Project Scope Department Status Budget Ward Action
Mumbuni Ecde
  • 1No. ECDE Classroom
  • 1No.lockable metallic cabinet
  • 1No. Wooden Desk
  • 1No. Wooden Arm Chair
  • Water harvesting goods (5,000Ltrs Water Tank and Base)
  •  Full Electrical Works
  • Display Pinned board
  • Branding, Publicity and Signwriting
Department of ICT, Education and Internship Ongoing Ksh 1,470,000 Ukia
Mutungu Ecde
  • 2 No. ECDE Classrooms with an office and Store
  • Electrical Works (conduits only)
  • 2 No. Wooden Desks
  • 2 No. Wooden Arm Chairs
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  • Display Pinned board
  • Branding, Publicity and Signwriting
  • 2 No. Black board
Department of ICT, Education and Internship Ongoing Ksh 2,940,000 Kilungu
Kikwasuni Ecde
  • 1No. ECDE Classroom with an office and Store
  • 3-Door Pit Latrine with Urinal
  • 1No. Wooden Desk
  • 1No. Wooden Arm Chair
  • 20 No. Kiddy chairs
  • 10 No. Kiddy tables
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  • Electrical Works (electrical conduits only)
  • Display Pinned board
  • Branding, Publicity and Signwriting
  • Blackboard
Department of ICT, Education and Internship Ongoing Ksh 2,450,000 Ivingoni/Nzambani
Kwa Muatha Ecde
  • 2 No. ECDE Classrooms with an office and Store
  • Electrical Works (conduits only)
  • 2 No. Wooden Desks
  • 2 No. Wooden Arm Chairs
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  • Display Pinned board
  • Branding, Publicity and Signwriting
  • 2 No. Black board
Department of ICT, Education and Internship Ongoing Ksh 2,940,000 Mukaa
Ivinga Nzia Ctti

Electrification, fencing and construction of a workshop

Department of ICT, Education and Internship Ongoing Ksh 3,430,000 Mavindini
Mavindini Ctti Dormitory

Construction of a dormitory

Department of ICT, Education and Internship Ongoing Ksh 3,430,000 Mavindini
Kimuumo Ecde
  • 1No. ECDE Classroom with an office and Store
  • 1No.lockable metallic cabinet
  • 1No. Wooden Desk
  • 1No. Wooden Arm Chair
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  • Electrical Works (conduits only)
  • Display Pinned board
  • 20 No. Kiddy chairs
  • 10 No. Kiddy tables
  • Branding, Publicity and Signwriting
  • 1No. whiteboard
  • 1No. blackboard
  • 2 No. duster
  • 10 No. Mark pens
  • Shelves
Department of ICT, Education and Internship Ongoing Ksh 1,960,000 Kikumini/Muvau
Ngomano Ecde
  • 2No. ECDE Classrooms with an office and Store
  • 3-Door Pit Latrine with Urinal
  • Electrical Works (conduits only)
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  • Display Pinned board
  • Branding, Publicity and Signwriting
  • 2No. Black Board
Department of ICT, Education and Internship Ongoing Ksh 3,430,000 Kathonzweni
Yinthungu Ctti

Construction of a dormitory for the male trainees

Department of ICT, Education and Internship Ongoing Ksh 1,960,000 Kitise/Kithuki
Yiuma Ecde
  • 2 No. ECDE Classrooms with an office and Store
  • Electrical Works (conduits only)
  • 2 No. Wooden Desks
  • 2 No. Wooden Arm Chairs
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  • Display Pinned board
  •   Branding, Publicity and Signwriting
  •   2 No. Black board
Department of ICT, Education and Internship Ongoing Ksh 2,940,000 Nzaui/Kilili/Kalamba
Nzueni Ecde
  • 2 No. ECDE Classrooms with an office and Store
  • 3-Door Pit Latrine with Urinal
  •  Full Electrical Works
  • Shelves
  • 2 No. Wooden Desks
  • 2 No. Wooden Arm Chairs
  • Water harvesting goods (10,000Ltrs Water Tank and base)
  • 40 No. Kiddy chairs and 20. No. Kiddy tables
  • Play equipment 4 piece set (double swing, slide, climbing frame and double see-saw)
  • Display soft board
  • Branding, Publicity and Signwriting
  • 2 No. Blackboard
  • 4 No. duster
  • 20 No. Markpens
  • 2 No. White board
Department of ICT, Education and Internship Ongoing Ksh 3,920,000 Kithungo/Kitundu
Kakuswi Ctti Dormitory

