Purchase of certified maize seeds – DK 8031
and Duma 43
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 5,000,000
Kilungu
Ndiani Water Project
2km raising main, (utumo umu area supply), 100cu.m masonry tank, 2km distribution line, 2No. water kiosks with tanks.
Department of Water and Sanitation
Completed
Ksh 2,000,000
Kilungu
Support To Groups – Kilungu
– Purchase of 15 (100-seater) Tents and Chairs
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 3,000,000
Kilungu
Youth Empowerment-kilungu
Youth empowerment(Training and licensing of Boda Boda Riders and car driving)
Department of Gender, Children, Youth, Sports and Social Services
Ongoing
Ksh 1,400,000
Kilungu
Mutungu Health Centre - Medical Bills For The Needy Cases And Pwds
payment of medical bills and surgical implants for vulnerable
Department of Health Services
Completed
Ksh 500,000
Kilungu
Rehabilitation Of Kwa Sikauti- Kisyulya Road In Kilungu Ward
2.5Kms heavy grading, 1km road graveling, installation of drainage structures such as 600mm dia 22m culvert, 40 gabions and keywalls
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 3,904,677
Kilungu
Rehabilitation Of Nthunguni Gulley And Tree Compensation During Road Reopening
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 400,000
Kilungu
Routine Maintenance Of Roads in Kilungu ward -Fuel
Light grading was carried out on several roads across the area. These included: Ithemboni
– Kwa Luli – Kaia Road (2 km and 1.5 km sections), Kaia – Katumi AIC (1
km), Ithemboni – Nduu Primary (2.5 km), Nduu Field levelling, Katumi –
Kithimani (1.5 km), Kisyani – Katulye – Utumo Umu (1.5 km), Kikoko –
Matua Road (1 km and 1.5 km sections), Kivaku – Upendo Road (1 km), ABC
Ngiini – Kyakathuku Road (2 km), Kyamathenga Catholic – Kyamatua
Secondary School (1 km), Junction Kyamatheka – Kwa Nzovi (1.2 km),
Junction Kikoko Girls – Kyangela Primary (0.5 km), Kisekini – Ndeini
Road (0.8 km), Kauti – Kya Ngonye Road (1 km), Kauti – Kiima Road (1.2
km), Mwanyani – Katumani Road (1.5 km), Nunguni – AIC Nungi – Kya
Kalinge (1.5 km), Katumi – Kwa BK (0.5 km and 0.7 km sections), Nunguni –
Nduu Junction – Kwa Mumbi – Kwa BK (1.8 km), Catholic Kyekolo – Kwa
Mbaa Muange (1 km), Katulye – Kyekolo, Utumoni Road (2 km), Kikuyuni –
Kyaini Road (1.4 km), Iiani – Uini Road (1 km), Kwa Mukuta – Ivumbu –
Kyambo (2.3 km), and Kikoko – Kitende Road (1.8 km
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 327,229
Kilungu
Ilovoto Water Project
Constructions of two water weirs/sand dams, Draw off pipeline,Mutanda line,Ngilani-Kithangathini line,Kaeani shops-Domino line, Enhancement of gravity distribution lines, Supply of 50 vertical sacks and 50 Conical gardens, Supply of high value tree seedlings(600 Avocado seedlings), Support to two Agro-forestry tree nurseries with tree nursery management materials,, capacity building on tree nursery management and Agro-forestry
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 13,000,000
Kilungu
Design And Construction Of Water Supply To Nunguni Market - Phase 1
Design and Construction of Water Supply to Nunguni Market - Phase 1
Department of Water and Sanitation
Completed
Ksh 10,000,000
Kilungu
Isovya Ctti
Construction of a dormitory and fencing
Department of ICT, Education and Internship
Completed
Ksh 4,900,000
Ilima
Road Improvement Programme
Road opening and grading of :- 1. Mikimani -Kyapota road,Kikuswi-ivaini kwa Mbinda- Kyakithuku- kivani road, Ngunga- kyanga- Ngolomoko- kiumoni-Mitini road, 2. Wautu- Katikomu -Kyangala road,3. St.Teresia -Inyokoni -Musalala road, 4.Kivani-Katondoloni- Kwa maoka -Mbusyani- Kwa Recho- Mwaani road
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 3,430,000
Ilima
Kyambeke Health Centre – Upgrading Of The Facility
Renovation of OPD Block and construction of Kitchen.
