1. EXISTING INTAKE IMPROVEMENTS AND REHABILITATION
• Expansion of Intake Galleries pipe OD63mm Perforated infiltration pipe to OD250mm.
2. EXISTING TREATMENT PLANT IMPROVEMENTS AND REHABILITATION
• Commissioning of treatment plant
• Introduce air blowersÂ
• Expand wash water collector
• Scour water to soak any pit
• Filter sand washingÂ
• Solar streetlighting
• Injector pump with accessories before flocculation channel and at contact tankÂ
• New Flocculation basinÂ
• Clear water Stand tap with pipe accessoriesÂ
• Painting to elevated tank, access ladders Â
• Gauge repair for the contact tank
• Provide, install commission a second submersible Pump at the contact tank  with the same specifications, with all accessories for  rising main to Mukononi .
3. RIASING MAIN TO MUKONONI RESERVOIR 7277 KILOMETERS OD110
• With all AppurtenancesÂ
4. 250m3 MUKONONI TANK
5. DISTRIBUTION NETWORK FOR MAKINDU, KIKUMBULYU NORTH AND NGUUMO WARDS 27KILOMETERSÂ
• Mukononi Musingini Kamboo line 11.8km OD90
• Mukononi Kathyaka Nyayo shopping cefxdvv  ftnter 10.9km OD90
• Mukononi Symule 4.30km OD90
• With all AppurtenancesÂ
8NO. WATER KIOSKS