Construction of a domitory

Department of ICT, Education and Internship Ongoing Ksh 6,860,000 Kisau/Kiteta
Ctti Capitation

CTTI capitation

Department of ICT, Education and Internship Ongoing Ksh 20,553,968 Headquaters
Mukaatini Ctti

Construction of a dormitory

Department of ICT, Education and Internship Ongoing Ksh 3,920,000 Mbooni
Ukaatuni Ctti

Equipping 

Department of ICT, Education and Internship Ongoing Ksh 1,751,882 Ukia
Mukononi Ecde
  • 2No. ECDE Classrooms with an office and Store
  •  3-Door Pit Latrine with Urinal
  • Electrical Works (conduits only)
  • Water harvesting goods (5,000Ltrs Water Tank and base)
  • Display Pinned board
  • Branding, Publicity and Signwriting
  • 2No. Black Board
Department of ICT, Education and Internship Ongoing Ksh 3,430,000 Kikumbulyu North
Ndeini Ctti Electricity

Electrification

Department of ICT, Education and Internship Ongoing Ksh 490,000 Nguumo
Mulasya Ecde
  • 2No. ECDE Classrooms with an office and Store
  • Electrical Works (conduits only)
  • Shelves
  • 2No. Wooden Desks
  • 2No. Wooden Arm Chairs
  • Water harvesting goods (5,000Ltrs Water Tank)
  • Play equipment - 4 piece set (double swing, slide, climbing frame and double see-saw)
  • Display Pinned board
  • Branding, Publicity and Signwriting
  • 2 No. Black board retained
  • 4 No. Duster
  • 20 No. Mark pens
  • 2 No, Whiteboard
Department of ICT, Education and Internship Ongoing Ksh 3,136,000 Kisau/Kiteta
Danida- Primary Healthcare In Devolved Context

Funds used for Primary healthcare facilities funding

Department of Health Services Ongoing Ksh 13,732,881 Headquaters
Facility Infrastructure Improvement Including Makueni Mortuary, Sultan Hospital, Theatre For Kibwezi And Others

Makueni Mortuary, Kibwezi SCH Renovations.Cabinet paper preparation for Sultan Hamud;Procurement stage: Kisau SCH OPD block, Nzukini Disp Renovations, Katangini Maternity

Department of Health Services Ongoing Ksh 12,000,000 Headquaters
Katangini Dispensary -completion Of Maternity Block And Incinerator

Renovation of maternity and incinarator

Department of Health Services Ongoing Ksh 1,960,000 Kalawa
Kikumini Model Health Center

Construction of new Outpatient block

Department of Health Services Ongoing Ksh 5,000,000 Kikumini/Muvau
Kithembe Sub-ward Dispensaries: Fencing, Solar Energy At Nyaani Dispensary, Health Facilities Upgrading

Fencing, solar installation at Nyaani dispensary

Department of Health Services Ongoing Ksh 1,960,000 Kilungu
Kyambeke Health Centre – Upgrading Of The Facility

Renovation of OPD Block and construction of Kitchen.

Department of Health Services Ongoing Ksh 2,450,000 Ilima
Kyanganda Dispensary – Fencing, Solarization And Water Connectivity

Fencing and renovations of OPD block

Department of Health Services Ongoing Ksh 1,960,000 Kilungu
Musalala Dispensary – Upgrading

Upgrading and renovation of the facility

Department of Health Services Ongoing Ksh 1,000,000 Ilima
Nutrition International Donor Funding

Funds used for support of Nutrition activities in the county.

