All Projects In FY 2025/2026

Go Back

Project Scope Department Status Budget Ward Action
Tree Planting
  • Tree growing at Masue,Mwambwani Hill forests and along Mutiswa river 
Department of Lands, Urban Planning and Development, Environment and Climate Change Completed Ksh 1,000,000 Mbitini
Mechanical Road Opening And Widening Mechanical road opening and widening of Kavuthu- A.I.C Kiioi road 5.5km and Kwa Vutu- Yumbani road 6.7Km Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 2,970,000 Mbitini
Masokani Ctti & Kithumani Ctti - Water Tanks Installation of gutters and water tanks Department of ICT, Education and Internship Completed Ksh 1,470,000 Mbitini
Kavuthu Coldroom  Operationalization of post harvest facility (cold room pack house) at Kavuthu  in Mbitini ward Department of Agriculture, Livestock, Fisheries & Cooperative Development Completed Ksh 100,000 Mbitini
Kithumani- Mbalani-Katundu Drift culverts installation and spot gravelling of Kithumani- Mbalani- Katundu Drift Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 3,920,000 Mbitini
Kyumbuni Ecde
  • 2No. ECDE Classrooms with an office and Store
  • 3-Door Pit Latrine with Urinal
  • Electrical Works (conduits only)
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  • Display Pinned board
  • Branding, Publicity and Signwriting
  • 2No. Black Board
Department of ICT, Education and Internship Completed Ksh 3,430,000 Mbitini
Kwa Kitei Drift Kwa Kitei Drift -Construction of 35m drift and protection works Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 3,430,000 Mbitini
Grain And Pulse Value Chain Development Grain and pulse value chain development- 2.112MT maize, 3.05MT beans, distributed to 2,581 beneficiaries Department of Agriculture, Livestock, Fisheries & Cooperative Development Completed Ksh 2,000,000 Mbitini
Upgrading Of Mbitini Dispensary completion of the OPD block Department of Health Services Completed Ksh 3,000,000 Mbitini
Muambwani ECDE Construction of 2 No.classrooms and a 3 door pit latrine Department of ICT, Education and Internship Completed Ksh 3,500,000 Mbitini
Ward Motorcycle Purchase of motorcycle Department of Water and Sanitation Completed Ksh 276,600 Mbitini
Mbitini Borehole HGS, Drilling Department of Water and Sanitation Completed Ksh 1,360,000 Mbitini
Ilengeni Water Project Intake and treatment works, pumping systems, pipeline, water points and storage Department of Water and Sanitation Completed Ksh 6,870,000 Mbitini
Yuuni Ecde Construction of 2 No. classroom and 3 door pit latrine Department of ICT, Education and Internship Completed Ksh 1,255,660 Mbitini
Issuance Of Certified Maize Seeds  Issuance of certified Maize seeds only, DK 8031  Department of Agriculture, Livestock, Fisheries & Cooperative Development Completed Ksh 4,000,000 Mbitini
Installation Of Highmast Floodlight At Mutyambua Market Installation of 20M high mast floodlight with 6No. 400W LED fittings Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 2,000,000 Mbitini
Road Improvement Programme In Mbitini Ward Mulala-Kithumani-Mungyani-Kasikeu 21Masokani CTTI-Mbuvuni Pri 3.2Mwanyani-Mbukuni 1.3Kithembeoni-Mungyani Coffee Factory 1.2Katundu-Nthunguni 1.3 Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 1,000,000 Mbitini
Distribution Of Ilengeni Water Feasibility survey, survey and design, construction of distribution pipeline to Masue, Construction of water kiosk, installation of 10,000 m3 plastic tank Department of Water and Sanitation Completed Ksh 2,000,000 Mbitini
Mbitini Ward Bursary Bursary allocation – Application , Vetting, award and distribution Department of ICT, Education and Internship Completed Ksh 4,000,000 Mbitini
