusters From River... | Completed | Ksh 1,410,250 | |
| 300 | Athi Tunguni Kilema Water Project- Intake Sump Pump Set Replacement | Completed | Ksh 1,500,000 | |
| 301 | Kithokoosyo – Miambani Water Project | Completed | Ksh 77,000 | |
| 302 | Kimawasco Line Extension-mbeetwani (water) | Completed | Ksh 1,500,000 | |
| 303 | Electrification Of Kilui Water Project- Electrification - By Kimawasco | Completed | Ksh 3,500,000 | |
| 304 | Kibmawasco– Kilui Water Extension To Ngolomoki – Kwa Sunza -kalulini -matinga Line, Mikuyuni ... | Completed | Ksh 8,000,000 | |
| 305 | Rehabilitation And Distribution Of Kithokoosyo Water Project | Completed | Ksh 6,000,000 | |
| 306 | Extension Of Kimawasco From Gff To Miamba | Completed | Ksh 2,500,000 | |
| 307 | Ilingoni Pipeline Extension By Kibmawasco | Completed | Ksh 433,965 | |
| 308 | Purchase Of 5000l Water Tanks To Groups (climate Change Adaptaion) | Completed | Ksh 1,000,000 | |
| 309 | Syumile Borehole- Re-drilling With County Own Machine,test Pumping, Casing And Solar Power... | Completed | Ksh 90,000 | |
| 310 | Repair Of Mukameni, Kyandulu, Maumbuni Boreholes | Completed | Ksh 1,000,000 | |
| 311 | Aligon Pumping Set | Completed | Ksh 1,500,000 | |
| 312 | Kaunguni Dispensary Borehole | Completed | Ksh 140,623 | |
| 313 | Yikisemei Bohehole | Completed | Ksh 1,500,000 | |
| 314 | Makusu Borehole | Completed | Ksh 111,852 | |
| 315 | Kwa Kathoka Borehole | Completed | Ksh 2,113,755 | |
| 316 | Syumile Borehole | Completed | Ksh 1,960,000 | |
| 317 | Kalakalya Borehole | Completed | Ksh 1,500,000 | |
| 318 | Sekeleni Earthdam | Completed | Ksh 3,430,000 | |
| 319 | Kalungu-ngambi Ya Myunzyu Extension Of Water Pipeline | Completed | Ksh 2,940,000 | |
| 320 | Mivuyuni Borehole | Completed | Ksh 1,563,600 | |
| 321 | Drilling Of Ngaamba Borehole | Completed | Ksh 2,979,200 | |
| 322 | Mukameni Borehole Water Project | Completed | Ksh 6,000,000 | |
| 323 | Construction Of Water Stand At Kwangala Borehole | Completed | Ksh 500,000 | |
| 324 | Kyandulu Borehole - Pipeline Extension To Kibarani -kyusyani - Syiembeni Villages | Completed | Ksh 3,000,000 | |
| 325 | Kwa Kathoka Borehole Water Project -distribution To Ilatu Health Facility And The Surrounding... | Completed | Ksh 4,000,000 | |
| 326 | Matiku Borehole | Completed | Ksh 1,409,940 | |
| 327 | Emali Town Borehole | Completed | Ksh 2,021,860 | |
| 328 | Tutini Water Project | Completed | Ksh 55,300 | |
| 329 | Nguasini Water Earth Dam | Completed | Ksh 84,000 | |
| 330 | Emali Police Station Borehole | Completed | Ksh 35,784 | |
| 331 | Katune Borehole -distribution To Kwa Kotoe | Completed | Ksh 25,200 | |
| 332 | Rehabilitation Of Stalled Boreholes In The Ward ( Kwa Kimulu, Kiiwai, Emali, Nduuduni Etc) | Completed | Ksh 1,960,000 | |
| 333 | Distribution Of Water At Ilengeni Springs | Completed | Ksh 5,900,000 | |
| 334 | Feasibility Study Of Muooni Mega Dam | Completed | Ksh 1,000,000 | |
| 335 | Distribution Of Mumbuni Samp(solarisation And Distribution At Source) | Completed | Ksh 4,900,000 | |
