Not Started Projects In FY 2024/2025

Go Back

Project Scope Department Status Budget Ward Action
Kalamba Ecde

Construction of one classroom

Department of ICT, Education and Internship Not Started Ksh 1,200,000 Nzaui/Kilili/Kalamba    
Tents And Chairs To Five Groups-nzaui/kilili/kalamba Department of Gender, Children, Youth, Sports and Social Services Not Started Ksh 1,250,000 Nzaui/Kilili/Kalamba    
Pwd Support-assistive Devices -support Pwds With Assorted Assistive Devices Kikumini/muvau Department of Gender, Children, Youth, Sports and Social Services Not Started Ksh 500,000 Kikumini/Muvau    
Support To Special Groups With Tents And Chairs-kathonzweni Ward Department of Gender, Children, Youth, Sports and Social Services Not Started Ksh 1,000,000 Kathonzweni    
Pwd Support-assistive Devices -support Pwds With Assorted Assistive Devices Kathonzweni Department of Gender, Children, Youth, Sports and Social Services Not Started Ksh 500,000 Kathonzweni    
Opening And Grading Of Wito Farm-mbavini- Kaiani-sinai-ctti-nguthunu-nditiku-kwa Kaunda Road

7km road opening,7km road grading, 24m culvert, 160cm3 catch water drains

Department of Infrastructure, Transport, Public Works, Housing and Energy Not Started Ksh 3,000,000 Mavindini    
Pwd Support-assistive Devices -support Pwds With Assorted Assistive Devices Kitise/kithuki Department of Gender, Children, Youth, Sports and Social Services Not Started Ksh 500,000 Kitise/Kithuki    
Mulima Earthdam Phase 2
Mulima earthdam - Desilting, Construction of a treatment and Water distribution and Supply supply phase 2 (rehabilitation of syiluni pipeline and installation of water storage tanks for the existing 5No. water kiosks and rehabilitation of vandalized kwa kiinga genset)
Department of Water and Sanitation Not Started Ksh 40,000,000 Mbooni    
Yatwa Ecde

Construction of 2no. ECDE Classrooms with an office,3-Door Pit Latrine with Urinal, Electrical Works, Shelving to the stores, 2No.lockable metallic cabinets,2No. Wooden Desks,2No. Wooden Arm Chairs, Water harvesting goods (10,000Ltrs Water Tank and base),40 No. Kiddy chairs and 20. No. Kiddy tables, Play equipment 4 piece set (double swing, slide, climbing frame and double see-saw), Display soft board and Branding, Publicity and Signwriting

Department of ICT, Education and Internship Not Started Ksh 4,400,000 Mbooni    
Ikokani Water Project

 Rehabilitation and desilting of the intake, Distribution line to Kalawani market, Kakenge and Tututha areas, Re-design of pumping system to Mulooni andDistribution line to Mulooni and Kanoto areas.Ikokani we have kalawani market , 4no schoolsMatungwa primary school, Matungwa Secondary School, Kiliku primary school, Tututha Secondary school and Tututha Primary school), 4no. water kiosks (kalawani market,kiliku primary,kithuluni market and leva market).

Department of Water and Sanitation Not Started Ksh 7,000,000 Tulimani    
Road Impovement Programme In Kako/waia Ward

4km mechanical road opening, 4km heavy grading,  installation of 56m culverts and 1100m mitre drains

Department of Infrastructure, Transport, Public Works, Housing and Energy Not Started Ksh 4,000,000 Kako/Waia    
Mutanda Ctti Twin Workshop
Construction of a twin workshop
Department of ICT, Education and Internship Not Started Ksh 3,000,000 Kalawa    
Pwd Support-assistive Devices -kalawa Department of Gender, Children, Youth, Sports and Social Services Not Started Ksh 500,000 Kalawa    
Rehabilitation Tuvilani-kiongwani Girls-kavuko-kwawala-rubis Petrol Station Road

Opening, grading, murraming, installation structures and drainage of Tuvilani-Kiongwani Girls-Kavuko-Kwawala-Rubis Petrol Station Road

Department of Infrastructure, Transport, Public Works, Housing and Energy Not Started Ksh 3,100,000 Kiima Kiu/Kalanzoni    
Purchase Of Tents And Chairs To 10 Groups Mukaa

Purchase of tents and chairs to 10 groups(Aka ma Meko CBO,Uka Wone CBO,Kwa Kakue CBO,Kya Wendo Welfare,Ndwikili Welfare,Wenyeani Welfare,Kiunduani Welfare,Kamuthini Welfare,Kyathuki Welfare and Muamba wa Kithumba Welfare)

Department of Gender, Children, Youth, Sports and Social Services Not Started Ksh 2,500,000 Mukaa    
Support To Groups – Kilungu

– Purchase of 15 (100-seater) Tents and Chairs

Department of Gender, Children, Youth, Sports and Social Services Not Started Ksh 3,000,000 Kilungu    
Support To Groups With Gas Cylinders -kikumbulyu South Department of Gender, Children, Youth, Sports and Social Services Not Started Ksh 2,000,000 Kikumbulyu South    
Katangini Ecde

Construction of one classroom

Department of ICT, Education and Internship Not Started Ksh 1,000,000 Nguumo    
Support To Groups With Chairs And Tents-emali/mulala Department of Gender, Children, Youth, Sports and Social Services Not Started Ksh 2,500,000 Emali/Mulala    
Kyaani and Ngokolani toilets Construction Of Toilets At Kyaani and Ngokolani Department of Trade, Marketing, Industry, Culture and Tourism. Not Started Ksh 1,300,000 Thange    
Matulani Ecde

Construction of 2no. ECDE Classrooms with an office,3-Door Pit Latrine with Urinal,Electrical Works, Supply of 2No.lockable metallic cabinets,2No. Wooden Desks,2No. Wooden Arm Chairs,Water harvesting goods (10,,000Ltrs Water Tank and base),40 No. Kiddy chairs and 20. No. Kiddy tables,Play equipment 4 piece set (double swing, slide, climbing frame and double see-saw),Display soft board and Branding, Publicity and Signwriting

Department of ICT, Education and Internship Not Started Ksh 3,600,000 Ivingoni/Nzambani    
Muthingiini-Nzambani Roads 8km road opening along Muthingiini-Nzambani road through machine hire 107hrs
Department of Infrastructure, Transport, Public Works, Housing and Energy Not Started Ksh 2,000,000 Ivingoni/Nzambani    
Makutano-Kyaani -Kiuani - Vololo road

 3Kms road widening , 6.3Kms grading , installation of  Culverts 16m, gabions 15No, 0.9km spot gravelling, and intallation of 315cm Catch water drains along  Makutano-Kyaani -Kiuani - Vololo road

Department of Infrastructure, Transport, Public Works, Housing and Energy Not Started Ksh 3,000,000 Nguu/Masumba