Ngoto Ecde Construction of 2no. ECDE Classrooms with an office; Electrical Works; Shelving to the stores; 2No. Wooden Desks; 2No. Wooden Arm Chairs; Water harvesting goods (10,000Ltrs Water Tank and base); 40 No. Kiddy chairs and 20. No. Kiddy tables; Play equipment 4 piece set (double swing, slide, climbing frame and double seesaw); Display soft Pin board, White Board & Mark-Pens and ; Branding, Publicity and Signwriting Department of ICT, Education and Internship Completed Ksh 3,600,000 Mbitini
Kavuthu Ecde Construction of 2no. ECDE Classrooms with an office; Electrical Works; Shelving to the stores; Water harvesting goods (10,000Ltrs Water Tank and base); 40 No. Kiddy chairs and 20. No. Kiddy tables; Play equipment 4 piece set (double swing, slide, climbing frame and double see-saw); Display soft Pin board, White Board & Mark Pens and Branding, Publicity and Signwriting Department of ICT, Education and Internship Completed Ksh 3,600,000 Mbitini
Mbeletu Playground -levelling And Protection Works-mbitini Ward Department of Gender, Children, Youth, Sports and Social Services Completed Ksh 4,000,000 Mbitini
Purchase Of Chairs And Tents-mbitini Ward Department of Gender, Children, Youth, Sports and Social Services Completed Ksh 3,000,000 Mbitini
Sports And Youth Development Programme -mbitini Facilitation for ligi mashinani Department of Gender, Children, Youth, Sports and Social Services Completed Ksh 450,000 Mbitini
Pwd Support-assistive Devices -support Pwds With Assorted Assistive Devices Mbitini Department of Gender, Children, Youth, Sports and Social Services Completed Ksh 500,000 Mbitini
Fencing Of Mutyambua Health Center chainlink fence Department of Health Services Ongoing Ksh 1,000,000 Mbitini
Rehabilitation And Extension Of Mbuthani Water Project And Kwo Thuku Works Mobilization and demobilization of plant, equipment and personnel for satisfactory execution of the works , intake works and rehabilitation  of existing distribution line , Rising main pipeline to Masue village 1000M, Construction of tank platform and supply of 10m3 plastic water tank at Kwa Musembi, construction of a communal water point Department of Water and Sanitation Completed Ksh 1,500,000 Mbitini
Pa System- Mbitini Ward Department of Gender, Children, Youth, Sports and Social Services Completed Ksh 1,000,000 Mbitini
Pa System- Emali/mulala Ward Purchase and delivery of PA System to organized groups Department of Gender, Children, Youth, Sports and Social Services Completed Ksh 1,000,000 Mbitini
Mbuthani Water Sump construction of Rc sump,  upgrading of  pumping system rehabilitation Department of Water and Sanitation Completed Ksh 3,796,770 Mbitini
Road Maintenance in Mbitini ward– (fuel) Road grading and murraming on selected roads within the ward Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 986,944 Mbitini
Opening Of Roads Kithumani – Muamani Road Road opening, grading along Kithumani- Muamani road Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 2,000,000 Mbitini
Road Improvement - in Mbitini ward through NYS Road grading and murraming on selected roads within the ward  Kyemundu sub - ward   Mulala-Kithumani-Mungyani-Kasikeu 21 Masokani CTTI-Mbuvuni Pri 3.2 Mwanyani-Mbukuni 1.3 Kithembeoni-Mungyani Coffee Factory 1.2 Katundu-Nthunguni 1.3 Mumbwani-Mbalani 2.6 Musambweni-Yumbani-Kitulani 4.1 Kwa Mutula-Mbeletu Ngongo 3 Mbeletu Sec Sch Rd 2.1 Mutyambua sub - ward   1. Mutula-Kwa Uthuku 1.2 2. Kivuani-Mutanda 1 3.Mutyambua-Mukameni-Kyumbuni-Muani River 9.7 4. Kathekani Primary play ground   5. Serena Williams Junction-Manooni 3.8   55.5 Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 1,446,336 Mbitini
Mbulutini Drift- Construction Of A Drift Construction of a 100m drift, 40pcs Gabion installation 400m cut off drains for road harvestingInstallation of a concrete markpost Department of Infrastructure, Transport, Public Works, Housing and Energy Ongoing Ksh 12,500,000 Mbitini
Kwa Kathoka Town Planning
  • Planning of Kwa Kathoka Town 
Department of Lands, Urban Planning and Development, Environment and Climate Change Completed Ksh 1,000,000 Kikumini/Muvau
