Construction of chambers to abstract raw water
• Laying and anchoring of HDPE pipe Re-route a section of pipeline (500m) at the source
• Re-route a section of pipeline (800m) at Kwa sive and nyanzi
• Repair works on Kyuasini line
• Installation of air release valves and wash-outs on the intake gravity line