Department of Health Services Ongoing Ksh 21,013,780 Headquaters
Nutrition Programme - Matching Grant

Funds used to support Nutrition activities

Department of Health Services Ongoing Ksh 15,545,512 Headquaters
Surgical Implants And Medical Bills

payment of medical bills and procurement of surigcal implants

Department of Health Services Ongoing Ksh 734,566 Kikumbulyu South
Upgrading Kathonzweni Health Center.

Upgrading of the facility

Department of Health Services Ongoing Ksh 686,000 Kathonzweni
Upgrading Kithyululu Model Health Centre

Construction of new U-shaped OPD block

Department of Health Services Ongoing Ksh 4,750,000 Masongaleni
Upgrading Of Makasa Dispensary(fencing And Gate)

Fencing and Gate installation

Department of Health Services Ongoing Ksh 1,470,000 Nguu/Masumba
Upgrading Of Nzukini Health Centre (renovations)

Renovation works at the facility

Department of Health Services Ongoing Ksh 980,000 Ilima
Upgranding Of Mavindini Health Center

construction of Laboratory block 

Department of Health Services Ongoing Ksh 4,312,000 Mavindini
Upgrading Of Mutulani Dispensary-

Construction of staff house

Department of Health Services Ongoing Ksh 2,568,358 Kee
Upgrading Of Mutulani Dispensary With Ashpit, Incinerator,laboratory Eqquipping And Staff Quarters

Fencing, renovation of maternity and drainage system 

Department of Health Services Ongoing Ksh 2,960,000 Kee
Purchase Of Ambulances

SUPPLY AND DELIVERY OF Equipped AMBULANCES

Department of Health Services Ongoing Ksh 20,000,000 Headquaters
Purchase Of Tanks

Purchase and supply of 3 of water tanks

Department of Health Services Ongoing Ksh 451,760 Nzaui/Kilili/Kalamba
Water Fund Establishment Department of Water and Sanitation Ongoing Ksh 3,419,000 Headquaters
Water Supply To Nunguni-phase 1

Feasibility studies and design of Nunguni Water Supply Project (Consultancy)

Department of Water and Sanitation Ongoing Ksh 2,287,965 Kilungu
Makueni Rural Water Board(maruwab) Operationalization

Institutionalization of MARUWAB and operationalization of the institution.

Department of Water and Sanitation Ongoing Ksh 4,373,617 Headquaters
Athi Tunguni Water Project

1. EXISTING INTAKE IMPROVEMENTS AND REHABILITATION
• Expansion of Intake Galleries pipe OD63mm Perforated infiltration pipe to OD250mm.
2. EXISTING TREATMENT PLANT IMPROVEMENTS AND REHABILITATION
• Commissioning of treatment plant
• Introduce air blowers 
• Expand wash water collector
• Scour water to soak any pit
• Filter sand washing 
• Solar streetlighting
• Injector pump with accessories before flocculation channel and at contact tank 
• New Flocculation basin 
• Clear water Stand tap with pipe accessories 
• Painting to elevated tank, access ladders  
• Gauge repair for the contact tank
• Provide, install commission a second submersible Pump at the contact tank   with the same specifications, with all accessories for   rising main to Mukononi .
3. RIASING MAIN TO MUKONONI RESERVOIR 7277 KILOMETERS OD110
• With all Appurtenances 
4. 250m3 MUKONONI TANK
5. DISTRIBUTION NETWORK FOR MAKINDU, KIKUMBULYU NORTH AND NGUUMO WARDS 27KILOMETERS 
• Mukononi Musingini Kamboo line 11.8km OD90
• Mukononi Kathyaka Nyayo shopping cefxdvv  ftnter 10.9km OD90
• Mukononi Symule 4.30km OD90
• With all Appurtenances 

8NO. WATER KIOSKS

Department of Water and Sanitation Ongoing Ksh 37,500,000 Kikumbulyu South
Ndiani Water Project – Solarization, 2km Distribution Line With Water Kiosks

NA

Department of Water and Sanitation Ongoing Ksh 5,880,000 Kilungu
Rehabilitation Of Nzalani Earth Dam- Scooping Of The Dam Construction Of Embankment Wall

