Distribution to Kaukuswi, water kiosk, platform and 1000lt storage tank
Department of Water and Sanitation
Completed
Ksh 980,000
Nzaui/Kilili/Kalamba
Mbiuni Borehole
Drilling and Caping
Department of Water and Sanitation
Completed
Ksh 1,000,000
Nzaui/Kilili/Kalamba
Water Tanks
Supply of 5No: 1000lts Water Tanks
Department of Water and Sanitation
Completed
Ksh 1,201,499
Nzaui/Kilili/Kalamba
Kwa Moto Water Sump
Connection to power grid to the water project
Department of Water and Sanitation
Completed
Ksh 1,470,000
Nzaui/Kilili/Kalamba
Maumi Ecde
1No. ECDE Classroom
1No.lockable metallic cabinet
1No. Wooden Desk
1No. Wooden Arm Chair
Water harvesting goods (5,000Ltrs Water Tank and base)
Full Electrical Works
Display Pinned board
Branding, Publicity and Signwriting
20 No. Kiddy chairs
10 No. Kiddy tables
Play equipment - 3 piece set (double swing, slide and climbing frame)
Department of ICT, Education and Internship
Ongoing
Ksh 2,400,000
Nzaui/Kilili/Kalamba
Kanzili Borehole
Drilling and Caping
Department of Water and Sanitation
Completed
Ksh 1,500,000
Nzaui/Kilili/Kalamba
Ngaa Borehole
Drilling and Caping
Department of Water and Sanitation
Completed
Ksh 1,500,000
Nzaui/Kilili/Kalamba
Purchase Of Tanks
Purchase and supply of 3 of water tanks
Department of Health Services
Completed
Ksh 451,760
Nzaui/Kilili/Kalamba
Isololo Kwakoki Bh Pipeline Extention
Construction of isololo and kwa koki BH an pipeline extention
Department of Water and Sanitation
Completed
Ksh 5,390,000
Nzaui/Kilili/Kalamba
Ndumoni Dispensary (purchase Of Land)
Ndumoni dispensary (purchase of land)
Department of Lands, Urban Planning and Development, Environment and Climate Change
Ongoing
Ksh 200,000
Nzaui/Kilili/Kalamba
Mulata Dispensary (purchase Of Land)
Mulata dispensary (purchase of land)
Department of Lands, Urban Planning and Development, Environment and Climate Change
Ongoing
Ksh 75,000
Nzaui/Kilili/Kalamba
Transportation Of Manure (fuel)
Transportation of Manure (Fuel)
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 1,000,000
Nzaui/Kilili/Kalamba
Road Improvement Programme Through Road Opening And Grading Of Roads
14km road opening in Nzaui/Kilili/ Kalamba ward
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 4,706,086
Nzaui/Kilili/Kalamba
Supply Of Water Tanks And Piping
Supply of 10,000 liters water tanks and piping for the various water projects – Kilinga, Kisinzi, Mwanyani and Ithimani and Yanthooko water projects.