Road Improvements Light grading on various roads across the ward :- Furaha -Kwa mutune- Mangauni -Kiaoni -Kwa nzivu - Kwa Nyumba (14.2km), Kwa Mutevu- Kona- west Ngosini- Kari central - Makutano road 13.2km), Kwa Nguta -Catholiic church (6.km), Kyemwole- Kwa Matolo- Muvau- Kyusyani -Kavuliloni- Mwilu (17.2km), Ngunu-Itaa 14.3Km, Fiveten- kwa niko-Nzaai(10.5km), Kangondi-Kitonyini-Mwilu(4.7km) Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 4,900,000 Kikumini/Muvau
Agricultural Training Institute - Kwa Kathoka  Funds intent to for Implementation of damliner, shednet, poultry drinkers, poultry feeders, green house, payment of casuals inter connection and purchase of projectors Department of Agriculture, Livestock, Fisheries & Cooperative Development Completed Ksh 6,898,299 Kikumini/Muvau
Kambi Mawe Ecde
  • 1No. ECDE Classroom with an office and Store
  • 1No. Wooden Desk
  • 1No. Wooden Arm Chair
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  • Electrical Works (conduits only)
  • Display Pinned board
  • 20 No. Kiddy chairs
  • 10 No. Kiddy tables
  • Branding, Publicity and Signwriting
  • 1 No. whiteboard
  • 1No. blackboard
  • 2 No. duster
  • 10 No. Mark pens
  • Shelves
Department of ICT, Education and Internship Completed Ksh 1,960,000 Kikumini/Muvau
Kikumini Model Health Center Construction of new Outpatient block Department of Health Services Completed Ksh 4,585,142 Kikumini/Muvau
Kwa Kateli Drift Kwa Kateli Drift- Construction of a 35m drift, Gabion installation and cut off drains for road harvesting  Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 2,940,000 Kikumini/Muvau
Kwa Kisoi Gulley Kwa Kisoi Gulley - Construction of culverts  and scour checks Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 1,470,000 Kikumini/Muvau
Kwa Mulinge Drift Kwa Mulinge drift- construction of a drift, culverts, installation of gabions and excavation of roads for water structures Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 1,470,000 Kikumini/Muvau
Kwa Mwenga Culverts Construction of culverts and scour checks  Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 1,470,000 Kikumini/Muvau
Kimuumo Ecde
  • 1No. ECDE Classroom with an office and Store
  • 1No.lockable metallic cabinet
  • 1No. Wooden Desk
  • 1No. Wooden Arm Chair
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  • Electrical Works (conduits only)
  • Display Pinned board
  • 20 No. Kiddy chairs
  • 10 No. Kiddy tables
  • Branding, Publicity and Signwriting
  • 1No. whiteboard
  • 1No. blackboard
  • 2 No. duster
  • 10 No. Mark pens
  • Shelves
Department of ICT, Education and Internship Completed Ksh 1,960,000 Kikumini/Muvau
Green Grams Value Chain Addition Provision of certified green grams seeds to farmers  Department of Agriculture, Livestock, Fisheries & Cooperative Development Completed Ksh 1,500,000 Kikumini/Muvau
Demarcation Of Riparian Land Within Ndukuma
  • Community sensitization
  • Tree planting and grass reseeding
  • Demarcation of the reparian to be done by Water Resource Authority(WRA) 
Department of Lands, Urban Planning and Development, Environment and Climate Change Completed Ksh 730,113 Kikumini/Muvau
Climate Change Intiative
  • Purchase and supply of tree nursery operations and management tools and equipment 
Department of Lands, Urban Planning and Development, Environment and Climate Change Completed Ksh 1,000,000 Kikumini/Muvau
Kwa Kathoka Community Borehole   Drilling of Kwa Kathoka Community Borehole Department of Water and Sanitation Completed Ksh 90,000 Kikumini/Muvau
Kwa Mutemwa Borehole Drilling and development of borehole Department of Water and Sanitation Completed Ksh 3,920,000 Kikumini/Muvau