Construction of Nzalani  Earth Dam; Embankment, Desilting of reservoir

Department of Water and Sanitation Ongoing Ksh 3,500,000 Kee
Water Improvement Programme

Installation of pumping system at Kithuni BH, Distribution

Department of Water and Sanitation Ongoing Ksh 700,000 Kee
Rehabilitation Of Dams( Kivaku, Ndumani, Imilini And Kikonde Earth Dams)

Construction of Nzalani  Earth Dam; Embankment, Desilting of reservoir

Department of Water and Sanitation Ongoing Ksh 5,978,000 Kee
Water Boreholes Maintenance

Upgrading of Solar Pumping System - Ithanzeni BH Project

Department of Water and Sanitation Ongoing Ksh 980,000 Ukia
Ithanzeni Bore Hole: Upgrading Of Solar Pump System

Upgrading of Solar Pumping System - Ithanzeni BH Project

Department of Water and Sanitation Ongoing Ksh 1,960,000 Ukia
Kilala Bh Water Project

Extension of Mbalani Pipeline, Extension of Kilala Project line to Kyumu, Kyumu Water Kiosk, Mbalani Water Kiosk

Department of Water and Sanitation Ongoing Ksh 1,470,000 Ukia
Extension Of Kwa Mwilu Sand Dam Water Project – 3km Return Lines, 2no. 1.5km Katikomu Village Distribution Line And Kyangunzu-nzeveni Dl 2km 5tanks.

Desilting of Sump and Operationalization of the Pumping System
• Kyangunzu Distribution Line 
• Construction of 100CU.M Masonry Tank
• Return Pipeline
• Extension of Katikomu Distribution Line to Nzeveni
• Construction of 1No. Nzeveni Water Kiosk

Department of Water and Sanitation Ongoing Ksh 6,370,000 Ilima
Equipment Hire For Desilting Earth Dams(kwa Kitwa,kwa Manza, Kwa Kasau And Victoria Earth Dams)

Equipment hire for desilting earth dams(Kwa Kitwa,Kwa Manza, Kwa Kasau and Victoria Earth dams)

Department of Water and Sanitation Ongoing Ksh 2,940,000 Mtito Andei
Drilling Of Talent Centre Borehole, Solarisation, Kiosk/distribution Within The Centre And Water Tank

Drilling of  Talent Centre Borehole, Solarisation, Kiosk/Distribution within the centre and Water tank

Department of Water and Sanitation Ongoing Ksh 2,940,000 Ivingoni/Nzambani
Kwa Kalekye Borehole

Drilling and Equipping (solarization, kiosk, tank) of Kwa Kalekye borehole 

Department of Water and Sanitation Ongoing Ksh 2,940,000 Ivingoni/Nzambani
Mang’elete Borehole

Drilling and Equipping (solarization, kiosk, tank) of Mang’elete Borehole

Department of Water and Sanitation Ongoing Ksh 2,940,000 Ivingoni/Nzambani
Extension Of Ngwata, Kativani, Kiange, Yumbuni, And Kyuasini By KIBWAWASCO

Extension of Ngwata, Kativani, Kiange, Yumbuni, and Kyuasini by KIBMAWASCO.

Department of Water and Sanitation Ongoing Ksh 4,116,000 Masongaleni
Kiambani Borehole

Kiambani borehole –Drilling , equipping with Solar, and distribution

Department of Water and Sanitation Ongoing Ksh 3,430,000 Masongaleni
Extension Of Water By 4kms Makutano- Makongeni- Masimbani- Mbondeni (kwa Kalee) To Mwaani Market And Construction Of Kiosks By Kibmawasco

Extension of water by 4Kms Makutano- Makongeni- Masimbani- Mbondeni (Kwa Kalee) to Mwaani market and Construction of kiosks by KIBMAWASCO

Department of Water and Sanitation Ongoing Ksh 3,920,000 Masongaleni
New Extension Of Ngai Ndethya River Sump Water To Nthungunu -- Construction Of A Tank, Installation Of A Submersible Pump, Elevated Tank And Distribution Lines