Department of Water and Sanitation
Completed
Ksh 4,000,000
Nzaui/Kilili/Kalamba
Supply Of Water Tanks And Distribution Pipes For Mandela, Kweleli, Syaolwe, Kwa Moto And Isololo Water Project
Supply of Water tanks and distribution pipes mandela, Kweleli, Syaolwe, Kwa Moto and Isololo water project
Department of Water and Sanitation
Completed
Ksh 4,000,000
Nzaui/Kilili/Kalamba
Nzaui/kilili/kalamba Ward Bursary
Bursary allocation – Application, Vetting, award and distribution
Department of ICT, Education and Internship
Completed
Ksh 7,000,000
Nzaui/Kilili/Kalamba
Kwa Kalui Ecde
Construction of one classroom
Department of ICT, Education and Internship
Completed
Ksh 2,400,000
Nzaui/Kilili/Kalamba
Maatha Ecde
Construction of one classroom
Department of ICT, Education and Internship
Completed
Ksh 2,400,000
Nzaui/Kilili/Kalamba
Kalamba Ecde
Construction of one classroom
Department of ICT, Education and Internship
Ongoing
Ksh 1,200,000
Nzaui/Kilili/Kalamba
Tents And Chairs To Five Groups-nzaui/kilili/kalamba
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 1,250,000
Nzaui/Kilili/Kalamba
Sports And Youth Development Programme -nzaui/kilili/kalamba
Facilitation for ligi mashinani/ cash awards
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 405,000
Nzaui/Kilili/Kalamba
Youth Ujuzi Teketeke-nzaui/kilili/kalamba
Driving course training
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 850,000
Nzaui/Kilili/Kalamba
Pwd Support-assistive Devices -support Pwds With Assorted Assistive Devices Nzaui/kilili/kalamba
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 500,000
Nzaui/Kilili/Kalamba
Surgical Implants
Department of Health Services
Completed
Ksh 2,000,000
Nzaui/Kilili/Kalamba
Planting Of Trees -climate Change Fund
Planting of trees -Climate change fund
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 700,000
Nzaui/Kilili/Kalamba
Rehabilitation Of Mandela Sump And Muthini Borehole
Mobilization and demobilization to and from site, servicing of sub mersile pump, replacement of 3 phase sub motor, Rehabilitation of pumping set and plumping works, installation of electrical works
Department of Water and Sanitation
Completed
Ksh 609,736
Nzaui/Kilili/Kalamba
Support To Women Groups - Nzui/kilili/kalamba
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 500,000
Nzaui/Kilili/Kalamba
Issuance Of Birth Certificates
Facilitation for issuance of birth certificates
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 200,000
Nzaui/Kilili/Kalamba
Support To Groups-chairs And Tents (nzaui Region, Catholic Parish Matiliku, Ndumoni Welfare, Kikui Welfare, Tuwaa Welfare, Yimwaa Welfare, New Nzaui Welfare, Kawala Welfare-nzaui, Kiluluini Welfare And Yiuma Welfare
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 1,250,000
Nzaui/Kilili/Kalamba
Kwa Moto Electrical And Rehabilitation Works
Rehabilitation of pumping set and plumbing works , installation of electrical works
Department of Water and Sanitation
Completed
Ksh 3,787,578
Nzaui/Kilili/Kalamba
Rehabilitation Of Kalima Sump
Rehabilitation of kalima sump
Department of Water and Sanitation
Completed
Ksh 609,737
Nzaui/Kilili/Kalamba
Matiliku Sub County Hospital Portable Xray
Purchase and installation of portable AI Supported XRAY Machine
Department of Health Services
Completed
Ksh 8,000,000
Nzaui/Kilili/Kalamba
Rehabilitation Of Market Lighting (mulika Mwizi) And Street Lightings
Rehabilitation of market lighting (Mulika Mwizi) and street lightings
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 200,000
Nzaui/Kilili/Kalamba
Support To Women Groups - Nzaui/kilili/klamba
Provision of catering items
Department of Gender, Children, Youth, Sports and Social Services
Ongoing
Ksh 500,000
Nzaui/Kilili/Kalamba
Tree Planting