Department of Health Services
Completed
Ksh 934,702
Ilima
Avocado Value Chain Development
Avocado Value Chain development - Procurement of organic fertilizer
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 1,500,000
Ilima
Grading, Murraming And Installation Of Structures Along Mbaloni – Kyenzenzeni Road
Grading, murraming and installation of structures at Mbaloni – Kyangunzu – Wautu – Kyambeke – Kwa Mwove – Nzukini – Kisuu – Upendo – Syathani – Kyenzenzeni Road to be done.
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 5,880,000
Ilima
Musalala Dispensary – Upgrading
Upgrading and renovation of the facility
Department of Health Services
Completed
Ksh 943,085
Ilima
Upgrading Of Kyang’a Dispensary – Construction Of Staff Quarters
Construction of staff house
Department of Health Services
Completed
Ksh 3,430,000
Ilima
Upgrading Of Nzukini Health Centre (renovations)
Renovation works at the facility
Department of Health Services
Completed
Ksh 980,000
Ilima
Kwa Mwilu Sand Dam
n/a
Department of Water and Sanitation
Completed
Ksh 553,860
Ilima
Construction Of Sand Dam And Sump Tank At Mukilitwa River
Sand Dam Concrete wallInfiltration Intake Chamber & Draw-Off System
Department of Water and Sanitation
Completed
Ksh 92,734
Ilima
Kyakithuku Borehole
Construction of 75CM Masonry Tank, Kyamanza Distribution Line, Return Distribution Line, Operationalization of Kyamulinge BH
Department of Water and Sanitation
Completed
Ksh 184,510
Ilima
Kwa Matolo Earth Dam
• Earth dam expansion • Spillway protection.• Construction of a check dam.
Department of Water and Sanitation
Completed
Ksh 5,482,000
Ilima
Upgrading Of Kavatanzou Dispensary
Renovation of the facility and tiling
Department of Health Services
Completed
Ksh 1,466,506
Ilima
Upgrading Of Kyambeke Dispensary-construction Of Two Wards -male And Female
Renovation of Waiting bay, fencing and gate
Department of Health Services
Completed
Ksh 15,783
Ilima
Ilima Water Tanks For Elderly
Purchase and supply of water tanks each of 3,200litres
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 1,000,000
Ilima
Ilima Ward Bursary
Bursary allocation, application, vetting, award and distribution
Department of ICT, Education and Internship
Completed
Ksh 5,000,000
Ilima
Mwaani Ecde
Construction of two class rooms with office and store, water harvesting (10,000 ltrs water tank)
Department of ICT, Education and Internship
Completed
Ksh 3,500,000
Ilima
Inyokoni Ecde
Construction of two class rooms with office and store, water harvesting (10,000 ltrs water tank)
Department of ICT, Education and Internship
Completed
Ksh 3,500,000
Ilima
Kiluluini Ecde
Construction of two class rooms with office and store, water harvesting (10,000 ltrs water tank)
Department of ICT, Education and Internship
Completed
Ksh 3,500,000
Ilima
Kathangathini Ecde
Construction of one class room with office and store, Installation of water harvesting goods(10,000 ltrs water tank)
Department of ICT, Education and Internship
Completed
Ksh 2,500,000
Ilima
Market lighting at Mutini, Musalala and Kwa Mwove markets
Repair and rehabilitation of solar market lights to integrated solar powered market lights at Mutini, Musalala and Kwa Mwove markets
Department of Infrastructure, Transport, Public Works, Housing and Energy
Ongoing
Ksh 1,500,000
Ilima
Supply Of Certified Seeds
Supply of certified seeds
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 1,500,000
Ilima
Kiusyi Water Project
Intake Enhancement, Submersible Pump & Control Pannel, Raising Main, Solarization, Rehabilitation Of Distribution Line To An Existing Water Kiosk At Mwaani Market
Department of Water and Sanitation
Completed
Ksh 5,000,000
Ilima
Gbv –ilima
– Facilitation of GBV victims for medical support and other logistics
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 1,000,000
Ilima