| 336 | Emali Police Station Borehole | Completed | Ksh 61,110 | |
| 337 | Restoring Water At Emali | Completed | Ksh 4,345,016 | |
| 338 | Emali Rehabilitation Centre Borehole | Completed | Ksh 100,000 | |
| 339 | Mulala Primary Borehole | Completed | Ksh 6,000,000 | |
| 340 | Kwa Maima Earth Dam | Completed | Ksh 4,000,000 | |
| 341 | Emali Township Borehole | Completed | Ksh 2,000,000 | |
| 342 | Piping Of Matiku Borehole | Completed | Ksh 500,000 | |
| 343 | Emali Chiefs Borehole | Completed | Ksh 406,439 | |
| 344 | Mulala Primary School Borehole | Completed | Ksh 6,000,000 | |
| 345 | Drilling Of Emali Town Borehole | Completed | Ksh 2,000,000 | |
| 346 | Drilling And Equipping Of Emali Rehabilitation Centre Borehole | Completed | Ksh 644,814 | |
| 347 | Drilling And Equipping Of Matiku Borehole | Completed | Ksh 3,000,000 | |
| 348 | Drilling And Equipping Of Emali Town Borehole | Completed | Ksh 2,500,000 | |
| 349 | Drilling And Extension Of Kwa Kioko Kiluluini Village Kavingoni Borehole | Completed | Ksh 2,057,995 | |
| 350 | Drilling And Extension Of Kwa Kioko Kiluluini Village Kavingoni Borehole | Completed | Ksh 2,057,955 | |
| 351 | Improvement Of Emali Town Water Reticulation | Completed | Ksh 500,000 | |
| 352 | Mulala Primary Borehole - Borehole Drilling And Development With Casing, Solar Pumping System,... | Completed | Ksh 3,994,680 | |
| 353 | Matiliku/ Kwa Kasoda Tanks | Completed | Ksh 299,900 | |
| 354 | Extension Of Ngwata, Kativani, Kiange, Yumbuni, And Kyuasini By KIBWAWASCO | Completed | Ksh 4,116,000 | |
| 355 | Kiambani Borehole | Completed | Ksh 3,430,000 | |
| 356 | Extension Of Water By 4kms Makutano- Makongeni- Masimbani- Mbondeni (kwa Kalee) To Mwaani Market... | Completed | Ksh 3,920,000 | |
| 357 | Maintenance Of Boreholes In Masongaleni Ward | Completed | Ksh 490,000 | |
| 358 | Ivuso Earth Dam | Completed | Ksh 873,780 | |
| 359 | Silimbi Kalata Water Project | Completed | Ksh 27,940 | |
| 360 | Ovo Earth Pan | Completed | Ksh 47,455 | |
| 361 | Extension Of Kyamulinzi Water Project From Kithyululu To Wa Ndei | Completed | Ksh 1,000,000 | |
| 362 | Muthenyenze Borehole | Completed | Ksh 1,160,000 | |
| 363 | Kiambani Borehole | Completed | Ksh 5,115,704 | |
| 364 | Ndauni Pipeline | Completed | Ksh 4,500,000 | |
| 365 | Uyi Earth Dam-counter Funding With Ndma | Completed | Ksh 9,941,310 | |
| 366 | Rehabilitation Of Mitonguni Pipeline, Test Pumpin Of Mitooni Borehole | Completed | Ksh 275,047 | |
| 367 | Ulilinzi Borehole -equipping, Purification And Distribution | Completed | Ksh 5,181,579 | |
| 368 | Kativani Borehole -rehabilitation, Purification And Distribution | Completed | Ksh 1,556,877 | |
| 369 | Development And Rehabilitation Of Ngwata Water Pipeline Project By Kimawasco - Masongaleni) -... | Completed | Ksh 10,000,000 | |
| 370 | Equipment Hire For Desilting Earth Dams(kwa Kitwa,kwa Manza, Kwa Kasau And Victoria Earth Dams) | Completed | Ksh 2,940,000 | |