Tree growing at Masue,Mwambwani Hill forests and along Mutiswa river
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 1,000,000
Mbitini
Mechanical Road Opening And Widening
Mechanical road opening and widening of Kavuthu- A.I.C Kiioi road 5.5km and Kwa Vutu- Yumbani road 6.7Km
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 2,970,000
Mbitini
Masokani Ctti & Kithumani Ctti - Water Tanks
Installation of gutters and water tanks
Department of ICT, Education and Internship
Completed
Ksh 1,470,000
Mbitini
Kavuthu Coldroom
Operationalization of post harvest facility (cold room pack house) at Kavuthu in Mbitini ward
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 100,000
Mbitini
Kithumani- Mbalani-Katundu Drift
culverts installation and spot gravelling of Kithumani- Mbalani- Katundu Drift
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 3,920,000
Mbitini
Kyumbuni Ecde
2No. ECDE Classrooms with an office and Store
3-Door Pit Latrine with Urinal
Electrical Works (conduits only)
Water harvesting goods (5,000Ltrs Water Tank and base)
Display Pinned board
Branding, Publicity and Signwriting
2No. Black Board
Department of ICT, Education and Internship
Completed
Ksh 3,430,000
Mbitini
Kwa Kitei Drift
Kwa Kitei Drift -Construction of 35m drift and protection works
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 3,430,000
Mbitini
Grain And Pulse Value Chain Development
Grain and pulse value chain development- 2.112MT maize, 3.05MT beans, distributed to 2,581 beneficiaries
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 2,000,000
Mbitini
Upgrading Of Mbitini Dispensary
completion of the OPD block
Department of Health Services
Completed
Ksh 3,000,000
Mbitini
Muambwani ECDE
Construction of 2 No.classrooms and a 3 door pit latrine
Department of ICT, Education and Internship
Completed
Ksh 3,500,000
Mbitini
Ward Motorcycle
Purchase of motorcycle
Department of Water and Sanitation
Completed
Ksh 276,600
Mbitini
Mbitini Borehole
HGS, Drilling
Department of Water and Sanitation
Completed
Ksh 1,360,000
Mbitini
Ilengeni Water Project
Intake and treatment works, pumping systems, pipeline, water points and storage
Department of Water and Sanitation
Completed
Ksh 6,870,000
Mbitini
Yuuni Ecde
Construction of 2 No. classroom and 3 door pit latrine
Department of ICT, Education and Internship
Completed
Ksh 1,255,660
Mbitini
Issuance Of Certified Maize Seeds
Issuance of certified Maize seeds only, DK
8031
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 4,000,000
Mbitini
Installation Of Highmast Floodlight At Mutyambua Market
Installation of 20M high mast floodlight with 6No. 400W LED fittings
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 2,000,000
Mbitini
Road Improvement Programme In Mbitini Ward
Mulala-Kithumani-Mungyani-Kasikeu 21Masokani CTTI-Mbuvuni Pri 3.2Mwanyani-Mbukuni 1.3Kithembeoni-Mungyani Coffee Factory 1.2Katundu-Nthunguni 1.3
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,000,000
Mbitini
Distribution Of Ilengeni Water
Feasibility survey, survey and design, construction of distribution pipeline to Masue, Construction of water kiosk, installation of 10,000 m3 plastic tank
Department of Water and Sanitation
Completed
Ksh 2,000,000
Mbitini
Mbitini Ward Bursary
Bursary allocation – Application , Vetting, award and distribution
Department of ICT, Education and Internship
Completed
Ksh 4,000,000
Mbitini
Ngoto Ecde
Construction of 2no. ECDE Classrooms with an office; Electrical Works; Shelving to the stores; 2No. Wooden Desks; 2No. Wooden Arm Chairs; Water harvesting goods (10,000Ltrs Water Tank and base); 40 No. Kiddy chairs and 20. No. Kiddy tables; Play equipment 4 piece set (double swing, slide, climbing frame and double seesaw); Display soft Pin board, White Board & Mark-Pens and ; Branding, Publicity and Signwriting