Purchase Of Tents And Chairs For Organized Groups-ilima
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 1,500,000
Ilima
Boda Boda Training And Licensing Ilima
Boda boda training and licensing
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 1,000,000
Ilima
Sports Development – Ward Tournament Ilima
Facilitation for ligi mashinani
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 300,000
Ilima
Mwaani Dispensary – Construction Of Galley
construction of galley
Department of Health Services
Ongoing
Ksh 1,000,000
Ilima
Kiusyi Wear Rehabilitation
Kiusyi wear rehabilitation
Department of Water and Sanitation
Completed
Ksh 1,475,624
Ilima
Musalala/akatch Stadium
Department of Gender, Children, Youth, Sports and Social Services
Under Procurement
Ksh 984,850
Ilima
Requisition For Kwa Mwilu Water Project- Solar Power System Rehabilitation
Strengthening steel towerReplacement of broken solar panels
Department of Water and Sanitation
Ongoing
Ksh 414,979
Ilima
Extension Of Kwa Mwilu Sand Dam Water Project- 3km Return Lines , 2 No . 1.5km Katikomu Village Distribution Line And Kyangunzu- Nzeveni D1 2km 5 Tanks
Extension of Kwa mwilu sand dam water project- 3km return lines , 2 no . 1.5km Katikomu village distribution line and Kyangunzu- Nzeveni D1 2km 5 tanks
Department of Water and Sanitation
Ongoing
Ksh 5,730,820
Ilima
Purchase Of Institutional
supply and delivery of water tanks
Department of Water and Sanitation
Completed
Ksh 2,000,000
Ilima
Wautu Kyangaati Sand Dam And Water Project
Sand dam construction,Reinforced concrete sump, Solar pumping system,Raising main, 100m3 masonry water tank and communal water access point at Kwa Chief,Construction of Kyangaati-wautu gravity line with 2 communal water points,Agroforestry and Riparian land conservation initiative(5000 Avocado and 400 Assorted riparian tree species), Community outreach program on SLM and Best practices in Agroforestry.
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 15,499,911
Ilima
Machine Hire For The Following Roads; Abc Kavatanzou – Mutambukoni- Kamunandani – Kwa Ndile Road – Opening And Grading, Kiluluini-kikuswi-kivwauni-mitini Road – Grading, Kyambeke-kyakatoni-matwiku-mwaani Road – Grading, Kwamwove-nzukini-isovya-kavatanzou Road - Grading - Mtf
Machine hire/fuel levy for the following roads; ABC Kavatanzou – Mutambukoni- Kamunandani – kwa ndile road – opening and grading, 2. Kilolo kyenzeni _musalala 14kms 3. kwakitela Nzukini CTTI Nzukini SA- 5kms 4. Nzukini kasekis-Musalala-6kms 5. Musalala-nzukini-4kms 6. Musalala-ST Teresia-8KMs 7. Kalongo -kilungu-Kyathani-12kms 8. Kwa MUkeka – Mashariki-Kivuuni-4Kms 9. Kyathani-Kisuu-Nzukini-Iksaasu- 12Kms
Department of Infrastructure, Transport, Public Works, Housing and Energy
Ongoing
Ksh 4,500,000
Ilima
Ai Development
AI Development
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Under Procurement
Ksh 329,685
Ilima
Purchase Of Land For Mwaani Dispensary
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 1,000,000
Ilima
Kaumoni - Nthangathi - Kitutu Road
Construction of 3 short drifts
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 2,940,000
Ukia
Kisimbi-mutanga/ Nthangathi- Muiu Road
6kms road opening and grading along Kisimbi-Mutanga/ Nthangathi- Muiu roads
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 2,940,000
Ukia
Development and enforcement of Municipal Plans and development control
Roads opening and graveling using county machine
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 500,000
Ukia
Mumbuni Ecde
1No. ECDE Classroom
1No.lockable metallic cabinet
1No. Wooden Desk
1No. Wooden Arm Chair
Water harvesting goods (5,000Ltrs Water Tank and Base)
Full Electrical Works
Display Pinned board
Branding, Publicity and Signwriting
Department of ICT, Education and Internship
Completed
Ksh 1,470,000
Ukia
Nzouni - Mutambuukoni - Kavani Road