| 371 | New Extension Of Ngai Ndethya River Sump Water To Nthungunu -- Construction Of A Tank, Installation... | Completed | Ksh 7,506,800 | |
| 372 | Kambu-kiteng'ei Water Project | Completed | Ksh 4,000,000 | |
| 373 | Construction Of Sand Dam At Kambu Sump Along Kambu River-distribution To Syethe, Ngomano, Kyunyu,... | Completed | Ksh 435,655 | |
| 374 | Kwa Diana New Phase- Solar Installation,submersible Pump Installation, Errection And Installation... | Completed | Ksh 247,971 | |
| 375 | Kwa Daina Mavindini Pipeline Improvement | Completed | Ksh 2,340,000 | |
| 376 | Kambu Kitengei Water Project | Completed | Ksh 7,500,000 | |
| 377 | Hydrological Survey, Drilling And Test Pumping At Mang'elete | Completed | Ksh 1,800,000 | |
| 378 | Ngai Ndethya Water Project | Completed | Ksh 7,417,400 | |
| 379 | Nzouni Borehole | Completed | Ksh 3,430,000 | |
| 380 | Ithayoni Bh | Completed | Ksh 27,962 | |
| 381 | Distribution Of Water From Machinery Town To Mbulutini Thange And A Water Tank Of 10,000 Litres -... | Completed | Ksh 33,490 | |
| 382 | "mangelete Water Project -establishment Of Water Pipeline To Nzayo Solarization And... | Completed | Ksh 6,000,000 | |
| 383 | Kambu-kitengeei Water Project -establishing Of Water Pipeline To Nzoila And Mitooni-construction... | Completed | Ksh 3,000,000 | |
| 384 | Kikunduku Borehole | Completed | Ksh 3,430,000 | |
| 385 | Drilling And Equipping Muthungue Boreholeborehole | Completed | Ksh 3,500,000 | |
| 386 | Supply And Delivery Of One Motorbike For Thange Ward | Completed | Ksh 200,000 | |
| 387 | Rehabilitation Of Nzouni Borehole | Completed | Ksh 3,500,000 | |
| 388 | Kambu Water Project By Kimawasco | Completed | Ksh 2,500,000 | |
| 389 | Mbulutini Springs-sump Rehabilitation ,solarisation, Storage Tanks, Distribution And Construction... | Completed | Ksh 2,000,000 | |
| 390 | "thange Sand Dam -storage Tank And Distribution " | Completed | Ksh 2,000,000 | |
| 391 | Equipping Of Muthungue Borehole | Completed | Ksh 2,246,680 | |
| 392 | Drilling Of Talent Centre Borehole, Solarisation, Kiosk/distribution Within The Centre And Water... | Completed | Ksh 2,940,000 | |
| 393 | Kwa Kalekye Borehole | Completed | Ksh 2,940,000 | |
| 394 | Mang’elete Borehole (Changed to equip Kalekye borehole) | Completed | Ksh 2,940,000 | |
| 395 | Drilling Of Kwa Maundu | Completed | Ksh 2,036,680 | |
| 396 | Utu Borehole | Completed | Ksh 967,120 | |
| 397 | Kitenge Borehole | Completed | Ksh 18,970 | |
| 398 | Completion Of Manguluku Earth Dam - Fencing, Construction Of Cattle Traps, Construction Of Toilet | Completed | Ksh 17,152 | |
| 399 | Maia Atatu Earth Dam | Completed | Ksh 18,422 | |
| 400 | Water Development | Completed | Ksh 500,000 | |
| 401 | Katheka Kai Borehole | Completed | Ksh 4,000,000 | |
| 402 | Rehabilitation Of Kwa Kalekye Borehole | Completed | Ksh 4,000,000 | |
| 403 | Drilling Of Nzambani Boreholeborehole | Completed | Ksh 1,800,000 | |
| 404 | Distribution Of Mikuyuni Bh | Completed | Ksh 3,000,000 | |
| 405 | Equipping Nzambani Bh With Pump , Solarisation, Tank And Kiosks | Completed | Ksh 3,000,000 | |