Distribution of Ngai Ndethya river sump water to Nthungunu -- Construction of a tank, installation of a submersible pump, elevated tank and distribution--------- lines

Department of Water and Sanitation Ongoing Ksh 7,506,800 Mtito Andei
Kambu-kiteng'ei Water Project

Rehabilitation of Kambu-Kiteng'ei Water project- Rehabilitation of tanks, distribution lines and revival of closed kiosks.- KIMAWASCO

Department of Water and Sanitation Ongoing Ksh 4,000,000 Mtito Andei
Nzouni Borehole

Drilling and equipping of Nzouni borehole 

Department of Water and Sanitation Ongoing Ksh 3,430,000 Thange
Kamwinzi Earthdam

Kamwinzi Earthdam-County machinery desilting

Department of Water and Sanitation Ongoing Ksh 490,000 Tulimani
Akwash Water Project

AKWASH water project- Extension of AKWASH and distribution  to kathongo  kavumbu and Mweleli clusters

Department of Water and Sanitation Ongoing Ksh 1,312,182 Kalawa
Nyaanyaa Earthdam Phase 2

Construction of 1.3km rising main, construction of 1No. Water kiosk and installation of 1No. 10Cubic metres plastic storage tank.

Department of Water and Sanitation Ongoing Ksh 1,568,000 Kako/Waia
Solarization And Distribution Of Makaia Borehole

Solarization and Distribution of Makaia borehole - Installation of solar panels, Water distribution to Kathamba market, kathamba schools, mba market, Mba schools, Mwaani market, Sakai primary school, Kwa mutumba and Mavitini

Department of Water and Sanitation Ongoing Ksh 6,860,000 Kako/Waia
Rehabilitation Of Wanzauni Kikima Pipeline

Rehabilitation of Wanzauni Kikima pipeline

Department of Water and Sanitation Ongoing Ksh 686,000 Tulimani
Kavingiliti Earthdam

Kavingiliti earthdam - in house machines

Department of Water and Sanitation Ongoing Ksh 2,940,000 Kako/Waia
Kwa Ivali Earthdam

Desiling reservoir and rehabilitation of spillway

Department of Water and Sanitation Ongoing Ksh 4,900,000 Kalawa
Lungu Borehole

Drilling of borehole and test pumping

Department of Water and Sanitation Ongoing Ksh 2,374,220 Kisau/Kiteta
Kithongo Borehole

Drilling of borehole and test pumping

Department of Water and Sanitation Ongoing Ksh 2,374,221 Kisau/Kiteta
Kimandi Borehole

Construction of 2No. Water kiosks, installation of 2No. 10cm cubic metres plastic storage tanks, water distribution pipeline to kyambusya and rehabilitation of rising main.

Department of Water and Sanitation Ongoing Ksh 3,710,279 Kisau/Kiteta
Songeni Water Project

Drilling of borehole, equipping and solarizing, construction of 0.6 km rising main to Itulu water kiosk

Department of Water and Sanitation Ongoing Ksh 4,900,000 Kisau/Kiteta
Kwa Matinga Water Project

Drilling of borehole, equipping and solarizing, construction of 1.0km rising main to kwa Matinga storage tank, rehabilitation of 3.4km distribution pipeline ,construction of 1No. water kiosk and installation 2No.5 cubic metres plastic storage tank

Department of Water and Sanitation Ongoing Ksh 4,794,228 Kisau/Kiteta
Drilling Of Mutooni Borehole

Drilling borehole and test pumping

Department of Water and Sanitation Ongoing Ksh 1,660,000 Kithungo/Kitundu
Rehabilitation Of Water Tank And Pipeline Rehabilitation To Yatwa-itaani Village( Uviuni)

Rehabilitation of rising main to Yatwa Primary school, rehabilitation of yatwa - Itaani pipeline and rehabilitation masonry tank collapsed roof slab.