Road Improvement Grading of Road -Furaha-Kwa Mutune-Mangauni-Kiaoni-Kwa Nzivu –Kwa Kyumba -14.2Km,Kwa Mutevu-Kona-West Ngosini—Kari Central –Makutano road, Kwa Nguta-Catholic Church -6.0Km4. Kyemwole-Kwa Matolo-Muvau-Kyusyani-Kavuliloni -17.2Km5. Ngunu-T.Ten-Kaseve-Ndukuma-Itaa -14.3Km6. Five Ten –Beach –Kwa Niko –Nzaai -10.5 Km7. Kangondi-Kitonyoni-Mwilu-4.7Km Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 1,000,000 Kikumini/Muvau
Kwa Malombe Earth Dam Department of Water and Sanitation Completed Ksh 1,982,000 Kikumini/Muvau
Ndukuma Ecde
  • 1No. ECDE Classroom with an office and Store
  • 1No.lockable metallic cabinet
  • 1No. Wooden Desk
  • 1No. Wooden Arm Chair
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  • Electrical Works (conduits only)
  • Display Pinned board
  • 20 No. Kiddy chairs
  • 10 No. Kiddy tables
  • Branding, Publicity and Signwriting
  • 1No. whiteboard
  • 1No. blackboard
  • 2 No. duster
  • 10 No. Mark pens
  • Shelves
Department of ICT, Education and Internship Completed Ksh 1,960,000 Kikumini/Muvau
Thwake Sand Dam Raising the Weir, Pipeline extension to Kwakathoka market and connection to existing line from Kwakathoka to Kyemule Department of Water and Sanitation Ongoing Ksh 9,212,000 Kikumini/Muvau
Routine Maintenance Of Muvau/kikumini Ward Access Roads Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 5,500,000 Kikumini/Muvau
Road Improvement Programme - Kikumini/muvau Ward Road opening and light grading on selected roads across the ward Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 3,500,000 Kikumini/Muvau
Installation Of Road Structures in Muvau/ Kikumini ward construction of drainage structures (gabions and culverts) Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 4,000,000 Kikumini/Muvau
Rehabilitation Of Kikumini Borehole Solarization, elevation tank, Rehabilitation of pipeline from source to Kona Baridi, Kari, Central and Kikumini Market. Department of Water and Sanitation Completed Ksh 5,500,000 Kikumini/Muvau
Desilting Of Kwa Muia Earth Dam De silting of the Dam  Department of Water and Sanitation Completed Ksh 3,000,000 Kikumini/Muvau
Installation Of Pumping Unit,flashing Of Kwa Mwenga Borehole Mobilization and demobilization of plant, machinery, equipment and personnel for  satisfactory execution of works, borehole flashing using county rig, replacement of submersible pump, rehabilitation of of water supply networks, supply of 10cm3 plastic tank, construction of borehole chamber Department of Water and Sanitation Completed Ksh 1,000,000 Kikumini/Muvau
Feasibility Study For Distribution Of Ndukuma Earthdam - Feasibility study for distribution water, draw off system (siphon system); Connect with existing pipeline kwa phillip to kyemole; Conservation of water ways; rehabilitation of existing pipeline to the existing tanks and Pegging of the dam area Department of Water and Sanitation Completed Ksh 15,000,000 Kikumini/Muvau
Distribution Of Water From Itaa Borehole To Kwa Kiviku General items and preliminaries , water connection to Kwa Mutunga water kiosk Department of Water and Sanitation Completed Ksh 1,000,000 Kikumini/Muvau
Kikumini/muvau Bursary Bursary allocation – Application , Vetting, award and distribution Department of ICT, Education and Internship Completed Ksh 3,000,000 Kikumini/Muvau
Kithoni Ecde Centre Construction of one classroom Department of ICT, Education and Internship Completed Ksh 2,500,000 Kikumini/Muvau
Sports And Youth Development Programme -kikumini/muvau Facilitation for Ligi mashinani/ cash awards Department of Gender, Children, Youth, Sports and Social Services Completed Ksh 300,000 Kikumini/Muvau
Pwd Support-assistive Devices -support Pwds With Assorted Assistive Devices Kikumini/muvau Department of Gender, Children, Youth, Sports and Social Services Ongoing Ksh 500,000 Kikumini/Muvau