Department of ICT, Education and Internship
Completed
Ksh 3,600,000
Mbitini
Kavuthu Ecde
Construction of 2no. ECDE Classrooms with an office; Electrical Works; Shelving to the stores; Water harvesting goods (10,000Ltrs Water Tank and base); 40 No. Kiddy chairs and 20. No. Kiddy tables; Play equipment 4 piece set (double swing, slide, climbing frame and double see-saw); Display soft Pin board, White Board & Mark Pens and Branding, Publicity and Signwriting
Department of ICT, Education and Internship
Completed
Ksh 3,600,000
Mbitini
Mbeletu Playground -levelling And Protection Works-mbitini Ward
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 4,000,000
Mbitini
Purchase Of Chairs And Tents-mbitini Ward
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 3,000,000
Mbitini
Sports And Youth Development Programme -mbitini
Facilitation for ligi mashinani
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 450,000
Mbitini
Pwd Support-assistive Devices -support Pwds With Assorted Assistive Devices Mbitini
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 500,000
Mbitini
Fencing Of Mutyambua Health Center
chainlink fence
Department of Health Services
Completed
Ksh 1,000,000
Mbitini
Rehabilitation And Extension Of Mbuthani Water Project And Kwo Thuku Works
Mobilization and demobilization of plant, equipment and personnel for satisfactory execution of the works , intake works and rehabilitation of existing distribution line , Rising main pipeline to Masue village 1000M, Construction of tank platform and supply of 10m3 plastic water tank at Kwa Musembi, construction of a communal water point
Department of Water and Sanitation
Completed
Ksh 1,500,000
Mbitini
Pa System- Mbitini Ward
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 1,000,000
Mbitini
Pa System- Emali/mulala Ward
Purchase and delivery of PA System to organized groups
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 1,000,000
Mbitini
Mbuthani Water Sump
construction of Rc sump, upgrading of pumping system rehabilitation
Department of Water and Sanitation
Completed
Ksh 3,796,770
Mbitini
Road Maintenance in Mbitini ward– (fuel)
Road grading and murraming on selected roads within the ward
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 986,944
Mbitini
Opening Of Roads Kithumani – Muamani Road
Road opening, grading along Kithumani- Muamani road
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 2,000,000
Mbitini
Road Improvement - in Mbitini ward through NYS
Road grading and murraming on selected roads within the ward
Kyemundu
sub - ward
Mulala-Kithumani-Mungyani-Kasikeu
21
Masokani
CTTI-Mbuvuni Pri
3.2
Mwanyani-Mbukuni
1.3
Kithembeoni-Mungyani
Coffee Factory
1.2
Katundu-Nthunguni
1.3
Mumbwani-Mbalani
2.6
Musambweni-Yumbani-Kitulani
4.1
Kwa
Mutula-Mbeletu Ngongo
3
Mbeletu
Sec Sch Rd
2.1
Mutyambua
sub - ward
1.
Mutula-Kwa Uthuku
1.2
2.
Kivuani-Mutanda
1
3.Mutyambua-Mukameni-Kyumbuni-Muani
River
9.7
4.
Kathekani Primary play ground
5.
Serena Williams Junction-Manooni
3.8
55.5
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,446,336
Mbitini
Mbulutini Drift- Construction Of A Drift
Construction of a 100m drift, 40pcs Gabion installation 400m cut off drains for road harvestingInstallation of a concrete markpost
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 12,500,000
Mbitini
Kwa Kathoka Town Planning
Planning of Kwa Kathoka Town
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 1,000,000
Kikumini/Muvau
Road Improvements
Light grading on various roads across the ward :- Furaha -Kwa mutune- Mangauni -Kiaoni -Kwa nzivu - Kwa Nyumba (14.2km), Kwa Mutevu- Kona- west Ngosini- Kari central - Makutano road 13.2km), Kwa Nguta -Catholiic church (6.km), Kyemwole- Kwa Matolo- Muvau- Kyusyani -Kavuliloni- Mwilu (17.2km), Ngunu-Itaa 14.3Km, Fiveten- kwa niko-Nzaai(10.5km), Kangondi-Kitonyini-Mwilu(4.7km)