Department of Water and Sanitation Ongoing Ksh 1,960,000 Mbooni
Upper Ngwani Water Project

Installation of pump, solarization, rehabilitation of kakima pipeline and pipeline extension to Tulimani primary school.

Department of Water and Sanitation Ongoing Ksh 2,509,811 Tulimani
Katatu Dam

i.    Desilting and expansion of the reservoir
ii.    Making good of the spillway and embankment
iii.    Construction of a check dams and cut off drains.

Department of Water and Sanitation Ongoing Ksh 3,920,000 Kiima Kiu/Kalanzoni
Muatineni Borehole

  Equipping and distribution of Muatineni borehole

Department of Water and Sanitation Ongoing Ksh 3,920,000 Kasikeu
Masokani Borehole

i.    Solarisation 
ii.    Pumping system installation
iii.    Water distribution to 1 kiosk and 2 schools – Masokani primary and Masokani secondary schools.
Iv. Borehole drilling, casing, caping.
V. Borehole test pumping.

Department of Water and Sanitation Ongoing Ksh 4,900,000 Kasikeu
Mutiluni Borehole

 i.    Borehole flushing and test pumping.
ii.    Installation of 1.4km of pipeline.
iii.    Construction of 1no. water kiosk.
iv.    Installation of a borehole pump 
v.    Installation of a fence at source 
vi.    Drilling of a complementary borehole.

Department of Water and Sanitation Ongoing Ksh 4,900,000 Mukaa
Maiani Borehole

  Drilling, casing, and capping.

Department of Water and Sanitation Ongoing Ksh 4,900,000 Mukaa
Water Improvement Programme

Repair of Boreholes

Department of Water and Sanitation Ongoing Ksh 57,556 Kithungo/Kitundu
Kalakalya Borehole

i. Equipping Borehole with solar and pump
ii. Installation of a 10m3 plastic tank 
iii. Rehabilitation of Steel tower

Department of Water and Sanitation Ongoing Ksh 1,500,000 Nguumo
Pipeline Extension To Kiaoni Market (kibmawasco)

i. 1.3km DN50 pipeline extension
ii. Installation of1No. 10m3 plastic water tanks on 1m high masonry platforms 
iii. Construction of 1No communal water points

Department of Water and Sanitation Ongoing Ksh 1,000,000 Kikumbulyu North
Kibmawasco– Kilui Water Extension To Ngolomoki – Kwa Sunza -kalulini -matinga Line, Mikuyuni – Kasarani Line , Mitundu – Malatani Line , Kalungu-ilingoni-kamunzyu Line And Matundani One Main Line, Matua-kwa Kimote Line

KIBMAWASCO– Kilui water extension to Ngolomoki – Kwa Sunza -Kalulini -Matinga Line, Mikuyuni  – Kasarani Line , Mitundu – Malatani line , Kalungu-Ilingoni-Kamunzyu line and Matundani One main Line, Matua-Kwa Kimote line

Department of Water and Sanitation Ongoing Ksh 8,000,000 Kikumbulyu South
Kalii Earth Dam

Not viable

Department of Water and Sanitation Ongoing Ksh 2,940,000 Makindu
Sekeleni Earthdam

i. Embankment shaping
ii.  Desilting  
iii. Spillway protection

Department of Water and Sanitation Ongoing Ksh 3,430,000 Nguumo
Distribution Of Water At Ilengeni Springs

Distribution of water at Ilengeni Springs

Department of Water and Sanitation Ongoing Ksh 5,900,000 Emali/Mulala
Kimawasco Line Extension-mbeetwani (water)

i. 2.2km DN63 HDPE line
ii. Construction of 1No. Water kiosk at Mbeetwani

Department of Water and Sanitation Ongoing Ksh 1,500,000 Kikumbulyu South
Feasibility Study Of Muooni Mega Dam

a) Community Mobilization and engagement
b) Feasibility study 
c) Workshops 

Department of Water and Sanitation Ongoing Ksh 1,000,000 Emali/Mulala
Distribution Of Mumbuni Samp(solarisation And Distribution At Source)

i. Installation of Solar Power
ii. Installation of a submersible solar powered pump
iii. Construction of a power house
iv. Connection to existing Muselele line