Construction of Culverts and small drifts along Nzouni - Mutambuukoni - Kavani road1. Kyamuthei -kavani - mutambuukoni- nzouni kyeng'eethe - kwakamoli - ikalyoni - muvani – kyau ikalyoni kwa muumbi kwa musau – kaseveniswaa - nthongoni muthini - isuuni Singinature - isuuni Ukia ndivuni - mutula matindini 2. Kwa muloka - muiu,Kilala - silanga – ithanzeni,Kaiti polytechnic - kaloa - mbalani Itangini - kalima – muselele
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,960,000
Ukia
Road Improvement
Road improvement -MTF (inhouse works)
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,960,000
Ukia
Road Improvement
Road improvement -light grading
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,960,000
Ukia
Ukaatuni Ctti
Equipping
Department of ICT, Education and Internship
Completed
Ksh 1,751,882
Ukia
Ithanzeni Borehole- Extension And Water Distribution
• Rising Main• Ithanzeni Return Line• Construction of 100CU.M Masonry Tank
Department of Water and Sanitation
Completed
Ksh 3,920,000
Ukia
Water Extension Line From Kyau Kwa Munanga To Kwa Kitili
Supply of pipes and fittings to Kyau BH Water Project
Department of Water and Sanitation
Completed
Ksh 102,052
Ukia
Construction Of Sump Tank And Piping Of Mbaani Water Project
Construction of chambers to abstract raw water• Laying and anchoring of HDPE pipe Re-route a section of pipeline (500m) at the source • Re-route a section of pipeline (800m) at Kwa sive and nyanzi • Repair works on Kyuasini line • Installation of air release valves and wash-outs on the intake gravity line
Department of Water and Sanitation
Completed
Ksh 305,355
Ukia
Kaumoni Earth Dam- Expansion Of Shallow Well And Water Treatmen
Drilling and development of Kaumoni Earth Dam Borehole
Department of Water and Sanitation
Completed
Ksh 602,200
Ukia
Itenge Water Project- Water Distribution
Construction of 100Cu.M sump tank
Department of Water and Sanitation
Completed
Ksh 1,960,000
Ukia
Kyeng'eethe Water Project- Extension And Distribution And Solar Installation
Extension of Utaati Rising Main, Utaati Junction Communal Water Point
Department of Water and Sanitation
Completed
Ksh 114,371
Ukia
Water Boreholes Maintenance
Upgrading of Solar Pumping System - Ithanzeni BH Project
Department of Water and Sanitation
Completed
Ksh 980,000
Ukia
Ithanzeni Bore Hole: Upgrading Of Solar Pump System
Upgrading of Solar Pumping System - Ithanzeni BH Project
Department of Water and Sanitation
Completed
Ksh 1,960,000
Ukia
Kilala Bh Water Project
Extension of Mbalani Pipeline, Extension of Kilala Project line to Kyumu, Kyumu Water Kiosk, Mbalani Water Kiosk
Department of Water and Sanitation
Completed
Ksh 1,470,000
Ukia
Kaiti Miting'ani Sand Dam : Construction Of Sump, Increase Sand Dam Height By 1.5m And Construction Of Raised Main Ms Panel Tank At Yiumo Kwa Mukosi
Raising of sand dam wall, construction of 100Cu.M Sump Tank, Construction of Yiumo Elevated 50Cu.M steel tank
Department of Water and Sanitation
Completed
Ksh 7,840,000
Ukia
Kyuasini Health Centre
Construction of staff house
Department of Health Services
Completed
Ksh 400,113
Ukia
Upgrading Of Kilala Dispensary; Staff House
Construction of a new OPD block
Department of Health Services
Completed
Ksh 3,194,400
Ukia
Chairs - Ukia Ward
Purchase of 270 chairs
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 266,900
Ukia
Social Protection Ukia
Purchase of beds and beddings
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 233,100
Ukia
Kwa Kamoli (utaati) Talent Centre
Levelling of the field
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 737,350
Ukia
Development Of Farm Ponds- Fuel
Funds used purchase fuel and repair of backhoe for farm ponds excavation. Targetting 60 farmponds per households( the project provides fuel and the farmer pays ksh3500 per hour on dry rate ) the activities is implemented during dry spell.