Equiping And Distribution Of Kwa Mutemwa Borehole Mobilisation and demobilisation of  plant, equipment and personnel for satisfactory satisfaction of works , equipping of the boreholeInstallation of solar powerConstruction of Rising mainConstruction of 50m3 masonry tankConstruction of borehole chamber and valve chambers Department of Water and Sanitation Completed Ksh 6,450,805 Kikumini/Muvau
Thwake Sump and Distribution Line Construction of 100cm3 reinforced concrete sump tank, pipeline connection 2050M, construction of 48M3 HOT DIP galvanized steel elevated  water tank , Raising of sand dam well Department of Water and Sanitation Completed Ksh 9,172,000 Kikumini/Muvau
Construction Of A Keywall Along Ngomeni Road Construction of a keywall along Ngomeni road Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 500,000 Kikumini/Muvau
Erection Of A Perimeter Wall At Kingutheni
  • Chainlink fencing
  • Construction of gate
  • Gatehouse construction
Department of Lands, Urban Planning and Development, Environment and Climate Change Under Procurement Ksh 1,541,500 Kikumini/Muvau
Desilting, Expansion, Construction Of Treatment Works Of Ndukuma Earth Dam And Extension To Wote Town - Phase 1 Desilting, Expansion, construction of treatment works of Ndukuma Earth Dam and extension to Wote town - phase 1 Department of Water and Sanitation Completed Ksh 45,509,592 Kikumini/Muvau
Purchase Of A Backhoe Purchase of a Backhoe Department of Water and Sanitation Completed Ksh 14,960,000 Kathonzweni
Market Survey, Preparation of Deed Plan and issuance of Leasehold Title Deeds, Lims and opening of roads of Kathonzweni Market Plans
  • Market survey 
  • Preparation of perimeter survey
  • Issuance of leasehold title deeds 
Department of Lands, Urban Planning and Development, Environment and Climate Change Completed Ksh 7,700,000 Kathonzweni
Kathonzweni Dairy water connection(piping contract terminated ) payment of electricity bills. procurement of pastueriser and  water purification & softening machine advertised. Department of Agriculture, Livestock, Fisheries & Cooperative Development Completed Ksh 9,500,000 Kathonzweni
Kiangi Youth Empowerment Centre Phase 1: construction of 2 No classrooms, office and reception Phase 2: Construction of a lecture room and 2 door pit latrine Department of ICT, Education and Internship Completed Ksh 4,910,388 Kathonzweni
Kathonzweni Ctti - Pit Latrine Construction of a pit latrine Department of ICT, Education and Internship Completed Ksh 980,000 Kathonzweni
Itumbule Dispensary – Fencing, Wiring, And Construction Of Soak Pit, Ash Pit And Incinerator At Itumbule Dispensary.  Fencing, wiring, and construction of soak pit, ash pit and incinerator at Itumbule Dispensary.  Department of Health Services Completed Ksh 1,274,000 Kathonzweni
Construction Of A Public Toilet At Ikaasu Market Construction of 2-Door pit latrine and urinal at Ikaasu Market  Department of Trade, Marketing, Industry, Culture and Tourism. Completed Ksh 500,000 Kathonzweni
Ngomano Ecde
  • 2No. ECDE Classrooms with an office and Store
  • 3-Door Pit Latrine with Urinal
  • Electrical Works (conduits only)
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  • Display Pinned board
  • Branding, Publicity and Signwriting
  • 2No. Black Board
Department of ICT, Education and Internship Completed Ksh 3,430,000 Kathonzweni
Construction Of Modern Toilets In Kathonzweni Town
  • 3 No. W.C Toilets
  • 2 No. PWD toilets
  • Ticket office
  • Rain Water goods(Gutters and downpipe)
  • 5,000 Litres Plastic Storage Water Tank 
  • Floor tilling 
  • Internal plumbing and drainage works
  • Electrical installation 
  • Septic and soak pit 
  • Branding and signage
Department of Lands, Urban Planning and Development, Environment and Climate Change Completed Ksh 1,980,546 Kathonzweni
Construction Of A Public Toilet At Kavumbu Market(kathonzweni) Construction of 2 Door pit latrine and urinal at Kavumbu Market(Kathonzweni) Department of Trade, Marketing, Industry, Culture and Tourism. Completed Ksh 500,000 Kathonzweni