Department of Water and Sanitation Ongoing Ksh 4,900,000 Emali/Mulala
Improvement Of Water In Kikumbulyu North Ward By Kibmawasco-kasayani Market To Cutline, Kwa Kakumi To Kwa Rose Muambani, Kasayani Market To Kwa Presillah Mutinda , Ndetani Ccti To Aic Kalinga To Kwa Kitheka, Kathyaka Market To Kilisa To King’uutheni And Nyayo Market To Soko Muyo

. Rehabilitation of Kathyaka – Nyayo water pipeline extension 1.32km
ii. Cutline Makaani  pipeline extension 4km 

Department of Water and Sanitation Ongoing Ksh 4,300,000 Kikumbulyu North
Construction Of Kathyaka Masonry Tank/ Under Kibmawasco

. Rehabilitation of Kathyaka – Nyayo water pipeline extension 1.32km
ii. Cutline Makaani  pipeline extension 4km 

Department of Water and Sanitation Ongoing Ksh 4,410,000 Kikumbulyu North
Athi-tunguni Water Project

1. EXISTING INTAKE IMPROVEMENTS AND REHABILITATION
• Expansion 

of Intake Galleries pipe OD63mm Perforated infiltration pipe to OD250mm.1. EXISTING INTAKE IMPROVEMENTS AND REHABILITATION

• Expansion of Intake Galleries pipe OD63mm Perforated infiltration pipe to OD250mm.
2. EXISTING TREATMENT PLANT IMPROVEMENTS AND REHABILITATION
• Commissioning of treatment plant
• Introduce air blowers 
• Expand wash water collector
• Scour water to soak any pit
• Filter sand washing 
• Solar streetlighting
• Injector pump with accessories before flocculation channel and at contact tank 
• New Flocculation basin 
• Clear water Stand tap with pipe accessories 
• Painting to elevated tank, access ladders  
• Gauge repair for the contact tank
• Provide, install commission a second submersible Pump at the contact tank   with the same specifications, with all accessories for   rising main to Mukononi .
3. RIASING MAIN TO MUKONONI RESERVOIR 7277 KILOMETERS OD110
• With all Appurtenances 
4. 250m3 MUKONONI TANK
5. DISTRIBUTION NETWORK FOR MAKINDU, KIKUMBULYU NORTH AND NGUUMO WARDS 27KILOMETERS 
• Mukononi Musingini Kamboo line 11.8km OD90
• Mukononi Kathyaka Nyayo shopping cefxdvv  ftnter 10.9km OD90
• Mukononi Symule 4.30km OD90
• With all Appurtenances 

8NO. WATER KIOSKS

Department of Water and Sanitation Ongoing Ksh 6,000,000 Kikumbulyu North
Makindu-kiu Catchment Borehole

Drilling and developing the borehole and capping

Department of Water and Sanitation Ongoing Ksh 1,500,000 Makindu
Athi Tunguni Water Project

1. EXISTING INTAKE IMPROVEMENTS AND REHABILITATION
• Expansion of Intake Galleries pipe OD63mm Perforated infiltration pipe to OD250mm.
2. EXISTING TREATMENT PLANT IMPROVEMENTS AND REHABILITATION
• Commissioning of treatment plant
• Introduce air blowers 
• Expand wash water collector
• Scour water to soak any pit
• Filter sand washing 
• Solar streetlighting
• Injector pump with accessories before flocculation channel and at contact tank 
• New Flocculation basin 
• Clear water Stand tap with pipe accessories 
• Painting to elevated tank, access ladders  
• Gauge repair for the contact tank
• Provide, install commission a second submersible Pump at the contact tank   with the same specifications, with all accessories for   rising main to Mukononi .
3. RIASING MAIN TO MUKONONI RESERVOIR 7277 KILOMETERS OD110
• With all Appurtenances 
4. 250m3 MUKONONI TANK
5. DISTRIBUTION NETWORK FOR MAKINDU, KIKUMBULYU NORTH AND NGUUMO WARDS 27KILOMETERS 
• Mukononi Musingini Kamboo line 11.8km OD90
• Mukononi Kathyaka Nyayo shopping cefxdvv  ftnter 10.9km OD90
• Mukononi Symule 4.30km OD90
• With all Appurtenances 