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 1,412,400
Ukia
Ukia Ward Bursary
Bursaries-bursary allocation- Application, Vetting, award and distribution
Department of ICT, Education and Internship
Completed
Ksh 4,000,000
Ukia
Kisyungii Ecde
Construction of one class, toilet, an office,10,000L water tank and renovation of the existing class.
Department of ICT, Education and Internship
Completed
Ksh 3,300,000
Ukia
Rerec Matching Grant (for Ukia -10 Villages In Upper Iuani Cluster)
Installation of transformers, construction and extension of HV lines, construction of distribution lv lines networks across 10 villages in upper Iuani cluster
Department of Infrastructure, Transport, Public Works, Housing and Energy
Ongoing
Ksh 3,000,000
Ukia
Construction Of Concrete Slab 40m Long Along Makuli Forest Road At Kwa Mbunga
Construction of 40M drift, 8m long culvert and150m catchwater drain
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,800,000
Ukia
Construction of road structures across Ukia sub ward
Construction of road structures
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,500,000
Ukia
Road Improvement Programme Through Installation Of Road Structures Across Kilala/iuani
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,500,000
Ukia
Construction Of Concrete Slab 30m Long Along Kavani Kituluku Dispensary Road
Construction of 30M drift and 150cm catchwater drain
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,500,000
Ukia
Installation Of 2-15 M Concrete Pole Market Lights At Ikalyoni Market And Kyau Market
Installation of 15 m concrete pole, 4No. lanterns C/W all accessories and 400W LED Fittings Market lights at Ikalyoni market and Kyau market
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,400,000
Ukia
Drilling And Equipping Borehole In Ukia Girls Secondary School
Borehole test pumping for 24 hours continuouslyWater quality analysis
Department of Water and Sanitation
Completed
Ksh 5,000,000
Ukia
Itenge Water Project
-Installation of 3KM 3” diameter Itenge rising main. Submersible pump, control panel, solarization,2.5Km Makongo, Kyambalasi, Kilolo rising main 2Km Nzouni rising main
Department of Water and Sanitation
Completed
Ksh 5,000,000
Ukia
Ithanze Water Project
2.5Km water distribution pipeline while connecting existing Ithanze Water kiosk
Department of Water and Sanitation
Completed
Ksh 3,000,000
Ukia
Kwa Kamoli Talent Center Ukia
Kwa Kamoli talent center-Construction of a modern talent center and equipping
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 1,500,000
Ukia
Sports And Youth Development Programme Ukia
Facilitation to ligi mashinani, ward league games.