| 406 | Utu Distribution To Yumbuni Market ( Water Kiosk ) | Completed | Ksh 2,000,000 | |
| 407 | Kwa Kaluki Borehole | Completed | Ksh 105,414 | |
| 408 | Yumbuni Borehole | Completed | Ksh 442,460 | |
| 409 | Yikivumbu Water Sump | Completed | Ksh 1,193,000 | |
| 410 | Thithi Borehole | Completed | Ksh 80,000 | |
| 411 | Ndovoini Borehole- Installation Of A Casing, Pump, Motor And Solarization | Completed | Ksh 50,000 | |
| 412 | Distribution Of Kwa Mukonyo Borehole | Completed | Ksh 40,000 | |
| 413 | Yumbuni Borehole- Water Distribution. Extension Of The Pipeline | Completed | Ksh 94,000 | |
| 414 | Kwa Mukonyo Kwelela Borehole | Completed | Ksh 131,514 | |
| 415 | Construction Of Sump At Kimia Kateiko | Completed | Ksh 60,000 | |
| 416 | Kimia-kateiko Water Project-water Distribution. Extension Of The Pipeline For 4kms | Completed | Ksh 4,900,000 | |
| 417 | Katangini Water Project | Completed | Ksh 2,985,128 | |
| 418 | Kakili Borehole Markets | Completed | Ksh 3,000,000 | |
| 419 | Ndimitava Kwa Mutoa And Desilting Of Ndiani Water Projec | Completed | Ksh 476,990 | |
| 420 | Yikivumbu Borehole-drilling And Distribution Drilling,test-pumping,solarization, Equipping And... | Completed | Ksh 3,500,000 | |
| 421 | Kakili Borehole-installation Of Submassive Pump And Soalrization | Completed | Ksh 3,500,000 | |
| 422 | "kwa Malika Sump Rehabilitation, Solarization And Distribution -sump, Rehabilitation, Solarization,... | Completed | Ksh 3,500,000 | |
| 423 | Kikuu Kiangini Water Project | Completed | Ksh 3,700,000 | |
| 424 | Water Development Programs | Completed | Ksh 2,303,000 | |
| 425 | Makueni Rural Water Board(maruwab) Operationalization | Completed | Ksh 4,373,617 | |
| 426 | Development Of Water Sources For Kibwezi East | Completed | Ksh 1,912,910 | |
| 427 | Water Tank Matching Programme | Completed | Ksh 42,410 | |
| 428 | Water Exploration Equipment | Completed | Ksh 705,420 | |
| 429 | DTF Construction | Completed | Ksh 2,700,000 | |
| 430 | Dam Construction by (dcu) | Completed | Ksh 9,000,000 | |
| 431 | Drilling And Test Pumping Unit (dtu) Rig | Completed | Ksh 5,000,000 | |
| 432 | Project Feasibility Studies | Completed | Ksh 4,000,000 | |
| 433 | Water Development Programme | Completed | Ksh 3,787,578 | |
| 434 | Kenya Water And Sanitation And Hygiene K-wash | Completed | Ksh 5,000,000 | |
| 435 | Water Project Security Systems | Completed | Ksh 4,700,000 | |
| 436 | Dam Construction Unit(dcu) - Maintenance Machinery And Hire Of Machinery For The Dam Construction... | Completed | Ksh 15,000,000 | |
| 437 | Drilling And Test Pumping Unit(dtu) - Maintenance Rig | Completed | Ksh 5,000,000 | |
| 438 | Irrigation Development Programme | Completed | Ksh 2,000,000 | |
| 439 | Drilling Of Boreholes | Completed | Ksh 948,850 | |
| 440 | Drilling Of Boreholes | Completed | Ksh 1,042,600 | |
| 441 | Drilling Of Boreholes | Completed | Ksh 1,143,911 | |
| 442 | Operationalization Of Bore Holes & Other Water Sources | Completed | Ksh 3,722,800 | |
