Light grading was carried out on several roads across the area. These included: Ithemboni – Kwa Luli – Kaia Road (2 km and 1.5 km sections), Kaia – Katumi AIC (1 km), Ithemboni – Nduu Primary (2.5 km), Nduu Field levelling, Katumi – Kithimani (1.5 km), Kisyani – Katulye – Utumo Umu (1.5 km), Kikoko – Matua Road (1 km and 1.5 km sections), Kivaku – Upendo Road (1 km), ABC Ngiini – Kyakathuku Road (2 km), Kyamathenga Catholic – Kyamatua Secondary School (1 km), Junction Kyamatheka – Kwa Nzovi (1.2 km), Junction Kikoko Girls – Kyangela Primary (0.5 km), Kisekini – Ndeini Road (0.8 km), Kauti – Kya Ngonye Road (1 km), Kauti – Kiima Road (1.2 km), Mwanyani – Katumani Road (1.5 km), Nunguni – AIC Nungi – Kya Kalinge (1.5 km), Katumi – Kwa BK (0.5 km and 0.7 km sections), Nunguni – Nduu Junction – Kwa Mumbi – Kwa BK (1.8 km), Catholic Kyekolo – Kwa Mbaa Muange (1 km), Katulye – Kyekolo, Utumoni Road (2 km), Kikuyuni – Kyaini Road (1.4 km), Iiani – Uini Road (1 km), Kwa Mukuta – Ivumbu – Kyambo (2.3 km), and Kikoko – Kitende Road (1.8 km