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 4,900,000
Kikumini/Muvau
Agricultural Training Institute - Kwa Kathoka
Funds intent to for Implementation of damliner, shednet, poultry drinkers, poultry feeders, green house, payment of casuals inter connection and purchase of projectors
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 6,898,299
Kikumini/Muvau
Kambi Mawe Ecde
1No. ECDE Classroom with an office and Store
1No. Wooden Desk
1No. Wooden Arm Chair
Water harvesting goods (5,000Ltrs Water Tank and base)
Electrical Works (conduits only)
Display Pinned board
20 No. Kiddy chairs
10 No. Kiddy tables
Branding, Publicity and Signwriting
1 No. whiteboard
1No. blackboard
2 No. duster
10 No. Mark pens
Shelves
Department of ICT, Education and Internship
Completed
Ksh 1,960,000
Kikumini/Muvau
Kikumini Model Health Center
Construction of new Outpatient block
Department of Health Services
Completed
Ksh 4,585,142
Kikumini/Muvau
Kwa Kateli Drift
Kwa Kateli Drift- Construction of a 35m drift, Gabion installation and cut off drains for road harvesting
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 2,940,000
Kikumini/Muvau
Kwa Kisoi Gulley
Kwa Kisoi Gulley - Construction of culverts and scour checks
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,470,000
Kikumini/Muvau
Kwa Mulinge Drift
Kwa Mulinge drift- construction of a drift, culverts, installation of gabions and excavation of roads for water structures
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,470,000
Kikumini/Muvau
Kimuumo Ecde
1No. ECDE Classroom with an office and Store
1No.lockable metallic cabinet
1No. Wooden Desk
1No. Wooden Arm Chair
Water harvesting goods (5,000Ltrs Water Tank and base)
Electrical Works (conduits only)
Display Pinned board
20 No. Kiddy chairs
10 No. Kiddy tables
Branding, Publicity and Signwriting
1No. whiteboard
1No. blackboard
2 No. duster
10 No. Mark pens
Shelves
Department of ICT, Education and Internship
Completed
Ksh 1,960,000
Kikumini/Muvau
Kwa Mwenga Culverts
Construction of culverts and scour checks
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,470,000
Kikumini/Muvau
Green Grams Value Chain Addition
Provision of certified green grams seeds to farmers
Department of Agriculture, Livestock, Fisheries & Cooperative Development
Completed
Ksh 1,500,000
Kikumini/Muvau
Demarcation Of Riparian Land Within Ndukuma
Community sensitization
Tree planting and grass reseeding
Demarcation of the reparian to be done by Water Resource Authority(WRA)
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 730,113
Kikumini/Muvau
Climate Change Intiative
Purchase and supply of tree nursery operations and management tools and equipment
Department of Lands, Urban Planning and Development, Environment and Climate Change
Completed
Ksh 1,000,000
Kikumini/Muvau
Kwa Kathoka Community Borehole
Drilling of Kwa Kathoka Community Borehole
Department of Water and Sanitation
Completed
Ksh 90,000
Kikumini/Muvau
Kwa Mutemwa Borehole
Drilling and development of borehole
Department of Water and Sanitation
Completed
Ksh 3,920,000
Kikumini/Muvau
Road Improvement
Grading of Road -Furaha-Kwa Mutune-Mangauni-Kiaoni-Kwa Nzivu –Kwa Kyumba -14.2Km,Kwa Mutevu-Kona-West Ngosini—Kari Central –Makutano road, Kwa Nguta-Catholic Church -6.0Km4. Kyemwole-Kwa Matolo-Muvau-Kyusyani-Kavuliloni -17.2Km5. Ngunu-T.Ten-Kaseve-Ndukuma-Itaa -14.3Km6. Five Ten –Beach –Kwa Niko –Nzaai -10.5 Km7. Kangondi-Kitonyoni-Mwilu-4.7Km
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 1,000,000
Kikumini/Muvau
Ndukuma Ecde
1No. ECDE Classroom with an office and Store
1No.lockable metallic cabinet
1No. Wooden Desk
1No. Wooden Arm Chair