| 443 | Water Tank Matching Programme | Completed | Ksh 6,183,410 | |
| 444 | Purchase Of Water Exploration Equipment | Completed | Ksh 10,000,000 | |
| 445 | Prefeasibility; Construction Of Flagship Earrth Dams | Completed | Ksh 1,000,000 | |
| 446 | Operationalization Of The Water Act | Completed | Ksh 9,500,000 | |
| 447 | Water Fund Establishment | Completed | Ksh 800,000 | |
| 448 | Ngua/syengoni Brehole- Supply And Delivery Of Drilling Materials | Completed | Ksh 3,000,000 | |
| 449 | Development Of Water Sources For Kibwezi East (flagship Projects) | Completed | Ksh 1,961,669 | |
| 450 | Construction Of A New Sump Tank And Construction Of A Latrine At Kaiti 2 | Ongoing | Ksh 6,700,000 | |
| 451 | Kwa Moto Water Project - Improvement Of Pipeline From Kwa Moto - Ndovea- Kyuasini - Matiliku Market | Ongoing | Ksh 1,280,000 | |
| 452 | Kwa Ndule Water Sum(new Project) -construction Of Sump And Distribution Of Water To Kasevini | Ongoing | Ksh 3,000,000 | |
| 453 | Extension Of Ndumoni Borehole Pipeline | Ongoing | Ksh 600,000 | |
| 454 | Supply of Flloca water to Kalima | Ongoing | Ksh 720,000 | |
| 455 | Purchase Of 5000l Water Tanks | Ongoing | Ksh 450,000 | |
| 456 | Thwake Sand Dam | Ongoing | Ksh 9,212,000 | |
| 457 | Ndukuma Dam - Water Distribution | Ongoing | Ksh 4,500,000 | |
| 458 | Thwake Sump And Pipeline | Ongoing | Ksh 3,992,900 | |
| 459 | Kambi Mawe Borehole | Ongoing | Ksh 3,000,000 | |
| 460 | Kangi Water Project | Ongoing | Ksh 425,000 | |
| 461 | Operationalization Of Kiosks And Distribution Of Ndukuma | Ongoing | Ksh 8,000,000 | |
| 462 | Kwa Kikuu Kavisi Water Project | Ongoing | Ksh 2,000,000 | |
| 463 | Mantainance And Fueling Of Ward Backhoe | Ongoing | Ksh 2,000,000 | |
| 464 | "kwa Nzeki/makovo Earth Dam –reconstruction Of Embankment, Repair Of Spill Way, Desilting And... | Ongoing | Ksh 6,000,000 | |
| 465 | Mulima Earthdam Phase 2 | Ongoing | Ksh 40,000,000 | |
| 466 | Kikima Water Project -rehabilitation Of Pipeline, Servicing Of Pumps, Desilting And Improvement Of... | Ongoing | Ksh 2,000,000 | |
| 467 | Iani Sand Dams Water Project -pumping And Distribution Of Iani Sand Dams Water Project - In Phases | Ongoing | Ksh 4,000,000 | |
| 468 | Kwa Matenge Earth Dam Costruction- and distribution to Sofia Kithendu | Ongoing | Ksh 4,000,000 | |
| 469 | Rehabilitation And Extension Of Kwa Makaia Borehole Water Project. Rehabilitation Of Kisoi Munyao... | Ongoing | Ksh 4,000,000 | |
| 470 | Nzaini Water Project Phase 1 -pumping System And Solarization, Pumping Line To Kingalani Top... | Ongoing | Ksh 7,000,000 | |
| 471 | Mumela Borehole -drilling, Equipping And Distribution | Ongoing | Ksh 3,500,000 | |
| 472 | Mutanda Borehole -drilling, Equipping And Distribution | Ongoing | Ksh 3,500,000 | |
| 473 | Mulolongo Borehole -drilling, Equipping, Distribution To Matangi, Maviameu And Kathanzi Villages | Ongoing | Ksh 4,000,000 | |
| 474 | Drilling And Equipping Of Kwa Nzelu Borehole -drilling, Equipping And Distribution | Ongoing | Ksh 4,000,000 | |