Machine Hire For Opening Of Feeder Roads opening and grading of  of yemulwa - kitutu-mathemba road, munathi - syethemkt-kwa syeni - kiangine market road Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 1,960,000 Kathonzweni
Fuel For Grading Using County Machinery Light Grading of  Mbuvo- Kanthiitu - Tamu tamu (section) 3kmLight grading along Yekanga - Kwa Sukali - Kanzokea 4.5kmLight grading along Kathonzweni - Mathemba 5.6 KmLight grading along Kathonzweni - Kathamboni 5.7KmLight grading along Mathemba - Yembondo 2.5Km Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 1,470,000 Kathonzweni
Six (6) Market Lights At Mutini, Kiangini, Kyunyu, Ngomano, Thavu, And Ikaasu Markets. Installation of double arm metallic pole 8.5m high , fixing of 150W integrated solar streetlights fittings Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 1,470,000 Kathonzweni
Upgrading Kathonzweni Health Center. Upgrading of the facility Department of Health Services Completed Ksh 685,414 Kathonzweni
Construction Of Staff Quarters At Kiangini Dispensary construction of 2 bedroom staff house Department of Health Services Completed Ksh 2,960,000 Kathonzweni
Youth Sports Tournament Kathonzweni Purchase of sport items Department of Gender, Children, Youth, Sports and Social Services Completed Ksh 397,500 Kathonzweni
Wheelchairs And Assistive Devices To Pwd Kathonzweni Purchase and distribution of assistive devices Department of Gender, Children, Youth, Sports and Social Services Completed Ksh 500,000 Kathonzweni
Kwa Mbila Water Project Distribution from Mbuvo - Makutano -Milute, construction of a tank platform, supply of 1 No 10000 litres water tank, construction of a water point Department of Water and Sanitation Completed Ksh 1,960,000 Kathonzweni
Itumbule Bh solarization, borehole flashing, supply of 10 m3 plastic tank, operationalization of 1 No water point Department of Water and Sanitation Completed Ksh 2,450,000 Kathonzweni
Desilting Of Matinga 2 And Kyambusya Earth Dams Desilting Department of Water and Sanitation Completed Ksh 3,857,180 Kathonzweni
Water Improvement And Borehole Maintenance Department of Water and Sanitation Completed Ksh 524,207 Kathonzweni
Kwa Mbila Water Project Supply and installation of 42 Salor Panel 280Watts Department of Water and Sanitation Completed Ksh 1,960,000 Kathonzweni
Drilling And Develovement Of Kiteei Mutini Bh DRILLING AND DEVELOPMENT OF BOREHOLE Department of Water and Sanitation Completed Ksh 2,837,000 Kathonzweni
Desilting Of Mitooni Earthdam In Kitise Kithuki Ward Department of Water and Sanitation Completed Ksh 1,491,000 Kathonzweni
Rehabilitation Of Kaiani Borehole Department of Water and Sanitation Completed Ksh 931,750 Kathonzweni
Training Of Young Agripreneurs  Training of young agripreneurs  Department of Agriculture, Livestock, Fisheries & Cooperative Development Completed Ksh 500,000 Kathonzweni
Agricultural Development( Subsidized Ai Services)  Agricultural development( Subsidized AI services)  Department of Agriculture, Livestock, Fisheries & Cooperative Development Completed Ksh 900,000 Kathonzweni
Agricultural Development( Supply Of Certified Pasture Seeds)  Agricultural development( Supply of certified pasture seeds)  Department of Agriculture, Livestock, Fisheries & Cooperative Development Completed Ksh 1,000,000 Kathonzweni
Opening,grading And Road Structures OfLondokwe- Mbuvo Nzau- Munathi- Syethe- Kwa Mbalya Road 6km road opening,6km road grading, 24m culvert 4 No of gabbions,240cm3 water catch drains along Londokwe - Mbuvo- Nzau - Kwa Mbalya road Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 3,000,000 Kathonzweni
Gravelling, Installation Of Culverts, Gabions And Drifts Along Kathamboni Spill Way Excavation, filling and installation of culvert Department of Infrastructure, Transport, Public Works, Housing and Energy Completed Ksh 3,000,000 Kathonzweni