Water harvesting goods (5,000Ltrs Water Tank and base)
Electrical Works (conduits only)
Display Pinned board
20 No. Kiddy chairs
10 No. Kiddy tables
Branding, Publicity and Signwriting
1No. whiteboard
1No. blackboard
2 No. duster
10 No. Mark pens
Shelves
Department of ICT, Education and Internship
Completed
Ksh 1,960,000
Kikumini/Muvau
Kwa Malombe Earth Dam
Department of Water and Sanitation
Completed
Ksh 1,982,000
Kikumini/Muvau
Thwake Sand Dam
Raising the Weir, Pipeline extension to Kwakathoka market and connection to existing line from Kwakathoka to Kyemule
Department of Water and Sanitation
Ongoing
Ksh 9,212,000
Kikumini/Muvau
Routine Maintenance Of Muvau/kikumini Ward Access Roads
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 5,500,000
Kikumini/Muvau
Road Improvement Programme - Kikumini/muvau Ward
Road opening and light grading on selected roads across the ward
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 3,500,000
Kikumini/Muvau
Installation Of Road Structures in Muvau/ Kikumini ward
construction of drainage structures (gabions and culverts)
Department of Infrastructure, Transport, Public Works, Housing and Energy
Completed
Ksh 4,000,000
Kikumini/Muvau
Rehabilitation Of Kikumini Borehole
Solarization, elevation tank, Rehabilitation of pipeline from source to Kona Baridi, Kari, Central and Kikumini Market.
Department of Water and Sanitation
Completed
Ksh 5,500,000
Kikumini/Muvau
Desilting Of Kwa Muia Earth Dam
De silting of the Dam
Department of Water and Sanitation
Completed
Ksh 3,000,000
Kikumini/Muvau
Installation Of Pumping Unit,flashing Of Kwa Mwenga Borehole
Mobilization and demobilization of plant, machinery, equipment and personnel for satisfactory execution of works, borehole flashing using county rig, replacement of submersible pump, rehabilitation of of water supply networks, supply of 10cm3 plastic tank, construction of borehole chamber
Department of Water and Sanitation
Completed
Ksh 1,000,000
Kikumini/Muvau
Feasibility Study For Distribution Of Ndukuma Earthdam
- Feasibility study for distribution water, draw off system (siphon system); Connect with existing pipeline kwa phillip to kyemole; Conservation of water ways; rehabilitation of existing pipeline to the existing tanks and Pegging of the dam area
Department of Water and Sanitation
Completed
Ksh 15,000,000
Kikumini/Muvau
Distribution Of Water From Itaa Borehole To Kwa Kiviku
General items and preliminaries , water connection to Kwa Mutunga water kiosk
Department of Water and Sanitation
Completed
Ksh 1,000,000
Kikumini/Muvau
Kikumini/muvau Bursary
Bursary allocation – Application , Vetting, award and distribution
Department of ICT, Education and Internship
Completed
Ksh 3,000,000
Kikumini/Muvau
Kithoni Ecde Centre
Construction of one classroom
Department of ICT, Education and Internship
Completed
Ksh 2,500,000
Kikumini/Muvau
Sports And Youth Development Programme -kikumini/muvau
Facilitation for Ligi mashinani/ cash awards
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 300,000
Kikumini/Muvau
Pwd Support-assistive Devices -support Pwds With Assorted Assistive Devices Kikumini/muvau
Department of Gender, Children, Youth, Sports and Social Services
Completed
Ksh 500,000
Kikumini/Muvau
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
Done waiting inspection
Project Awarded more funds in FY2024/25 and redesigned. Current it's at procurement level.
Has additional funds in 2024/25.
To be implemented in FY 2024/25
Construction works stopped for re-designing and addition of funds.
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
No remarks available
Fill All Required Fields
Project Remarks
For in house works 2 Trips Rockfilling along Nthangu –Watuka and 0.9km Road opening along Kwa Kamuya – Kaiti were done