| 475 | Water Supply To Nunguni-phase 1 | Ongoing | Ksh 2,287,965 | |
| 476 | Ikuma Water Project -ikuma To Ndeini Rising Main Rehabilitation And Distribution To Kisekini And... | Ongoing | Ksh 2,500,000 | |
| 477 | Extension Of Kwa Mwilu Sand Dam Water Project- 3km Return Lines , 2 No . 1.5km Katikomu Village... | Ongoing | Ksh 5,730,820 | |
| 478 | Kyambeke Borehole Water Project -distribution To Kyambeke Level Iv Hospital, Markets Up To Ndolo... | Ongoing | Ksh 4,000,000 | |
| 479 | Athi Tunguni Water Project | Ongoing | Ksh 37,500,000 | |
| 480 | Kiboko Twaandu Water Project World Vision Kenya Matching Gtant | Ongoing | Ksh 7,500,000 | |
| 481 | Yinzau Borehole -drilling, Equipping Solarization Of New Borehole & Rehabilitation Of Kiu Muuni... | Ongoing | Ksh 1,900,000 | |
| 482 | Construction of a masonry tank at Ndetani (225 cubic meter capacity) - KIBMAWASCO | Ongoing | Ksh 4,000,000 | |
| 483 | Construction of a masonry tank at Kisayani (225 cubic meter capacity) - KIMAWASCO | Ongoing | Ksh 4,000,000 | |
| 484 | Kimawasco Water Extension To Ilingoni, Mabuyuni And Masalani,solarization And Extension Of Water... | Ongoing | Ksh 5,000,000 | |
| 485 | Tunguni Borehole | Ongoing | Ksh 5,000,000 | |
| 486 | Kwa Maima Earth Dam | Ongoing | Ksh 2,920,000 | |
| 487 | Emali Police Station Borebole | Ongoing | Ksh 204,721 | |
| 488 | Rehabilitation Of Kwa Nzele Water Sump Tank -rehabilitation Of The Sump Tank And Water Distribution | Ongoing | Ksh 6,000,000 | |
| 489 | Supply Of 10000l Water Tanks And Construction Of Tank Platform | Ongoing | Ksh 299,900 | |
| 490 | Emali Kwa Chief Borehole | Ongoing | Ksh 406,439 | |
| 491 | Kiambani Borehole | Ongoing | Ksh 5,115,704 | |
| 492 | Borehole Drilling -borehole To Supply Water To Ivoleni Area | Ongoing | Ksh 1,800,000 | |
| 493 | Drilling Of Manyatta Bh | Ongoing | Ksh 2,000,000 | |
| 494 | Water Development Programme - Water Development Programme(repairs And Maintenance Of Boreholes) | Ongoing | Ksh 3,000,000 | |
| 495 | Feasibility For Distribution Of Mzima Springs Water | Ongoing | Ksh 5,000,000 | |
| 496 | Kasooni Water Project -distribution Of The Water | Under Procurement | Ksh 1,500,000 | |
| 497 | Solarization And Equipping Of Kathamboni Borehole | Under Procurement | Ksh 2,000,000 | |
| 498 | Expansion Of Kooi Earthdam | Under Procurement | Ksh 3,000,000 | |
| 499 | Kaumoni Borehole -equipping, Solarization And Distribution | Under Procurement | Ksh 1,000,000 | |
| 500 | Water Connection From Utafiti To Kwa Masaku | Under Procurement | Ksh 1,500,000 | |
| 501 | Purchase Of Water Tanks-kibmawasco | Under Procurement | Ksh 300,000 | |
| 502 | Maluini/miangeni - Kwa Kamii Water Project By Kimawasco | Under Procurement | Ksh 1,500,000 | |
| 503 | Kwa Martha Earthdam Canal Construction | Under Procurement | Ksh 400,000 | |
| 504 | Desilting Of Kwa Matundu And Kwa Kaswii Earthdam | Under Procurement | Ksh 1,420,411 |
12. The Office of the Governor
| # | Project Name | Status | Budget | Action |
|---|