8NO. WATER KIOSKS

Department of Water and Sanitation Ongoing Ksh 8,820,000 Makindu
Kalungu-ngambi Ya Myunzyu Extension Of Water Pipeline

Construction of  Kalungu-Ilingoni-Kamunzyu line 
a. Equipping with Solar power and pump
b. 4.5km DN63 HDPE pipeline
c. Rehabilitation of 2No. existing Kiosks and tank

Department of Water and Sanitation Ongoing Ksh 2,940,000 Nguumo
Athi Water Project

1. EXISTING INTAKE IMPROVEMENTS AND REHABILITATION
• Expansion of Intake Galleries pipe OD63mm Perforated infiltration pipe to OD250mm.
2. EXISTING TREATMENT PLANT IMPROVEMENTS AND REHABILITATION
• Commissioning of treatment plant
• Introduce air blowers 
• Expand wash water collector
• Scour water to soak any pit
• Filter sand washing 
• Solar streetlighting
• Injector pump with accessories before flocculation channel and at contact tank 
• New Flocculation basin 
• Clear water Stand tap with pipe accessories 
• Painting to elevated tank, access ladders  
• Gauge repair for the contact tank
• Provide, install commission a second submersible Pump at the contact tank   with the same specifications, with all accessories for   rising main to Mukononi .
3. RIASING MAIN TO MUKONONI RESERVOIR 7277 KILOMETERS OD110
• With all Appurtenances 
4. 250m3 MUKONONI TANK
5. DISTRIBUTION NETWORK FOR MAKINDU, KIKUMBULYU NORTH AND NGUUMO WARDS 27KILOMETERS 
• Mukononi Musingini Kamboo line 11.8km OD90
• Mukononi Kathyaka Nyayo shopping cefxdvv  ftnter 10.9km OD90
• Mukononi Symule 4.30km OD90
• With all Appurtenances 

8NO. WATER KIOSKS

Department of Water and Sanitation Ongoing Ksh 4,900,000 Nguumo
Athi-tunguni Water Project

1. EXISTING INTAKE IMPROVEMENTS AND REHABILITATION
• Expansion of Intake Galleries pipe OD63mm Perforated infiltration pipe to OD250mm.
2. EXISTING TREATMENT PLANT IMPROVEMENTS AND REHABILITATION
• Commissioning of treatment plant
• Introduce air blowers 
• Expand wash water collector
• Scour water to soak any pit
• Filter sand washing 
• Solar streetlighting
• Injector pump with accessories before flocculation channel and at contact tank 
• New Flocculation basin 
• Clear water Stand tap with pipe accessories 
• Painting to elevated tank, access ladders  
• Gauge repair for the contact tank
• Provide, install commission a second submersible Pump at the contact tank   with the same specifications, with all accessories for   rising main to Mukononi .
3. RIASING MAIN TO MUKONONI RESERVOIR 7277 KILOMETERS OD110
• With all Appurtenances 
4. 250m3 MUKONONI TANK
5. DISTRIBUTION NETWORK FOR MAKINDU, KIKUMBULYU NORTH AND NGUUMO WARDS 27KILOMETERS 
• Mukononi Musingini Kamboo line 11.8km OD90
• Mukononi Kathyaka Nyayo shopping cefxdvv  ftnter 10.9km OD90
• Mukononi Symule 4.30km OD90
• With all Appurtenances 

8NO. WATER KIOSKS

Department of Water and Sanitation Ongoing Ksh 9,506,000 Nguumo
Mbata Borehole Department of Water and Sanitation Ongoing Ksh 150,000 Kitise/Kithuki
Ward Motorcycle

Purchase of motorcycle

Department of Water and Sanitation Ongoing Ksh 276,600 Mbitini