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 300,000
Ukia
Pwd Support-assistive Devises Ukia
PWD support-assistive Devises-support PWDs with assorted assistive devices
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 500,000
Ukia
Supply Of 500 Chairs To Organized Groups - Ukia ward
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 500,000
Ukia
Nzouni Dispensary-construction Of Staff Quarters, Placenta Pit, Ash Pit, Electrification And Fencing
construction Of Staff Quarters, Placenta Pit, Ash Pit, Electrification And Fencing
Department of Health Services
Completed
Ksh 4,500,000
Ukia
Grading And Murraming Of Road Across Kilala/iuani - Fuel
Road grading and murraming on selected roads within the ward
Department of Infrastructure, Transport, Public Works, Housing and Energy
Ongoing
Ksh 1,500,000
Ukia
Grading And Spot Murraming Of Road Across Ukia Sub Ward
Grading and spot Murraming along 1) Kyamunyaliti
to Kyamuthei – 3.5Kms, 2) Kyamuthei
to Kyuasini - 6.7kms, 3) Kyamuthei
to Kiniu -5.9 kms, 4) Limuni
to Isuuni – 2.5 kms, 5) Signature
to Isuuni- 2.5 kms, 6) Mukuyuni
to Isuuni 3 kms, 7) Kivutini
to Ivumbuni- 5.9 kms, 8) Itangini
to Ndumbi -11 kms
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,500,000
Ukia
Supply Of Pipes And Fittings For Kilala Health Centre And Kyambiwa Water Project
Supply
of pipes and fittings for Kilala health centre and Kyambiwa water project
Department of Water and Sanitation
Under Procurement
Ksh 80,000
Ukia
Kaiti-Miting'ani water project
Solar Pumping System – solar tower-
solar panels, Rising Main from sump to Yiumo, Construction of Yiumo - Kaseveni
Gravity Line, Kwa Muumbika Pipeline extension, Construction of Yiumo-Kwa
Nyamai-Ukia Junction - Mitingani – Kwa Musuvali Pipeline, 3 No. communal water points –Iviani,
Kwa Mumbika and Kwa Musuvali, Standard Water Kiosk 3m x2.5m (3 No
- Miting'ani, kwa Nyamai and Kaseveni), Establishment of 2 Demo sites with
drip kits – Mitingani & Kaseveni, supply of 600 assorted agroforestry
tree seedling, Riparian conservation (Supply and
planting of 200 assorted riparian tree species) Supply and delivery of 50 vertical
sacks and 50 conical gardens, Capacity building on climate smart agriculture
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 11,000,000
Ukia
Makindu Fire Station
Fencing of fire station
Department of Devolution, Public Service, Public Participation and Special Programs
Completed
Ksh 300,000
Makindu
Centralized Small-scale Farming
supply of 6.048MT green grams seeds distributed to 3,024 beneficiaries
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 2,500,000
Makindu
Kiboko Town Planning
Kiboko Town Planning
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 3,320,000
Makindu
Town Planning of Thithi/simba Market
Town Planning Of Thithi/simba Market
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 1,000,000
Makindu
Machine Hire-grading Of Kwa Kasoli-kwa Nthoka Wote Road,kandengya-ndalani-junction (kisingo-ngomano Road),miangeni-kamboo Market-kamboo Health Center-kamboo Secondary-kamboo Rpimary School,ngomano-kamboo Market -kikauni,kalii Secondary Kawala Market
Bush Clearing
Road opening and grading of 24km
installation of gabions, culverts and cut off mitre drains for road run-off harvesting
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 4,900,000
Makindu
Roads Improvement Programme
Roads improvement programme within the ward using county machines Grading of Kwa kethi-kwa kisambi –kwa ngala-rombo- Makindu stock yard-kwa selu-mulili-wote road- Masalani-kalindiloni-nduluni- Kwa kijana-kwa kamanda-syusyani-kisingo-kai road- Shine star-kwa esther-kwa malungu-back to abc kai- Kwa karanja-kwa malembwa-kwa agnes-kyanda kikauni
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 490,000
Makindu
Streetlighting Kiambani Primary,secondary Schools And Makindu Town
Installation of single arm metallic pole 8.5m high , fixing of 150W integrated solar streetlights fittings
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 3,430,000
Makindu
Installation Of Flood Light Masts At Makindu Upper Market
Installation of starter bars, Installation of polygon 20m high pole, fixing of 9no. 400W fittings , Installation of manual/automatic pulleys and winches, kplc metering of the mast.
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 2,940,000
Makindu
Electrification And Fencing Of Kai Dispensary
fencing and electricity connection to the facility
Department of Health Services
Completed
Ksh 2,999,266
Makindu
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
Project Awarded more funds in FY2024/25 and redesigned. Current it's at procurement level.
Has additional funds in 2024/25.
To be implemented in FY 2024/25
Construction works stopped for re-designing and addition of funds.
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
For in house works 2 Trips Rockfilling along Nthangu –Watuka and 0.9km Road opening along Kwa Kamuya – Kaiti were done